Digital Mains Signalling Centraltest <strong>Emergency</strong> <strong>Lighting</strong> System<br />

These functions can be performed separately for<br />

the total installation or for a zone. Results are<br />

shown on the display and a hard copy can be printed<br />

on demand.<br />

The CU can communicate with every luminaire by<br />

periodically running inquiry functions, advising the<br />

operator via display in the event of a one or more<br />

units of the system do not respond .<br />

Luminaires are not affected if communication with<br />

CU is interrupted. As each unit is identified by a<br />

specific address, many installations can operate on<br />

a single power supply line.<br />

Operational test<br />

The CU runs the operational test automatically or<br />

on a specific demand. The operator can use the<br />

CU to program the time lag between two automatic<br />

tests as well as the test timing.<br />

During any test, the luminaire lights up for about<br />

one minute to verify the correct working of the fluorescent<br />

tube and the battery. The CU collects and<br />

stores any failure and reports to the operator via<br />

display or a print out, stating test day , test time<br />

and also type of failure and identification number of<br />

the luminaires involved.<br />

The multicoloured LED located on the front of the<br />

luminaire facilitates identification of the defective<br />

unit and also indicates (See AT section) the luminaire’s<br />

status.<br />

Full duration test<br />

The full duration test is run as the functionality test<br />

but, because the state of the luminaires’ battery is<br />

checked by the unit microprocessor, is longer ,collecting<br />

and storing any possible failure. Test results<br />

are shown on the display, as well as it’s possible to<br />

print out test date and time, type of failure and identification<br />

number of the luminaires involved.<br />

The multicoloured LED located on the front of the<br />

luminaire facilitates identification of the defective<br />

unit and also indicates (See AT section) the luminaires<br />

status.The operator can program automatic<br />

testing frequency between 1 and 99 weeks or can<br />

run tests on demand.<br />

INSTALLATION 1 REMOTE CONTROL STATION<br />

INSTALLATION 2<br />

LUMINARES<br />

PRINTER<br />

PC<br />

LUMINARES<br />

PRINTER<br />

CU<br />

MODEM<br />

CENTRAL MODULE<br />

PC<br />

MODEM<br />

MODEM<br />

TELEPHONE LINE<br />

TELEPHONE LINE<br />

CTOC<br />

CONTROL UNIT<br />

Ordering code Article Power supply Battery Controlled Luminaires Weight kg<br />

Control unit<br />

2995 9402CTOC 230V NiCd 7.2V-1.2 Ah max 500 4.7<br />

Control rack<br />

3002 9408CTOC RACK 230V NiCd 7.2V-1.2 Ah max 500 4.7<br />

Control module 3008 9421CTOC 230V NiCd 7.2V-1.2 Ah max 500 4.2<br />

CTOC<br />

ACCESSORIES<br />

Ordering code Article Description<br />

3128 MODEM V90 Modem V90<br />

3009 9422CTOC Singlephase coupler - Din 4<br />

3010 9423CTOC 3 Phase coupler - Din 2<br />

3011 9424CTOC Singlephase filter - Din 9<br />

3012 9425CTOC 3 Phase repeater - Din 6<br />

3013 9426CTOC 3 Phase repeater HT - Din 9+6<br />