ENVIRONMENTAL<br />

ASSESSMENT<br />

I-95 DEFENSE ACCESS ROADS RAMPS TO<br />

ENGINEER PROVING GROUND<br />

SECTION 2<br />

ALTERNATIVES<br />

2.1 INTRODUCTION<br />

This section discusses the range of alternatives considered, the process used to identify and screen the alternatives,<br />

alternatives considered and eliminated from further consideration, and alternatives carried forward for<br />

detailed study. The No-build Alternative was retained and it serves as a baseline for alternatives comparison.<br />

A Preferred Alternative has been identified and several other build alternatives have been considered.<br />

2.2 ALTERNATIVES DEVELOPMENT AND SCREENING<br />

The flowchart below illustrates the steps in the alternatives development and screening process. This<br />

process involved identifying a range of alternatives initially and then narrowing the options to the Preferred<br />

Alternative for detailed consideration. Among the criteria used in evaluating potential alternatives were<br />

the existing and programmed future road networks, the proposed location of the NGA facilities and potential<br />

access points, travel patterns, levels of service for existing versus proposed conditions for future years, facility<br />

security considerations, right of way considerations, and <strong>environmental</strong> constraints.<br />

STEP 1<br />

Develop<br />

Conceptual<br />

Alternatives<br />

STEP 2<br />

Purpose and<br />

Need Met<br />

YES<br />

STEP 3<br />

Screening<br />

Criteria Met<br />

Engineering<br />

<br />

<br />

<br />

YES<br />

NO<br />

NO<br />

Alternatives<br />

Retained<br />

Eliminated<br />

Conceptual<br />

Alternatives<br />

2.3 ALTERNATIVES CONSIDERED BUT ELIMINATED FROM DETAILED STUDY<br />

Through the alternatives screening, several concepts and alternatives were eliminated from further consideration<br />

and were not carried forward for detailed study. TABLE 1 lists the eliminated alternatives and reasons for<br />

their elimination.<br />

4