3.0 <strong>Transmission</strong> Interfaces <strong>IESO</strong>_REP_0265v22.0<br />
<strong>Ontario</strong> <strong>Transmission</strong> <strong>System</strong><br />
6000<br />
FETT Nov. 1, 2011 to Nov. 1, <strong>2012</strong><br />
5000<br />
FETT Limit<br />
4000<br />
3000<br />
FETT (MW)<br />
2000<br />
1000<br />
0<br />
-1000<br />
0 10 20 30 40 50 60 70 80 90 100<br />
-2000<br />
percentage of time (%)<br />
FIO Nov. 1, 2011 to Nov. 1, <strong>2012</strong><br />
3500<br />
3000<br />
FIO Limit<br />
2500<br />
2000<br />
FIO (MW)<br />
1500<br />
1000<br />
500<br />
0<br />
-500<br />
0 10 20 30 40 50 60 70 80 90 100<br />
percentage of time (%)<br />