CITY OF LABELLE<br />
MEMBRANE WATER TREATMENT FACILITY<br />
PROJECT MANUAL<br />
VOLUME 2<br />
MEMBRANE BUILDING ARCHITECTURAL<br />
Prepared For:<br />
City <strong>of</strong> LaBelle, Florida<br />
481 Highway 80 West<br />
LaBelle, Florida 33935<br />
Prepared By:<br />
411 Pablo Avenue<br />
Jacksonville Beach, Florida 32250<br />
(904) 249-8009<br />
Certificate <strong>of</strong> Authorization #00004669<br />
DECEMBER 2011
CITY OF LABELLE, FLORIDA<br />
MEMBRANE WATER TREATMENT FACILITY<br />
PROJECT MANUAL<br />
TABLE OF CONTENTS<br />
VOLUME 2 – MEMBRANE BUILDING ARCHITECTURAL<br />
DIVISION 0 - BIDDING AND CONTRACT REQUIREMENTS<br />
Reference Volume 1 <strong>of</strong> Project Manual<br />
DIVISION 1 - GENERAL REQUIREMENTS<br />
Reference Volume 1 <strong>of</strong> Project Manual<br />
DIVISION 2 - SITE WORK<br />
SECTIONS<br />
02361 Termite Control<br />
DIVISION 3 - CONCRETE<br />
SECTIONS<br />
03300 Cast-in-Place Concrete<br />
DIVISION 4 - MASONRY<br />
SECTIONS<br />
04810 Unit Masonry Assemblies<br />
-i-<br />
99-326 100% Submittal<br />
CITY OF LABELLE MEMBRANE WTF December 2011
TABLE OF CONTENTS (CONT.)<br />
VOLUME 2 – MEMBRANE BUILDING ARCHITECTURAL<br />
DIVISION 5 – METALS<br />
SECTIONS<br />
05120 Structural Steel<br />
05210 Steel Joists<br />
05310 Steel Decking<br />
05530 Fiberglass Reinforced Plastic Molded Grating<br />
DIVISION 6 – WOOD AND PLASTICS<br />
SECTIONS<br />
06105 Miscellaneous Carpentry<br />
06402 Interior Architectural Woodwork<br />
DIVISION 7 – THERMAL AND MOISTURE PROTECTION<br />
SECTIONS<br />
07170 Bentonite Panel Waterpro<strong>of</strong>ing<br />
07210 Thermal Insulation<br />
07220 Lightweight Insulating Concrete Ro<strong>of</strong> Insulation<br />
07411 Metal Ro<strong>of</strong> Panels<br />
07552 SBS-Modified Bituminous Membrane Ro<strong>of</strong>ing<br />
07620 Sheet Metal Flashing and Trim<br />
07841 Through-Penetration Firestop Systems<br />
07920 Joint Sealants<br />
-ii-<br />
99-326 100% Submittal<br />
CITY OF LABELLE MEMBRANE WTF December 2011
TABLE OF CONTENTS (CONT.)<br />
VOLUME 2 – MEMBRANE BUILDING ARCHITECTURAL<br />
DIVISION 8 – DOORS AND WINDOWS<br />
SECTIONS<br />
08111 Hollow Metal Doors and Frames<br />
08211 Flush Wood Doors<br />
08311 Access Doors and Frames<br />
08332 Overhead Coiling Doors<br />
08412 Impact Resistant Aluminum-Framed Entrances and Storefronts<br />
08710 Door Hardware<br />
08800 Glazing<br />
DIVISION 9 – FINISHES<br />
SECTIONS<br />
09111 Non-Structural Metal Framing<br />
09220 Portland Cement Plaster<br />
09250 Gypsum Board<br />
09310 Tiling<br />
09511 Acoustical Panel Ceilings<br />
09912 Painting (Pr<strong>of</strong>essional Line Products)<br />
09960 High Performance Coatings<br />
DIVISON 10 – SPECIALTIES<br />
SECTIONS<br />
10200 Louvers and Vents<br />
10431 Signs<br />
-iii-<br />
99-326 100% Submittal<br />
CITY OF LABELLE MEMBRANE WTF December 2011
TABLE OF CONTENTS (CONT.)<br />
VOLUME 2 – MEMBRANE BUILDING ARCHITECTURAL<br />
10520 Fire Protection Specialties<br />
10530 Prefabricated Aluminum Walkway Covers<br />
10700 Exterior Sun Control Devices<br />
10801 Toilet and Bath Accessories<br />
DIVISON 11 – EQUIPMENT<br />
SECTIONS<br />
11451 Residential Appliances<br />
DIVISION 12 – FURNISHINGS<br />
SECTIONS<br />
12491 Horizontal Louver Blinds<br />
DIVISION 13 – SPECIAL CONSTRUCTION<br />
Not Used<br />
DIVISION 14 – CONVEYING SYSTEMS<br />
Not Used<br />
DIVISION 15 – MECHANICAL<br />
SECTIONS<br />
15400 Plumbing<br />
15500 Heating, Ventilating and Air Conditioning<br />
-iv-<br />
99-326 100% Submittal<br />
CITY OF LABELLE MEMBRANE WTF December 2011
TABLE OF CONTENTS (CONT.)<br />
VOLUME 2 – MEMBRANE BUILDING ARCHITECTURAL<br />
DIVISION 16 – ELECTRICAL<br />
SECTIONS<br />
16000 Electrical<br />
-v-<br />
99-326 100% Submittal<br />
CITY OF LABELLE MEMBRANE WTF December 2011
SECTION 02361<br />
TERMITE CONTROL<br />
PART 1 - GENERAL<br />
1.1 RELATED DOCUMENTS<br />
A. Drawings and general provisions <strong>of</strong> the Contract, including General and<br />
Supplementary Conditions and Division 1 Specification Sections, apply to this Section.<br />
1.2 SUMMARY<br />
A. This Section includes the following for termite control:<br />
1. Soil <strong>treatment</strong>.<br />
1.3 DEFINITIONS<br />
A. EPA: Environmental Protection Agency.<br />
B. PCO: Pest control operator.<br />
1.4 SUBMITTALS<br />
A. Warranties: Special warranties specified in this Section.<br />
1.5 QUALITY ASSURANCE<br />
A. Applicator Qualifications: A PCO who is licensed according to regulations <strong>of</strong><br />
authorities having jurisdiction to apply termite control <strong>treatment</strong> in jurisdiction where<br />
Project is located and who is experienced and has completed termite control <strong>treatment</strong><br />
similar to that indicated for this Project and whose work has a record <strong>of</strong> successful inservice<br />
performance.<br />
B. Regulatory Requirements: Formulate and apply termiticides, and label with a Federal<br />
registration number, to comply with EPA regulations and authorities having jurisdiction.<br />
1.6 PROJECT CONDITIONS<br />
A. Environmental Limitations: To ensure penetration, do not treat soil that is <strong>water</strong><br />
saturated or frozen. Do not treat soil while precipitation is occurring. Comply with<br />
EPA-Registered Label requirements and requirements <strong>of</strong> authorities having jurisdiction.<br />
1.7 COORDINATION<br />
02361-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
Termite Control<br />
A. Coordinate soil <strong>treatment</strong> application with excavating, filling, and grading and<br />
concreting operations. Treat soil under footings, grade beams, and ground-supported<br />
slabs, before construction.<br />
1.8 WARRANTY<br />
A. Warranty Period: One year from date <strong>of</strong> Substantial Completion.<br />
PART 2 - PRODUCTS<br />
2.1 SOIL TREATMENT<br />
A. Termiticide: Provide an EPA-registered termiticide complying with requirements <strong>of</strong><br />
authorities having jurisdiction, in a soluble or emulsible, concentrated formulation that<br />
dilutes with <strong>water</strong> or foaming agent, and formulated to prevent termite infestation. Use<br />
only soil <strong>treatment</strong> solutions that are not harmful to plants. Provide quantity required<br />
for application at the label volume and rate for the maximum termiticide concentration<br />
allowed for each specific use, according to the product's EPA-Registered Label.<br />
PART 3 - EXECUTION<br />
3.1 EXAMINATION<br />
A. Examine substrates, areas, and conditions, with Applicator present, for compliance<br />
with requirements for moisture content <strong>of</strong> the soil, interfaces with earthwork, slab and<br />
foundation work, landscaping, and other conditions affecting performance <strong>of</strong> termite<br />
control. Proceed with application only after unsatisfactory conditions have been<br />
corrected.<br />
3.2 PREPARATION<br />
A. General: Comply with the most stringent requirements <strong>of</strong> authorities having jurisdiction<br />
and with manufacturer's written instructions for preparing substrate. Remove all<br />
extraneous sources <strong>of</strong> wood cellulose and other edible materials such as wood debris,<br />
tree stumps and roots, stakes, formwork, and construction waste wood from soil and<br />
around foundations.<br />
B. Soil Treatment Preparation: Remove foreign matter and impermeable soil materials<br />
that could decrease <strong>treatment</strong> effectiveness on areas to be treated. Loosen, rake, and<br />
level soil to be treated, except previously compacted areas under slabs and footings.<br />
Termiticides may be applied before placing compacted fill under slabs if recommended<br />
by termiticide manufacturer.<br />
C. Fit filling hose connected to <strong>water</strong> source at the site with a backflow preventer,<br />
complying with requirements <strong>of</strong> authorities having jurisdiction.<br />
3.3 APPLICATION, GENERAL<br />
02361-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
Termite Control<br />
A. General: Comply with the most stringent requirements <strong>of</strong> authorities having jurisdiction<br />
and with manufacturer's EPA-Registered Label for products.<br />
3.4 APPLYING SOIL TREATMENT<br />
A. Application: Mix soil <strong>treatment</strong> termiticide solution to a uniform consistency. Provide<br />
quantity required for application at the label volume and rate for the maximum specified<br />
concentration <strong>of</strong> termiticide, according to manufacturer's EPA-Registered Label, to the<br />
following so that a continuous horizontal and vertical termiticidal barrier or treated zone<br />
is established around and under building construction. Distribute the <strong>treatment</strong> evenly.<br />
1. Slabs-on-Grade: Under ground-supported slab construction, including footings,<br />
building slabs, and attached slabs as an overall <strong>treatment</strong>. Treat soil materials<br />
before concrete footings and slabs are placed.<br />
2. Foundations: Adjacent soil including soil along entire inside perimeter <strong>of</strong><br />
foundation walls, along both sides <strong>of</strong> interior partition walls, around plumbing<br />
pipes and electric conduit penetrating slab, and around interior column footers<br />
and along entire outside perimeter, from grade to bottom <strong>of</strong> footing. Avoid soil<br />
washout around footings.<br />
3. Crawlspaces: Soil under and adjacent to foundations as previously indicated.<br />
Treat adjacent areas including around entrance platform, ramps, and equipment<br />
bases. Apply overall <strong>treatment</strong> only where attached concrete platform and ramps<br />
are on fill or ground.<br />
4. Penetrations: At expansion joints, control joints, and areas where slabs will be<br />
penetrated.<br />
B. Avoid disturbance <strong>of</strong> treated soil after application. Keep <strong>of</strong>f treated areas until<br />
completely dry.<br />
C. Protect termiticide solution, dispersed in treated soils and fills, from being diluted until<br />
ground-supported slabs are installed. Use <strong>water</strong>pro<strong>of</strong> barrier according to EPA-<br />
Registered Label instructions.<br />
D. Post warning signs in areas <strong>of</strong> application.<br />
E. Reapply soil <strong>treatment</strong> solution to areas disturbed by subsequent excavation, grading,<br />
landscaping, or other construction activities following application.<br />
END OF SECTION 02361<br />
02361-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 033000<br />
CAST-IN-PLACE CONCRETE<br />
GENERAL<br />
1.1 SUMMARY<br />
A. Section includes cast-in-place concrete, including formwork, reinforcement, concrete<br />
materials, mixture design, placement procedures, and finishes.<br />
1.2 ACTION SUBMITTALS<br />
A. Product Data: For each type <strong>of</strong> product indicated.<br />
B. Design Mixtures: For each concrete mixture.<br />
C. Steel Reinforcement Shop Drawings: Placing drawings that detail fabrication, bending,<br />
and placement.<br />
1.3 INFORMATIONAL SUBMITTALS<br />
A. Welding certificates.<br />
B. Material certificates.<br />
C. Material test reports.<br />
D. Floor surface flatness and levelness measurements.<br />
1.4 QUALITY ASSURANCE<br />
A. Manufacturer Qualifications: A firm experienced in manufacturing ready-mixed<br />
concrete products and that complies with ASTM C 94/C 94M requirements for<br />
production facilities and equipment.<br />
1. Manufacturer certified according to NRMCA's "Certification <strong>of</strong> Ready Mixed<br />
Concrete Production Facilities."<br />
B. Testing Agency Qualifications: An independent agency, qualified according to<br />
ASTM C 1077 and ASTM E 329 for testing indicated.<br />
C. Welding Qualifications: Qualify procedures and personnel according to<br />
AWS D1.4/D 1.4M, "Structural Welding Code - Reinforcing Steel."<br />
03300-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
D. ACI Publications: Comply with the following unless modified by requirements in the<br />
Contract Documents:<br />
1. ACI 301, "Specifications for Structural Concrete," Sections 1 through 5.<br />
2. ACI 117, "Specifications for Tolerances for Concrete Construction and Materials."<br />
E. Concrete Testing Service: Engage a qualified independent testing agency to perform<br />
material evaluation tests and to design concrete mixtures.<br />
F. Preinstallation Conference: Conduct conference at Project site.<br />
PRODUCTS<br />
1.5 FORM-FACING MATERIALS<br />
A. Smooth-Formed Finished Concrete: Form-facing panels that will provide continuous,<br />
true, and smooth concrete surfaces. Furnish in largest practicable sizes to minimize<br />
number <strong>of</strong> joints.<br />
B. Rough-Formed Finished Concrete: Plywood, lumber, metal, or another approved<br />
material. Provide lumber dressed on at least two edges and one side for tight fit.<br />
1.6 STEEL REINFORCEMENT<br />
A. Recycled Content <strong>of</strong> Steel Products: Postconsumer recycled content plus one-half <strong>of</strong><br />
preconsumer recycled content not less than 60 percent.<br />
B. Reinforcing Bars: ASTM A 615/A 615M, Grade 60, deformed.<br />
C. Plain-Steel Welded Wire Reinforcement: ASTM A 185/A 185M, plain, fabricated from<br />
as-drawn steel wire into flat sheets.<br />
D. Galvanized-Steel Welded Wire Reinforcement: ASTM A 185/A 185M, plain, fabricated<br />
from galvanized-steel wire into flat sheets.<br />
E. Bar Supports: Bolsters, chairs, spacers, and other devices for spacing, supporting,<br />
and fastening reinforcing bars and welded wire reinforcement in place. Manufacture<br />
bar supports from steel wire, plastic, or precast concrete according to CRSI's "Manual<br />
<strong>of</strong> Standard Practice.<br />
1.7 CONCRETE MATERIALS<br />
A. Cementitious Material: Use the following cementitious materials, <strong>of</strong> the same type,<br />
brand, and source, throughout Project:<br />
1. Portland Cement: ASTM C 150, Type I,.<br />
a. Fly Ash: ASTM C 618, Class F.<br />
03300-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
. Ground Granulated Blast-Furnace Slag: ASTM C 989, Grade 100 or 120.<br />
B. Normal-Weight Aggregates: ASTM C 33, graded.<br />
1. Maximum Coarse-Aggregate Size: As indicated.<br />
2. Fine Aggregate: Free <strong>of</strong> materials with deleterious reactivity to alkali in cement.<br />
C. Water: ASTM C 94/C 94M and potable.<br />
1.8 ADMIXTURES<br />
A. Air-Entraining Admixture: ASTM C 260.<br />
B. Chemical Admixtures: Provide admixtures certified by manufacturer to be compatible<br />
with other admixtures and that will not contribute <strong>water</strong>-soluble chloride ions exceeding<br />
those permitted in hardened concrete. Do not use calcium chloride or admixtures<br />
containing calcium chloride.<br />
1. Water-Reducing Admixture: ASTM C 494/C 494M, Type A.<br />
2. Retarding Admixture: ASTM C 494/C 494M, Type B.<br />
3. Water-Reducing and Retarding Admixture: ASTM C 494/C 494M, Type D.<br />
4. High-Range, Water-Reducing Admixture: ASTM C 494/C 494M, Type F.<br />
5. High-Range, Water-Reducing and Retarding Admixture: ASTM C 494/C 494M,<br />
Type G.<br />
6. Plasticizing and Retarding Admixture: ASTM C 1017/C 1017M, Type II.<br />
1.9 WATERSTOPS<br />
A. Flexible Rubber Waterstops: CE CRD-C 513, for embedding in concrete to prevent<br />
passage <strong>of</strong> fluids through joints. Factory fabricate corners, intersections, and<br />
directional changes.<br />
1.10 VAPOR RETARDERS<br />
A. Sheet Vapor Retarder: ASTM E 1745, Class A, B, or C. <strong>Inc</strong>lude manufacturer's<br />
recommended adhesive or pressure-sensitive tape.<br />
1.11 LIQUID FLOOR TREATMENTS<br />
A. VOC Content: Liquid floor <strong>treatment</strong>s shall have a VOC content <strong>of</strong> 200 g/L or less<br />
when calculated according to 40 CFR 59, Subpart D (EPA Method 24).<br />
B. Penetrating Liquid Floor Treatment: Clear, chemically reactive, <strong>water</strong>borne solution <strong>of</strong><br />
inorganic silicate or siliconate materials and proprietary components; odorless; that<br />
penetrates, hardens, and densifies concrete surfaces.<br />
C. Products: Provide Conspec by Dayton Superior; Intraseal or approved equivalent.<br />
Product must include a minimum 10 year warranty.<br />
03300-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
1.12 CURING MATERIALS<br />
A. Evaporation Retarder: Waterborne, monomolecular film forming, manufactured for<br />
application to fresh concrete.<br />
B. Absorptive Cover: AASHTO M 182, Class 2, burlap cloth made from jute or kenaf,<br />
weighing approximately 9 oz./sq. yd. when dry.<br />
C. Moisture-Retaining Cover: ASTM C 171, polyethylene film or white burlappolyethylene<br />
sheet.<br />
D. Water: Potable.<br />
E. Clear, Waterborne, Membrane-Forming Curing Compound: ASTM C 309, Type 1,<br />
Class B, dissipating.<br />
1.13 RELATED MATERIALS<br />
A. Expansion- and Isolation-Joint-Filler Strips: ASTM D 1751, asphalt-saturated cellulosic<br />
fiber or ASTM D 1752, cork or self-expanding cork.<br />
B. Semi-rigid Joint Filler: Two-component, semi-rigid, 100 percent solids, epoxy resin<br />
with a Type A shore durometer hardness <strong>of</strong> 85 or greater per ASTM D 2240.<br />
1. Products: Provide MM-80/MM-80P semi-rigid epoxy joint filler by<br />
Metzger/McGuire Co. or approved equivalent. Color to be selected by Architect.<br />
1.14 CONCRETE MIXTURES<br />
A. Prepare design mixtures for each type and strength <strong>of</strong> concrete, proportioned on the<br />
basis <strong>of</strong> laboratory trial mixture or field test data, or both, according to ACI 301.<br />
B. Cementitious Materials: Use fly ash, pozzolan, ground granulated blast-furnace slag,<br />
and silica fume as needed to reduce the total amount <strong>of</strong> portland cement, which would<br />
otherwise be used, by not less than 40 percent.<br />
C. Admixtures: Use admixtures according to manufacturer's written instructions.<br />
1. Use <strong>water</strong>-reducing high-range <strong>water</strong>-reducing or plasticizing admixture in<br />
concrete, as required, for placement and workability.<br />
2. Use <strong>water</strong>-reducing and retarding admixture when required by high<br />
temperatures, low humidity, or other adverse placement conditions.<br />
D. Proportion normal-weight concrete mixture as follows:<br />
1. Minimum Compressive Strength: As indicated.<br />
2. Slump Limit: 4 inches, plus or minus 1 inch (8 inches for concrete with verified<br />
slump <strong>of</strong> 2 to 4 inches before adding high-range <strong>water</strong>-reducing admixture or<br />
plasticizing admixture).<br />
3. Air Content: 2.5 to 4.5 percent, at point <strong>of</strong> delivery.<br />
03300-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
4. Air Content: Do not allow air content <strong>of</strong> trowel-finished floors to exceed 3<br />
percent.<br />
1.15 FABRICATING REINFORCEMENT<br />
A. Fabricate steel reinforcement according to CRSI's "Manual <strong>of</strong> Standard Practice."<br />
1.16 CONCRETE MIXING<br />
A. Ready-Mixed Concrete: Measure, batch, mix, and deliver concrete according to<br />
ASTM C 94/C 94M and ASTM C 1116/C 1116M, and furnish batch ticket information.<br />
1. When air temperature is between 85 and 90 deg F, reduce mixing and delivery<br />
time from 1-1/2 hours to 75 minutes; when air temperature is above 90 deg F,<br />
reduce mixing and delivery time to 60 minutes.<br />
EXECUTION<br />
1.17 FORMWORK<br />
A. Design, erect, shore, brace, and maintain formwork, according to ACI 301, to support<br />
vertical, lateral, static, and dynamic loads, and construction loads that might be<br />
applied, until structure can support such loads.<br />
B. Construct formwork so concrete members and structures are <strong>of</strong> size, shape, alignment,<br />
elevation, and position indicated, within tolerance limits <strong>of</strong> ACI 117.<br />
1.18 EMBEDDED ITEMS<br />
A. Place and secure anchorage devices and other embedded items required for adjoining<br />
work that is attached to or supported by cast-in-place concrete. Use setting drawings,<br />
templates, diagrams, instructions, and directions furnished with items to be embedded.<br />
1.19 VAPOR RETARDERS<br />
A. Sheet Vapor Retarders: Place, protect, and repair sheet vapor retarder according to<br />
ASTM E 1643 and manufacturer's written instructions.<br />
1. Lap joints 6 inches and seal with manufacturer's recommended tape.<br />
1.20 STEEL REINFORCEMENT<br />
A. General: Comply with CRSI's "Manual <strong>of</strong> Standard Practice" for placing reinforcement.<br />
03300-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
1. Do not cut or puncture vapor retarder. Repair damage and reseal vapor retarder<br />
before placing concrete.<br />
1.21 JOINTS<br />
A. General: Construct joints true to line with faces perpendicular to surface plane <strong>of</strong><br />
concrete.<br />
B. Construction Joints: Install so strength and appearance <strong>of</strong> concrete are not impaired,<br />
at locations indicated and as approved by Architect.<br />
C. Contraction Joints in Slabs-on-Grade: Form weakened-plane contraction joints,<br />
sectioning concrete into areas as indicated. Construct contraction joints as follows:<br />
1. Sawed Joints: Form contraction joints with power saws equipped with<br />
shatterpro<strong>of</strong> abrasive or diamond-rimmed blades. Cut 1/8-inch- wide joints into<br />
concrete when cutting action will not tear, abrade, or otherwise damage surface<br />
and before concrete develops random contraction cracks.<br />
D. Isolation Joints in Slabs-on-Grade: After removing formwork, install joint-filler strips at<br />
slab junctions with vertical surfaces, such as column pedestals, foundation walls, grade<br />
beams, and other locations, as indicated.<br />
