Options considered PEL projects a decline in K-5<br />
enrollment from current levels<br />
ELEMENTARY SCHOOL OPTIONS<br />
December 6, 2011<br />
OPTION MATTISON AVENUE SHADY GROVE<br />
BLUE BELL STONY CREEK<br />
of 1971 students to 1718 in SY<br />
EXCESS<br />
LOWER 2020-21. GWYNEDD TOTAL(-252)<br />
CAPACITY<br />
PROS<br />
CONS<br />
1<br />
Maintain existing<br />
configuration. Improve<br />
schools as required.<br />
Grades: K-3 Grades: K-5 Grades: K-5 Grades: K-5 Grades: K-5<br />
Capacity: 218 Capacity: 662 Capacity: 471 Capacity: 471 Capacity: 585 2407 592<br />
Enrollment: 157 Enrollment: 503 Enrollment: 425 Enrollment: 386 Enrollment: 500 1815*<br />
Estimated<br />
Cost:<br />
$3.4 m Estimated<br />
Cost:<br />
$10.7 m Estimated<br />
Cost:<br />
$8.0 m Estimated<br />
Cost:<br />
$8.6 m Estimated<br />
Cost:<br />
$6.1 m $36.8 m<br />
• No redistricting<br />
• 21st Century <strong>School</strong>s not<br />
achieved<br />
• Excess capacity of >10%<br />
• No major renovations to<br />
any elementary school<br />
• No Green improvement<br />
1A<br />
Maintain existing<br />
configuration.<br />
Renovate all schools<br />
except Lower<br />
Gwynedd. Improve<br />
Lower Gwynedd as<br />
required.<br />
Grades: K-3 Grades: K-5 Grades: K-5 Grades: K-5 Grades: K-5<br />
Capacity: 218 Capacity: 662 Capacity: 471 Capacity: 471 Capacity: 585 2407 592<br />
Estimated<br />
Cost:<br />
$7.1 m Estimated<br />
Cost:<br />
$18.0 m Estimated<br />
Cost:<br />
$13.5 m Estimated<br />
Cost:<br />
$13.3 m Estimated<br />
Cost:<br />
$6.1 m $58.0 m<br />
• No redistricting<br />
• Some Green<br />
improvement<br />
• 21st Century <strong>School</strong>s not<br />
achieved<br />
• Excess capacity of >10%<br />
• Renovations disruptive<br />
without swing space<br />
2<br />
Close Mattison Avenue<br />
& integrate into Shady<br />
Grove and Lower<br />
Gwynedd. Improve<br />
schools as required.<br />
(Transfer 157<br />
students)<br />
Vacate/Sell<br />
Grades: K-5 Grades: K-5 Grades: K-5 Grades: K-5<br />
Capacity: 662 Capacity: 471 Capacity: 471 Capacity: 585 2189 374<br />
Estimated<br />
Cost:<br />
$10.7 m Estimated<br />
Cost:<br />
$8.0 m Estimated<br />
Cost:<br />
$8.6 m Estimated<br />
Cost:<br />
$6.1 m $33.4 m<br />
• More efficient bus run<br />
• <strong>School</strong> transition from<br />
grades 3-4 eliminated<br />
• Better use of excess<br />
capacity at SG<br />
• Minimal cost with<br />
improved efficiency<br />
• Excess capacity of >10%<br />
• 21st Century <strong>School</strong>s not<br />
achieved<br />
• Loss of neighborhood<br />
school<br />
• No major renovation to<br />
any elementary school<br />
• Potential redistricting<br />
• No Green improvement<br />
2A<br />
3<br />
Close Mattison Avenue<br />
& integrate into Shady<br />
Grove. Renovate Shady<br />
Grove (adding<br />
capacity). Renovate<br />
Blue Bell and Stony<br />
Creek. Improve Lower<br />
Gwynedd as required.<br />
(Transfer 157 students)<br />
Close Mattison Avenue<br />
and Blue Bell; renovate<br />
Shady Grove (adding<br />
capacity); renovate &<br />
add 5 classrooms to<br />
Stony Creek; improve<br />
Lower Gwynedd.<br />
(Transfer 582 students)<br />
Vacate/Sell<br />
Vacate/Sell<br />
Grades: K-5 Grades: K-5 Grades: K-5 Grades: K-5<br />
Capacity: 754 Capacity: 471 Capacity: 471 Capacity: 585 2281 466<br />
Estimated<br />
Cost:<br />
$18.0 m Estimated<br />
Cost:<br />
$13.5 m Estimated<br />
Cost:<br />
$13.4 m Estimated<br />
Cost:<br />
Grades: K-5 Grades: K-5 Grades: K-5<br />
$6.1 m $51.0 m<br />
Capacity: 754 Vacate/Sell Capacity: 586 Capacity: 585 1925 110<br />
Estimated<br />
Cost:<br />
$18.0 m<br />
Estimated<br />
Cost:<br />
$17.7 m Estimated<br />
Cost:<br />
$6.1 m $41.8 m<br />
• More efficient bus run<br />
• <strong>School</strong> transition from<br />
grades 3-4 eliminated<br />
• Better use of excess<br />
capacity at SG<br />
• Minimal cost with<br />
improved efficiency<br />
• Improvement toward<br />
21st Century <strong>School</strong>s<br />
• Some Green<br />
improvement<br />
• Excess capacity of 10%<br />
• Loss of neighborhood<br />
school<br />
• Potential redistricting<br />
• Loss of neighborhood<br />
school<br />
• Requires redistricting<br />
BRESLIN RIDYARD FADERO ARCHITECTS<br />
DHUY Engineering, Inc.