25.01.2015 Views

el fayoum Gas Pipeline - European Investment Bank

el fayoum Gas Pipeline - European Investment Bank

el fayoum Gas Pipeline - European Investment Bank

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

construction phase<br />

16 Frequency of Patrol 31<br />

17 Specifications of Valve Rooms 32<br />

18 Maximum, Minimum and Average Air<br />

53<br />

temperature<br />

19 rain and r<strong>el</strong>ative humidity 53<br />

20 WIND 55<br />

21 Alternatives analysis 64<br />

22 Comparison of the three considered alternatives 65<br />

23 Environmental Impact of the proposed air<br />

71<br />

emissions<br />

24 Sound Pressure Lev<strong>el</strong>s of Construction<br />

77<br />

Machinery<br />

25 heat stress 83<br />

26 The environmental control plan during the<br />

132<br />

construction phase<br />

27 the environmental control plan during the<br />

operation phase<br />

133<br />

List of figures<br />

Figure No. Title Page No.<br />

1 gas consumption 3<br />

2 TIME SCHEDULE 28<br />

3<br />

Stages of the Horizontal Directional Drilling<br />

Technique (HDD)<br />

4 intensity distribution of earthquakes 46<br />

5 location of permanent seismic stations and<br />

47<br />

epicenters<br />

6 Epicentral distribution of all earthquakes, focal 48<br />

mechanisms of principal earthquakes and active<br />

seismic trends.<br />

7 Maximum, Minimum and Average Air<br />

53<br />

temperature<br />

8 amount of rain fall in the study area 54<br />

9 amount of humidity in the study area 54<br />

10 WIND at study area 56<br />

11 WIND at study area 56<br />

40

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!