E. Waterstops: Install in construction joints and at other joints indicated according to<br />
manufacturer's written instructions.<br />
1.22 CONCRETE PLACEMENT<br />
A. Before placing concrete, verify that installation <strong>of</strong> formwork, reinforcement, and<br />
embedded items is complete and that required inspections have been performed.<br />
B. Deposit concrete continuously in one layer or in horizontal layers <strong>of</strong> such thickness that<br />
no new concrete will be placed on concrete that has hardened enough to cause seams<br />
or planes <strong>of</strong> weakness. If a section cannot be placed continuously, provide<br />
construction joints as indicated. Deposit concrete to avoid segregation.<br />
1. Consolidate placed concrete with mechanical vibrating equipment according to<br />
ACI 301.<br />
C. Cold-Weather Placement: Comply with ACI 306.1.<br />
D. Hot-Weather Placement: Comply with ACI 301.<br />
1.23 FINISHING FORMED SURFACES<br />
A. Rough-Formed Finish: As-cast concrete texture imparted by form-facing material with<br />
tie holes and defects repaired and patched. Remove fins and other projections that<br />
exceed specified limits on formed-surface irregularities.<br />
03300-6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
1. Apply to concrete surfaces not exposed to public view.<br />
B. Smooth-Formed Finish: As-cast concrete texture imparted by form-facing material,<br />
arranged in an orderly and symmetrical manner with a minimum <strong>of</strong> seams. Repair and<br />
patch tie holes and defects. Remove fins and other projections that exceed specified<br />
limits on formed-surface irregularities.<br />
1. Apply to concrete surfaces exposed to public view or to be covered with a<br />
coating or covering material applied directly to concrete.<br />
C. Related Unformed Surfaces: At tops <strong>of</strong> walls, horizontal <strong>of</strong>fsets, and similar unformed<br />
surfaces adjacent to formed surfaces, strike <strong>of</strong>f smooth and finish with a texture<br />
matching adjacent formed surfaces. Continue final surface <strong>treatment</strong> <strong>of</strong> formed<br />
surfaces uniformly across adjacent unformed surfaces unless otherwise indicated.<br />
1.24 FINISHING FLOORS AND SLABS<br />
A. General: Comply with ACI 302.1R recommendations for screeding, restraightening,<br />
and finishing operations for concrete surfaces. Do not wet concrete surfaces.<br />
B. Scratch Finish: While still plastic, texture concrete surface that has been screeded and<br />
bull-floated or darbied. Use stiff brushes, brooms, or rakes to produce a pr<strong>of</strong>ile<br />
amplitude <strong>of</strong> 1/4 inch in one direction.<br />
C. Float Finish: Consolidate surface with power-driven floats or by hand floating if area is<br />
small or inaccessible to power driven floats. Restraighten, cut down high spots, and fill<br />
low spots. Repeat float passes and restraightening until surface is left with a uniform,<br />
smooth, granular texture.<br />
D. Trowel Finish: After applying float finish, apply first troweling and consolidate concrete<br />
by hand or power-driven trowel. Continue troweling passes and restraighten until<br />
surface is free <strong>of</strong> trowel marks and uniform in texture and appearance. Grind smooth<br />
any surface defects that would telegraph through applied coatings or floor coverings.<br />
1. Finish and measure surface so gap at any point between concrete surface and<br />
an unleveled, freestanding, 10-ft.- long straightedge resting on two high spots<br />
and placed anywhere on the surface does not exceed 3/16 inch.<br />
E. Broom Finish: Apply a broom finish to exterior concrete platforms, steps, ramps, and<br />
elsewhere as indicated.<br />
1.25 CONCRETE PROTECTING AND CURING<br />
A. General: Protect freshly placed concrete from premature drying and excessive cold or<br />
hot temperatures. Comply with ACI 306.1 for cold-weather protection and ACI 301 for<br />
hot-weather protection during curing.<br />
B. Evaporation Retarder: Apply evaporation retarder to unformed concrete surfaces if<br />
hot, dry, or windy conditions cause moisture loss approaching 0.2 lb/sq. ft. x h before<br />
03300-7<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
and during finishing operations. Apply according to manufacturer's written instructions<br />
after placing, screeding, and bull floating or darbying concrete, but before float<br />
finishing.<br />
C. Cure concrete according to ACI 308.1, by one or a combination <strong>of</strong> the following<br />
methods:<br />
1. Moisture Curing: Keep surfaces continuously moist for not less than seven days.<br />
2. Moisture-Retaining-Cover Curing: Cover concrete surfaces with moistureretaining<br />
cover for curing concrete, placed in widest practicable width, with sides<br />
and ends lapped at least 12 inches, and sealed by <strong>water</strong>pro<strong>of</strong> tape or adhesive.<br />
Cure for not less than seven days. Immediately repair any holes or tears during<br />
curing period using cover material and <strong>water</strong>pro<strong>of</strong> tape.<br />
3. Curing Compound: Apply uniformly in continuous operation by power spray or<br />
roller according to manufacturer's written instructions. Recoat areas subjected to<br />
heavy rainfall within three hours after initial application. Maintain continuity <strong>of</strong><br />
coating and repair damage during curing period.<br />
a. Removal: After curing period has elapsed, remove curing compound<br />
without damaging concrete surfaces by method recommended by curing<br />
compound manufacturer.<br />
4. Curing and Sealing Compound: Apply uniformly to floors and slabs indicated in a<br />
continuous operation by power spray or roller according to manufacturer's written<br />
instructions. Recoat areas subjected to heavy rainfall within three hours after<br />
initial application. Repeat process 24 hours later and apply a second coat.<br />
Maintain continuity <strong>of</strong> coating and repair damage during curing period.<br />
1.26 LIQUID FLOOR TREATMENTS<br />
A. Penetrating Liquid Floor Treatment: Prepare, apply, and finish penetrating liquid floor<br />
<strong>treatment</strong> according to manufacturer's written instructions.<br />
1. Remove curing compounds, sealers, oil, dirt, laitance, and other contaminants<br />
and complete surface repairs.<br />
2. Do not apply to concrete that is less than seven days old.<br />
3. Do not apply when the air or surface temperatures are less than 40°F.<br />
4. Apply liquid onto surface to the point <strong>of</strong> rejection, scrubbing into surface until a<br />
gel forms; rewet; and repeat brooming or scrubbing. Rinse with <strong>water</strong>; remove<br />
excess material until surface is dry. Apply a second coat in a similar manner if<br />
surface is rough or porous. Do not let treated surfaces dry during application or<br />
coats.<br />
5. Puddles <strong>of</strong> liquid floor hardener shall be squeegeed out to prevent white residue<br />
from appearing on the surface. If residue appears, remove per manufacturer’s<br />
instructions.<br />
6. Maintenance cleaning <strong>of</strong> the floor should be accomplished with the use <strong>of</strong> a<br />
mechanical scrubber.<br />
03300-8<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
1.27 JOINT FILLING<br />
A. Prepare, clean, and install joint filler according to manufacturer's written instructions.<br />
Products and installation shall be in compliance or exceed the joint filling criteria<br />
established in ACI 302 and ACI 360.<br />
1. Defer joint filling as long as possible to allow for maximum slab shrinkage and<br />
joint widening. As a minimum, joint filling shall not occur until concrete has aged<br />
at least six months and the <strong>facility</strong> is under permanent temperature control.<br />
B. Remove dirt, debris, saw cuttings, curing compounds, and sealers from joints; leave<br />
contact faces <strong>of</strong> joint clean and dry.<br />
C. Install semi-rigid joint filler full depth in saw-cut joints at interior, exposed areas.<br />
Overfill joint and trim joint filler flush with top <strong>of</strong> joint after hardening. The use <strong>of</strong> a<br />
compressible foam backer rod is strictly prohibited. Significant deficiencies in<br />
workmanship, including less than proper filler depth, inadequate joint cleaning,<br />
concave filler pr<strong>of</strong>ile, etc. shall require removal and replacement.<br />
1.28 CONCRETE SURFACE REPAIRS<br />
A. Defective Concrete: Repair and patch defective areas when approved by Architect.<br />
Remove and replace concrete that cannot be repaired and patched to Architect's<br />
approval.<br />
1.29 FIELD QUALITY CONTROL<br />
A. Testing and Inspecting: Owner will engage a qualified testing and inspecting agency to<br />
perform field tests and inspections and prepare test reports.<br />
B. Testing agency shall report inspection results promptly in writing to Contractor and<br />
Architect.<br />
C. Remove and replace work that does not comply with specified requirements.<br />
D. Additional inspecting at Contractor’s expense, will be performed to determine<br />
compliance <strong>of</strong> corrected work with specified requirements.<br />
PART 2 - END OF SECTION 033000<br />
03300-9<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 04810<br />
UNIT MASONRY ASSEMBLIES<br />
PART 1 - GENERAL<br />
1.1 RELATED DOCUMENTS<br />
A. Drawings and general provisions <strong>of</strong> the Contract, including General and<br />
Supplementary Conditions and Division 1 Specification Sections, apply to this Section.<br />
1.2 SUMMARY<br />
A. This Section includes unit masonry assemblies consisting <strong>of</strong> the following:<br />
1. Concrete masonry units (CMUs).<br />
2. Mortar and grout.<br />
3. Reinforcing steel.<br />
4. Masonry joint reinforcement.<br />
5. Ties and anchors.<br />
6. Embedded flashing.<br />
7. Miscellaneous masonry accessories.<br />
B. Related Sections include the following:<br />
1. Division 7 Section "Through-Penetration Firestop Systems" for firestopping at<br />
openings in masonry walls.<br />
2. Division 7 Section "Joint Sealants" for sealing control and expansion joints in unit<br />
masonry.<br />
1.3 DEFINITIONS<br />
A. Reinforced Masonry: Masonry containing reinforcing steel in grouted cells.<br />
1.4 PERFORMANCE REQUIREMENTS<br />
A. Provide unit masonry that develops indicated net-area compressive strengths (f' m ) at<br />
28 days.<br />
1.5 SUBMITTALS<br />
A. Product Data: For each type <strong>of</strong> product indicated.<br />
B. Shop Drawings: For the following:<br />
1. Reinforcing Steel: Detail bending and placement <strong>of</strong> unit masonry reinforcing<br />
bars. Comply with ACI 315, "Details and Detailing <strong>of</strong> Concrete<br />
Reinforcement." Show elevations <strong>of</strong> reinforced walls.<br />
04810-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
UNIT MASONRY ASSEMBLIES<br />
C. Material Certificates: <strong>Inc</strong>lude statements <strong>of</strong> material properties indicating compliance<br />
with requirements including compliance with standards and type designations within<br />
standards. Provide for each type and size <strong>of</strong> the following:<br />
1. Masonry units.<br />
a. <strong>Inc</strong>lude material test reports substantiating compliance with requirements.<br />
b. For masonry units used in structural masonry, include data and<br />
calculations establishing average net-area compressive strength <strong>of</strong> units.<br />
2. Joint reinforcement.<br />
3. Anchors, ties, and metal accessories.<br />
D. Mix Designs: For each type <strong>of</strong> mortar and grout. <strong>Inc</strong>lude description <strong>of</strong> type and<br />
proportions <strong>of</strong> ingredients.<br />
1. <strong>Inc</strong>lude test reports, per ASTM C 780, for mortar mixes required to comply with<br />
property specification.<br />
2. <strong>Inc</strong>lude test reports, per ASTM C 1019, for grout mixes required to comply with<br />
compressive strength requirement.<br />
1.6 QUALITY ASSURANCE<br />
A. Source Limitations for Mortar Materials: Obtain mortar ingredients <strong>of</strong> a uniform quality,<br />
including color for exposed masonry, from a single manufacturer for each cementitious<br />
component and from one source or producer for each aggregate.<br />
B. Fire-Resistance Ratings: Where indicated, provide materials and construction identical<br />
to those <strong>of</strong> assemblies with fire-resistance ratings determined per ASTM E 119 by a<br />
testing and inspecting agency, by equivalent concrete masonry thickness, or by other<br />
means, as acceptable to authorities having jurisdiction.<br />
1.7 DELIVERY, STORAGE, AND HANDLING<br />
A. Store masonry units on elevated platforms in a dry location. If units are not stored in<br />
an enclosed location, cover tops and sides <strong>of</strong> stacks with <strong>water</strong>pro<strong>of</strong> sheeting, securely<br />
tied. If units become wet, do not install until they are dry.<br />
B. Deliver preblended, dry mortar mix in moisture-resistant containers designed for lifting<br />
and emptying into dispensing silo. Store preblended, dry mortar mix in delivery<br />
containers on elevated platforms, under cover, and in a dry location or in a metal<br />
dispensing silo with weatherpro<strong>of</strong> cover.<br />
C. Store masonry accessories, including metal items, to prevent corrosion and<br />
accumulation <strong>of</strong> dirt and oil.<br />
1.8 PROJECT CONDITIONS<br />
A. Protection <strong>of</strong> Masonry: During construction, cover tops <strong>of</strong> walls, projections, and sills<br />
with <strong>water</strong>pro<strong>of</strong> sheeting at end <strong>of</strong> each day's work. Cover partially completed<br />
masonry when construction is not in progress.<br />
04810-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
UNIT MASONRY ASSEMBLIES<br />
1. Extend cover a minimum <strong>of</strong> 24 inches (600 mm) down both sides and hold cover<br />
securely in place.<br />
B. Do not apply uniform floor or ro<strong>of</strong> loads for at least 12 hours and concentrated loads for<br />
at least 3 days after building masonry walls or columns.<br />
C. Stain Prevention: Prevent grout, mortar, and soil from staining the face <strong>of</strong> masonry to<br />
be left exposed or painted. Immediately remove grout, mortar, and soil that come in<br />
contact with such masonry.<br />
1. Protect base <strong>of</strong> walls from rain-splashed mud and from mortar splatter by<br />
spreading coverings on ground and over wall surface.<br />
2. Protect sills, ledges, and projections from mortar droppings.<br />
3. Protect surfaces <strong>of</strong> window and door frames, as well as similar products with<br />
painted and integral finishes, from mortar droppings.<br />
4. Turn scaffold boards near the wall on edge at the end <strong>of</strong> each day to prevent rain<br />
from splashing mortar and dirt onto completed masonry.<br />
D. Cold-Weather Requirements: Do not use frozen materials or materials mixed or<br />
coated with ice or frost. Do not build on frozen substrates. Remove and replace unit<br />
masonry damaged by frost or by freezing conditions. Comply with cold-weather<br />
construction requirements contained in ACI 530.1/ASCE 6/TMS 602.<br />
1. Cold-Weather Cleaning: Use liquid cleaning methods only when air temperature<br />
is 40 deg F (4 deg C) and above and will remain so until masonry has dried, but<br />
not less than 7 days after completing cleaning.<br />
E. Hot-Weather Requirements: Comply with hot-weather construction requirements<br />
contained in ACI 530.1/ASCE 6/TMS 602.<br />
PART 2 - PRODUCTS<br />
2.1 MANUFACTURERS<br />
A. In other Part 2 articles where titles below introduce lists, the following requirements<br />
apply to product selection:<br />
1. Manufacturers: Subject to compliance with requirements, provide products by<br />
one <strong>of</strong> the manufacturers specified.<br />
2.2 MASONRY UNITS, GENERAL<br />
A. Defective Units: Referenced masonry unit standards may allow a certain percentage<br />
<strong>of</strong> units to exceed tolerances and to contain chips, cracks, or other defects exceeding<br />
limits stated in the standard. Do not uses units where such defects, including<br />
dimensions that vary from specified dimensions by more than stated tolerances, will be<br />
exposed in the completed Work or will impair the quality <strong>of</strong> completed masonry.<br />
2.3 CONCRETE MASONRY UNITS (CMUs)<br />
A. Shapes: Provide shapes indicated and as follows:<br />
04810-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
UNIT MASONRY ASSEMBLIES<br />
1. Provide special shapes for lintels, corners, jambs, sashes, movement joints,<br />
headers, bonding, and other special conditions.<br />
2. Provide square-edged units for outside corners, unless otherwise indicated.<br />
B. Concrete Masonry Units: ASTM C 90.<br />
1. Unit Compressive Strength: Provide units with minimum average net-area<br />
compressive strength <strong>of</strong> 1900 psi (13.1 MPa).<br />
2. Weight Classification: Normal weight.<br />
3. Size (Width): Manufactured to dimensions 3/8 inch less than nominal<br />
dimensions.<br />
2.4 CONCRETE AND MASONRY LINTELS<br />
A. General: Provide either concrete or masonry lintels, at Contractor's option, complying<br />
with requirements below.<br />
B. Concrete Lintels: Precast units made from concrete matching concrete masonry units<br />
in color, texture, and compressive strength and with reinforcing bars indicated or<br />
required to support loads indicated. Cure precast lintels by same method used for<br />
concrete masonry units.<br />
C. Concrete Lintels: Precast or formed-in-place concrete lintels complying with<br />
requirements in Division 3 Section "Cast-in-Place Concrete."<br />
D. Masonry Lintels: Prefabricated or built-in-place masonry lintels made from bond beam<br />
concrete masonry units with reinforcing bars placed as indicated and filled with coarse<br />
grout. Cure precast lintels before handling and installing. Temporarily support built-inplace<br />
lintels until cured.<br />
2.5 MORTAR AND GROUT MATERIALS<br />
A. Colored Cement Product: Packaged blend made from portland cement and lime<br />
masonry cement or mortar cement and mortar pigments, all complying with specified<br />
requirements, and containing no other ingredients.<br />
1. Formulate blend as required to produce color indicated or, if not indicated, as<br />
selected from manufacturer's standard colors.<br />
2. Pigments shall not exceed 10 percent <strong>of</strong> portland cement by weight.<br />
3. Pigments shall not exceed 5 percent <strong>of</strong> masonry cement or mortar cement by<br />
weight.<br />
4. Available Products:<br />
a. Colored Portland Cement-Lime Mix:<br />
1) Holcim (US) <strong>Inc</strong>.; Rainbow Mortamix Custom Color Cement/Lime.<br />
2) Lafarge North America <strong>Inc</strong>.; Eaglebond.<br />
3) Lehigh Cement Company; Lehigh Custom Color Portland/Lime<br />
Cement.<br />
b. Colored Masonry Cement:<br />
1) Holcim (US) <strong>Inc</strong>.; Rainbow Mortamix Custom Color Masonry Cement.<br />
2) Lafarge North America <strong>Inc</strong>.; Florida Custom Color Masonry.<br />
04810-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
UNIT MASONRY ASSEMBLIES<br />
3) Lehigh Cement Company; Lehigh Custom Color Masonry Cement.<br />
B. Aggregate for Mortar: ASTM C 144.<br />
1. For mortar that is exposed to view, use washed aggregate consisting <strong>of</strong> natural<br />
sand or crushed stone.<br />
2. For joints less than 1/4 inch (6.5 mm) thick, use aggregate graded with 100<br />
percent passing the No. 16 (1.18-mm) sieve.<br />
3. Colored-Mortar Aggregates: Natural sand or crushed stone <strong>of</strong> color necessary to<br />
produce required mortar color.<br />
C. Aggregate for Grout: ASTM C 404.<br />
D. Cold-Weather Admixture: Nonchloride, noncorrosive, accelerating admixture<br />
complying with ASTM C 494/C 494M, Type C, and recommended by manufacturer for<br />
use in masonry mortar <strong>of</strong> composition indicated.<br />
1. Available Products:<br />
E. Water: Potable.<br />
a. Addiment <strong>Inc</strong>orporated; Mortar Kick.<br />
b. Euclid Chemical Company (The); Accelguard 80.<br />
c. Grace Construction Products, a unit <strong>of</strong> W. R. Grace & Co. - Conn.; Morset.<br />
d. Sonneborn, Div. <strong>of</strong> ChemRex; Trimix-NCA.<br />
2.6 REINFORCEMENT<br />
A. Uncoated Steel Reinforcing Bars: ASTM A 615/A 615M or ASTM A 996/A 996M,<br />
Grade 60 (Grade 420).<br />
B. Masonry Joint Reinforcement, General: ASTM A 951.<br />
1. Interior Walls: Hot-dip galvanized, carbon steel.<br />
2. Exterior Walls: Hot-dip galvanized, carbon steel.<br />
3. Wire Size for Side Rods: W1.7 or 0.148-inch (3.8-mm) diameter.<br />
4. Wire Size for Cross Rods: W1.7 or 0.148-inch (3.8-mm) diameter.<br />
5. Wire Size for Veneer Ties: W1.7 or 0.148-inch (3.8-mm) diameter.<br />
6. Spacing <strong>of</strong> Cross Rods, Tabs, and Cross Ties: Not more than 16 inches (407<br />
mm) o.c.<br />
7. Provide in lengths <strong>of</strong> not less than 10 feet (3 m), with prefabricated corner and<br />
tee units.<br />
C. Masonry Joint Reinforcement for Single-Wythe Masonry: Either ladder or truss type<br />
with single pair <strong>of</strong> side rods.<br />
2.7 TIES AND ANCHORS<br />
A. Materials: Provide ties and anchors specified in subsequent paragraphs that are made<br />
from materials that comply with eight subparagraphs below, unless otherwise<br />
indicated.<br />
04810-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
UNIT MASONRY ASSEMBLIES<br />
1. Hot-Dip Galvanized, Carbon-Steel Wire: ASTM A 82; with ASTM A 153/A 153M,<br />
Class B-2 coating.<br />
B. Wire Ties, General: Unless otherwise indicated, size wire ties to extend at least<br />
