22.01.2015 Views

Item 13 - Watershed Conservation Authority

Item 13 - Watershed Conservation Authority

Item 13 - Watershed Conservation Authority

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Item</strong> <strong>13</strong><br />

DATE: July 18, 20<strong>13</strong><br />

TO:<br />

FROM:<br />

SUBJECT:<br />

WCA Governing Board<br />

Mark Stanley, Executive Officer<br />

<strong>Item</strong> <strong>13</strong>: Consideration of a resolution authorizing an amendment to<br />

the Memorandum of Understanding with the Los Angeles County<br />

Flood Control District for the Emerald Necklace Feasibility Study &<br />

Implementation Plan.<br />

RECOMMENDATION: Authorize the Executive Officer to enter into an amended<br />

Memorandum of Understanding (MOU) with the Los Angeles County Flood Control<br />

District that directs additional funding to the Emerald Necklace Feasibility Study &<br />

Implementation Plan.<br />

BACKGROUND: The Emerald Necklace is an approximately 17-mile interconnected<br />

network of bikeways, multi-use trails, parks, and greenways along the Rio Hondo and<br />

the San Gabriel River, see the Figure 1: Map of the Emerald Necklace. Located within<br />

both the Upper San Gabriel River <strong>Watershed</strong> and a portion of the Los Angeles River<br />

<strong>Watershed</strong>, the Emerald Necklace stretches from Peck Road Water <strong>Conservation</strong> Park<br />

in the north to Whittier Narrows Regional Park in the south along the Rio Hondo. At<br />

the San Gabriel River, it stretches from the existing Hanson Quarry in the north to<br />

Whittier Narrows Regional Park in the south. Connecting the two rivers is the “Clasp”,<br />

a proposed trail that would extend along the existing Hanson Quarry from Peck Road<br />

Water <strong>Conservation</strong> Park on the Rio Hondo to the San Gabriel River.<br />

Figure 1: Map of the Emerald Necklace<br />

1


<strong>Item</strong> <strong>13</strong><br />

In 2005, Amigos de los Ríos, a California non-profit organization, in conjunction with<br />

various cities and stakeholders, developed a Vision Plan for the Emerald Necklace.<br />

The Emerald Necklace Vision Plan contains 29 projects of which 16 are within or<br />

include the area under Los Angeles County Flood Control District (LACFCD) or Los<br />

Angeles County Department of Parks and Recreation (LACDPR) jurisdiction.<br />

Interconnecting these projects in the Vision Plan are opportunities for the development<br />

of trails and linear greenway projects along the Rio Hondo and the San Gabriel River.<br />

In 2006 a coordination committee was formed to facilitate projects and project<br />

development along the Emerald Necklace, this committee consists of a member from<br />

each of the following agencies and organizations: Amigos de los Rios, LACFCD,<br />

LACDPR, Los Angeles County Supervisorial District 1 staff, and the Rivers and<br />

Mountains Conservancy. In order to identify issues and create solutions to<br />

implementing the Vision Plan, this committee recognized the need to analyze the<br />

technical feasibility of projects that are proposed for property or facilities under<br />

LACFCD or LACDPR, and prioritize those projects based on public safety, community<br />

support and benefit, connectivity, as well as implementation and operation &<br />

maintenance costs. The extent of above listed planning activities were combined,<br />

resulting in the development of the scope of work for the Emerald Necklace Feasibility<br />

Study and Implementation Plan.<br />

To finance this planning project, the coordination committee raised funds from<br />

Southern California Edison as well as the LACFCD. A total of $500,000 was raised for<br />

the planning project with LACFCD providing $200,000 and Southern California Edison<br />

providing $300,000. The WCA was hire to manage the project and coordinate the work<br />

with the committee members. Subsequently, WCA contracted with a consultant team<br />

to provide technical services for the project. The purpose of the MOU agreement with<br />

LACFCD is to work closely with the staff as well as to fund a portion of the Emerald<br />

Necklace Feasibility Study and Implementation Plan. The MOU between LACFCD &<br />

