Options considered<br />
OPTION 1<br />
Detailed Construction Options and Cost Estimates<br />
Baseline Option Summary<br />
Elementary <strong>School</strong> Options Summary<br />
OPTION 1<br />
Description:<br />
Maintain the existing school configuration of grade structure and number of schools. Improve<br />
each facility as required with capital project improvements over a 10 year time frame.<br />
Estimated Cost:<br />
Mattison Avenue Elementary <strong>School</strong> Improvements * $ 3,436,586<br />
Shady Grove Elementary <strong>School</strong> Improvements * $ 10,732,787<br />
Blue Bell Elementary <strong>School</strong> Improvements * $ 7,998,978<br />
Stony Creek Elementary <strong>School</strong> Improvements * $ 8,565,895<br />
Lower Gwynedd Elementary <strong>School</strong> Improvements * $ 6,084,163<br />
Total Estimated Cost: $ 36,818,409<br />
* See Capital Improvements Summary for detailed costs.<br />
Pros:<br />
• No redistricting is required.<br />
Cons:<br />
• 21 st Century <strong>School</strong>s are not achieved.<br />
• There is an excess capacity of greater than 10% of the projected enrollment.<br />
• No major renovations are planned for any elementary school.<br />
• There are no Green building features, sustainable or energy efficient improvements.<br />
BRESLIN RIDYARD FADERO ARCHITECTS<br />
DHUY Engineering, Inc.