<strong>Whittier</strong> <strong>Bridge</strong>/I-<strong>95</strong> Improvement Project FEIR<br />

Chapter 1.0: Changes Since the Draft <strong>Environmental</strong> <strong>Impact</strong> <strong>Report</strong> and Resolution of Additional Issues<br />

Table 1-3:<br />

Riverfront Area Mitigation – Newburyport<br />

Existing<br />

<strong>Impact</strong> Estimates<br />

(sf)<br />

Area of Riverfront on Site 356,000<br />

<strong>Impact</strong>ed<br />

Areas (sf)<br />

Areas<br />

Subject to<br />

RFA<br />

Mitigation<br />

(sf)<br />

Existing Degraded 22,925 N/A<br />

Previously Developed<br />

(Engineered Sideslopes) 13,614 13,614<br />

Undisturbed 1,060 N/A<br />

Total 37,599 13,614<br />

Temporary <strong>Impact</strong>ed<br />

Riverfront (Undisturbed) 4,770 N/A<br />

Mitigation Rationale<br />

Mitigation not required for redevelopment of<br />

Existing Degraded areas.<br />

Previously Developed areas (i.e. Engineered<br />

Side Slopes / Previously Graded Areas) may<br />

require mitigation under 310 CMR 10.58(5)(e)<br />

Does not require mitigation under 310 CMR<br />

10.58(4)(d)1, though undisturbed impacts<br />

cannot cumulatively exceed 10% of RFA on the<br />

lot.<br />

Does not require mitigation under 310 CMR<br />

10.58(4)(d)1, though undisturbed impacts<br />

cannot cumulatively exceed 10% of RFA on the<br />

lot. The 4,770 s.f. of temporary impacts will be<br />

mitigated through "in kind" or in situ restoration.<br />

Temporary <strong>Impact</strong>ed<br />

* Temporary <strong>Impact</strong>s will be mitigated through<br />

Riverfront (Previously<br />

"in kind" or in situ restoration, and are therefore<br />

Developed) 15,590 * not included in the mitigation calculation below.<br />

Overall Total 57,<strong>95</strong>9 0 Includes permanent and temporary impacts<br />

Mitigation Calculations<br />

10% of total RFA 35,600<br />

Existing Degraded 22,925<br />

Difference between 10% of<br />

site and Existing Degraded<br />

= additional allowed<br />

alteration without mitigation 12,675<br />

Area Of Permanent<br />

Previously Developed<br />

<strong>Impact</strong>s 13,614<br />

Required Mitigation under<br />

310 CMR 10.58(e) 939<br />

Proposed Restoration<br />

Area for Permanent<br />

<strong>Impact</strong>s 12,200<br />

Proposed Restoration for<br />

Temporary <strong>Impact</strong>s 20,360<br />

Total Mitigation 32,560<br />

Note: Refer to Figure 1-7 for locations of impacted and restored areas.<br />

Proposed <strong>Impact</strong>s to permanent and temporary<br />

Undisturbed RFA must not exceed 35,600 s.f.<br />

under 310 CMR 10.58(4)(d)1. (project 29,770<br />

s.f. below threshold).<br />

The proposed work may alter up to 10% if the<br />

degraded area is less than 10% of the riverfront<br />

area on the site; 310 CMR 10.58(5)(e).<br />

The redevelopment work may impact up to<br />

12,675 s.f. without requiring Mitigation; 310<br />

CMR 10.58(5)(e).<br />

Difference between <strong>Impact</strong>s to Previously<br />

Developed RA (13,614) and additional area to<br />

achieve 10% degraded RA (12,675).<br />

Mitigation provided at an approximate 5:1 ratio<br />

for permanent impacts through restoration of<br />

existing degraded areas.<br />

Mitigation provided at 1:1 ratio for temporary<br />

impacts (15,590 s.f + 4,770 s.f.)<br />

Permanent <strong>Impact</strong> Mitigation + Temporary<br />

<strong>Impact</strong> Mitigation.<br />

1-20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!