WCA is attached as Exhibit A.<br />

Since the initiation of the Emerald Necklace Feasibility Study and Implementation<br />

Plan project in early 2011, the feasibility study portion identified 44 project that will<br />

enhance the Emerald Necklace, and improve multi-use trails and Class I bikeways.<br />

With input from the coordination committee, a sub-set of 16 projects have been<br />

prioritized, and represent an initial phase that is being further analysis within the<br />

ongoing development of the Implementation Plan, as well as a draft Program EIR.<br />

These 16 projects were further prioritized, with seven projects identified as high<br />

priority with input from community members and stakeholders. These high priority<br />

projects will lead to the development of the 'Clasp' and reduce traffic conflicts,<br />

primarily within the Whittier Narrows. High priority project are receiving further<br />

analysis within the Implementation Plan and Program EIR.<br />

Parallel to the development of the Implementation Plan, the County of Los Angeles<br />

Department of Public Works (DPW) also prepared and submitted a grant proposal to<br />

the Transportation Investment Generating Economic Recovery (TIGER) Program<br />

administered by the U.S. Department of Transportation. This grant proposal included<br />

one project not previously identified within the feasibility study, as well as the<br />

modification of two projects identified as high priority. Illustration of the proposed<br />

projects are included as Exhibit B.<br />

2


<strong>Item</strong> <strong>13</strong><br />

To ensure these projects can meet the Federal TIGER Grant Program implementation<br />

timeline requirements, the WCA and DPW staff proposes to incorporate the added<br />

projects into the WCA's current Implementation Plan and draft Program EIR planning<br />

work. Additionally, WCA and DPW staff is proposing to utilize the WCA's consultant<br />

contract with Withers & Sandgren for the planning task necessary to conduct NEPA<br />

analysis and documentation for the TIGER projects. This approach is intended to<br />

complete the CEQA and NEPA requirements for the TIGER projects in a compressed<br />

timeline. With approval from the Los Angeles County Board of Supervisors, the DPW<br />

has agreed to fund this added scope. As the administrators of the LACFCD, the DPW<br />

intends to direct these funds to the WCA through an amendment to the existing MOU<br />

with LACFCD.<br />

Fiscal Information: The Emerald Necklace Feasibility Study and Implementation<br />

Plan has two sources of funding: 1) LACFCD funds in the amount of $200,000, and 2)<br />

$300,000 in funding from Southern California Edison through the California<br />

Community Foundation (CCF). LACFCD funds are held by the WCA, while the WCA<br />

invoices CCF directly on a reimbursement basis.<br />

This action would increase the total contribution from the LACFCD by an amount<br />

currently being determined, that includes $40,500 for consultants efforts to<br />

incorporate the TIGER projects in the Implementation Plan and CEQA EIR process<br />

(Exhibit C) and a yet to be determined amount for the NEPA efforts. The total added<br />

funding from the LACFCD will include the actual cost of the professional services, plus<br />