halfway through veneer but with at least 5/8-inch (16-mm) cover on outside face.<br />
Outer ends <strong>of</strong> wires are bent 90 degrees and extend 2 inches (50 mm) parallel to face<br />
<strong>of</strong> veneer.<br />
C. Adjustable Anchors for Connecting to Structure: Provide anchors that allow vertical or<br />
horizontal adjustment but resist tension and compression forces perpendicular to plane<br />
<strong>of</strong> wall.<br />
1. Screw-Attached, Masonry-Veneer Anchors: Units consisting <strong>of</strong> a wire tie and a<br />
metal anchor section.<br />
a. Anchor Section: Rib-stiffened, sheet metal plate with screw holes top and<br />
bottom, 2-3/4 inches (70 mm) wide by 3 inches (75 mm) high; with<br />
projecting tabs having slotted holes for inserting vertical legs <strong>of</strong> wire tie<br />
specially formed to fit anchor section.<br />
b. Available Products:<br />
1) Dayton Superior Corporation, Dur-O-Wal Division; D/A 213.<br />
2) Wire-Bond; RJ-711.<br />
2.8 MISCELLANEOUS ANCHORS<br />
A. Unit Type Inserts in Concrete: Cast-iron or malleable-iron wedge-type inserts.<br />
B. Postinstalled Anchors: Provide chemical or torque-controlled expansion anchors, with<br />
capability to sustain, without failure, a load equal to six times the load imposed when<br />
installed in solid or grouted unit masonry and equal to four times the load imposed<br />
when installed in concrete, as determined by testing per ASTM E 488 conducted by a<br />
qualified independent testing agency.<br />
1. Corrosion Protection: Carbon-steel components zinc plated to comply with<br />
ASTM B 633, Class Fe/Zn 5 (5 microns) for Class SC 1 service condition (mild).<br />
2.9 MISCELLANEOUS MASONRY ACCESSORIES<br />
A. Compressible Filler: Premolded filler strips complying with ASTM D 1056, Grade 2A1;<br />
compressible up to 35 percent; <strong>of</strong> width and thickness indicated; formulated from<br />
neoprene.<br />
B. Preformed Control-Joint Gaskets: Made from styrene-butadiene-rubber compound,<br />
complying with ASTM D 2000, Designation M2AA-805 and designed to fit standard<br />
sash block and to maintain lateral stability in masonry wall; size and configuration as<br />
indicated.<br />
C. Bond-Breaker Strips: Asphalt-saturated, organic ro<strong>of</strong>ing felt complying with<br />
ASTM D 226, Type I (No. 15 asphalt felt).<br />
D. Reinforcing Bar Positioners: Wire units designed to fit into mortar bed joints spanning<br />
masonry unit cells with loops for holding reinforcing bars in center <strong>of</strong> cells. Units are<br />
04810-6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
UNIT MASONRY ASSEMBLIES<br />
formed from 0.142-inch (3.6-mm) steel wire, hot-dip galvanized after fabrication.<br />
Provide units with either two loops or four loops as needed for number <strong>of</strong> bars<br />
indicated.<br />
1. Available Products:<br />
a. Dayton Superior Corporation, Dur-O-Wal Division; D/A 810, D/A 812 or<br />
D/A 817.<br />
b. Heckmann Building Products <strong>Inc</strong>.; No. 376 Rebar Positioner.<br />
c. Hohmann & Barnard, <strong>Inc</strong>.; #RB or #RB-Twin Rebar Positioner.<br />
d. Wire-Bond; O-Ring or Double O-Ring Rebar Positioner.<br />
2.10 MORTAR AND GROUT MIXES<br />
A. General: Do not use admixtures, including pigments, air-entraining agents,<br />
accelerators, retarders, <strong>water</strong>-repellent agents, antifreeze compounds, or other<br />
admixtures, unless otherwise indicated.<br />
B. Preblended, Dry Mortar Mix: Furnish dry mortar ingredients in form <strong>of</strong> a preblended<br />
mix. Measure quantities by weight to ensure accurate proportions, and thoroughly<br />
blend ingredients before delivering to Project site.<br />
C. Mortar for Unit Masonry: Comply with ASTM C 270, Property Specification. Provide<br />
the following types <strong>of</strong> mortar for applications stated unless another type is indicated or<br />
needed to provide required compressive strength <strong>of</strong> masonry.<br />
1. For masonry below grade or in contact with earth, use Type S.<br />
2. For reinforced masonry, use Type N.<br />
3. For exterior, above-grade, load-bearing and non-load-bearing walls and parapet<br />
walls; for interior load-bearing walls; for interior non-load-bearing partitions; and<br />
for other applications where another type is not indicated, use Type N.<br />
D. Pigmented Mortar: Use colored cement product.<br />
E. Colored-Aggregate Mortar: Produce required mortar color by using colored aggregates<br />
and natural color or white cement as necessary to produce required mortar color.<br />
1. Mix to match Architect's sample.<br />
F. Grout for Unit Masonry: Comply with ASTM C 476.<br />
1. Use grout <strong>of</strong> type indicated for dimensions <strong>of</strong> grout spaces and pour height.<br />
2. Provide grout with a slump <strong>of</strong> 8 to 10 inches as measured according to<br />
ASTM C 143/C 143M.<br />
PART 3 - EXECUTION<br />
3.1 EXAMINATION<br />
A. Examine conditions, with Installer present, for compliance with requirements for<br />
installation tolerances and other conditions affecting performance <strong>of</strong> work.<br />
04810-7<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
UNIT MASONRY ASSEMBLIES<br />
1. For the record, prepare written report, endorsed by Installer, listing conditions<br />
detrimental to performance <strong>of</strong> work.<br />
2. Verify that foundations are within tolerances specified.<br />
3. Verify that reinforcing dowels are properly placed.<br />
B. Before installation, examine rough-in and built-in construction for piping systems to<br />
verify actual locations <strong>of</strong> piping connections.<br />
C. Proceed with installation only after unsatisfactory conditions have been corrected.<br />
3.2 INSTALLATION, GENERAL<br />
A. Thickness: Build single-wythe walls to actual widths <strong>of</strong> masonry units, using units <strong>of</strong><br />
widths indicated.<br />
B. Build chases and recesses to accommodate items specified in this and other Sections.<br />
C. Leave openings for equipment to be installed before completing masonry. After<br />
installing equipment, complete masonry to match the construction immediately<br />
adjacent to opening.<br />
D. Use full-size units without cutting if possible. If cutting is required to provide a<br />
continuous pattern or to fit adjoining construction, cut units with motor-driven saws;<br />
provide clean, sharp, unchipped edges. Allow units to dry before laying unless wetting<br />
<strong>of</strong> units is specified. Install cut units with cut surfaces and, where possible, cut edges<br />
concealed.<br />
E. Select and arrange units for exposed unit masonry to produce a uniform blend <strong>of</strong> colors<br />
and textures.<br />
1. Mix units from several pallets or cubes as they are placed.<br />
F. Comply with construction tolerances in ACI 530.1/ASCE 6/TMS 602 and with the<br />
following:<br />
1. For conspicuous vertical lines, such as external corners, door jambs, reveals,<br />
and expansion and control joints, do not vary from plumb by more than 1/8 inch<br />
in 10 feet (3 mm in 3 m), 1/4 inch in 20 feet (6 mm in 6 m), or 1/2 inch (12 mm)<br />
maximum.<br />
2. For vertical alignment <strong>of</strong> exposed head joints, do not vary from plumb by more<br />
than 1/4 inch in 10 feet (6 mm in 3 m), or 1/2 inch (12 mm) maximum.<br />
3. For conspicuous horizontal lines, such as lintels, sills, parapets, and reveals, do<br />
not vary from level by more than 1/8 inch in 10 feet (3 mm in 3 m), 1/4 inch in 20<br />
feet (6 mm in 6 m), or 1/2 inch (12 mm) maximum.<br />
4. For exposed bed joints, do not vary from thickness indicated by more than plus<br />
or minus 1/8 inch (3 mm), with a maximum thickness limited to 1/2 inch (12 mm).<br />
Do not vary from bed-joint thickness <strong>of</strong> adjacent courses by more than 1/8 inch (3<br />
mm).<br />
5. For exposed head joints, do not vary from thickness indicated by more than plus<br />
or minus 1/8 inch (3 mm). Do not vary from adjacent bed-joint and head-joint<br />
thicknesses by more than 1/8 inch (3 mm).<br />
04810-8<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
UNIT MASONRY ASSEMBLIES<br />
6. For faces <strong>of</strong> adjacent exposed masonry units, do not vary from flush alignment<br />
by more than 1/16 inch (1.5 mm) except due to warpage <strong>of</strong> masonry units within<br />
tolerances specified for warpage <strong>of</strong> units.<br />
7. For exposed bed joints and head joints <strong>of</strong> stacked bond, do not vary from a<br />
straight line by more than 1/16 inch (1.5 mm) from one masonry unit to the next.<br />
3.3 LAYING MASONRY WALLS<br />
A. Lay out walls in advance for accurate spacing <strong>of</strong> surface bond patterns with uniform<br />
joint thicknesses and for accurate location <strong>of</strong> openings, movement-type joints, returns,<br />
and <strong>of</strong>fsets. Avoid using less-than-half-size units, particularly at corners, jambs, and,<br />
where possible, at other locations.<br />
B. Bond Pattern for Exposed Masonry: Unless otherwise indicated, lay exposed masonry<br />
in running bond; do not use units with less than nominal 4-inch (100-mm) horizontal<br />
face dimensions at corners or jambs.<br />
C. Lay concealed masonry with all units in a wythe in running bond or bonded by lapping<br />
not less than 4-inches (100-mm). Bond and interlock each course <strong>of</strong> each wythe at<br />
corners. Do not use units with less than nominal 4-inch (100-mm) horizontal face<br />
dimensions at corners or jambs.<br />
D. Stopping and Resuming Work: Stop work by racking back units in each course from<br />
those in course below; do not tooth. When resuming work, clean masonry surfaces<br />
that are to receive mortar, remove loose masonry units and mortar, and wet brick if<br />
required before laying fresh masonry.<br />
E. Built-in Work: As construction progresses, build in items specified in this and other<br />
Sections. Fill in solidly with masonry around built-in items.<br />
F. Where built-in items are to be embedded in cores <strong>of</strong> hollow masonry units, place a<br />
layer <strong>of</strong> metal lath, wire mesh, or plastic mesh in the joint below and rod mortar or grout<br />
into core.<br />
G. Fill cores in hollow concrete masonry units with grout 24 inches (600 mm) under<br />
bearing plates, beams, lintels, posts, and similar items, unless otherwise indicated.<br />
H. Build non-load-bearing interior partitions full height <strong>of</strong> story to underside <strong>of</strong> solid floor or<br />
ro<strong>of</strong> structure above, unless otherwise indicated.<br />
1. Install compressible filler in joint between top <strong>of</strong> partition and underside <strong>of</strong><br />
structure above.<br />
2. Fasten partition top anchors to structure above and build into top <strong>of</strong> partition.<br />
Grout cells <strong>of</strong> CMUs solidly around plastic tubes <strong>of</strong> anchors and push tubes down<br />
into grout to provide 1/2-inch (13-mm) clearance between end <strong>of</strong> anchor rod and<br />
end <strong>of</strong> tube. Space anchors 48 inches (1200 mm) o.c., unless otherwise<br />
indicated.<br />
3. Wedge non-load-bearing partitions against structure above with small pieces <strong>of</strong><br />
tile, slate, or metal. Fill joint with mortar after dead-load deflection <strong>of</strong> structure<br />
above approaches final position.<br />
4. At fire-rated partitions, treat joint between top <strong>of</strong> partition and underside <strong>of</strong><br />
structure above to comply with Division 7 Section "Fire-Resistive Joint Systems."<br />
04810-9<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
UNIT MASONRY ASSEMBLIES<br />
3.4 MORTAR BEDDING AND JOINTING<br />
A. Lay concrete masonry units as follows:<br />
1. With face shells fully bedded in mortar and with head joints <strong>of</strong> depth equal to bed<br />
joints.<br />
2. With webs fully bedded in mortar in all courses <strong>of</strong> piers, columns, and pilasters.<br />
3. With webs fully bedded in mortar in grouted masonry, including starting course<br />
on footings.<br />
4. With entire units, including areas under cells, fully bedded in mortar at starting<br />
course on footings where cells are not grouted.<br />
B. Lay solid masonry units with completely filled bed and head joints; butter ends with<br />
sufficient mortar to fill head joints and shove into place. Do not deeply furrow bed<br />
joints or slush head joints.<br />
C. Tool exposed joints slightly concave when thumbprint hard, using a jointer larger than<br />
joint thickness, unless otherwise indicated.<br />
D. Cut joints flush for masonry walls to receive plaster or other direct-applied finishes<br />
(other than paint), unless otherwise indicated.<br />
3.5 COMPOSITE MASONRY<br />
A. Bond wythes <strong>of</strong> composite masonry together using one <strong>of</strong> the following methods:<br />
1. Masonry Joint Reinforcement: Installed in horizontal mortar joints.<br />
2. Header Bonding: Provide masonry unit headers extending not less than 3 inches<br />
(76 mm) into each wythe. Space headers not over 8 inches (203 mm) clear<br />
horizontally and 16 inches (406 mm) clear vertically.<br />
B. Corners: Provide interlocking masonry unit bond in each wythe and course at corners,<br />
unless otherwise indicated.<br />
1. Provide continuity with masonry joint reinforcement at corners by using<br />
prefabricated L-shaped units as well as masonry bonding.<br />
C. Intersecting and Abutting Walls: Unless vertical expansion or control joints are shown<br />
at juncture, bond walls together as follows:<br />
1. Provide continuity with masonry joint reinforcement by using prefabricated T-<br />
shaped units.<br />
3.6 MASONRY JOINT REINFORCEMENT<br />
A. General: Install entire length <strong>of</strong> longitudinal side rods in mortar with a minimum cover<br />
<strong>of</strong> 5/8 inch (16 mm) on exterior side <strong>of</strong> walls, 1/2 inch (13 mm) elsewhere. Lap<br />
reinforcement a minimum <strong>of</strong> 6 inches (150 mm).<br />
1. Space reinforcement not more than 16 inches (406 mm) o.c.<br />
2. Space reinforcement not more than 8 inches (203 mm) o.c. in foundation walls<br />
and parapet walls.<br />
04810-10<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
UNIT MASONRY ASSEMBLIES<br />
3. Provide reinforcement not more than 8 inches (203 mm) above and below wall<br />
openings and extending 12 inches (305 mm) beyond openings.<br />
a. Reinforcement above is in addition to continuous reinforcement.<br />
B. Interrupt joint reinforcement at control and expansion joints, unless otherwise indicated.<br />
C. Provide continuity at wall intersections by using prefabricated T-shaped units.<br />
D. Provide continuity at corners by using prefabricated L-shaped units.<br />
E. Cut and bend reinforcing units as directed by manufacturer for continuity at returns,<br />
<strong>of</strong>fsets, column firepro<strong>of</strong>ing, pipe enclosures, and other special conditions.<br />
3.7 ANCHORING MASONRY TO STRUCTURAL MEMBERS<br />
A. Anchor masonry to structural members where masonry abuts or faces structural<br />
members to comply with the following:<br />
1. Provide an open space as indicated on the drawings between masonry and<br />
structural member, unless otherwise indicated. Keep open space free <strong>of</strong> mortar<br />
and other rigid materials.<br />
2. Anchor masonry to structural members with anchors embedded in masonry joints<br />
and attached to structure.<br />
3. Space anchors as indicated, but not more than 16 inches (610 mm) o.c. vertically<br />
and 16 inches (915 mm) o.c. horizontally.<br />
3.8 CONTROL AND EXPANSION JOINTS<br />
A. General: Install control and expansion joint materials in unit masonry as masonry<br />
progresses. Do not allow materials to span control and expansion joints without<br />
provision to allow for in-plane wall or partition movement.<br />
B. Form control joints in concrete masonry as follows:<br />
1. Install temporary foam-plastic filler in head joints and remove filler when unit<br />
masonry is complete for application <strong>of</strong> sealant.<br />
C. Provide horizontal, pressure-relieving joints by either leaving an air space or inserting a<br />
compressible filler <strong>of</strong> width required for installing sealant and backer rod specified in<br />
Division 7 Section "Joint Sealants," but not less than 3/8 inch (10 mm).<br />
1. Locate horizontal, pressure-relieving joints beneath shelf angles supporting<br />
masonry.<br />
3.9 LINTELS<br />
A. Install lintels where indicated.<br />
B. Provide concrete or masonry lintels where shown and where openings <strong>of</strong> more than 24<br />
inches (610 mm) for block-size units are shown without structural steel or other<br />
supporting lintels.<br />
04810-11<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
UNIT MASONRY ASSEMBLIES<br />
C. Provide minimum bearing <strong>of</strong> 8 inches (200 mm) at each jamb, unless otherwise<br />
indicated.<br />
3.10 REINFORCED UNIT MASONRY INSTALLATION<br />
A. Temporary Formwork and Shores: Construct formwork and shores as needed to<br />
support reinforced masonry elements during construction.<br />
1. Construct formwork to provide shape, line, and dimensions <strong>of</strong> completed<br />
masonry as indicated. Make forms sufficiently tight to prevent leakage <strong>of</strong> mortar<br />
and grout. Brace, tie, and support forms to maintain position and shape during<br />
construction and curing <strong>of</strong> reinforced masonry.<br />
2. Do not remove forms and shores until reinforced masonry members have<br />
hardened sufficiently to carry their own weight and other temporary loads that<br />
may be placed on them during construction.<br />
B. Placing Reinforcement: Comply with requirements in ACI 530.1/ASCE 6/TMS 602.<br />
C. Grouting: Do not place grout until entire height <strong>of</strong> masonry to be grouted has attained<br />
enough strength to resist grout pressure.<br />
1. Comply with requirements in ACI 530.1/ASCE 6/TMS 602 for cleanouts and for<br />
grout placement, including minimum grout space and maximum pour height.<br />
2. Limit height <strong>of</strong> vertical grout pours to not more than 60 inches (1520 mm).<br />
3.11 FIELD QUALITY CONTROL<br />
A. Inspectors: Owner may engage qualified independent inspectors to perform<br />
inspections and prepare reports. Allow inspectors access to scaffolding and work<br />
areas, as needed to perform inspections.<br />
B. Testing Agency: Owner may engage a qualified independent testing and inspecting<br />
agency to perform field tests and inspections indicated below and prepare test reports:<br />
1. Payment for these services will be made by Owner.<br />
2. Retesting <strong>of</strong> materials failing to comply with specified requirements shall be done<br />
at Contractor's expense.<br />
3.12 REPAIRING, POINTING, AND CLEANING<br />
A. Remove and replace masonry units that are loose, chipped, broken, stained, or<br />
otherwise damaged or that do not match adjoining units. Install new units to match<br />
adjoining units; install in fresh mortar, pointed to eliminate evidence <strong>of</strong> replacement.<br />
B. Pointing: During the tooling <strong>of</strong> joints, enlarge voids and holes, except weep holes, and<br />
completely fill with mortar. Point up joints, including corners, openings, and adjacent<br />
construction, to provide a neat, uniform appearance. Prepare joints for sealant<br />
application, where indicated.<br />
C. In-Progress Cleaning: Clean unit masonry as work progresses by dry brushing to<br />
remove mortar fins and smears before tooling joints.<br />
04810-12<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
UNIT MASONRY ASSEMBLIES<br />
D. Final Cleaning: After mortar is thoroughly set and cured, clean exposed masonry as<br />
follows:<br />
1. Remove large mortar particles by hand with wooden paddles and nonmetallic<br />
scrape hoes or chisels.<br />
2. Test cleaning methods on sample wall panel; leave one-half <strong>of</strong> panel uncleaned<br />
for comparison purposes. Obtain Architect's approval <strong>of</strong> sample cleaning before<br />
proceeding with cleaning <strong>of</strong> masonry.<br />
3. Protect adjacent stone and nonmasonry surfaces from contact with cleaner by<br />
covering them with liquid strippable masking agent or polyethylene film and<br />
<strong>water</strong>pro<strong>of</strong> masking tape.<br />
4. Wet wall surfaces with <strong>water</strong> before applying cleaners; remove cleaners promptly<br />
by rinsing surfaces thoroughly with clear <strong>water</strong>.<br />
5. Clean concrete masonry by cleaning method indicated in NCMA TEK 8-2A<br />
applicable to type <strong>of</strong> stain on exposed surfaces.<br />
6. Clean precast trim to comply with precast supplier's written instructions.<br />
3.13 MASONRY WASTE DISPOSAL<br />
A. Salvageable Materials: Unless otherwise indicated, excess masonry materials are<br />
Contractor's property. At completion <strong>of</strong> unit masonry work, remove from Project site.<br />
END OF SECTION 04810<br />
04810-13<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 05120<br />
STRUCTURAL STEEL<br />
PART 1 - GENERAL<br />
1.1 SUMMARY<br />
A. This Section includes structural steel.<br />
1.2 PERFORMANCE REQUIREMENTS<br />
A. Structural Performance: Engineer structural-steel connections required by the Contract<br />
Documents to be selected or completed by fabricator to withstand design loadings<br />
indicated.<br />
1. Engineering Responsibility: Engage a fabricator who utilizes a qualified<br />
pr<strong>of</strong>essional engineer to prepare calculations, Shop Drawings, and other<br />
structural data for structural-steel connections. Fabricator shall submit signed<br />
and sealed shop drawings and calculations.<br />
