Options considered<br />

SECONDARY SCHOOL OPTIONS<br />

December 6, 2011<br />

OPTION<br />

MIDDLE SCHOOL<br />

HIGH SCHOOL<br />

TOTAL PROS CONS<br />

1<br />

Maintain existing<br />

configuration. Improve<br />

schools as required.<br />

Grades: 6-8 Grades: 9-12<br />

Capacity: 1286 Capacity: 1658 2944<br />

Enrollment: 1055 Enrollment: 1328 2383*<br />

Estimated Cost: $17.6 m Estimated Cost: $30.2 m $47.8 m<br />

• Least cost<br />

• No major renovations to<br />

either school<br />

• No 21st Century <strong>School</strong><br />

improvement<br />

Grades: 6-8 Grades: 9-12<br />

2<br />

Renovate Middle <strong>School</strong> and<br />

High <strong>School</strong><br />

Capacity: 1286 Capacity: 1658 2944<br />

Enrollment: 1055 Enrollment: 1328 2383*<br />

• Better 21st Century <strong>School</strong><br />

improvement<br />

• Some Green improvement<br />

• Most inefficiencies and<br />

adjacencies remain in place<br />

• Many windowless CR in MS<br />

• Phasing is disruptive<br />

Estimated Cost: $33.3 m Estimated Cost: $55.8 m $89.1 m<br />

Grades: 6-8 Grades: 9-12<br />

2A<br />

Renovate Middle <strong>School</strong> and<br />

High <strong>School</strong>. Convert MS<br />

pool into Auditorium and<br />

add a new pool at HS.<br />

Capacity: 1286 Capacity: 1658 2944<br />

Enrollment: 1055 Enrollment: 1328 2383*<br />

• Better 21st Century <strong>School</strong><br />

improvement<br />

• Some Green improvement<br />

• Most inefficiencies and<br />

adjacencies remain in place<br />

• Many windowless CR in MS<br />

• Phasing is disruptive<br />

Estimated Cost: $39.9 m Estimated Cost: $64.0 m $103.9 m<br />

Grades: 6-8 Grades: 9-12<br />

3<br />

Build New Middle <strong>School</strong><br />

adjacent to old. Rebuild<br />

High <strong>School</strong> mostly on<br />

footprint of old High <strong>School</strong>.<br />

Improve stadium.<br />

Capacity: 1100 Capacity: 1500 2600<br />

Enrollment: 1055 Enrollment: 1328 2383*<br />

• Best 21st Century <strong>School</strong>s<br />

• Better Green improvement<br />

• Cost<br />

• Phased construction of HS<br />

Estimated Cost: $53.9 m Estimated Cost: $96.6 m $150.6 m<br />

3A<br />

Renovate Middle <strong>School</strong>.<br />

Convert MS pool into<br />

Auditorium. Rebuild High<br />

<strong>School</strong> mostly on footprint<br />

of old High <strong>School</strong> and add<br />

a new pool. Improve<br />

stadium.<br />

Grades: 6-8 Grades: 9-12<br />

Capacity: 1286 Capacity: 1500 2786<br />

Enrollment: 1055 Enrollment: 1328 2383*<br />

Estimated Cost: $39.9 m Estimated Cost: $96.6 m $136.6 m<br />

• Better 21st Century <strong>School</strong>s<br />

• Better Green improvement<br />

• Cost<br />

• Phasing is disruptive<br />

BRESLIN RIDYARD FADERO ARCHITECTS<br />

DHUY Engineering, Inc.