15% for WCA project management and administration.<br />

3


Exhibit A <strong>Item</strong> <strong>13</strong><br />

4


Exhibit A <strong>Item</strong> <strong>13</strong><br />

5


Exhibit A <strong>Item</strong> <strong>13</strong><br />

6


Exhibit A <strong>Item</strong> <strong>13</strong><br />

7


BL<br />

GABRIEL<br />

BLVD<br />

ROSEMEAD<br />

BLVD<br />

TEMPLE<br />

AV<br />

S<br />

ANITA<br />

SANTA<br />

AV<br />

AV<br />

ANITA<br />

MYRTLE<br />

AV<br />

Exhibit B<br />

APPENDIX A-1. Project Map<br />

Pasadena<br />

BLVD<br />

Sierra Madre<br />

<strong>Item</strong> <strong>13</strong><br />

BLVD<br />

Monrovia<br />

Bradbury<br />

FRWY<br />

FOOTHILL<br />

W COLORADO PL<br />

BLVD<br />

AV<br />

BL<br />

E<br />

BLVD<br />

DUARTE<br />

RD<br />

ROSEMEAD<br />

Unincorporated<br />

TUNAS<br />

DUARTE<br />

SUNSET<br />

DR<br />

BLVD<br />

TEMPLE<br />

CITY<br />

RD<br />

BLVD<br />

BALDWIN<br />

HU N TINGTON<br />

AV<br />

DUARTE<br />

Arcadia<br />

LAS TUNAS<br />

Peck Road Water<br />

<strong>Conservation</strong> Park<br />

DR<br />

ARCADIA WASH<br />

Unincorp.<br />

SANTA ANITA WASH<br />

RD<br />

RD<br />

Unincorp.<br />

S<br />

AV<br />

MYRTLE<br />

FRWY<br />

SAWPIT WASH<br />

ARROW<br />

Irwindale<br />

PROJECT 1<br />

DR<br />

BUENA VISTA<br />

FRWY<br />

HWY<br />

SAN<br />

RIVER<br />

HUNTINGTON<br />

Duarte<br />

GABRIEL<br />

FRWY<br />

SAN<br />

ARROW<br />

BL<br />

GABRIEL<br />

RIVER<br />

FRWY<br />

SantaFeDam<br />

Recreation<br />

Area<br />

San Gabriel<br />

Temple City<br />

BLVD<br />

RIVER<br />

Quarry<br />

Clasp<br />

PARK<br />

SAN<br />

SAN<br />

ALHAMBRA WASH<br />

RUBIO WASH<br />

Rosemead<br />

BERNARDINO<br />

BLVD<br />

DR<br />

BLVD<br />

AV<br />

FRWY<br />

CITY<br />

VALLEY<br />

EATON WASH<br />

GARVEY<br />

BALDWIN<br />

BLVD<br />

RIO HONDO<br />

AV<br />

TYLER<br />

AV<br />

SAN<br />

SANTA<br />

El Monte<br />

RD<br />

PECK<br />

VALLEY<br />

RAMONA<br />

AV<br />

AV<br />

DURFEE<br />

§¨¦ 210 §¨¦ 10<br />

SAN GABRIEL RIVER<br />

SAN<br />

GABRIEL<br />

BERNARDINO<br />

BLVD<br />

FRWY<br />

WALNUT CREEK<br />

RAMONA<br />

BALDWIN<br />

BL<br />

Baldwin Park<br />

BIG DALTON WASH<br />

AV<br />

SAN<br />

PACIFIC<br />

PUENTE<br />

West Covina<br />

R<br />

IEL<br />

RUSH ST<br />

BL<br />

SAN<br />

BLVD<br />

PROJECT 3<br />

Montebello<br />

RIO HONDO<br />

BL<br />

GABRIEL<br />

Pico Rivera<br />

BLVD<br />

BLVD<br />

FRWY<br />

BLVD<br />

BLVD<br />

ROSEMEAD<br />

RIVER<br />

PROJECT 2<br />

Whittier Narrows<br />

Recreation Area<br />

Unincorporated<br />

Whittier<br />

Narrows<br />

FRWY<br />

D<br />

Legg<br />

Lake<br />

SAN<br />

POMONASANTA ANITA<br />

DURFEE<br />

G<br />

WORKMAN<br />

BEVERLY<br />

NORWALK<br />

South El Monte<br />

BLVD<br />

ABRIEL<br />

RIVER<br />

SAN GABRIEL RIVER<br />

MILL<br />

FRWY<br />

SAN<br />

RD<br />

RD<br />

TYLER<br />

PECK<br />

Unincorporated<br />

Whittier<br />

PECK<br />

WO RKMAN<br />