1.3 SUBMITTALS<br />
A. Product Data: For each product indicated.<br />
B. Shop Drawings: Show fabrication <strong>of</strong> structural-steel components, including<br />
connections, splices, holes, welds, and bolts.<br />
C. Welding certificates.<br />
1.4 QUALITY ASSURANCE<br />
A. Fabricator Qualifications: A qualified fabricator who participates in the AISC Quality<br />
Certification Program and is designated an AISC-Certified Plant, Category I,<br />
conventional steel structures.<br />
B. Comply with applicable provisions in AISC's " Specification for Structural Steel<br />
Buildings--Allowable Stress Design and Plastic Design" and RCSC's "Specification for<br />
Structural Joints Using ASTM A 325 or A 490 Bolts."<br />
C. Welding: Qualify procedures and personnel according to AWS D1.1, "Structural<br />
Welding Code--Steel."<br />
1.5 STORAGE AND PROTECTION<br />
A. Store steel members <strong>of</strong>f ground and protect steel members and packaged materials<br />
from erosion and deterioration.<br />
05120-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
STRUCTURAL STEEL<br />
B. Store fasteners in a protected place. Clean and relubricate bolts and nuts that become<br />
dry or rusty before use.<br />
PART 2 - PRODUCTS<br />
2.1 MATERIALS<br />
A. Structural-Steel Shapes, Plates, and Bars: As Indicated.<br />
B. Cold-Formed Structural-Steel Tubing: ASTM A 500, Grade B.<br />
C. Anchor Rods, Bolts, Nuts: ASTM A 325, headed bolts, Type 1, heavy hex steel<br />
structural bolts and heavy hex carbon-steel nuts.<br />
D. High-Strength Bolts, Nuts, and Washers: ASTM A 325, Type 1, heavy hex steel<br />
structural bolts, heavy hex carbon-steel nuts, and hardened carbon-steel washers,<br />
uncoated.<br />
E. Primer: Fabricator's standard lead- and chromate-free, nonasphaltic, rust-inhibiting<br />
primer.<br />
F. Nonmetallic, Shrinkage-Resistant Grout: Premixed, ASTM C 1107, <strong>of</strong> consistency<br />
suitable for application.<br />
G. Recycled Content <strong>of</strong> Steel Products: Provide products with an average recycled<br />
content <strong>of</strong> steel products so postconsumer recycled content plus one-half <strong>of</strong><br />
preconsumer recycled content is not less than 60 percent.<br />
H. Steel shall be regionally (within 500 miles) processed and produced. Contractor shall<br />
submit certifications verifying compliance.<br />
2.2 FABRICATION<br />
A. Fabricate and assemble structural steel in shop to greatest extent possible. Fabricate<br />
structural steel according to AISC specifications referenced in this Section and in Shop<br />
Drawings.<br />
1. Comply with fabrication tolerance limits in AISC's "Code <strong>of</strong> Standard Practice for<br />
Steel Buildings and Bridges" for structural steel.<br />
2. Shop install and tighten high-strength bolts according to RCSC's "Specification<br />
for Structural Joints Using ASTM A 325 or A 490 Bolts."<br />
a. Connection Type: Snug tightened, unless indicated as slip-critical, directtension,<br />
or tensioned shear/bearing connections.<br />
3. Weld Connections: Comply with AWS D1.1 for procedures, appearance and<br />
quality <strong>of</strong> welds, and methods used in correcting welding work.<br />
05120-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
STRUCTURAL STEEL<br />
B. Shop Priming: Shop prime steel, except surfaces embedded in concrete or mortar,<br />
surfaces to be field welded, surfaces to be high-strength bolted with slip-critical<br />
connections, and surfaces to receive sprayed-on firepro<strong>of</strong>ing.<br />
1. Surface Preparation: SSPC-SP 2, "Hand Tool Cleaning," or SSPC-SP 3, "Power<br />
Tool Cleaning."<br />
2. Priming: Immediately after surface preparation, apply primer according to<br />
manufacturer's written instructions and at rate recommended by SSPC to provide<br />
a dry film thickness <strong>of</strong> not less than 1.5 mils. Use priming methods that result in<br />
full coverage <strong>of</strong> joints, corners, edges, and exposed surfaces.<br />
2.3 SOURCE QUALITY CONTROL<br />
A. Owner will engage an independent testing and inspecting agency to perform shop tests<br />
and inspections and to prepare test reports. Comply with Part 3 "Field Quality Control"<br />
Article.<br />
PART 3 - EXECUTION<br />
3.1 ERECTION<br />
A. Examination: Verify elevations <strong>of</strong> concrete and masonry bearing surfaces and<br />
locations <strong>of</strong> anchorages for compliance with requirements.<br />
B. Erect structural steel accurately in locations and to elevations indicated and according<br />
to AISC specifications referenced in this Section.<br />
C. Base and Bearing Plates: Clean concrete and masonry bearing surfaces <strong>of</strong> bondreducing<br />
materials and roughen surfaces before setting base and bearing plates.<br />
Clean bottom surface <strong>of</strong> base and bearing plates and set on wedges, shims, or setting<br />
nuts as required.<br />
1. Tighten anchor bolts, cut <strong>of</strong>f wedges or shims flush with edge <strong>of</strong> base or bearing<br />
plate, and pack grout solidly between bearing surfaces and plates.<br />
D. Maintain erection tolerances <strong>of</strong> structural steel within AISC's "Code <strong>of</strong> Standard<br />
Practice for Steel Buildings and Bridges."<br />
E. Install and tighten high-strength bolts according to RCSC's "Specification for Structural<br />
Joints Using ASTM A 325 or A 490 Bolts."<br />
1. Connection Type: Snug tightened, unless indicated as slip-critical, direct-tension,<br />
or tensioned shear/bearing connections.<br />
F. Weld Connections: Comply with AWS D1.1 for procedures, appearance and quality <strong>of</strong><br />
welds, and methods used in correcting welding work.<br />
3.2 FIELD QUALITY CONTROL<br />
A. Owner will engage a qualified testing and inspecting agency to perform field tests and<br />
inspections and to prepare test reports.<br />
05120-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
STRUCTURAL STEEL<br />
1. Correct deficiencies in or remove and replace structural steel that test reports<br />
and inspections indicate do not comply with specified requirements.<br />
2. Additional testing, at Contractor's expense, will be performed to determine<br />
compliance <strong>of</strong> corrected Work with specified requirements.<br />
3. High-strength bolted connections will be tested and inspected according to<br />
RCSC's "Specification for Structural Joints Using ASTM A 325 or A 490 Bolts."<br />
4. In addition to visual inspection, welded connections will be tested and inspected<br />
according to AWS D1.1 procedures.<br />
END OF SECTION 05120<br />
05120-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 05210<br />
STEEL JOISTS<br />
PART 1 - GENERAL<br />
1.1 SUMMARY<br />
A. This Section includes the following:<br />
1. Open-web, K-series AND KCS-series steel joists.<br />
1.2 SUBMITTALS<br />
A. Product Data: For each type <strong>of</strong> joist, accessory, and product indicated.<br />
B. Shop Drawings: Showing layout, mark, number, type, location, and spacings <strong>of</strong> joists.<br />
<strong>Inc</strong>lude joining and anchorage details, bracing, bridging, accessories; splice and<br />
connection locations and details; and attachments to other construction. Special Joists<br />
shall include signed and sealed shop drawings and calculations.<br />
C. Welding certificates.<br />
D. Research/evaluation reports.<br />
1.3 QUALITY ASSURANCE<br />
A. Manufacturer Qualifications: A firm experienced in manufacturing joists similar to those<br />
indicated for this Project and with a record <strong>of</strong> successful in-service performance.<br />
1. Manufacturer must be certified by SJI to manufacture joists complying with SJI<br />
standard specifications and load tables.<br />
B. SJI Specifications: Comply with SJI's "Standard Specifications Load Tables and<br />
Weight Tables for Steel Joists and Joist Girders" (hereafter, "Specifications"),<br />
applicable to types <strong>of</strong> joists indicated.<br />
C. Welding: Qualify procedures and personnel according to AWS D1.1, "Structural<br />
Welding Code--Steel," and AWS D1.3, "Structural Welding Code--Sheet Steel."<br />
1.4 DELIVERY, STORAGE, AND HANDLING<br />
A. Deliver, store, and handle joists as recommended in SJI's "Specifications."<br />
PART 2 - PRODUCTS<br />
2.1 MATERIALS<br />
05210-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
STEEL JOISTS<br />
A. Steel: Comply with SJI's "Specifications" for chord and web members.<br />
B. High-Strength Bolts and Nuts: ASTM A 325, Type 1, heavy hex steel structural bolts,<br />
heavy hex carbon-steel nuts, and hardened carbon-steel washers; plain, uncoated.<br />
2.2 PRIMERS<br />
A. Primer: SSPC-Paint 15, Type I, red oxide; FS TT-P-636, red oxide; or manufacturer's<br />
standard shop primer complying with performance requirements <strong>of</strong> either <strong>of</strong> these redoxide<br />
primers.<br />
2.3 STEEL JOISTS<br />
A. Manufacture steel joists according to SJI's "Specifications," with steel-angle top- and<br />
bottom-chord members, and as follows:<br />
1. Manufacture K-series steel joists and KCS-type K-series steel joists. according to<br />
"Standard Specifications for Open Web Steel Joists, K-Series," with steel-angle<br />
top- and bottom-chord members, underslung ends, and parallel top chord.<br />
B. Comply with AWS requirements and procedures for shop welding, appearance, quality<br />
<strong>of</strong> welds, and methods used in correcting welding work.<br />
2.4 JOIST ACCESSORIES<br />
A. Bridging: Provide bridging anchors and number <strong>of</strong> rows <strong>of</strong> horizontal or diagonal<br />
bridging <strong>of</strong> material, size, and type required by SJI's "Specifications" for type <strong>of</strong> joist,<br />
chord size, spacing, and span.<br />
B. Supply miscellaneous accessories, including splice plates and bolts required by joist<br />
manufacturer to complete joist installation.<br />
2.5 SHOP PAINTING<br />
A. Clean and remove loose scale, heavy rust, and other foreign materials from fabricated<br />
joists and accessories by hand-tool cleaning, SSPC-SP 2 or power-tool cleaning,<br />
SSPC-SP 3.<br />
B. Apply 1 shop coat <strong>of</strong> primer to joists and joist accessories to be primed to provide a<br />
continuous, dry paint film not less than 1 mil thick.<br />
PART 3 - EXECUTION<br />
3.1 INSTALLATION<br />
A. Do not install joists until supporting construction is in place and secured.<br />
05210-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
STEEL JOISTS<br />
B. Install joists and accessories plumb, square, and true to line; securely fasten to<br />
supporting construction according to SJI's "Specifications," joist manufacturer's written<br />
recommendations, and requirements in this Section.<br />
C. Field weld joists to supporting steel bearing plates. Coordinate welding sequence and<br />
procedure with placement <strong>of</strong> joists. Comply with AWS requirements and procedures<br />
for welding, appearance and quality <strong>of</strong> welds, and methods used in correcting welding<br />
work.<br />
D. Bolt joists to supporting steel framework using high-strength structural bolts, unless<br />
otherwise indicated. Comply with RCSC's "Allowable Stress Design Specification for<br />
Structural Joints Using ASTM A 325 or ASTM A 490 Bolts " for high-strength structural<br />
bolt installation and tightening requirements.<br />
E. Install and connect bridging concurrently with joist erection, before construction loads<br />
are applied. Anchor ends <strong>of</strong> bridging lines at top and bottom chords if terminating at<br />
walls or beams.<br />
END OF SECTION 05210<br />
05210-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 05310<br />
STEEL DECKING<br />
PART 1 - GENERAL<br />
1.1 RELATED DOCUMENTS<br />
A. Drawings and general provisions <strong>of</strong> the Contract, including General and<br />
Supplementary Conditions and Division 01 Specification Sections, apply to this<br />
Section.<br />
1.2 SUMMARY<br />
A. This Section includes the following:<br />
1. Ro<strong>of</strong> Deck<br />
2. Noncomposite vented ro<strong>of</strong> deck.<br />
B. Related Sections include the following:<br />
1. Division 03 Section "Lightweight Insulating Concrete" for lightweight insulating<br />
concrete fill.<br />
2. Division 05 Section "Structural Steel Framing" for shop- and field-welded shear<br />
connectors.<br />
3. Division 05 Section "Metal Fabrications" for framing deck openings with<br />
miscellaneous steel shapes.<br />
4. Division 09 painting Sections for repair painting <strong>of</strong> primed deck.<br />
1.3 SUBMITTALS<br />
A. Product Data: For each type <strong>of</strong> deck, accessory, and product indicated.<br />
B. Shop Drawings: Show layout and types <strong>of</strong> deck panels, anchorage details, reinforcing<br />
channels, pans, cut deck openings, special jointing, accessories, and attachments to<br />
other construction.<br />
C. Product Certificates: For each type <strong>of</strong> steel deck, signed by product manufacturer.<br />
D. Welding certificates.<br />
E. Field quality-control test and inspection reports.<br />
F. Product Test Reports: Based on evaluation <strong>of</strong> comprehensive tests performed by a<br />
qualified testing agency, indicating that each <strong>of</strong> the following complies with<br />
requirements:<br />
1. Power-actuated mechanical fasteners.<br />
G. Research/Evaluation Reports: For steel deck.<br />
05310-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
STEEL DECKING<br />
1.4 QUALITY ASSURANCE<br />
A. Testing Agency Qualifications: An independent agency qualified according to<br />
ASTM E 329 for testing indicated.<br />
B. Welding: Qualify procedures and personnel according to AWS D1.3, "Structural<br />
Welding Code - Sheet Steel."<br />
C. Fire-Test-Response Characteristics: Where indicated, provide steel deck units<br />
identical to those tested for fire resistance per ASTM E 119 by a testing and inspecting<br />
agency acceptable to authorities having jurisdiction.<br />
1. Fire-Resistance Ratings: Indicated by design designations <strong>of</strong> applicable testing<br />
and inspecting agency.<br />
2. Steel deck units shall be identified with appropriate markings <strong>of</strong> applicable testing<br />
and inspecting agency.<br />
D. AISI Specifications: Comply with calculated structural characteristics <strong>of</strong> steel deck<br />
according to AISI's "North American Specification for the Design <strong>of</strong> Cold-Formed Steel<br />
Structural Members."<br />
E. FMG Listing: Provide steel ro<strong>of</strong> deck evaluated by FMG and listed in its "Approval<br />
Guide, Building Materials" for Class 1 fire rating and Class 1-90 windstorm ratings.<br />
F. Recycled Content <strong>of</strong> Steel Products: Provide products with an average recycled<br />
content <strong>of</strong> steel products so postconsumer recycled content plus one-half <strong>of</strong><br />
preconsumer recycled content is not less than 25 percent.<br />
1.5 DELIVERY, STORAGE, AND HANDLING<br />
A. Protect steel deck from corrosion, deformation, and other damage during delivery,<br />
storage, and handling.<br />
B. Stack steel deck on platforms or pallets and slope to provide drainage. Protect with a<br />
<strong>water</strong>pro<strong>of</strong> covering and ventilate to avoid condensation.<br />
1. Protect and ventilate ro<strong>of</strong> deck to maintain free <strong>of</strong> moisture.<br />
PART 2 - PRODUCTS<br />
2.1 MANUFACTURERS<br />
A. Available Manufacturers: Subject to compliance with requirements, manufacturers<br />
<strong>of</strong>fering products that may be incorporated into the Work include, but are not limited to,<br />
the following:<br />
B. Manufacturers: Subject to compliance with requirements, provide products by one <strong>of</strong><br />
the following:<br />
1. Steel Deck:<br />
a. ASC Pr<strong>of</strong>iles, <strong>Inc</strong>.<br />
05310-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
STEEL DECKING<br />
b. Canam Steel Corp.;The Canam Manac Group.<br />
c. Consolidated Systems, <strong>Inc</strong>.<br />
d. DACS, <strong>Inc</strong>.<br />
e. D-Mac Industries <strong>Inc</strong>.<br />
f. Epic Metals Corporation.<br />
g. Marlyn Steel Decks, <strong>Inc</strong>.<br />
h. New Millennium Building Systems, LLC.<br />
i. Nucor Corp.; Vulcraft Division.<br />
j. Ro<strong>of</strong> Deck, <strong>Inc</strong>.<br />
k. United Steel Deck, <strong>Inc</strong>.<br />
l. Valley Joist; Division <strong>of</strong> EBSCO Industries, <strong>Inc</strong>.<br />
m. Verco Manufacturing Co.<br />
n. Wheeling Corrugating Company; Div. <strong>of</strong> Wheeling-Pittsburgh Steel<br />
Corporation.<br />
2.2 ROOF DECK<br />
A. Steel Ro<strong>of</strong> Deck: Fabricate panels, without top-flange stiffening grooves, to comply<br />
with "SDI Specifications and Commentary for Steel Ro<strong>of</strong> Deck," in SDI Publication<br />
No. 30, and with the following:<br />
1. Galvanized Steel Sheet: ASTM A 653/A 653M, Structural Steel (SS), Grade 33,<br />
G60 zinc coating.<br />
2. Deck Pr<strong>of</strong>ile: Type B, wide rib.<br />
3. Pr<strong>of</strong>ile Depth: 1-1/2 inches.<br />
4. Design Uncoated-Steel Thickness: As indicated.<br />
5. Location: Steep sloped ro<strong>of</strong>.<br />
2.3 NONCOMPOSITE VENTED ROOF DECK<br />
A. Noncomposite Vented Steel Form Deck: Fabricate ribbed- and vented-steel sheet<br />
noncomposite form-deck panels to comply with "SDI Specifications and Commentary<br />
for Noncomposite Steel Form Deck," in SDI Publication No. 30, and with the following:<br />
1. Galvanized and Shop-Primed Steel Sheet: ASTM A 653/A 653M, Structural<br />
Steel (SS), Grade 33, G90 zinc coating; cleaned, pretreated, and primed with<br />
manufacturer's standard baked-on, rust-inhibitive primer.<br />
a. Color: Manufacturer's standard.<br />
2. Pr<strong>of</strong>ile Depth: 1-1/2 inches.<br />
3. Design Uncoated-Steel Thickness: As noted on plan.<br />
4. Span Condition: Triple span or more.<br />
5. Side Laps: Overlapped.<br />
6. Vent Slot Area: Manufacturer's standard vent slots providing 1-1/2 percent open<br />
area.<br />
7. Location: Beneath lightweight insulating concrete.<br />
2.4 ACCESSORIES<br />
A. General: Provide manufacturer's standard accessory materials for deck that comply<br />
with requirements indicated.<br />
05310-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
STEEL DECKING<br />
B. Mechanical Fasteners: Corrosion-resistant, low-velo<strong>city</strong>, power-actuated or<br />
pneumatically driven carbon-steel fasteners; or self-drilling, self-threading screws.<br />
C. Side-Lap Fasteners: Corrosion-resistant, hexagonal washer head; self-drilling, carbonsteel<br />
screws, No. 10 minimum diameter.<br />
D. Flexible Closure Strips: Vulcanized, closed-cell, synthetic rubber.<br />
E. Miscellaneous Sheet Metal Deck Accessories: Steel sheet, minimum yield strength <strong>of</strong><br />
33,000 psi, not less than 0.0359-inch design uncoated thickness, <strong>of</strong> same material and<br />
finish as deck; <strong>of</strong> pr<strong>of</strong>ile indicated or required for application.<br />
F. Pour Stops and Girder Fillers: Steel sheet, minimum yield strength <strong>of</strong> 33,000 psi, <strong>of</strong><br />
same material and finish as deck, and <strong>of</strong> thickness and pr<strong>of</strong>ile recommended by SDI<br />
Publication No. 30 for overhang and slab depth.<br />
G. Column Closures, End Closures, Z-Closures, and Cover Plates: Steel sheet, <strong>of</strong> same<br />
material, finish, and thickness as deck, unless otherwise indicated.<br />
H. Piercing Hanger Tabs: Piercing steel sheet hanger attachment devices for use with<br />
floor deck.<br />
I. Recessed Sump Pans: Single-piece steel sheet, 0.0747 inch thick, <strong>of</strong> same material<br />
and finish as deck, with 3-inch- wide flanges and sloped recessed pans <strong>of</strong> 1-1/2-inch<br />
minimum depth. For drains, cut holes in the field.<br />
J. Flat Sump Plate: Single-piece steel sheet, 0.0747 inch thick, <strong>of</strong> same material and<br />
finish as deck. For drains, cut holes in the field.<br />
K. Galvanizing Repair Paint: ASTM A 780.<br />
L. Repair Paint: Manufacturer's standard rust-inhibitive primer <strong>of</strong> same color as primer.<br />
PART 3 - EXECUTION<br />
3.1 EXAMINATION<br />
A. Examine supporting frame and field conditions for compliance with requirements for<br />
installation tolerances and other conditions affecting performance.<br />
3.2 INSTALLATION, GENERAL<br />
A. Install deck panels and accessories according to applicable specifications and<br />
commentary in SDI Publication No. 30, manufacturer's written instructions, and<br />
requirements in this Section.<br />
B. Install temporary shoring before placing deck panels, if required to meet deflection<br />
limitations.<br />
C. Locate deck bundles to prevent overloading <strong>of</strong> supporting members.<br />
05310-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
STEEL DECKING<br />
D. Place deck panels on supporting frame and adjust to final position with ends accurately<br />
aligned and bearing on supporting frame before being permanently fastened. Do not<br />
stretch or contract side-lap interlocks.<br />
1. Align cellular deck panels over full length <strong>of</strong> cell runs and align cells at ends <strong>of</strong><br />
abutting panels.<br />
E. Place deck panels flat and square and fasten to supporting frame without warp or<br />
deflection.<br />
F. Cut and neatly fit deck panels and accessories around openings and other work<br />
projecting through or adjacent to deck.<br />
G. Provide additional reinforcement and closure pieces at openings as required for<br />
strength, continuity <strong>of</strong> deck, and support <strong>of</strong> other work.<br />
