Options considered<br />
SECONDARY SCHOOL OPTIONS<br />
December 6, 2011<br />
OPTION<br />
MIDDLE SCHOOL<br />
HIGH SCHOOL<br />
TOTAL PROS CONS<br />
1<br />
Maintain existing<br />
configuration. Improve<br />
schools as required.<br />
Grades: 6-8 Grades: 9-12<br />
Capacity: 1286 Capacity: 1658 2944<br />
Enrollment: 1055 Enrollment: 1328 2383*<br />
Estimated Cost: $17.6 m Estimated Cost: $30.2 m $47.8 m<br />
• Least cost<br />
• No major renovations to<br />
either school<br />
• No 21st Century <strong>School</strong><br />
improvement<br />
Grades: 6-8 Grades: 9-12<br />
2<br />
Renovate Middle <strong>School</strong> and<br />
High <strong>School</strong><br />
Capacity: 1286 Capacity: 1658 2944<br />
Enrollment: 1055 Enrollment: 1328 2383*<br />
• Better 21st Century <strong>School</strong><br />
improvement<br />
• Some Green improvement<br />
• Most inefficiencies and<br />
adjacencies remain in place<br />
• Many windowless CR in MS<br />
• Phasing is disruptive<br />
Estimated Cost: $33.3 m Estimated Cost: $55.8 m $89.1 m<br />
Grades: 6-8 Grades: 9-12<br />
2A<br />
Renovate Middle <strong>School</strong> and<br />
High <strong>School</strong>. Convert MS<br />
pool into Auditorium and<br />
add a new pool at HS.<br />
Capacity: 1286 Capacity: 1658 2944<br />
Enrollment: 1055 Enrollment: 1328 2383*<br />
• Better 21st Century <strong>School</strong><br />
improvement<br />
• Some Green improvement<br />
• Most inefficiencies and<br />
adjacencies remain in place<br />
• Many windowless CR in MS<br />
• Phasing is disruptive<br />
Estimated Cost: $39.9 m Estimated Cost: $64.0 m $103.9 m<br />
Grades: 6-8 Grades: 9-12<br />
3<br />
Build New Middle <strong>School</strong><br />
adjacent to old. Rebuild<br />
High <strong>School</strong> mostly on<br />
footprint of old High <strong>School</strong>.<br />
Improve stadium.<br />
Capacity: 1100 Capacity: 1500 2600<br />
Enrollment: 1055 Enrollment: 1328 2383*<br />
• Best 21st Century <strong>School</strong>s<br />
• Better Green improvement<br />
• Cost<br />
• Phased construction of HS<br />
Estimated Cost: $53.9 m Estimated Cost: $96.6 m $150.6 m<br />
3A<br />
Renovate Middle <strong>School</strong>.<br />
Convert MS pool into<br />
Auditorium. Rebuild High<br />
<strong>School</strong> mostly on footprint<br />
of old High <strong>School</strong> and add<br />
a new pool. Improve<br />
stadium.<br />
Grades: 6-8 Grades: 9-12<br />
Capacity: 1286 Capacity: 1500 2786<br />
Enrollment: 1055 Enrollment: 1328 2383*<br />
Estimated Cost: $39.9 m Estimated Cost: $96.6 m $136.6 m<br />
• Better 21st Century <strong>School</strong>s<br />
• Better Green improvement<br />
• Cost<br />
• Phasing is disruptive<br />
BRESLIN RIDYARD FADERO ARCHITECTS<br />
DHUY Engineering, Inc.