Building Permit By-Law - Township of Tay
Building Permit By-Law - Township of Tay
Building Permit By-Law - Township of Tay
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
SCHEDULE “H” to <strong>By</strong>-law 2005-59<br />
ACKNOWLEDGEMENT BY APPLICANT OF INCOMPLETE APPLICATION<br />
ACKNOWLEDGEMENT BY APPLICANT OF AN INCOMPLETE APPLICATION<br />
Pursuant to Sentence 2.4.2.1.1B (5) <strong>of</strong> the <strong>Building</strong> Code<br />
Part A<br />
A prescreening <strong>of</strong> the application to ______________________________________________________________<br />
(describe work)<br />
at _______________________ reveals that the application is incomplete in that the following items are missing:<br />
(location <strong>of</strong> work)<br />
___________________________________________________________________________________________<br />
___________________________________________________________________________________________<br />
___________________________________________________________________________________________<br />
___________________________________________________________________________________________<br />
(The above list may not be complete. Further permit processing may indicate additional outstanding items that are<br />
required.)<br />
As such, the application is not entitled to the processing time periods prescribed in Column 3 <strong>of</strong> Table 2.4.1.1B<br />
<strong>of</strong> the <strong>Building</strong> Code.<br />
The <strong>Township</strong> <strong>of</strong> <strong>Tay</strong> will however accept the incomplete application for processing if the Acknowledgement<br />
below is completed.<br />
Part B<br />
I _________________________________________________________________________________________<br />
(print name <strong>of</strong> applicant)<br />
acknowledge that my application to _____________________________ at ______________________________<br />
(describe work)<br />
(location <strong>of</strong> work)<br />
does not meet the requirements <strong>of</strong> 2.4.1.1B (5) <strong>of</strong> the <strong>Building</strong> Code and therefore is not entitled to the time periods<br />
prescribed in Column 3 <strong>of</strong> Table 2.4.1.1B <strong>of</strong> the <strong>Building</strong> Code.<br />
Notwithstanding the above, I wish to have the application accepted for processing and understand that a permit<br />
cannot be issued until all the information is submitted and reviewed for compliance.<br />
I have authority to bind the corporation or partnership (if applicable).<br />
____________________<br />
(Date)<br />
______________________________<br />
(Signature <strong>of</strong> Applicant)<br />
26