4.0 <strong>Transmission</strong> Interconnections <strong>IESO</strong>_REP_0265v22.0<br />
<strong>Ontario</strong> <strong>Transmission</strong> <strong>System</strong><br />
2000<br />
<strong>Ontario</strong> to Quebec Nov. 1, 2011 to Nov. 1, <strong>2012</strong><br />
1500<br />
Flow into Quebec (MW)<br />
1000<br />
500<br />
0<br />
-500<br />
-1000<br />
0 10 20 30 40 50 60 70 80 90 100<br />
-1500<br />
-2000<br />
percentage of time (%)<br />
<strong>Ontario</strong> Net Export Nov. 1, 2011 to Nov. 1, <strong>2012</strong><br />
3500<br />
2500<br />
Flow out of <strong>Ontario</strong> (MW)<br />
1500<br />
500<br />
-500<br />
-1500<br />
-2500<br />
0 10 20 30 40 50 60 70 80 90 100<br />
-3500<br />
percentage of time (%)<br />
- End of Document -<br />
<strong>November</strong> 23, <strong>2012</strong> Public Page 23