Standard Emergency Lighting - Beta Industries
Standard Emergency Lighting - Beta Industries
Standard Emergency Lighting - Beta Industries
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
1 2 3 4 5<br />
Beghelli<br />
• CENTRALISED MANAGEMENT<br />
AND CONTROL<br />
• REDUCED MAINTENANCE COSTS<br />
• REDUCED OPERATION<br />
CONTROL COSTS<br />
• INCREASED SAFETY<br />
AND SECURITY<br />
ALSO IN RACK VERSION<br />
19” 3 UNITS<br />
CENTRAL MODULE<br />
FOR COMPUTER<br />
The Beghelli Central Test <strong>Emergency</strong> <strong>Lighting</strong> System (CT) is a<br />
centralised emergency lighting system with centrally controlled<br />
self testing emergency luminaires.<br />
CT performs the following functions :<br />
. operational and full duration testing of the luminaires<br />
. enabling or disabling the emergency function<br />
. system control<br />
CT can control up to 1024 units, including the Maintained (SA)<br />
and Non Maintained (SE). An interface booster is required every<br />
64 units, to amplify the data signals<br />
Control Unit (CU)<br />
A liquid cristal display (80 characters on 2 lines), a 24-column<br />
printer and a keyboard interface the operator with the CU.<br />
The display shows various selection menus to make easier the<br />
operator’s control, as well as the key to be pressed to start the<br />
various functions.<br />
A keyswitch located at the back of the keyboard can be used<br />
to prevent access by unauthorised persons.<br />
CT can be integrated into a centralised control system with a<br />
wider range of functions, or into a remote monitoring + control<br />
system via a telephone line. A two serial-line connector (RS232)<br />
are located at the back of the CU. A sealed, rechargeable 7,2V,<br />
1,2 Ah NiCd battery provides for 3 hours full duration in case of<br />
a power failure<br />
TO THE OTHER INTERFACES<br />
TO THE LUMINARES<br />
POWER LINE<br />
220 V<br />
DATA LINE<br />
#<br />
N P C A B N P C A B<br />
626<br />
626<br />
CENTRALTEST CENTRALTEST<br />
13 12 10 9 8 7 6 5 4 1<br />
INTERFACE<br />
CENTRALTEST 9410<br />
*<br />
Connection plan:<br />
an example<br />
CM CENTRALTEST<br />
10