Facilities Study Presentation - Wissahickon School District
Facilities Study Presentation - Wissahickon School District
Facilities Study Presentation - Wissahickon School District
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Enrollment & capacity<br />
WISSAHICKON SCHOOL DISTRICT<br />
FACILITY STUDY<br />
ELEMENTARY SCHOOLS Jun 30, 2011<br />
Building Capacity Comparison Present Potential*<br />
• PDE PlanCon FTE (PDE) PDE PDE<br />
• <strong>District</strong> class size guidelines (<strong>District</strong>) <strong>District</strong> <strong>District</strong><br />
averaged as follows:<br />
Grades K-1 = 20 students<br />
2-3 = 23 students<br />
4-5 = 25 students<br />
Blue Bell Elementary • Grades K-5 ** 500 425 525 471<br />
Current enrollment: approx. 425 Surplus = 75 0 100 46<br />
Lower Gwynedd Elementary • K-5 625 562 650 585<br />
500 125 62 150 85<br />
Mattison Avenue • K-3 225 195 250 218<br />
157 68 38 93 61<br />
Shady Grove Elementary • K-5 575 524 750 662<br />
503 72 21 247 159<br />
Stony Creek • K-5 475 425 550 471<br />
386 89 39 164 85<br />
* The Potential capacity reflects the increase gained by recapturing currently underutilized<br />
classrooms. These include spaces 660 square feet and larger presently assigned to the IU, used by<br />
guidance, enrichment, health, head start, and additional art or music rooms. The Potential <strong>District</strong><br />
capacity assumes an average of 23 students per recaptured classroom.<br />
** The Present capacity of Blue Bell reflects a reduction of one classroom to account for the fact that<br />
Music is housed in the temporary building. This necessitates displacing a room within the main<br />
building.<br />
BRESLIN RIDYARD FADERO ARCHITECTS<br />
DHUY Engineering, Inc.