El Sadat – El Faium <strong>Gas</strong> Pip<strong>el</strong>ine<br />

Environmental Impact Assessment<br />

3 : project Description<br />

OHSAS 18 0 0 1<br />

3-3 route description<br />

The gas pip<strong>el</strong>ine starts from El Sadat off take room then extends toward south direction<br />

parall<strong>el</strong> to SUMID pip<strong>el</strong>ines and El Ameriya Dashour pip<strong>el</strong>ine for a distance about 76 km .<br />

Then the pip<strong>el</strong>ine will extend through the 6 th of October city west to El haii El motamaiz and<br />

media production city . The pip<strong>el</strong>ine will cross Mehwar 26 July road, 6 th of October – El<br />

Wahat road and Cairo – El Faium road until it reaches Dashour compression station ( the<br />

end of the pip<strong>el</strong>ine ).<br />

There are 5 rooms along the pip<strong>el</strong>ine route:<br />

1- room no.(1) at zero km <strong>el</strong> sadat off take room<br />

2- room no. (2) at 32 km of area 25 X 50 m<br />

3-room no.(3) at 44 km of area 25 X 50 m<br />

4- room no.(4) at 56 km of area 25 X 50 m<br />

5- room no. (5) at 76 km from the start point<br />

Line route and the list of crossings of El Sadat – El Faium is shown on the attachments<br />

Cost of El Sadat – El Faium project is shown on the attachments<br />

November 2009<br />

27<br />

Egyptian Natural <strong>Gas</strong> Co. (GASCO)