ENVIRONMENTAL<br />
ASSESSMENT<br />
I-95 DEFENSE ACCESS ROADS RAMPS TO<br />
ENGINEER PROVING GROUND<br />
SECTION 2<br />
ALTERNATIVES<br />
2.1 INTRODUCTION<br />
This section discusses the range of alternatives considered, the process used to identify and screen the alternatives,<br />
alternatives considered and eliminated from further consideration, and alternatives carried forward for<br />
detailed study. The No-build Alternative was retained and it serves as a baseline for alternatives comparison.<br />
A Preferred Alternative has been identified and several other build alternatives have been considered.<br />
2.2 ALTERNATIVES DEVELOPMENT AND SCREENING<br />
The flowchart below illustrates the steps in the alternatives development and screening process. This<br />
process involved identifying a range of alternatives initially and then narrowing the options to the Preferred<br />
Alternative for detailed consideration. Among the criteria used in evaluating potential alternatives were<br />
the existing and programmed future road networks, the proposed location of the NGA facilities and potential<br />
access points, travel patterns, levels of service for existing versus proposed conditions for future years, facility<br />
security considerations, right of way considerations, and <strong>environmental</strong> constraints.<br />
STEP 1<br />
Develop<br />
Conceptual<br />
Alternatives<br />
STEP 2<br />
Purpose and<br />
Need Met<br />
YES<br />
STEP 3<br />
Screening<br />
Criteria Met<br />
Engineering<br />
<br />
<br />
<br />
YES<br />
NO<br />
NO<br />
Alternatives<br />
Retained<br />
Eliminated<br />
Conceptual<br />
Alternatives<br />
2.3 ALTERNATIVES CONSIDERED BUT ELIMINATED FROM DETAILED STUDY<br />
Through the alternatives screening, several concepts and alternatives were eliminated from further consideration<br />
and were not carried forward for detailed study. TABLE 1 lists the eliminated alternatives and reasons for<br />
their elimination.<br />