<strong>el</strong> sadat – <strong>el</strong> <strong>fayoum</strong> <strong>Gas</strong> Pip<strong>el</strong>ine<br />

Environmental Impact Assessment<br />

OHSAS 18001<br />

0.0- Executive & Non Technical Summary<br />

gradually in the El Noubaria conduit . water analysis will be done before the<br />

discharge to be sure that there is no effect on the surrounding environment.<br />

So, the impact of this test is low in magnitude and short duration; since the test last<br />

only for 24 hours. Also, sampling and analysis for the water after test, as w<strong>el</strong>l as<br />

the water of the canal, shall be done to assure that no change in the water quality<br />

has occurred. The analysis shall be done against Law 48/82.<br />

Incase that the water analysis is not comply with the specification of Law 48/82,<br />

GASCO committed for water treatment according to specifications of the Law<br />

• SOLID WASTE<br />

Solid waste in this project arises only from the construction phase. The solid waste<br />

resembled in the sands, stones and rubbles resulting from the trenching. The<br />

tunn<strong>el</strong>s of the pip<strong>el</strong>ine and flattening the route, empty containers, scraps, garbage,<br />

wood and waste from the w<strong>el</strong>ding works. The receptors in this case are the soil<br />

and/or the surface water if this waste being thrown on them. The impact resembled<br />

in affecting badly the quality of the water bodies besides its aesthetic value if these<br />

waste were thrown on the ground or into the surface water.<br />

As for our project, the soil, sands and rubbles that shall arise will be reused in<br />

backfilling of the pip<strong>el</strong>ine after laying in the trench. The areas along the pip<strong>el</strong>ine<br />

shall be restored as before. Regarding the garbage and other types of solid waste,<br />

GASCO shall use an authorized contractor for collecting and disposal of this waste<br />

in coordination with the local authorities. Therefore, the project will have a shortterm<br />

and low magnitude impact on aesthetics.<br />

• THE PIPELINE THROUGH THE AGRICULTURAL LANDS<br />

No agricultural lands on the line route.<br />

November 2009<br />

7<br />

Egyptian Natural <strong>Gas</strong> Co. (GASCO)