H. Comply with AWS requirements and procedures for manual shielded metal arc<br />
welding, appearance and quality <strong>of</strong> welds, and methods used for correcting welding<br />
work.<br />
I. Mechanical fasteners may be used in lieu <strong>of</strong> welding to fasten deck. Locate<br />
mechanical fasteners and install according to deck manufacturer's written instructions.<br />
3.3 ROOF-DECK INSTALLATION<br />
A. Fasten ro<strong>of</strong>-deck panels to steel supporting members by arc spot (puddle) welds <strong>of</strong> the<br />
surface diameter indicated or arc seam welds with an equal perimeter that is not less<br />
than 1-1/2 inches long, and as follows:<br />
1. Weld Diameter: 5/8 inch, nominal.<br />
2. Weld Spacing: Weld edge and interior ribs <strong>of</strong> deck units with a minimum <strong>of</strong> two<br />
welds per deck unit at each support. Space welds as indicated.<br />
B. Side-Lap and Perimeter Edge Fastening: Fasten side laps and perimeter edges <strong>of</strong><br />
panels between supports, at intervals as indicated, and as follows:<br />
1. Mechanically fasten with self-drilling, No. 10 diameter or larger, carbon-steel<br />
screws.<br />
2. Mechanically clinch or button punch.<br />
3. Fasten with a minimum <strong>of</strong> 1-1/2-inch- long welds.<br />
C. End Bearing: Install deck ends over supporting frame with a minimum end bearing <strong>of</strong><br />
1-1/2 inches, with end joints as follows:<br />
1. End Joints: Lapped 2 inches minimum.<br />
D. Ro<strong>of</strong> Sump Pans and Sump Plates: Install over openings provided in ro<strong>of</strong> deck and<br />
weld flanges to top <strong>of</strong> deck. Space welds not more than 12 inches apart with at least<br />
one weld at each corner.<br />
1. Install reinforcing channels or zees in ribs to span between supports and weld.<br />
05310-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
STEEL DECKING<br />
E. Miscellaneous Ro<strong>of</strong>-Deck Accessories: Install ridge and valley plates, finish strips, end<br />
closures, and reinforcing channels according to deck manufacturer's written<br />
instructions. Weld to substrate to provide a complete deck installation.<br />
1. Weld cover plates at changes in direction <strong>of</strong> ro<strong>of</strong>-deck panels, unless otherwise<br />
indicated.<br />
F. Flexible Closure Strips: Install flexible closure strips over partitions, walls, and where<br />
indicated. Install with adhesive according to manufacturer's written instructions to<br />
ensure complete closure.<br />
3.4 FIELD QUALITY CONTROL<br />
A. Testing Agency: Engage a qualified independent testing and inspecting agency to<br />
perform field tests and inspections and prepare test reports.<br />
B. Field welds will be subject to inspection.<br />
C. Testing agency will report inspection results promptly and in writing to Contractor and<br />
Architect.<br />
D. Remove and replace work that does not comply with specified requirements.<br />
E. Additional inspecting, at Contractor's expense, will be performed to determine<br />
compliance <strong>of</strong> corrected work with specified requirements.<br />
3.5 REPAIRS AND PROTECTION<br />
A. Galvanizing Repairs: Prepare and repair damaged galvanized coatings on both<br />
surfaces <strong>of</strong> deck with galvanized repair paint according to ASTM A 780 and<br />
manufacturer's written instructions.<br />
B. Repair Painting: Wire brush and clean rust spots, welds, and abraded areas on both<br />
surfaces <strong>of</strong> prime-painted deck immediately after installation, and apply repair paint.<br />
1. Apply repair paint, <strong>of</strong> same color as adjacent shop-primed deck, to bottom<br />
surfaces <strong>of</strong> deck exposed to view.<br />
C. Provide final protection and maintain conditions to ensure that steel deck is without<br />
damage or deterioration at time <strong>of</strong> Substantial Completion.<br />
END OF SECTION 05310<br />
05310-6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 05530<br />
FIBERGLASS REINFORCED PLASTIC MOLDED GRATINGS<br />
PART 1 - GENERAL<br />
1.1 SUMMARY<br />
A. Section <strong>Inc</strong>ludes:<br />
1. Fiberglass Reinforced Molded Gratings.<br />
1.2 PERFORMANCE REQUIREMENTS<br />
A. Delegated Design: Design gratings, including comprehensive engineering analysis by<br />
a qualified pr<strong>of</strong>essional engineer, using performance requirements and design criteria<br />
indicated.<br />
B. Structural Performance: Gratings shall withstand the effects <strong>of</strong> gravity loads and the<br />
following loads and stresses within limits and under conditions indicated.<br />
1. Floors: Uniform load <strong>of</strong> 100 lbf/sq. ft. or concentrated load <strong>of</strong> 300 LB., whichever<br />
produces the greater stress.<br />
2. Deflection shall not exceed 0.375 inches or L/D=120, whichever is less.<br />
3. Manufacturer shall certify that the stiffness <strong>of</strong> all panels manufactured are never<br />
more than 2.5% below the published load-deflection values.<br />
1.3 SUBMITTALS<br />
A. Product Data: For the following:<br />
1. Fiberglass Reinforced Molded Gratings.<br />
2. Clips and anchorage devices for gratings.<br />
B. Shop Drawings: <strong>Inc</strong>lude plans, sections, details, and attachments to other work.<br />
C. Delegated-Design Submittal: For installed products indicated to comply with<br />
performance requirements and design criteria, including analysis data signed and<br />
sealed by the qualified pr<strong>of</strong>essional engineer responsible for their preparation.<br />
D. Color samples.<br />
05530 - 1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
1.4 DELIVERY AND STORAGE<br />
A. Manufactured materials shall be delivered in original, unbroken pallets, packages,<br />
containers, or bundles bearing the label <strong>of</strong> the manufacturer. Adhesives, resins and<br />
their catalysts and hardeners shall be crated or boxed separately and noted as such to<br />
facilitate their movement to a dry indoor storage <strong>facility</strong>.<br />
B. All materials shall be carefully handled to prevent them from abrasion, cracking,<br />
twisting, other deformations, and other types <strong>of</strong> damage. Adhesives, resins and their<br />
catalyst are to be stored in dry storage facilities between 70 and 85 degrees Fahrenheit<br />
until they are required.<br />
1.5 QUALITY ASSURANCE<br />
A. Manufacturer’s Warranty: Manufacturer shall <strong>of</strong>fer a three (3) year limited warranty on<br />
all FRP products against defects in materials and workmanship.<br />
B. Manufacturer’s Certification: Manufacturer shall be certified to the ISO 9001-2000<br />
standard.<br />
C. Manufacturer certifies that the proposed materials used in their products do not contain<br />
heavy metals in amounts greater than that allowed by current EPA requirements.<br />
D. Installer Qualifications: An experienced installer who is approved by the FRP<br />
manufacturer.<br />
E. Grating Certification: All grating products shall be certified to NSF/ANSI Standard 61.<br />
F. Surface-Burning Characteristics: As determined by testing identical products<br />
according to ASTM E 84 by a qualified testing agency. Identify products with<br />
appropriate markings <strong>of</strong> applicable testing agency.<br />
1. Flame-Spread Index: 25 or less.<br />
2. Smoke-Developed Index: 450 or less.<br />
PART 2 - PRODUCTS<br />
2.1 FIBERGLASS REINFORCED PLASTICS MOLDED GRATING<br />
A. Manufacturer: Grating shall be <strong>of</strong> one piece molded construction with tops and bottoms<br />
<strong>of</strong> bearing bars and cross bars in the same plane. Grating shall have a square mesh<br />
pattern providing bi-directional strength. Gratings shall be reinforced with continuous<br />
rovings <strong>of</strong> equal number <strong>of</strong> layers in each direction. The top layer <strong>of</strong> reinforcement shall<br />
be no more than 1/8 inch below the top surface <strong>of</strong> the grating so as to provide<br />
maximum stiffness and prevent resin chipping <strong>of</strong> unreinforced surfaces. Percentage <strong>of</strong><br />
glass (by weight) shall not exceed 35% so as to achieve maximum corrosion<br />
resistance, and as required to maintain the specified structural requirements.<br />
05530 - 2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
B. After molding, no dry glass fibers shall be visible on any surface <strong>of</strong> bearing bars or<br />
cross bars. All bars shall be smooth and uniform with no evidence <strong>of</strong> fiber orientation<br />
irregularities, interlaminar voids, porosity, resin rich or resin starved areas.<br />
C. Non-slip Surfacing: Grating shall be manufactured with a concave, meniscus pr<strong>of</strong>ile on<br />
top <strong>of</strong> each bar providing maximum slip resistance.<br />
D. Grating bar intersections are to be filleted to a minimum radius <strong>of</strong> 1/16 inch to eliminate<br />
local stress connections and the possibility <strong>of</strong> resin cracking at these locations.<br />
E. Resin System: Manufacturer’s standard.<br />
F. Fiberglass reinforcement shall be continuous roving in sufficient quantities as need by<br />
application and/or physical properties required.<br />
G. Finish: All finished surfaces <strong>of</strong> FRP items and fabrications shall be smooth, resin-rich,<br />
free <strong>of</strong> voids and without dry spots, cracks, crazes or unreinforced areas. All galls<br />
fibers shall be well covered with resin to protect against exposure due to wear or<br />
weathering.<br />
H. Stainless-Steel Mechanical Grating Clips: Type 316 Stainless Steel.<br />
2.2 FASTENERS<br />
A. General: Unless otherwise indicated, provide Type 316 stainless-steel fasteners.<br />
Select fasteners for type, grade, and class required.<br />
1. Provide stainless steel fasteners for fastening stainless steel.<br />
B. Post-Installed Anchors: Torque-controlled expansion anchors or chemical anchors<br />
capable <strong>of</strong> sustaining, without failure, a load equal to six times the load imposed when<br />
installed in unit masonry and four times the load imposed when installed in concrete,<br />
as determined by testing according to ASTM E 488, conducted by a qualified<br />
independent testing agency.<br />
2.3 FABRICATION<br />
A. Cut, drill, and punch material cleanly and accurately. Remove burrs and ease edges to<br />
a radius <strong>of</strong> approximately 1/32 inch (1 mm) unless otherwise indicated. Remove sharp<br />
or rough areas on exposed surfaces.<br />
B. Form from materials <strong>of</strong> size, thickness, and shapes indicated, but not less than that<br />
needed to support indicated loads.<br />
C. Fit exposed connections accurately together to form hairline joints.<br />
D. Fabricate toeplates for attaching in the field.<br />
05530 - 3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
2.4 MOLDED FRP GRATINGS<br />
A. Basis-<strong>of</strong>-Design Product: Subject to compliance with requirements, provide Fibergrate<br />
1-1/2 inch deep by 1-1/2 inch by 1-1/2 inch Square Mesh as manufactured by<br />
Fibergrate Composite Structures, <strong>Inc</strong>. or comparable product:<br />
B. Fabricate cutouts in grating sections for penetrations <strong>of</strong> sizes and at locations<br />
indicated. Cut openings neatly and accurately to size. Edge-band openings with metal<br />
sheet or bars having a thickness not less than grating material.<br />
2.5 GRATING FRAMES AND SUPPORTS<br />
A. Frames and Supports for Gratings: Fabricate from metal shapes, plates, and bars <strong>of</strong><br />
welded construction to sizes, shapes, and pr<strong>of</strong>iles indicated and as necessary to<br />
receive gratings. Miter and weld connections for perimeter angle frames. Cut, drill,<br />
and tap units to receive hardware and similar items.<br />
1. Equip units indicated to be cast into concrete or built into masonry with integrally<br />
welded anchors.<br />
B. Galvanize steel frames and supports in the following locations:<br />
1. Interior, where indicated.<br />
2.6 STEEL FINISHES<br />
A. Galvanizing: Hot-dip galvanize items as indicated to comply with ASTM A 153/A 153M<br />
for steel and iron hardware and with ASTM A 123/A 123M for other steel and iron<br />
products.<br />
PART 3 - EXECUTION<br />
3.1 INSTALLATION, GENERAL<br />
A. Cutting, Fitting, and Placement: Perform cutting, drilling, and fitting required for<br />
installing gratings to the greatest extent possible at the manufacturer prior to delivery.<br />
Set units accurately in location, alignment, and elevation; measured from established<br />
lines and levels and free <strong>of</strong> rack.<br />
B. Measurements: Grating supplied shall meet the dimensional requirements and<br />
tolerances as shown or specified. Field verify existing conditions, including overall<br />
bearing dimensions, cut-outs, protrusions, penetrations and fabricate grating to fit<br />
actual field conditions.<br />
C. Layout: Each grating section shall be readily removable, except where indicated on the<br />
drawings. Manufacturer to provide openings and holes where indicated on the<br />
drawings. Grating openings which fit around protrusions (pipes, cables, machinery,<br />
etc.) shall be discontinuous at approximately the centerline <strong>of</strong> opening so each section<br />
<strong>of</strong> grating is readily removable.<br />
05530 - 4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
D. Sealing: All shop fabricated grating cuts shall be coated with vinyl ester to provide<br />
maximum corrosion resistance. All field fabricated grating cuts shall be coated similarly<br />
by the contractor in accordance with the manufacturer’s instructions.<br />
E. Hardware: Type 316 stainless steel hold-down clips shall be provided and space in<br />
accordance with manufacturer’s written instruction, but not less than four feet apart<br />
with a minimum <strong>of</strong> four per piece <strong>of</strong> grating.<br />
F. Fit exposed connections accurately together to form hairline joints Delete<br />
subparagraph below if no gratings are installed by welding and no grating frames<br />
require field welding.<br />
3.2 INSTALLING FRP GRATINGS<br />
A. General: Comply with manufacturer's written instructions for installing gratings. Use<br />
manufacturer's standard anchor clips and hold-down devices for bolted connections.<br />
B. Field cut and drill fiberglass reinforced plastic products with carbide or diamond tipped<br />
bits and blades. Seal cut or drilled surfaces in accordance with manufacturer’s<br />
instructions. Follow manufacturer’s instructions when cutting or drilling fiberglass<br />
products or using resin products. Provide adequate ventilation.<br />
END OF SECTION 05530<br />
05530 - 5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 06105<br />
MISCELLANEOUS CARPENTRY<br />
PART 1 - GENERAL<br />
1.1 SUMMARY<br />
A. This Section includes the following:<br />
1. Wood blocking and nailers.<br />
2. Plywood backing panels.<br />
PART 2 - PRODUCTS<br />
2.1 WOOD PRODUCTS, GENERAL<br />
A. Lumber: DOC PS 20 and applicable rules <strong>of</strong> grading agencies indicated. If no grading<br />
agency is indicated, provide lumber that complies with the applicable rules <strong>of</strong> any ruleswriting<br />
agency certified by the ALSC Board <strong>of</strong> Review. Provide lumber graded by an<br />
agency certified by the ALSC Board <strong>of</strong> Review to inspect and grade lumber under the<br />
rules indicated.<br />
1. Factory mark each piece <strong>of</strong> lumber with grade stamp <strong>of</strong> grading agency.<br />
2. Provide dressed lumber, S4S, unless otherwise indicated.<br />
2.2 WOOD-PRESERVATIVE-TREATED MATERIALS<br />
A. Preservative Treatment by Pressure Process: AWPA C2, except that lumber that is<br />
not in contact with the ground and is continuously protected from liquid <strong>water</strong> may be<br />
treated according to AWPA C31 with inorganic boron (SBX).<br />
1. Preservative Chemicals: Acceptable to authorities having jurisdiction and<br />
containing no arsenic or chromium.<br />
B. Kiln-dry lumber after <strong>treatment</strong> to a maximum moisture content <strong>of</strong> 19 percent. Do not<br />
use material that is warped or does not comply with requirements for untreated<br />
material.<br />
C. Mark lumber with <strong>treatment</strong> quality mark <strong>of</strong> an inspection agency approved by the<br />
ALSC Board <strong>of</strong> Review.<br />
D. Application: Treat items indicated on Drawings, and the following:<br />
1. Wood nailers.<br />
2. Wood bucks, sills, sleepers, blocking, and similar concealed members in contact<br />
with masonry or concrete.<br />
3. Wood framing members that are less than 18 inches (460 mm) above the ground<br />
in crawl spaces or unexcavated areas.<br />
4. Wood floor plates that are installed over concrete slabs-on-grade.<br />
06105-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
MISCELLANEOUS CARPENTRY<br />
2.3 MISCELLANEOUS LUMBER<br />
A. General: Provide miscellaneous lumber indicated and lumber for support or<br />
attachment <strong>of</strong> other construction, including the following:<br />
1. Blocking.<br />
2. Nailers.<br />
3. Furring.<br />
B. For concealed boards, provide lumber with 15 percent maximum moisture content and<br />
<strong>of</strong> the following species and grades:<br />
1. Mixed southern pine, No. 2 grade; SPIB.<br />
2.4 SUBSTRATE BOARDS<br />
A. Glass-Mat Gypsum Sheathing Board: ASTM C 1177/C 1177M.<br />
1. Type and Thickness: Type X, 5/8 inch (16 mm).<br />
2. Product: Subject to compliance with requirements, provide "Dens-Glass Gold"<br />
by Georgia-Pacific Corporation.<br />
B. Substrate-Board Fasteners: Factory-coated steel fasteners and metal or plastic plates<br />
complying with corrosion-resistance provisions in FMG 4470, designed for fastening<br />
substrate board to substrate.<br />
2.5 PLYWOOD BACKING PANELS<br />
A. Telephone and Electrical Equipment Backing Panels: DOC PS 1, Exposure 1, B-C<br />
Plugged, in thickness indicated or, if not indicated, not less than 1/2-inch (13-mm)<br />
nominal thickness.<br />
2.6 FASTENERS<br />
A. General: Where carpentry is exposed to weather, in ground contact, pressurepreservative<br />
treated, or in area <strong>of</strong> high relative humidity, provide fasteners with hot-dip<br />
zinc coating complying with ASTM A 153/A 153M.<br />
B. Screws for Fastening to Cold-Formed Metal Framing: ASTM C 954, except with wafer<br />
heads and reamer wings, length as recommended by screw manufacturer for material<br />
being fastened.<br />
PART 3 - EXECUTION<br />
3.1 INSTALLATION, GENERAL<br />
A. Set carpentry to required levels and lines, with members plumb, true to line, cut, and<br />
fitted. Fit carpentry to other construction; scribe and cope as needed for accurate fit.<br />
Locate furring, nailers, blocking, grounds, and similar supports to comply with<br />
requirements for attaching other construction.<br />
06105-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
MISCELLANEOUS CARPENTRY<br />
B. Install substrate boards according to the manufacturer’s written instructions.<br />
C. Do not splice structural members between supports, unless otherwise indicated.<br />
D. Comply with AWPA M4 for applying field <strong>treatment</strong> to cut surfaces <strong>of</strong> preservativetreated<br />
lumber.<br />
E. Securely attach carpentry work to substrate by anchoring and fastening as indicated,<br />
complying with the Florida Building Code, current edition.<br />
END OF SECTION 06105<br />
06105-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 06402<br />
INTERIOR ARCHITECTURAL WOODWORK<br />
PART 1 - GENERAL<br />
1.1 RELATED DOCUMENTS<br />
A. Drawings and general provisions <strong>of</strong> the Contract, including General and<br />
Supplementary Conditions and Division 01 Specification Sections, apply to this<br />
Section.<br />
1.2 SUMMARY<br />
A. This Section includes the following:<br />
1. Plastic-laminate cabinets.<br />
2. Plastic-laminate countertops.<br />
3. Solid-surfacing-material countertops.<br />
B. Related Sections include the following:<br />
1. Division 06 Section "Miscellaneous Carpentry" for wood furring, blocking, shims,<br />
and hanging strips required for installing woodwork and concealed within other<br />
construction before woodwork installation.<br />
1.3 DEFINITIONS<br />
A. Interior architectural woodwork includes wood furring, blocking, shims, and hanging<br />
strips for installing woodwork items unless concealed within other construction before<br />
woodwork installation.<br />
1.4 SUBMITTALS<br />
A. Product Data: For high-pressure decorative laminate, adhesive for bonding plastic<br />
laminate, solid-surfacing material, cabinet hardware and accessories.<br />
B. Shop Drawings: Show location <strong>of</strong> each item, dimensioned plans and elevations, largescale<br />
details, attachment devices, and other components.<br />
1. Show locations and sizes <strong>of</strong> furring, blocking, and hanging strips, including<br />
concealed blocking and reinforcement specified in other Sections.<br />
2. Show locations and sizes <strong>of</strong> cutouts and holes for plumbing fixtures, faucets and<br />
other items installed in architectural woodwork.<br />
C. Samples for Initial Selection:<br />
1. Plastic laminates.<br />
2. PVC edge material.<br />
3. Thermoset decorative panels.<br />
4. Solid-surfacing materials.<br />
06402-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
INTERIOR ARCHITECTURAL WOODWORK<br />
D. Product Certificates: For each type <strong>of</strong> product, signed by product manufacturer.<br />
1.5 QUALITY ASSURANCE<br />
A. Quality Standard: Unless otherwise indicated, comply with AWI's "Architectural<br />
Woodwork Quality Standards" for grades <strong>of</strong> interior architectural woodwork indicated<br />