AV<br />

GABRIEL<br />

This map is for planning purposes only. Los Angeles<br />

County expressly disclaims any liability for any<br />

inaccuracies which may be present in this map.<br />

CANYON<br />

§¨¦ 605<br />

MILL<br />

RIVER<br />

FRWY<br />

BASSETT<br />

Unincorporated<br />

AVOCADO HEIGHTS<br />

SAN JOSE CREEK<br />

·|} 60<br />

FRWY<br />

AMAR<br />

RD<br />

RD<br />

RD<br />

0 0.5<br />

1<br />

Mile<br />

Data contained in this map is produced in whole<br />

or part from the Los Angeles County Department<br />

of Public Works' digital database.<br />

Legend<br />

PU ENTE<br />

BLVD<br />

AV<br />

PUENTE<br />

VALLEY<br />

Industry<br />

TURNBULL<br />

AMAR<br />

Emerald Necklace<br />

River / Major Channel<br />

Existing Class I Bike Path<br />

Existing Class II Bike Path<br />

La Puente<br />

Proposed Bike Path/Trail Connection<br />

Proposed Bike Path/Trail Bridge<br />

City Boundary<br />

I<br />

RD<br />

CANYON<br />

SUNSET<br />

PUENTE CREEK<br />

Key Connector Projects:<br />

1 TheQuarry Clasp / Peck Park Trails<br />

2 Rush Street / Rio Hondo Bike Trail Connector and Bridge<br />

3 The San Gabriel Blvd / Rio Hondo Bike Trail Connector<br />

TURNBULL<br />

CANYON<br />

RD<br />

POMONA<br />

BLVD<br />

BLVD<br />

8<br />

Data contained in this map is produced in whole or part from the<br />

Thomas Bros. Maps ®. This map is copyrighted, and reproduced with<br />

permission granted, by Thomas Bros. Maps ®. All rights reserved.<br />

HA CIEND<br />

VALLE<br />

PATH: \\pwgisfile\GIS_Services\MPMGIS\projects\mpm\wk_EmeraldNecklace\Tiger20<strong>13</strong>_Grant4.mxd DATE: 5/28/20<strong>13</strong><br />

Survey/Mapping & Property Management Division, Mapping & GIS Services Section


<strong>Item</strong> <strong>13</strong><br />

S 4TH AV<br />

Irwindale<br />

SAN GABRIEL RIVER<br />

LOWER AZUSA RD<br />

ELROVIA AV<br />

9<br />

DURFEE AV<br />

LIVE OAK AV<br />

S PECK RD<br />

SAWPIT WASH<br />

SANTA ANITA WASH<br />

Unincorporated<br />

Unincorporated<br />

Arcadia<br />

El Monte<br />

Monrovia<br />

CLARK ST<br />

GOLDRING RD<br />

RIO HONDO PWY<br />

LA MADERA AV<br />

COGSWELL RD<br />

HEMLOCK ST<br />

PECK RD<br />

BUFFINGTON RD<br />

E LIVE OAK AV<br />

LYND AV<br />

S 9TH AV<br />

HALLWOOD DR<br />

S 8TH AV<br />

Exhibit B<br />

LENORE AV<br />

FARNA AV<br />

CEDAR AV<br />

LOWER AZUSA RD<br />

RIO<br />

HONDO


Exhibit B<br />

APPENDIX A-4. Project 2 Detail<br />

<strong>Item</strong> <strong>13</strong><br />

Rosemead<br />

Unincorporated<br />

RIO HONDO CHANNEL<br />

Whittier Narrows Golf Course<br />

CLUBHOUSE<br />

RUSH ST<br />

Legend<br />

Existing Class I Bike Path<br />

Proposed Bike Path/Trail Connection<br />

Proposed Bike Path/Trail Bridge<br />

Proposed Golf Cart Bridge<br />

City Boundary<br />

I<br />

0 150 300<br />

10<br />

Feet<br />

PATH: \\pwgisfile\GIS_Services\MPMGIS\projects\mpm\wk_EmeraldNecklace\Tiger20<strong>13</strong>_Grant_Proj2rev.mxd DATE: 5/28/20<strong>13</strong> This map is for planning purposes only


