conditions from Example 1 defined in the new HEC-18 update was adopted here with the following<br />
given parameters:<br />
Upstream channel width <strong>and</strong> bridge opening width (W)= 40 ft (12.2 m)<br />
Total discharge (Q) = 2800 ft 3 /s (79.3 m 3 /s)<br />
Upstream channel discharge (Q 1 ) = 2000 ft 3 /s (56.6 m 3 /s)<br />
Upstream floodplain discharge = 800 ft 3 /s (22.7 m 3 /s)<br />
Upstream channel flow depth (h u )= 10.0 ft (3.0 m)<br />
Bridge opening height (h b ) = 8.0 ft (2.4 m)<br />
Deck thickness (T) = 3 ft (0.91 m)<br />
Bed material D 50 = 15 mm (V c = 6.0 ft/s, 1.8 m/s, V c is the critical velocity <strong>for</strong> the sediment size)<br />
Upstream channel velocity (V=Q 1 /(W hu )) = 2000/(40 x 10) = 5.0 ft/s (1.5 m/s)<br />
Figure 2.4 presents Equations 2.2 <strong>and</strong> 2.3 <strong>for</strong> several different upstream velocities <strong>and</strong> other quantities<br />
defined as above. It was noted that the initial fit allows <strong>for</strong> separation zone thickness significantly<br />
greater than zero <strong>for</strong> the cases where the water level was just slightly above the bottom line of the<br />
bridge superstructure (<br />
. Although Equations 2.2 <strong>and</strong> 2.3 fit to the experimental scour<br />
data well, creation of a significant separation zone when the water is at a level that just touches the<br />
superstructure is counterintuitive. Also there was a discontinuity introduced between the two regions<br />
described by the curves – be<strong>for</strong>e overtopping <strong>and</strong> after overtopping.<br />
Figure 2.4 Initial fit based on Equations 2.2 <strong>and</strong> 2.3<br />
TRACC/TFHRC Y2Q2 Page 14