for construction, finishes, installation, and other requirements.<br />
1.6 DELIVERY, STORAGE, AND HANDLING<br />
A. Do not deliver woodwork until painting and similar operations that could damage<br />
woodwork have been completed in installation areas. If woodwork must be stored in<br />
other than installation areas, store only in areas where environmental conditions<br />
comply with requirements specified in "Project Conditions" Article.<br />
1.7 PROJECT CONDITIONS<br />
A. Environmental Limitations: Do not deliver or install woodwork until building is<br />
enclosed, wet work is complete, and HVAC system is operating and maintaining<br />
temperature and relative humidity at occupancy levels during the remainder <strong>of</strong> the<br />
construction period.<br />
B. Field Measurements: Where woodwork is indicated to fit to other construction, verify<br />
dimensions <strong>of</strong> other construction by field measurements before fabrication, and<br />
indicate measurements on Shop Drawings. Coordinate fabrication schedule with<br />
construction progress to avoid delaying the Work.<br />
1. Locate concealed framing, blocking, and reinforcements that support woodwork<br />
by field measurements before being enclosed, and indicate measurements on<br />
Shop Drawings.<br />
1.8 COORDINATION<br />
A. Coordinate sizes and locations <strong>of</strong> framing, blocking, furring, reinforcements, and other<br />
related units <strong>of</strong> Work specified in other Sections to ensure that interior architectural<br />
woodwork can be supported and installed as indicated.<br />
B. Hardware Coordination: Distribute copies <strong>of</strong> approved hardware schedule specified in<br />
Division 08 Section "Door Hardware (Scheduled by Describing Products)" to fabricator<br />
<strong>of</strong> architectural woodwork; coordinate Shop Drawings and fabrication with hardware<br />
requirements.<br />
PART 2 - PRODUCTS<br />
2.1 MATERIALS<br />
A. General: Provide materials that comply with requirements <strong>of</strong> AWI's quality standard for<br />
each type <strong>of</strong> woodwork and quality grade specified, unless otherwise indicated.<br />
06402-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
INTERIOR ARCHITECTURAL WOODWORK<br />
B. Wood Products: Comply with the following:<br />
1. Recycled Content <strong>of</strong> Medium-Density Fiberboard and Particleboard: Provide<br />
products with an average recycled content so postconsumer recycled content<br />
plus one-half <strong>of</strong> preconsumer recycled content is not less than 10 percent.<br />
2. Hardboard: AHA A135.4.<br />
3. Medium-Density Fiberboard: ANSI A208.2, Grade MD, made with binder<br />
containing no urea formaldehyde.<br />
4. Veneer-Faced Panel Products (Hardwood Plywood): HPVA HP-1, made with<br />
adhesive containing no urea formaldehyde.<br />
C. High-Pressure Decorative Laminate: NEMA LD 3, grades as indicated or, if not<br />
indicated, as required by woodwork quality standard.<br />
1. Manufacturer: Subject to compliance with requirements, provide high-pressure<br />
decorative laminates by one <strong>of</strong> the following:<br />
a. Formica Corporation.<br />
b. Nevamar Company, LLC; Decorative Products Div.<br />
c. Wilsonart International; Div. <strong>of</strong> Premark International, <strong>Inc</strong>.<br />
D. Chemical-Resistant, High-Pressure Decorative Laminate: NEMA LD 3, Grade HGP,<br />
and as follows:<br />
1. Laminate has the following ratings when tested with indicated reagents according<br />
to NEMA LD 3, Test Procedure 3.9.5:<br />
a. Nitric Acid (30 Percent): Moderate effect.<br />
b. Sulfuric Acid (77 Percent): Moderate effect.<br />
c. Hydrochloric Acid (37 Percent): Moderate effect.<br />
d. Phosphoric Acid (75 Percent): No effect.<br />
e. Acetic Acid (98 Percent): No effect.<br />
f. Formaldehyde: No effect.<br />
g. Ethyl Acetate: No effect.<br />
h. Ethyl Ether: No effect.<br />
i. Phenol (85 Percent): Moderate effect.<br />
j. Benzene: No effect.<br />
k. Xylene: No effect.<br />
l. Butyl Alcohol: No effect.<br />
m. Furfural: No effect.<br />
n. Methyl Ethyl Ketone: No effect.<br />
o. Sodium Hydroxide (25 Percent): No effect.<br />
p. Sodium Sulfide (15 Percent): No effect.<br />
q. Ammonium Hydroxide (28 Percent): No effect.<br />
r. Zinc Chloride: No effect.<br />
s. Gentian Violet: No effect.<br />
t. Methyl Red: No effect.<br />
2. Available Products: Subject to compliance with requirements, products that may<br />
be incorporated into the Work include, but are not limited to, the following:<br />
a. Formica Corporation; Lab Grade 840 Black.<br />
b. Panolam Industries International <strong>Inc</strong>orporated; Pionite Chemguard.<br />
c. Wilsonart International, Div. <strong>of</strong> Premark International, <strong>Inc</strong>.; Chemsurf.<br />
06402-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
INTERIOR ARCHITECTURAL WOODWORK<br />
E. Solid-Surfacing Material: Homogeneous solid sheets <strong>of</strong> filled plastic resin complying<br />
with ISSFA-2.<br />
1. Manufacturers: Subject to compliance with requirements, provide products by<br />
one <strong>of</strong> the following:<br />
a. Avonite, <strong>Inc</strong>.<br />
b. E. I. du Pont de Nemours and Company.<br />
c. Formica Corporation.<br />
d. Nevamar Company, LLC; Decorative Products Div.<br />
e. Swan Corporation (The).<br />
f. Wilsonart International; Div. <strong>of</strong> Premark International, <strong>Inc</strong>.<br />
2. Type: Standard type or Veneer type made from material complying with<br />
requirements for Standard type, as indicated, unless Special Purpose type is<br />
indicated.<br />
3. Colors and Patterns: As selected by Architect from manufacturer's full range.<br />
2.2 CABINET HARDWARE AND ACCESSORIES<br />
A. General: Provide cabinet hardware and accessory materials associated with<br />
architectural cabinets, except for items specified in Division 08 Section "Door Hardware<br />
(Scheduled by Describing Products)."<br />
B. Frameless Concealed Hinges (European Type): BHMA A156.9, B01602, 135 degrees<br />
<strong>of</strong> opening.<br />
C. Back-Mounted Pulls: BHMA A156.9, B02011.<br />
D. Wire Pulls: Back mounted, solid metal, 5 inches (127 mm) long, 2-1/2 inches (63.5<br />
mm) deep, and 5/16 inch (8 mm) in diameter.<br />
E. Catches: Magnetic catches, BHMA A156.9, B03141.<br />
F. Shelf Rests: BHMA A156.9, B04013; metal, two-pin type with shelf hold-down clip.<br />
G. Drawer Slides: BHMA A156.9, B05091.<br />
1. Heavy Duty (Grade 1HD-100 and Grade 1HD-200): Side mounted; fullovertravel-extension<br />
type; zinc-plated steel ball-bearing slides.<br />
2. Box Drawer Slides: Grade 1HD-100; for drawers not more than 6 inches (150<br />
mm) high and 24 inches (600 mm) wide.<br />
3. File Drawer Slides: Grade 1HD-100; for drawers more than 6 inches (150 mm)<br />
high or 24 inches (600 mm) wide.<br />
4. Pencil and / or Cash Drawer Slides: Grade 2; for drawers not more than 3 inches<br />
(75 mm) high and 24 inches (600 mm) wide.<br />
H. Door Locks: BHMA A156.11, E07121.<br />
I. Drawer Locks: BHMA A156.11, E07041.<br />
J. Grommets for Cable Passage through Countertops: 2-inch (51-mm) OD, black,<br />
molded-plastic grommets and matching plastic caps with slot for wire passage.<br />
1. Product: Subject to compliance with requirements, provide "OG series" by Doug<br />
Mockett & Company, <strong>Inc</strong>.<br />
06402-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
INTERIOR ARCHITECTURAL WOODWORK<br />
K. Exposed Hardware Finishes: For exposed hardware, provide finish that complies with<br />
BHMA A156.18 for BHMA finish number indicated.<br />
1. Satin Stainless Steel: BHMA 630.<br />
L. For concealed hardware, provide manufacturer's standard finish that complies with<br />
product class requirements in BHMA A156.9.<br />
2.3 MISCELLANEOUS MATERIALS<br />
A. Adhesives, General: Do not use adhesives that contain urea formaldehyde.<br />
B. VOC Limits for Installation Adhesives and Glues: Use installation adhesives that<br />
comply with the following limits for VOC content when calculated according to<br />
40 CFR 59, Subpart D (EPA Method 24):<br />
1. Wood Glues: 30 g/L.<br />
2. Contact Adhesive: 250 g/L.<br />
2.4 FABRICATION, GENERAL<br />
A. Interior Woodwork Grade: Unless otherwise indicated, provide Custom-grade interior<br />
woodwork complying with referenced quality standard.<br />
B. Wood Moisture Content: Comply with requirements <strong>of</strong> referenced quality standard for<br />
wood moisture content in relation to ambient relative humidity during fabrication and in<br />
installation areas.<br />
C. Fabricate woodwork to dimensions, pr<strong>of</strong>iles, and details indicated.<br />
D. Complete fabrication, including assembly and hardware application, to maximum<br />
extent possible before shipment to Project site. Disassemble components only as<br />
necessary for shipment and installation. Where necessary for fitting at site, provide<br />
ample allowance for scribing, trimming, and fitting.<br />
E. Shop-cut openings to maximum extent possible to receive hardware, appliances,<br />
plumbing fixtures, electrical work, and similar items. Locate openings accurately and<br />
use templates or roughing-in diagrams to produce accurately sized and shaped<br />
openings. Sand edges <strong>of</strong> cutouts to remove splinters and burrs.<br />
1. Seal edges <strong>of</strong> openings in countertops with a coat <strong>of</strong> varnish.<br />
2.5 PLASTIC-LAMINATE CABINETS<br />
A. Grade: Custom.<br />
B. AWI Type <strong>of</strong> Cabinet Construction: Flush overlay.<br />
C. Laminate Cladding for Exposed Surfaces: High-pressure decorative laminate<br />
complying with the following requirements:<br />
1. Horizontal Surfaces Other Than Tops: Grade HGS.<br />
2. Postformed Surfaces: Grade HGP.<br />
06402-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
INTERIOR ARCHITECTURAL WOODWORK<br />
3. Vertical Surfaces: Grade HGS.<br />
4. Edges: PVC T-Mold matching laminate in color, pattern and finish.<br />
D. Materials for Semiexposed Surfaces:<br />
1. Surfaces Other Than Drawer Bodies: High-pressure decorative laminate,<br />
Grade VGS.<br />
a. Edges <strong>of</strong> Plastic-Laminate Shelves: PVC T-mold matching laminate in<br />
color, pattern, and finish.<br />
b. For semiexposed backs <strong>of</strong> panels with exposed plastic-laminate surfaces,<br />
provide surface <strong>of</strong> high-pressure decorative laminate, Grade VGS.<br />
2. Drawer Sides and Backs: Solid-hardwood lumber.<br />
3. Drawer Bottoms: Hardwood plywood.<br />
E. Concealed Backs <strong>of</strong> Panels with Exposed Plastic Laminate Surfaces: High-pressure<br />
decorative laminate, Grade BKL.<br />
F. Colors, Patterns, and Finishes: Provide materials and products that result in colors<br />
and textures <strong>of</strong> exposed laminate surfaces complying with the following requirements:<br />
1. As indicated by laminate manufacturer's designations.<br />
2. As selected by Architect from laminate manufacturer's full range in the following<br />
categories:<br />
a. Solid colors, matte finish.<br />
b. Solid colors with core same color as surface, matte finish.<br />
2.6 PLASTIC-LAMINATE COUNTERTOPS<br />
A. Grade: Custom.<br />
B. High-Pressure Decorative Laminate Grade: HGS.<br />
C. Colors, Patterns, and Finishes: Provide materials and products that result in colors<br />
and textures <strong>of</strong> exposed laminate surfaces complying with the following requirements:<br />
1. As selected by Architect from manufacturer's full range in the following<br />
categories:<br />
a. Solid colors, matte finish.<br />
b. Solid colors with core same color as surface, matte finish.<br />
D. Edge Treatment: Same as laminate cladding on horizontal surfaces.<br />
E. Core Material: Medium-density fiberboard.<br />
F. Core Material at Sinks: exterior-grade plywood.<br />
G. Backer Sheet: Provide plastic-laminate backer sheet, Grade BKL, on underside <strong>of</strong><br />
countertop substrate.<br />
06402-6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
2.7 SOLID-SURFACING-MATERIAL COUNTERTOPS<br />
A. Grade: Custom.<br />
B. Solid-Surfacing-Material Thickness: 1/2 inch (13 mm).<br />
INTERIOR ARCHITECTURAL WOODWORK<br />
C. Colors, Patterns, and Finishes: Provide materials and products that result in colors <strong>of</strong><br />
solid-surfacing material complying with the following requirements:<br />
1. As selected by Architect from manufacturer's full range.<br />
D. Fabricate tops in one piece, unless otherwise indicated. Comply with solid-surfacingmaterial<br />
manufacturer's written recommendations for adhesives, sealers, fabrication,<br />
and finishing.<br />
1. Fabricate tops with loose backsplashes for field application.<br />
PART 3 - EXECUTION<br />
3.1 PREPARATION<br />
A. Before installation, condition woodwork to average prevailing humidity conditions in<br />
installation areas.<br />
B. Before installing architectural woodwork, examine shop-fabricated work for completion<br />
and complete work as required, including removal <strong>of</strong> packing and backpriming.<br />
3.2 INSTALLATION<br />
A. Grade: Install woodwork to comply with requirements for the same grade specified in<br />
Part 2 for fabrication <strong>of</strong> type <strong>of</strong> woodwork involved.<br />
B. Assemble woodwork and complete fabrication at Project site to comply with<br />
requirements for fabrication in Part 2, to extent that it was not completed in the shop.<br />
C. Install woodwork level, plumb, true, and straight. Shim as required with concealed<br />
shims. Install level and plumb (including tops) to a tolerance <strong>of</strong> 1/8 inch in 96 inches (3<br />
mm in 2400 mm).<br />
D. Scribe and cut woodwork to fit adjoining work, refinish cut surfaces, and repair<br />
damaged finish at cuts.<br />
E. Anchor woodwork to anchors or blocking built in or directly attached to substrates.<br />
Secure with countersunk, concealed fasteners and blind nailing as required for<br />
complete installation.<br />
F. Cabinets: Install without distortion so doors and drawers fit openings properly and are<br />
accurately aligned. Adjust hardware to center doors and drawers in openings and to<br />
provide unencumbered operation. Complete installation <strong>of</strong> hardware and accessory<br />
items as indicated.<br />
1. Install cabinets with no more than 1/8 inch in 96-inch (3 mm in 2400-mm) sag,<br />
bow, or other variation from a straight line.<br />
06402-7<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
INTERIOR ARCHITECTURAL WOODWORK<br />
G. Countertops: Anchor securely by screwing through corner blocks <strong>of</strong> base cabinets or<br />
other supports into underside <strong>of</strong> countertop.<br />
1. Align adjacent solid-surfacing-material countertops and form seams to comply<br />
with manufacturer's written recommendations using adhesive in color to match<br />
countertop. Carefully dress joints smooth, remove surface scratches, and clean<br />
entire surface.<br />
2. Install countertops with no more than 1/8 inch in 96-inch (3 mm in 2400-mm) sag,<br />
bow, or other variation from a straight line.<br />
3. Secure backsplashes to tops with concealed metal brackets at 16 inches (400<br />
mm) o.c. and to walls with adhesive.<br />
4. Calk space between backsplash and wall with sealant specified in Division 07<br />
Section "Joint Sealants."<br />
3.3 ADJUSTING AND CLEANING<br />
A. Repair damaged and defective woodwork, where possible, to eliminate functional and<br />
visual defects; where not possible to repair, replace woodwork. Adjust joinery for<br />
uniform appearance.<br />
B. Clean, lubricate, and adjust hardware.<br />
C. Clean woodwork on exposed and semiexposed surfaces. Touch up shop-applied<br />
finishes to restore damaged or soiled areas.<br />
END OF SECTION 06402<br />
06402-8<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 07170<br />
BENTONITE PANEL WATERPROOFING<br />
PART 1 - GENERAL<br />
1.1 RELATED DOCUMENTS<br />
The general provision <strong>of</strong> the Contract, including General and Supplementary<br />
Conditions and General Requirements, apply to the work specified in this section.<br />
1.2 DESCRIPTION OF WORK<br />
The extent <strong>of</strong> Basis-<strong>of</strong>-Design Geotextile/Bentonite Clay <strong>water</strong>pro<strong>of</strong>ing <strong>membrane</strong> is<br />
shown on the drawing and/or as specified herein.<br />
1.3 RELATED SECTIONS<br />
A. Division 03 - Concrete<br />
B. Division 04 - Masonry<br />
1.4 QUALITY ASSURANCE<br />
A. Manufacturer: Provide Geotextile/Bentonite Clay <strong>water</strong>pro<strong>of</strong>ing <strong>membrane</strong><br />
produced by a manufacturer with a minimum <strong>of</strong> 5 years experience in the<br />
<strong>water</strong>pro<strong>of</strong>ing industry.<br />
B. Installer: A firm with a minimum <strong>of</strong> 2 years experience in installing bentonite clay<br />
or other related <strong>water</strong>pro<strong>of</strong>ing products.<br />
1.5 SUBMITTALS<br />
A. Product data sheets, specifications, installation instructions and general<br />
recommendations for each type <strong>of</strong> product specified.<br />
B. Installer: Submit detail drawings for installation <strong>of</strong> product specified.<br />
C. Water Sample Test Result: A <strong>water</strong> sample (2 liters) is required on projects that<br />
have ground <strong>water</strong> and should be submitted to the <strong>water</strong>pro<strong>of</strong>ing manufacturer to<br />
test for contamination and compatibility with <strong>water</strong>pro<strong>of</strong>ing <strong>membrane</strong>. Submit to<br />
architect a letter <strong>of</strong> compatibility recommending which formulation to use.<br />
D. Warranty: Submit specimen <strong>of</strong> manufacturers’ standard warranty.<br />
1.6 WARRANTY<br />
A. Upon completion and acceptance <strong>of</strong> the work required by this section, the<br />
manufacturer will issue a warranty agreeing to promptly replace defective<br />
materials for a period <strong>of</strong> 5 years.<br />
1.7 PRODUCT DELIVERY, STORAGE AND HANDLING<br />
A. Deliver materials in original manufacturer’s packaging and store materials in strict<br />
accordance with manufacturer’s instructions.<br />
B. Remove and replace products that have been prematurely exposed to moisture.<br />
1.8 PROJECT CONDITIONS<br />
07170-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
A. Install materials in accordance with all safety and weather conditions required by<br />
the manufacturer.<br />
B. Install materials only after work on the applicable substrate is complete.<br />
C. Complete cast-in-place reinforced columns prior to <strong>membrane</strong> installation.<br />
PART 2 - PRODUCTS<br />
2.1 WATERPROOFING SYSTEM<br />
A. The Geotextile/Bentonite clay <strong>water</strong>pro<strong>of</strong>ing <strong>membrane</strong> shall be equivalent to<br />
CCW MiraCLAY supplied by Carlisle Coatings & Waterpro<strong>of</strong>ing <strong>Inc</strong>orporated,<br />
900 Hensley Lane, Wylie, Texas 75098, Phone (800) 527-7092 Fax: (972) 442-<br />
0076.<br />
B. Physical Properties for Geotextile/Bentonite Clay Waterpro<strong>of</strong>ing Membrane:<br />
CCW MiraCLAY Physical Properties:<br />
Property Test Method Value<br />
Bentonite Content — 1.0 lb/ft 2 (.488 kg/m 2 )*<br />
Nominal Dry Thickness — 0.25 in (6.4 mm)<br />
Weight — 75 lb (34.05 kg)<br />
Permeability ASTM D 5084 5 x 10 -9 cm/sec<br />
Grab Tensile Strength ASTM D 4632 95 lb (422 N)<br />
Grab Elongation ASTM D 4632 150%<br />
Puncture Resistance ASTM D 4833 120 psi (828 kPa)<br />
Hydrated Internal Shear ASTM D 5321 500 psf (24 kPa)<br />
Swell Index ASTM D 5890 2g (24 ml) min.<br />
Fluid Loss ASTM D 5891 18 ml max.<br />
Dimensions<br />
5.12 ft x 13.62 ft (69.75 ft²)<br />
Hydrostatic Head Pressure ASTM D751 228 ft (69.49 meter)<br />
Adhesion to Concrete ASTM D903 17.7 lb/in (8 kg/cm)<br />
*@ 12% moisture content<br />
C. Waterpro<strong>of</strong>ing system accessories supplied by <strong>water</strong>pro<strong>of</strong>ing <strong>membrane</strong><br />
manufacturer:<br />
Mastic: CCW MiraCLAY Mastic is used for detailing at terminations and<br />
penetrations. Also used to fill minor voids in concrete and as a fillet in angle<br />
changes.<br />
Granules: CCW MiraCLAY Granules used for horizontal to vertical transitions<br />
and for detailing at seams and slab penetrations.<br />
Waterstop: CCW MiraSTOP used as a <strong>water</strong>stop at cold concrete pours and<br />
between pre-cast concrete panels.<br />
D. Membrane to Substrate Fasteners: Fasteners, <strong>of</strong> the type and length suitable for<br />
the substrate, shall be used in conjunction with washers, <strong>of</strong> at least 1” diameter<br />
to attach the geotextile/bentonite clay <strong>water</strong>pro<strong>of</strong>ing <strong>membrane</strong> to the substrate.<br />
E. Membrane to Membrane Fasteners: Mechanically fasten <strong>membrane</strong> sheets<br />
together with a box stapler or similar device for horizontal applications.<br />
F. The Geotextile/Bentonite <strong>membrane</strong> shall consist <strong>of</strong> geotextile panels <strong>of</strong> sodium<br />
bentonite clay sandwiched between two layers <strong>of</strong> needle-punched woven and<br />
non-woven polypropylene fabrics.<br />
G. Drainage Composite: Shall be CCW MiraDRAIN ® as recommended by the<br />
manufacturer for each condition.<br />
H. Perimeter Drainage System: Where required shall be CCW QuickDRAIN.<br />
PART 3 - EXECUTION<br />
3.1 INSPECTION<br />
07170-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
A. Examine substrate and condition under which <strong>water</strong>pro<strong>of</strong>ing will be installed. Do<br />
not proceed with the work until unsatisfactory conditions have been corrected.<br />
3.2 SURFACE PREPARATION<br />
A. Lagging, Concrete Cassions, Shotcrete or Gunite Applications:<br />