Exhibit B<br />

APPENDIX A-5. Project 3 Detail<br />

PLAZA DR<br />

<strong>Item</strong> <strong>13</strong><br />

Whittier Narrows Recreation Area<br />

Proposed Class I Bike Path<br />

Bridge Underpass<br />

See A-5.2<br />

·|} 19<br />

Montebello<br />

Legend<br />

Existing Class I Bike Path<br />

Proposed Bike Path/Trail Connection<br />

Proposed Park-and-Ride Lot<br />

N LINCOLN AV<br />

SAN GABRIEL BLVD<br />

RIO HONDO<br />

Proposed Class I Bike Path<br />

with Barrier. See A-5.1<br />

Install Barrier and Enhance<br />

Existing Bike Path<br />

ROSEMEAD BLVD<br />

DURFEE<br />

AV<br />

SIP H O N RD<br />

Intersection Improvements<br />

City Boundary<br />

Unincorporated<br />

I<br />

0 200 400<br />

11<br />

Feet<br />

PATH: \\pwgisfile\GIS_Services\MPMGIS\projects\mpm\wk_EmeraldNeck lace\Tiger20<strong>13</strong>_Grant_Proj3rev2.mxd DATE: 5/28/20<strong>13</strong> This map is for planning purposes only


Exhibit C <strong>Item</strong> <strong>13</strong><br />

STAFFING AND FEE SCHEDULE - Emerald Necklace: Feasibility, Implementation Plan, and Programmatic EIR/EIS Additional Services for TIGER<br />

Project Inclusion<br />

Fee Estimates (6/14/20<strong>13</strong>)<br />

Withers & Sandgren -- BlueGreen Consulting<br />

Urban Assessment<br />

CWE ECORP<br />

Planners<br />

Urban Crossroads<br />

Environmental<br />

Hours<br />

TOTALS<br />

Jan Sandgren<br />

Principal Planner<br />

Lynne Dwyer<br />

Principal<br />

Martin Kammerer<br />

Principal<br />

Lacey Withers<br />

Principal<br />

Landscape Architect<br />

Patty Nalle<br />

Landscape Architect<br />

Landscape Designer<br />

Desiree Harbaugh<br />

Bryan Matsumoto<br />

Landscape Designer<br />

Vik Bapna Principal<br />

Engineer<br />

Project Engineer<br />

Labor Rate ($/hr) 150 150 150 150 110 110 85 154 101 125 N/A 145 90 165 100 165 100 90 75 110 145 140 108<br />

