25.01.2015 Views

el fayoum Gas Pipeline - European Investment Bank

el fayoum Gas Pipeline - European Investment Bank

el fayoum Gas Pipeline - European Investment Bank

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

El Sadat – El Faium <strong>Gas</strong> Pip<strong>el</strong>ine<br />

Environmental Impact Assessment<br />

3 : project Description<br />

OHSAS 18 0 0 1<br />

Backfilling<br />

W<strong>el</strong>ding & w<strong>el</strong>ding inspection<br />

Tie in including valves<br />

Piping pneumatic test<br />

Piping cleaning<br />

Installation of permanent facilitates (heaters, fractions towers, gas turbines…...)<br />

Brief descriptions of the key activities contained in each phase are outlined b<strong>el</strong>ow<br />

3.7.1 Pipe, installations, storage & stringing<br />

The project management s<strong>el</strong>ected the needed sites for storing the pipes and other<br />

installations in an area s<strong>el</strong>ected carefully for such purpose. The Contractor will pay<br />

great attention in adapting appropriate procedures (approved by GASCO) during<br />

transporting, handling, and stacking pipes and installations to ensure that no damage<br />

whatsoever results to the pipe or coating.<br />

Storage Piping material must be stored by type, size and material specification.<br />

Materials will be supplied colour marked, to differentiate types/services of materials.<br />

Care must be taken to s<strong>el</strong>ect and utilize special material such as that manufactured to<br />

NACE Std., ASME code and alloys for their required services only. Materials must be<br />

checked for their colour-coding<br />

Note: for Protection of All piping materials, they will be stored outdoors shall be supported off the<br />

ground.<br />

3.7.2 Foundations structural work or civil work<br />

At this stage, the site is ready for the commencement of starting the construction of the<br />

plant structure. Through the construction of the various components of the plant<br />

structure a lot but similar activities take place which follow the pattern for the<br />

preparation for pouring concrete. The pattern is as follow:<br />

Concrete shuttering: which involves the use of shuttering materials mainly plywood for<br />

forming the required shape and size of the component being constructed.<br />

Reinforced ste<strong>el</strong> preparation: which involves the sizing , cutting, and shaping of the<br />

reinforced ste<strong>el</strong> bars to the required shapes and sizes, as w<strong>el</strong>l as the laying of these bars in<br />

the shuttering a specified in the structural design.<br />

Concrete pouring inside the formed shuttering (form work) so a to form the required<br />

sk<strong>el</strong>eton of the structure. This is done through the use of a concrete batch plant which mix<br />

November 2009<br />

33 Egyptian Natural <strong>Gas</strong> Co. (GASCO)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!