1. Fill all spaces that are over 1" (25 mm) in width with grout or concrete to<br />
a smooth and uniform surface. Cover large gaps with 1/2" (12 mm)<br />
plywood or CCW MiraDRAIN 6000 or 6000XL.<br />
2. Trowel CCW MiraCLAY Mastic around all tieback plates and soldier<br />
beams a minimum <strong>of</strong> 1 1/2" (39 mm) thick and extend a minimum <strong>of</strong> 4"<br />
(10 cm) beyond the flange.<br />
3. Remove projections from the wall surface in excess <strong>of</strong> 3/4" (20 mm).<br />
B. Grade Substrates: Shall be level and uniform that is compacted to a minimum <strong>of</strong><br />
85% modified proctor.<br />
C. Concrete Application:<br />
1. Apply CCW MiraCLAY Mastic to all construction joints at a minimum <strong>of</strong><br />
1/4" (7 mm) thickness and a 3" (8 cm) minimum width.<br />
2. Remove projections from the wall surface in excess <strong>of</strong> 3/4" (20 mm).<br />
D. Honeycombing, voids and aggregate pockets exceeding 1” in diameter or have a<br />
depth greater than 3/4” should be filled with a non-shrink cementitious grout. Fill<br />
tie-rod holes with a non-shrink cementitious grout.<br />
3.3 INSTALLATION<br />
A. Prevent geotextile/bentonite clay <strong>water</strong>pro<strong>of</strong>ing <strong>membrane</strong> from hydrating before<br />
being covered with overburden. When threat <strong>of</strong> rain is imminent or backfill is not<br />
immediate, geotextile/bentonite clay <strong>water</strong>pro<strong>of</strong>ing <strong>membrane</strong> should be covered<br />
with polyethylene sheeting.<br />
B. Lagging Application<br />
1. Install a stripping piece <strong>of</strong> CCW MiraCLAY over each soldier beam that<br />
extends a minimum <strong>of</strong> 8" (20 cm) beyond either side <strong>of</strong> the beam. Each<br />
soldier beam shall have a double layer <strong>of</strong> CCW MiraCLAY Membrane.<br />
2. Install CCW MiraCLAY with the white non-woven side out, facing the<br />
installer.<br />
3. Starting at the bottom <strong>of</strong> the wall, unroll CCW MiraCLAY and nail across<br />
top <strong>of</strong> panel one nail per 12” (31cm) on center. Allow sheet to hang<br />
down, nailing only as required to stabilize.<br />
4. Install adjacent <strong>membrane</strong> by overlapping edges a minimum <strong>of</strong> 4” (10<br />
cm).<br />
5. Fasten <strong>membrane</strong> once every 18” (45 cm) on seams or as required to<br />
prevent blousing.<br />
6. Extend <strong>water</strong>pro<strong>of</strong>ing <strong>membrane</strong> to or above grade and fasten<br />
<strong>membrane</strong> once every 12" (30 cm).<br />
7. Install CCW MiraSTOP at all pour joints and exterior perimeter <strong>of</strong> tieback<br />
box outs.<br />
C. Underslab Application: (Concrete slab shall have a minimum thickness <strong>of</strong> 4" if<br />
reinforced or 5” if not reinforced).<br />
1. Install CCW MiraCLAY with the white non-woven side up, facing the<br />
installer.<br />
2. Overlap edges a minimum <strong>of</strong> 4” (10 cm).<br />
3. Protect CCW MiraCLAY from damage caused by chairs with sharp<br />
edges or points by placing a patch <strong>of</strong> CCW MiraCLAY under the chair.<br />
4. Staple joints <strong>of</strong>ten enough to prevent excessive movement.<br />
07170-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
5. Pour CCW MiraCLAY Granules or trowel CCW MiraCLAY Mastic around<br />
all penetrations and press in “cut-to-fit” collars <strong>of</strong> CCW MiraCLAY.<br />
6. Extend the installation <strong>of</strong> CCW MiraCLAY 12" (31 cm) up or beyond the<br />
perimeter slab forms.<br />
7. Inspect and repair any damaged material before concrete pour.<br />
D. Concrete Wall Application:<br />
1. Install CCW MiraCLAY with the white non-woven side out, facing the<br />
installer.<br />
2. Starting at the bottom <strong>of</strong> the wall, unroll CCW MiraCLAY and nail across<br />
top <strong>of</strong> panel one nail per 12" (31 cm) on center. Allow sheet to hang<br />
down nailing only as required to stabilize.<br />
3. Install adjacent <strong>membrane</strong> by overlapping edges a minimum <strong>of</strong> 4”<br />
(10cm).<br />
4. Fasten <strong>membrane</strong> once every 18” (45 cm) on seams or as required to<br />
prevent blousing with 3/4” (20 mm) to 1” (25mm) concrete nails with<br />
washers.<br />
5. Extend <strong>water</strong>pro<strong>of</strong>ing <strong>membrane</strong> to 6” below grade and fasten<br />
<strong>membrane</strong> to the substrate to maintain constant compression using a<br />
1/8” X 1” (3 X 25 mm) minimum termination bar. Trowel a 1/2” (12 mm)<br />
thick and 2” (5cm) wide bead <strong>of</strong> CCW MiraCLAY Mastic at top edge <strong>of</strong><br />
<strong>membrane</strong> and cover termination bar.<br />
6. Create a cant at any vertical to horizontal transition by applying a 1.5” to<br />
2” (4 cm to 5 cm) cant <strong>of</strong> CCW MiraCLAY Granules or CCW MiraCLAY<br />
Mastic.<br />
7. Strip in all outside corners and transitions with a min. 12" (30) piece <strong>of</strong><br />
CCW MiraCLAY <strong>membrane</strong> to double cover these areas.<br />
8. Make a min. 1” cant at all inside corners with CCW MiraCLAY Mastic.<br />
9. Backfill must be compactible soils free <strong>of</strong> construction debris and must<br />
be uniformly compacted to a minimum 85% Modified Protor density on<br />
each lift.<br />
3.4 PROTECTION AND DRAINAGE<br />
1. Protect the geotextile/bentonite clay <strong>water</strong>pro<strong>of</strong>ing <strong>membrane</strong> with CCW<br />
MiraDRAIN Drainage Composite.<br />
2. Install the CCW MiraDRAIN Drainage Composite according to the detailed<br />
drawings for the specific installation requirements <strong>of</strong> the project.<br />
3.6 BACKFILL<br />
Backfill with smooth and uniform material with no sharp projections or stones<br />
larger than 3/4”. Compact backfill to an 85% Modified Proctor density. Ensure<br />
backfill material is not contaminated with salt or other materials that could<br />
prevent the CCW MiraCLAY from hydrating.<br />
END OF SECTION 07170<br />
07170-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 07210<br />
THERMAL INSULATION<br />
PART 1 - GENERAL<br />
1.1 RELATED DOCUMENTS<br />
A. Drawings and general provisions <strong>of</strong> the Contract, including General and<br />
Supplementary Conditions and Division 01 Specification Sections, apply to this<br />
Section.<br />
1.2 SUMMARY<br />
A. This Section includes the following:<br />
1. Concealed building insulation.<br />
2. Foamed-in-place masonry wall insulation.<br />
3. Sound attenuation insulation.<br />
B. Related Sections include the following:<br />
1. Division 07 Section "Fire-Resistive Joint Systems" for insulation installed as part<br />
<strong>of</strong> a perimeter fire-resistive joint system.<br />
2. Division 09 Section "Gypsum Board" for installation in metal-framed assemblies<br />
<strong>of</strong> insulation specified by referencing this Section.<br />
1.3 SUBMITTALS<br />
A. Product Data: For each type <strong>of</strong> product indicated.<br />
B. Product Test Reports: Based on evaluation <strong>of</strong> comprehensive tests performed by a<br />
qualified testing agency for insulation products.<br />
C. Research/Evaluation Reports: For foam-plastic insulation.<br />
1.4 QUALITY ASSURANCE<br />
A. Source Limitations: Obtain each type <strong>of</strong> building insulation through one source from a<br />
single manufacturer.<br />
B. Fire-Test-Response Characteristics: Provide insulation and related materials with the<br />
fire-test-response characteristics indicated, as determined by testing identical products<br />
per test method indicated below by UL or another testing and inspecting agency<br />
acceptable to authorities having jurisdiction. Identify materials with appropriate<br />
markings <strong>of</strong> applicable testing and inspecting agency.<br />
1. Surface-Burning Characteristics: ASTM E 84.<br />
2. Fire-Resistance Ratings: ASTM E 119.<br />
3. Combustion Characteristics: ASTM E 136.<br />
07210-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
THERMAL INSULATION<br />
C. Foamed-in-place Masonry Wall Insulation:<br />
1. Engage an experienced installer who has been trained and licensed by the<br />
manufacturer and which has not less than ten years direct experience with the<br />
installation <strong>of</strong> the product used.<br />
2. Provide insulation produced by a single and approved manufacturer. The product<br />
must come from the manufacturer pre-mixed to ensure consistency.<br />
3. Insulation subcontractor shall carry Products and Completed Operations<br />
Insurance with minimum liability limits <strong>of</strong> $7,000,000.<br />
D. Recycled Content: Provide glass-fiber insulation with recycled content so<br />
postconsumer recycled content plus one-half <strong>of</strong> preconsumer recycled content is not<br />
less than 20 percent.<br />
1.5 DELIVERY, STORAGE, AND HANDLING<br />
A. Protect insulation materials from physical damage and from deterioration by moisture,<br />
soiling, and other sources. Store inside and in a dry location. Comply with<br />
manufacturer's written instructions for handling, storing, and protecting during<br />
installation.<br />
B. Protect insulation as follows:<br />
1. Do not expose to sunlight, except to extent necessary for period <strong>of</strong> installation<br />
and concealment.<br />
2. Protect against ignition at all times. Do not deliver insulating materials to Project<br />
site before installation time.<br />
3. Complete installation and concealment <strong>of</strong> insulation materials as rapidly as<br />
possible in each area <strong>of</strong> construction.<br />
PART 2 - PRODUCTS<br />
2.1 FOAMED-IN PLACE MASONRY INSULATION<br />
A. Foamed-in-place masonry insulation: Two component thermal insulation produced by<br />
combining a plastic resin and catalyst foaming agent surfactant which, when properly<br />
ratioed and mixed, together with compressed air produce a cold-setting foam insulation<br />
in the hollow cores <strong>of</strong> hollow unit masonry walls:<br />
1. Basis-<strong>of</strong>-Design Product:<br />
a. Core-Fill 500 manufactured by Tailored Chemical Products or equivalent<br />
product.<br />
2.2 GLASS-FIBER BLANKET INSULATION<br />
A. Available Manufacturers:<br />
1. CertainTeed Corporation.<br />
2. Owens Corning.<br />
07210-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
THERMAL INSULATION<br />
B. Unfaced, Glass-Fiber Blanket Insulation: ASTM C 665, Type I (blankets without<br />
<strong>membrane</strong> facing); consisting <strong>of</strong> fibers; with maximum flame-spread and smokedeveloped<br />
indexes <strong>of</strong> 25 and 50, respectively; passing ASTM E 136 for combustion<br />
characteristics.<br />
C. Where glass-fiber blanket insulation is indicated by the following thicknesses, provide<br />
blankets in batt or roll form with thermal resistances indicated:<br />
1. 5-1/2 inches (140 mm) thick with a thermal resistance <strong>of</strong> 19 deg F x h x sq. ft./Btu<br />
at 75 deg F (3.3 K x sq. m/W at 24 deg C).<br />
PART 3 - EXECUTION<br />
3.1 EXAMINATION<br />
A. Examine substrates and conditions, with Installer present, for compliance with<br />
requirements <strong>of</strong> Sections in which substrates and related work are specified and for<br />
other conditions affecting performance.<br />
1. Proceed with installation only after unsatisfactory conditions have been<br />
corrected.<br />
3.2 PREPARATION<br />
A. Clean substrates <strong>of</strong> substances harmful to insulation, including removing projections<br />
capable <strong>of</strong> interfering with insulation attachment.<br />
3.3 INSTALLATION, GENERAL<br />
A. Comply with insulation manufacturer's written instructions applicable to products and<br />
application indicated.<br />
B. Install insulation that is undamaged, dry, and unsoiled and that has not been left<br />
exposed at any time to ice, rain, and snow.<br />
C. Extend insulation in thickness indicated to envelop entire area to be insulated. Cut and<br />
fit tightly around obstructions and fill voids with insulation. Remove projections that<br />
interfere with placement.<br />
D. Water-Piping Coordination: If <strong>water</strong> piping is located within insulated exterior walls,<br />
coordinate location <strong>of</strong> piping to ensure that it is placed on warm side <strong>of</strong> insulation and<br />
insulation encapsulates piping.<br />
E. For preformed insulating units, provide sizes to fit applications indicated and selected<br />
from manufacturer's standard thicknesses, widths, and lengths. Apply single layer <strong>of</strong><br />
insulation units to produce thickness indicated unless multiple layers are otherwise<br />
shown or required to make up total thickness.<br />
07210-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
3.4 INSTALLATION OF FOAMED-IN-PLACE MASONRY INSULATION<br />
THERMAL INSULATION<br />
A. Apply insulation units to substrates by method indicated, complying with manufacturer's<br />
written instructions.<br />
B. Install foamed-in-place masonry insulation from the interior, prior to installation <strong>of</strong><br />
interior finish work and after all masonry and structural concrete work is in place.<br />
C. Fill all open cells and voids in hollow concrete masonry walls where shown on the<br />
drawings. The foam insulation shall be pressure injected through a series <strong>of</strong> 5/8 inch<br />
diameter to 7/8 inch diameter holes drilled into every vertical column <strong>of</strong> block cells<br />
(every 8 inches on center) beginning at an approximate height <strong>of</strong> four feet above<br />
finished floor level. Repeat this procedure at an approximate height <strong>of</strong> ten feet above<br />
the first horizontal row <strong>of</strong> holes (or as required) until the void is completely filled. Patch<br />
holes with the same mortar used originally between the unit masonry and score the<br />
joint to match the existing adjacent joint pr<strong>of</strong>ile.<br />
3.5 INSTALLATION OF GLASS FIBER AND SOUND ATTENUATION BUILDING<br />
INSULATION<br />
A. Apply insulation units to substrates by method indicated, complying with manufacturer's<br />
written instructions.<br />
B. Install glass-fiber insulation in cavities formed by framing members according to the<br />
following requirements:<br />
1. Use insulation widths and lengths that fill the cavities formed by framing<br />
members. If more than one length is required to fill cavity, provide lengths that<br />
will produce a snug fit between ends.<br />
2. Place insulation in cavities formed by framing members to produce a friction fit<br />
between edges <strong>of</strong> insulation and adjoining framing members.<br />
3. Maintain 3-inch (76-mm) clearance <strong>of</strong> insulation around recessed lighting<br />
fixtures.<br />
4. For metal-framed wall cavities where cavity heights exceed 96 inches (2438<br />
mm), support unfaced blankets mechanically and support faced blankets by<br />
taping flanges <strong>of</strong> insulation to flanges <strong>of</strong> metal studs.<br />
C. Stuff glass-fiber loose-fill insulation into miscellaneous voids and cavity spaces where<br />
shown. Compact to approximately 40 percent <strong>of</strong> normal maximum volume equaling a<br />
density <strong>of</strong> approximately 2.5 lb/cu. ft. (40 kg/cu. m).<br />
3.6 INSTALLATION OF INSULATION IN CEILINGS FOR SOUND ATTENUATION<br />
A. Install 3-inch- (76-mm-) thick, unfaced glass-fiber blanket insulation over suspended<br />
ceilings at partitions in a width that extends insulation 48 inches (1219 mm) on either<br />
side <strong>of</strong> partition.<br />
3.7 PROTECTION<br />
A. Protect installed insulation from damage due to harmful weather exposures, physical<br />
abuse, and other causes. Provide temporary coverings or enclosures where insulation<br />
07210-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
THERMAL INSULATION<br />
is subject to abuse and cannot be concealed and protected by permanent construction<br />
immediately after installation.<br />
END OF SECTION 07210<br />
07210-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 07220<br />
LIGHTWEIGHT INSULATING CONCRETE ROOF INSULATION<br />
PART 1 - GENERAL<br />
1.1 SUMMARY<br />
A. This Section includes the following:<br />
1. Lightweight Insulating Concrete Application to Prepared Substrate<br />
1.2 REFERENCE STANDARDS<br />
A. ASTM - American Society for Testing and Materials, Philadelphia, PA<br />
B. UL - Underwriters Laboratories, Northbrook, IL<br />
1.3 DEFINITIONS<br />
A. Lightweight insulating concrete ro<strong>of</strong> insulation components are defined by Underwriters<br />
Laboratories under sections CCVW for foamed plastic and CJZZ for floor or ro<strong>of</strong><br />
topping mixture in the latest edition <strong>of</strong> Underwriters Laboratories Fire Resistance<br />
Directory.<br />
1.4 SUBMITTALS<br />
A. Shop Drawings: <strong>Inc</strong>luding ro<strong>of</strong> plan, ro<strong>of</strong> slopes, and thickness <strong>of</strong> insulation.<br />
B. Product Data: For each type <strong>of</strong> product indicated including manufacturer’s instructions<br />
for the proper placement <strong>of</strong> the proposed lightweight insulating concrete ro<strong>of</strong> insulation<br />
system.<br />
C. Product test reports.<br />
D. Research/Evaluation Reports: For foam-plastic insulation.<br />
E. Installer Certificates: Signed by insulation system manufacturer certifying that Installer<br />
is approved, authorized, or licensed by manufacturer to install the insulation system.<br />
F. Warranties: Special warranties specified in this Section.<br />
G. Inspection Report: Copy <strong>of</strong> ro<strong>of</strong>ing system manufacturer's pull tests inspection report<br />
<strong>of</strong> completed insulation system installation.<br />
H. Manufacturer Certificates: Signed by insulation manufacturer certifying that insulation<br />
system complies with requirements specified in "Performance Requirements" Article.<br />
1. Submit evidence <strong>of</strong> meeting performance requirements.<br />
07220-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
LIGHTWEIGHT INSULATING CONCRETE ROOF INSULATION<br />
2. Submit a letter from the supplier <strong>of</strong> the proposed lightweight insulating concrete<br />
system confirming that the expanded polystyrene used as a component in the<br />
lightweight insulating concrete system is to be furnished by the supplier <strong>of</strong> the<br />
proposed lightweight insulating concrete system<br />
1.5 QUALITY ASSURANCE<br />
A. Installer Qualifications: A qualified firm that is approved, authorized, or licensed by<br />
ro<strong>of</strong>ing system manufacturer to install manufacturer's product and that is eligible to<br />
receive manufacturer's warranty. Installer shall have a minimum <strong>of</strong> five (5) years<br />
experience in successfully installing the same ro<strong>of</strong>ing materials.<br />
B. Testing Agency Compliance: Provide a lightweight insulating concrete system meeting<br />
the following fire resistance standards:<br />
1. Testing by Underwriters Laboratories in accordance with the procedures <strong>of</strong><br />
ASTM E 119 and listed in the most recent Underwriters Laboratories Fire<br />
Resistance Directory.<br />
1.6 DELIVERY, STORAGE, AND HANDLING<br />
A. Deliver ro<strong>of</strong>ing materials to Project site in the supplier’s original unopened packages<br />
with seals unbroken and labeled with manufacturer's name, product brand name and<br />
type, date <strong>of</strong> manufacture, Underwriters Laboratories label and directions for storage.<br />
B. Storage: Store bagged concrete aggregate products in a dry location until ready for<br />
application. Expanded polystyrene board should not be stored in areas <strong>of</strong> standing<br />
<strong>water</strong> prior to application.<br />
C. Handling: Handle all materials in such a manner as to preclude damage and<br />
contamination with moisture or foreign matter.<br />
D. Damaged Material: Any materials that are found to be damaged or stored in any<br />
manner other than stated above will be automatically rejected, removed and replaced<br />
at the Contractor’s expense.<br />
1.7 PROJECT / SITE CONDITIONS<br />
A. Requirements Prior to Job Start<br />
1. Notification: Give a minimum <strong>of</strong> 5 days notice to the Owner and manufacturer<br />
prior to commencing any work and notify both parties on a daily basis <strong>of</strong> any<br />
change in work schedule.<br />
2. Permits: Obtain all permits required by local agencies and pay all fees which<br />
may be required for the performance <strong>of</strong> the work.<br />
3. Safety: Familiarize every member <strong>of</strong> the application crew with all fire and safety<br />
regulations recommended by OSHA, NRCA and other industry or local<br />
government groups.<br />
B. Environmental Requirements<br />
07220-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
LIGHTWEIGHT INSULATING CONCRETE ROOF INSULATION<br />
1. Weather Limitations: Do not apply ro<strong>of</strong>ing materials during precipitation or in the<br />
event there is a probability <strong>of</strong> precipitation during application. Take adequate<br />
precautions to ensure that materials, applied ro<strong>of</strong>ing, and building interiors are<br />
protected from possible moisture damage or contamination. Proceed with<br />
installation only when existing and forecasted weather conditions permit ro<strong>of</strong>ing<br />
system to be installed according to manufacturer's written instructions and<br />
warranty requirements.<br />
2. Temperature Restrictions: When air temperatures <strong>of</strong> 40 degrees F or above are<br />
predicted to occur within the first 24 hours <strong>of</strong> placement, normal mixing and<br />