Carrie Sutkin<br />

DPDS<br />

PART A: (SUB to ECORP) $ 1,800<br />

DEFINING STAKEHOLDERS OBJECTIVES<br />

Assistant<br />

Anne Surdzial<br />

CEQA/NEPA Task<br />

Manager<br />

Associate<br />

Environmental Analyst<br />

Mari Quillman<br />

Principal Biologist<br />

Staff Biologist<br />

Roger Mason Principal<br />

Cultural Resources<br />

Specialist<br />

Staff Cultural<br />

Resources Specialist<br />

Contracts<br />

Clerical<br />

GIS<br />

Carlton Waters<br />

Traffic Engineer<br />

Aric Evatt<br />

Air Quality Specialist<br />

Bill Lawson<br />

Accoustical Engineer<br />

1.1 Kickoff Meetings<br />

1.2 Field Investigations 2<br />

1.3 Data Compilation and Review 1 6<br />

2.1 Identify and Document Project Team Agency Objectives<br />

2.2 Identify Additional Stakeholders 2<br />

2.3 Community Meetings and Agency Stakeholder Meeting<br />

3. Synthesis of All Project Objectives 1<br />

PART B $ 14,175<br />

FEASIBILITY STUDY<br />

4.1 Evaluate Feasibility of Projects 3<br />

4.2 Evaluate Environmental Impacts 8 40 1 6 8 8 4<br />

4.3 Agency and Stakeholder Meetings<br />

4.4 Benefit Cost Ratios<br />

4.5 Summary of Implementation Challenges (Report) 8 8 30<br />

4.6 Evaluate Connectivity and Develop Multi-Use Trails<br />

4.7 Evaluate the Feasibility of Linear Greenways and Projects<br />

PART C $ 21,360<br />

IMPLEMENTATION PLAN AND PROGRAMATIC EIR/EIS<br />

0<br />

2<br />

7<br />

0<br />

2<br />

0<br />

1<br />

3<br />

75<br />

0<br />

0<br />

46<br />

0<br />

0<br />

5.1 Develop an Implementation Plan (Report) 8 15<br />

5.2 Prepare Remaining Elements for a Programmatic EIR/EIS 4 1 3 1<br />

5.3 Develop Draft Programmatic EIR/EIS 32 56 2 4 4 21 12<br />

5.4 Administrative Final Programmatic EIR/EIS and Notices 8 12 1 1 1 4 2<br />

23<br />

9<br />

<strong>13</strong>1<br />

29<br />

PART D<br />

ALTERNATIVES FOR THE "CLASP"<br />

6.1 Develop Feasible Multi-Use Trail Alternative(s) for the Clasp<br />

PART E $ -<br />

SIGNAGE PLAN FOR THE EMERALD NECKLACE<br />

7.1 Signage Plan<br />

0<br />

Labor Total Fee $ 37,335<br />

Labor Total Hours 20 0 42 0 30 0 0 0 0 44 68 4 45 1 11 0 36 23 4 0 0<br />

Direct Cost/Expenses $ 1,800<br />

Mark-Up on Sub Consultants - Approx. 5% $ 1,237<br />

Grand Total: $ 40,372<br />

0<br />

12


<strong>Item</strong> <strong>13</strong><br />

July 18, 20<strong>13</strong> – <strong>Item</strong> <strong>13</strong><br />

RESOLUTION 20<strong>13</strong>-23<br />

CONSIDERATION OF A RESOLUTION AUTHORIZING AN<br />

AMENDMENT TO THE MEMORANDUM OF<br />

UNDERSTANDING WITH THE LOS ANGELES COUNTY<br />

FLOOD CONTROL DISTRICT FOR THE EMERALD<br />

NECKLACE FEASIBILITY STUDY & IMPLEMENTATION<br />

PLAN<br />

WHEREAS, the <strong>Watershed</strong> <strong>Conservation</strong> <strong>Authority</strong> (WCA) has been established to<br />

facilitate joint projects between the Rivers and Mountains Conservancy and Los<br />

Angeles County Flood Control District; and<br />

WHEREAS, The <strong>Watershed</strong> <strong>Conservation</strong> <strong>Authority</strong> has been established to focus on<br />

projects which will provide open space, habitat restoration, and watershed<br />

improvement projects in both the San Gabriel and Lower Los Angeles Rivers<br />

watershed; and<br />

WHEREAS, this action authorizes the Executive Officer to enter into an amended<br />

Memorandum of Understanding with the Los Angeles County Flood Control District for<br />

the Emerald Necklace Feasibility Study & Implementation Plan; and<br />

WHEREAS, this action is exempt from the environmental impact report requirements<br />

of the California Environmental Quality Act (CEQA).<br />

Therefore be it resolved that the WCA hereby:<br />

1. FINDS that this action is consistent with the purposes and objectives of the<br />

WCA.<br />

2. FINDS that the actions contemplated by this resolution are exempt from the<br />

environmental impact report requirements of the California Environmental<br />

Quality Act.<br />

3. ADOPTS the staff report dated July 18, 20<strong>13</strong>.<br />

4. AUTHORIZES the Executive Officer to enter into an amended Memorandum of<br />

Understanding with the Los Angeles County Flood Control District that directs<br />

additional funding to the Emerald Necklace Feasibility Study & Implementation<br />

Plan.<br />

~ End of Resolution ~<br />

//<br />

<strong>13</strong>


Resolution 20<strong>13</strong>-23<br />

<strong>Item</strong> <strong>13</strong><br />

Motion: _______________________ Second: _______________________<br />

Ayes: _________<br />

Nays: ____________ Abstentions: _____________<br />

Passed and Adopted by the Board of the<br />

WATERSHED CONSERVATION AUTHORITY<br />

On July 18, 20<strong>13</strong><br />

_________________________________<br />

Teresa Villegas, Chairperson<br />

ATTEST:<br />

______________________<br />

Terry Fujimoto<br />

Deputy Attorney General<br />

14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!