13.11.2012 Views

Love - Megève

Love - Megève

Love - Megève

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

spoRTs<br />

a gREaT<br />

dive ahead!<br />

66<br />

ThE INauguRaTIoN of ThE NEW<br />

fITNEss aREa IN apRIl 2011 sET<br />

ThE complETE REsTRucTuRINg<br />

of mEgèvE’s spoRTs aNd<br />

coNgREss cENTRE IN moTIoN,<br />

commENcINg WITh ThREE fIRsT<br />

sTagEs: RENovaTIoN of ThE<br />

INdooR ThEN ThE ouTdooR<br />

pools aNd ThE cREaTIoN of<br />

a balNEo-fITNEss cENTRE. a<br />

hugE pRoJEcT pREsENTEd To us<br />

by pascal sIRop, ThE pREsENT<br />

maNagER of ThE complEx.<br />

Megève Magazine: How do you present the renovation project of<br />

the nautical centre?<br />

Pascal Sirop: During the summer of 2011 the renovation of the indoor<br />

nautical centre will allow us, in a short time, to study carefully the<br />

different pools fitted with stainless steel 316l, a material that is very<br />

pleasant to the touch, easier to look after and will enable us to envisage<br />

shorter closing periods and thus gain between three and four weeks<br />

each year, allowing us to open for 350 days! The natural pools,<br />

overflowing and with the colour of a torrent will be more aesthetic<br />

and even more attractive. After renovating the centre we will be able<br />

to offer a 25 meter pool, fitted with depth contours or “équiprofondeur”<br />

at a depth of two meters along the entire length, quicker and better<br />

adapted to sports swimming, and a smaller pool with a zone for aqua<br />

gym 1m 30 deep, and a shallow “baby swimmer” zone heated to 32°c.<br />

MM: How will the nautical centre operate this winter?<br />

Pascal Sirop: This year we are starting something new: a prolonged<br />

opening of the outdoor Olympic pool after the summer, throughout<br />

the winter, with the water heated to between 28°c and 30°c and<br />

accessible by an airlock passage. It is a testing phase that inaugurates<br />

the future installations.<br />

MM: What are the next stages in the renovation of the Nautical Centre?<br />

Pascal Sirop: This first phase precedes a complete restructuring<br />

operation of the Sports and congress centre which plans the renovation<br />

of the outdoor Olympic pool in stainless steel with varying depths,<br />

notably of over 3 meters to make it easier to do an activity that has<br />

become very important in Megève: diving. The new pool which will<br />

also include a more shallow area for children, will be heated to 28°c<br />

in the winter thanks to energy given off when making ice for the<br />

skating rink. The restructuring also anticipates the creation of outdoor<br />

balneo-fitness pools, the renovation of the beach and a new layout<br />

for the Sports Spa: an area of 400 m² which could be accessible<br />

independently from the nautical centre. The global idea is to offer<br />

sports and relaxation swimming activities throughout the year.<br />

Alexandre Mollard

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!