4.0 <strong>Transmission</strong> Interconnections <strong>IESO</strong>_REP_0265v22.0<br />
<strong>Ontario</strong> <strong>Transmission</strong> <strong>System</strong><br />
Figure 4.3.3 One Year Rolling (Nov. 2011 – Nov. <strong>2012</strong>) Historical Flow Distribution - Interconnections<br />
400<br />
<strong>Ontario</strong> to Manitoba Nov. 1, 2011 to Nov. 1, <strong>2012</strong><br />
Flow into Manitoba (MW)<br />
300<br />
200<br />
100<br />
0<br />
-100<br />
-200<br />
-300<br />
-400<br />
Winter Limit<br />
Summer Limit<br />
0 10 20 30 40 50 60 70 80 90 100<br />
Summer Limit<br />
Winter Limit<br />
percentage of time (%)<br />
<strong>Ontario</strong> to Minnesota Nov. 1, 2011 to Nov. 1, <strong>2012</strong><br />
200<br />
150<br />
Limit<br />
Flow into Minnesota (MW)<br />
100<br />
50<br />
0<br />
-50<br />
-100<br />
0 10 20 30 40 50 60 70 80 90 100<br />
Limit<br />
-150<br />
percentage of time (%)<br />