application procedures may be used. When air temperatures <strong>of</strong> 32 to 40 degrees<br />
F or above are predicted to occur within the first 24 hours <strong>of</strong> placement, warm<br />
<strong>water</strong> may be used. The mix temperature should not exceed 100 degrees F at<br />
the point <strong>of</strong> placement. Do not install the lightweight insulating concrete system<br />
when air temperatures are below 32 degrees F.<br />
1.8 WARRANTY<br />
A. Ro<strong>of</strong> System Guarantee: Upon successful completion <strong>of</strong> the project, and after all post<br />
installation procedures have been completed, furnish the Owner with the insulation<br />
system manufacturer’s 10 year labor and materials warranty. The insulation system<br />
warranty shall include the composite ro<strong>of</strong> deck system consisting <strong>of</strong> aggregate fill and<br />
polystyrene insulation panels. All repair or replacement costs covered under the<br />
guarantee shall be borne by the insulation system manufacturer. The guarantee shall<br />
be term type, without deductables or limitations on coverage amount, and be issued at<br />
no additional cost to the Owner. Specific items covered under the term <strong>of</strong> the<br />
insulation system warranty include:<br />
1. The actual resistance to heat flow through the ro<strong>of</strong> insulation will be at least 80%<br />
<strong>of</strong> the design thermal resistance, provided that the ro<strong>of</strong>ing <strong>membrane</strong> is free <strong>of</strong><br />
leaks;<br />
2. The ro<strong>of</strong> insulation material will not cause structural damage to the building as a<br />
result <strong>of</strong> expansion from thermal or chemical action.<br />
3. The ro<strong>of</strong> insulation will remain in a rero<strong>of</strong>able condition should the ro<strong>of</strong><br />
<strong>membrane</strong> require replacement (excluding damage caused by fastener pullout<br />
during removal <strong>of</strong> the old <strong>membrane</strong>.)<br />
4. The ro<strong>of</strong> insulation material will not cause structural damage to the building as a<br />
result <strong>of</strong> expansion from thermal or chemical action.<br />
5. The Insulating Concrete Warranty will not limit, by geographic location, the<br />
Owner’s rights for claims, actions, and/or proceedings.<br />
a. Siplast Ten Year Ro<strong>of</strong> Insulation Performance Warranty or approved<br />
equivalent system.<br />
07220-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
LIGHTWEIGHT INSULATING CONCRETE ROOF INSULATION<br />
PART 2 - PRODUCTS<br />
2.1 MANUFACTURERS<br />
A. Acceptable Manufacturers: Provide a lightweight insulating concrete ro<strong>of</strong> insulation<br />
system incorporating vermiculite aggregate, pregenerated foam and expanded<br />
polystyrene board supplied by a single manufacturer:<br />
1. Basis <strong>of</strong> Design Manufacturer: ZIC Ro<strong>of</strong> Insulation System by Siplast, <strong>Inc</strong>. Irving,<br />
TX or approved equivalent.<br />
2.2 MATERIALS<br />
A. Lightweight Concrete System Description: Provide materials used in the light weight<br />
concrete ro<strong>of</strong> insulation system conforming to the following:<br />
1. Galvanized Metal Decking: Corrugated steel decking incorporating a pre-applied<br />
galvanized coating conforming to a minimum Class G-60 as specified in ASTM A<br />
525 and having slots in the flutes equal to a minimum <strong>of</strong> 0.75% <strong>of</strong> the deck area.<br />
Refer to general notes on the structural drawings and Specification Section<br />
53100 Steel Decking for metal deck specifications and attachment requirements.<br />
2. Portland Cement: Portland cement conforming to Type I, II, or III as defined by<br />
ASTM C150.<br />
3. Vermiculite Aggregate: Vermiculite concrete aggregate conforming to ASTM<br />
C332. Equivalent to ZIC Concrete Aggregate by Siplast, <strong>Inc</strong>., Irving, TX.<br />
4. Expanded Polystyrene Insulation Board: Expanded polystyrene (EPS) insulation<br />
board having a nominal density <strong>of</strong> 1 Pound per cubic foot (pcf) defined as Type I<br />
by ASTM C578 and containing approximately 3% <strong>of</strong> open area. Each bundle <strong>of</strong><br />
board shall be delivered to the job site with clear identification as to manufacturer<br />
and the Underwriter’s Laboratories Classified label on each bundle. Equivalent to<br />
Insulperm Insulation Board by Siplast, <strong>Inc</strong>., Irving, TX.<br />
5. Water: Potable <strong>water</strong> that is clean and free <strong>of</strong> deleterious amounts <strong>of</strong> acid, alkali<br />
and organic materials.<br />
2.3 MIX DESIGN<br />
A. Density: Mix Portland cement and vermiculite concrete in 1:6 volume ratio with <strong>water</strong> to<br />
achieve a wet density ranging from 44 to 60 pounds per cubic foot (pcf), resulting in a<br />
minimum dry density <strong>of</strong> 22 pounds per cubic foot (pcf), and minimum compressive<br />
strength <strong>of</strong> 140 pounds per square inch (psi).<br />
PART 3 - EXECUTION<br />
3.1 EXAMINATION<br />
A. General: Ensure that all surfaces to receive lightweight insulating concrete are free <strong>of</strong> oil<br />
grease, paints / primers, loose mill scale, dirt, or other foreign substances. Where<br />
07220-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
LIGHTWEIGHT INSULATING CONCRETE ROOF INSULATION<br />
necessary, cleaning or other corrections <strong>of</strong> the surfaces to receive lightweight<br />
insulating concrete is the responsibility <strong>of</strong> the party causing the unacceptable condition<br />
<strong>of</strong> the substrate.<br />
B. Substrate Acceptance: With the general contractor present, examine surfaces to receive<br />
the ro<strong>of</strong> insulation system and determined that the surfaces are acceptable prior to<br />
placement <strong>of</strong> the lightweight insulation concrete system.<br />
3.2 PREPARATION<br />
A. General: Remove <strong>water</strong> or any other substance that would interfere with bonding <strong>of</strong><br />
lightweight concrete system.<br />
3.3 APPLICATION<br />
A. General: Provide equipment and application procedures conforming to the material<br />
supplier’s application instructions.<br />
B. Applications <strong>Inc</strong>orporating Insulperm Insulation Board: When the specified Insulperm<br />
Insulation Board is to be incorporated into the lightweight insulating concrete system,<br />
fill the flutes and place a 1/8 inch minimum thickness <strong>of</strong> insulating concrete slurry coat<br />
over the top <strong>of</strong> the corrugations on metal deck before imbedding the Insulperm<br />
Insulation Board. Place the thickness <strong>of</strong> Insulaperm Insulation Board as shown in the<br />
approved shop drawings and in a brick-like pattern within 30 minutes <strong>of</strong> applying the<br />
insulating concrete slurry coat to the substrate. The maximum allowable Insulperm<br />
Insulation Board step in a stair-step design in one inch. Fill the holes in the Insulperm<br />
Insulation board and place a 2 inch minimum thickness <strong>of</strong> insulating concrete over the<br />
top <strong>of</strong> the Insulperm Insulation Board within four hours after application <strong>of</strong> the<br />
Insulperm Insulation Board.<br />
C. Thermal Value: Install the ZIC System to provide for an average thermal value <strong>of</strong> R-20<br />
or as shown on the architectural details / drawings.<br />
D. Ro<strong>of</strong> Slope: Install the ZIC System to provide for a minimum positive ro<strong>of</strong> slope <strong>of</strong> ¼<br />
inch per foot.<br />
3.4 FIELD QUALITY CONTROL<br />
A. Protection: Avoid ro<strong>of</strong>-top traffic over the ro<strong>of</strong> insulation system until one can walk over<br />
the surface without creating surface damage.<br />
B. Compressive Strength Testing: The Architect has the option to select an independent<br />
testing laboratory to randomly sample the top placement <strong>of</strong> insulating concrete to verify<br />
the thickness and density, and to secure and test compressive strength cylinders in<br />
accordance with ASTM C 495. The Owner will be responsible for the cost and<br />
engagement <strong>of</strong> the independent testing laboratory services.<br />
C. Application Monitoring: Monitor the thickness and wet density <strong>of</strong> the lightweight<br />
insulating concrete at the time <strong>of</strong> placement to determine conformance to the<br />
manufacturer’s requirements. Monitor the placement <strong>of</strong> proper thickness <strong>of</strong> polystyrene<br />
insulation board in accordance with the contract documents.<br />
07220-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
LIGHTWEIGHT INSULATING CONCRETE ROOF INSULATION<br />
D. Fastener Withdrawal Testing: Conduct a base ply fastener pull test 3 or more days<br />
following the application <strong>of</strong> the lightweight insulating concrete to ensure a minimum<br />
withdrawal resistance <strong>of</strong> 40 pounds per fastener.<br />
3.5 PATCHING<br />
A. Patching: Perform all patching and repairing <strong>of</strong> insulating concrete using Zono-Patch or<br />
other materials approved by the lightweight insulating concrete supplier.<br />
END OF SECTION 07220<br />
07220-6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 07411<br />
METAL ROOF PANELS<br />
PART 1 - GENERAL<br />
1.1 SUMMARY<br />
A. Section <strong>Inc</strong>ludes:<br />
1. Standing-seam metal ro<strong>of</strong>ing.<br />
1.2 ACTION SUBMITTALS<br />
A. Product Data: For each type <strong>of</strong> product indicated.<br />
B. Shop Drawings: Show installation layout <strong>of</strong> sheet metal ro<strong>of</strong>ing, including plans,<br />
elevations, expansion joint locations, and keyed details. Distinguish between shopand<br />
field-assembled work.<br />
1. <strong>Inc</strong>lude details for forming, joining, and securing sheet metal ro<strong>of</strong>ing, including<br />
pattern <strong>of</strong> seams, termination points, fixed points, expansion joints, ro<strong>of</strong><br />
penetrations, edge conditions, special conditions, connections to adjoining work,<br />
and details <strong>of</strong> accessory items.<br />
C. Samples: For each exposed product and for each finish specified.<br />
1.3 INFORMATIONAL SUBMITTALS<br />
A. Coordination Drawings: Ro<strong>of</strong> plans drawn to scale with coordinated details for<br />
penetrations and ro<strong>of</strong>-mounted items.<br />
B. Portable Roll-Forming Equipment Certificate: Issued by UL for equipment<br />
manufacturer's portable roll-forming equipment capable <strong>of</strong> producing panels that<br />
comply with UL requirements.<br />
C. Product test reports.<br />
D. Warranties: Sample <strong>of</strong> special warranties.<br />
1.4 CLOSEOUT SUBMITTALS<br />
A. Maintenance data.<br />
1.5 QUALITY ASSURANCE<br />
A. Roll-Formed Sheet Metal Ro<strong>of</strong>ing Fabricator Qualifications: Fabricator authorized by<br />
portable roll-forming equipment manufacturer to fabricate and install sheet metal<br />
ro<strong>of</strong>ing units required for this Project, and who maintains current UL certification <strong>of</strong> its<br />
portable roll-forming equipment.<br />
07411-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
METAL ROOF PANELS<br />
B. UL-Certified, Portable Roll-Forming Equipment: UL-certified, portable roll-forming<br />
equipment capable <strong>of</strong> producing ro<strong>of</strong>ing panels for sheet metal ro<strong>of</strong>ing assemblies that<br />
comply with UL 580 for Class 90 wind-uplift resistance. Maintain UL certification <strong>of</strong><br />
portable roll-forming equipment for duration <strong>of</strong> sheet metal ro<strong>of</strong>ing work.<br />
C. Sheet Metal Ro<strong>of</strong>ing Standard: Comply with SMACNA's "Architectural Sheet Metal<br />
Manual" unless more stringent requirements are specified or shown on Drawings.<br />
D. Preinstallation Conference: Conduct conference at Project site.<br />
1.6 WARRANTY<br />
A. Special Warranty: Warranty form in which Installer agrees to repair or replace<br />
components <strong>of</strong> sheet metal ro<strong>of</strong>ing that fail in materials or workmanship within Two<br />
years from date <strong>of</strong> Substantial Completion.<br />
B. Special Warranty on Finishes: Manufacturer's standard form in which manufacturer<br />
agrees to repair finish or replace sheet metal ro<strong>of</strong>ing that shows evidence <strong>of</strong><br />
deterioration <strong>of</strong> factory-applied finishes within 20 years from date <strong>of</strong> Substantial<br />
Completion.<br />
PART 2 - PRODUCTS<br />
2.1 ROOFING SHEET METALS<br />
A. General: Protect mechanical and other finishes on exposed surfaces from damage by<br />
applying a strippable, temporary protective film before shipping.<br />
B. Basis-<strong>of</strong>-Design: Peterson Aluminum corporation – Tite-Loc HS<br />
C. Aluminum Sheet: ASTM B 209 (ASTM B 209M), alloy as standard with manufacturer<br />
for finish required, with temper as required to suit forming operations and performance<br />
required.<br />
1. Thickness: 0.032 inch (0.81 mm) unless otherwise indicated.<br />
2. Vertical Seam Spacing: 16 inches.<br />
3. Surface: Smooth, flat.<br />
4. Factory Prime Coating: Where painting after installation is indicated, pretreat<br />
with white or light-colored, factory-applied, baked-on epoxy primer coat; minimum<br />
dry film thickness <strong>of</strong> 0.2 mil (0.005 mm).<br />
5. Exposed Coil-Coated Finish:<br />
a. Two-Coat Fluoropolymer: AAMA 620. Fluoropolymer finish containing not<br />
less than 70 percent PVDF resin by weight in color coat.<br />
6. Color: As selected by Architect from manufacturer's full range including metallic<br />
color options.<br />
07411-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
METAL ROOF PANELS<br />
2.2 UNDERLAYMENT MATERIALS<br />
A. Self-Adhering, High-Temperature Sheet: Minimum 30 to 40 mils (0.76 to 1.0 mm)<br />
thick, consisting <strong>of</strong> slip-resisting polyethylene-film top surface laminated to layer <strong>of</strong><br />
butyl or SBS-modified asphalt adhesive, with release-paper backing; cold applied.<br />
Provide primer when recommended by underlayment manufacturer.<br />
1. Thermal Stability: ASTM D 1970; stable after testing at 240 deg F (116 deg C).<br />
2. Low-Temperature Flexibility: ASTM D 1970; passes after testing at minus 20<br />
deg F (29 deg C).<br />
B. Slip Sheet: Building paper, 3-lb/100 sq. ft. (0.16-kg/sq. m minimum), rosin sized.<br />
2.3 MISCELLANEOUS MATERIALS<br />
A. General: Provide materials and types <strong>of</strong> fasteners, solder, welding rods, protective<br />
coatings, separators, sealants, and other miscellaneous items as required for a<br />
complete ro<strong>of</strong>ing system and as recommended by primary sheet metal or portable rollforming<br />
equipment manufacturer unless otherwise indicated.<br />
B. Fasteners:<br />
1. General:<br />
a. Fasteners for Flashing and Trim: Blind fasteners or self-drilling screws,<br />
gasketed, with hex-washer head.<br />
b. Blind Fasteners: High-strength aluminum or stainless-steel rivets suitable<br />
for metal being fastened.<br />
2. Fasteners for Aluminum Sheet: Aluminum or Series 300 stainless steel.<br />
C. Sealant Tape: Pressure-sensitive, 100 percent solids, gray polyisobutylene compound<br />
sealant tape with release-paper backing. Provide permanently elastic, nonsag,<br />
nontoxic, nonstaining tape 1/2 inch (13 mm) wide and 1/8 inch (3 mm) thick.<br />
D. Elastomeric Sealant: ASTM C 920, elastomeric polymer sealant as recommended by<br />
portable roll-forming equipment manufacturer for installation indicated; low modulus; <strong>of</strong><br />
type, grade, class, and use classifications required to seal joints in sheet metal ro<strong>of</strong>ing<br />
and remain <strong>water</strong>tight.<br />
E. Butyl Sealant: ASTM C 1311, single-component, solvent-release butyl rubber sealant;<br />
polyisobutylene plasticized; heavy bodied for hooked-type expansion joints with limited<br />
movement.<br />
F. Bituminous Coating: Cold-applied asphalt emulsion complying with ASTM D 1187.<br />
2.4 ACCESSORIES<br />
A. Sheet Metal Accessories: Provide components required for a complete sheet metal<br />
ro<strong>of</strong>ing assembly including trim, copings, fasciae, corner units, clips, flashings,<br />
sealants, gaskets, fillers, metal closures, closure strips, and similar items. Match<br />
material and finish <strong>of</strong> sheet metal ro<strong>of</strong>ing unless otherwise indicated.<br />
07411-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
METAL ROOF PANELS<br />
1. Provide accessories as recommended by portable roll-forming equipment<br />
manufacturer to produce sheet metal ro<strong>of</strong>ing assemblies that comply with UL 580<br />
for wind-uplift resistance classification specified in "Quality Assurance" Article.<br />
2. Cleats: For mechanically seaming into joints and formed from the following<br />
materials:<br />
a. Aluminum Ro<strong>of</strong>ing: 0.025-inch- (0.64-mm-) thick stainless steel.<br />
3. Clips: Minimum 0.062-inch- (1.59-mm-) thick, stainless-steel panel clips<br />
designed to withstand negative-load requirements.<br />
4. Closure Strips: Closed-cell, expanded, cellular, rubber or crosslinked, polyolefin<br />
foam or closed-cell laminated polyethylene; minimum 1-inch- (25-mm-) thick,<br />
flexible-closure strips; cut or premolded to match sheet metal ro<strong>of</strong>ing pr<strong>of</strong>ile.<br />
Provide closure strips where indicated or necessary to ensure weathertight<br />
construction.<br />
5. Flashing and Trim: Formed from same material and finish as sheet metal<br />
ro<strong>of</strong>ing, minimum thickness matching the sheet metal ro<strong>of</strong>ing.<br />
2.5 FABRICATION<br />
A. General: Custom fabricate sheet metal ro<strong>of</strong>ing to comply with details shown and<br />
recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to the<br />
design, dimensions (panel width and seam height), geometry, metal thickness, and<br />
other characteristics <strong>of</strong> installation indicated. Fabricate sheet metal ro<strong>of</strong>ing and<br />
accessories at the shop to greatest extent possible.<br />
1. Standing-Seam Ro<strong>of</strong>ing: Form standing-seam panels with finished seam height<br />
<strong>of</strong> 2 inches.<br />
B. General: Fabricate roll-formed sheet metal ro<strong>of</strong>ing panels with UL-certified, portable<br />
roll-forming equipment capable <strong>of</strong> producing ro<strong>of</strong>ing panels for sheet metal ro<strong>of</strong>ing<br />
assemblies that comply with UL 580 for wind-uplift resistance classification specified in<br />
"Quality Assurance" Article. Fabricate roll-formed sheet metal according to equipment<br />
manufacturer's written instructions and to comply with details shown.<br />
C. Form exposed sheet metal work to fit substrates without excessive oil canning,<br />
buckling, and tool marks; true to line and levels indicated; and with exposed edges<br />
folded back to form hems.<br />
1. Form and fabricate sheets, seams, strips, cleats, valleys, ridges, edge<br />
<strong>treatment</strong>s, integral flashings, and other components <strong>of</strong> metal ro<strong>of</strong>ing to pr<strong>of</strong>iles,<br />
patterns, and drainage arrangements shown on Drawings and as required for<br />
leakpro<strong>of</strong> construction.<br />
D. Metal Protection: Where dissimilar metals will contact each other, protect against<br />
galvanic action by painting contact surfaces with bituminous coating, by applying selfadhering<br />
sheet underlayment to each contact surface, or by other permanent<br />
separation as recommended by fabricator <strong>of</strong> sheet metal ro<strong>of</strong>ing or manufacturers <strong>of</strong><br />
the metals in contact.<br />
E. Sheet Metal Accessories: Custom fabricate flashings and trim to comply with<br />
recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to<br />
design, dimensions, metal, and other characteristics <strong>of</strong> item indicated. Obtain field<br />
measurements for accurate fit before shop fabrication.<br />
07411-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
METAL ROOF PANELS<br />
PART 3 - EXECUTION<br />
3.1 EXAMINATION AND PREPARATION<br />
A. Examine solid ro<strong>of</strong> sheathing to verify that sheathing joints are supported by framing or<br />
blocking and that tops <strong>of</strong> fasteners are flush with surface.<br />
1. Space fasteners as required by portable roll-forming equipment manufacturer for<br />
specified UL classification for wind-uplift resistance.<br />
3.2 UNDERLAYMENT INSTALLATION<br />
A. Self-Adhering Sheet Underlayment: Install self-adhering sheet underlayment, wrinkle<br />
free, on ro<strong>of</strong> sheathing under sheet metal ro<strong>of</strong>ing. Comply with temperature<br />
restrictions <strong>of</strong> underlayment manufacturer for installation; use primer rather than nails<br />
for installing underlayment at low temperatures. Apply over entire ro<strong>of</strong>, in shingle<br />
fashion to shed <strong>water</strong>, with end laps <strong>of</strong> not less than 6 inches (150 mm) staggered 24<br />
inches (600 mm) between courses. Overlap side edges not less than 3-1/2 inches (90<br />
mm). Roll laps with roller. Cover underlayment within 14 days.<br />
B. Apply slip sheet before installing sheet metal ro<strong>of</strong>ing.<br />
3.3 INSTALLATION, GENERAL<br />
A. General: Anchor sheet metal ro<strong>of</strong>ing and other components <strong>of</strong> the Work securely in<br />
place, with provisions for thermal and structural movement. Install fasteners, solder,<br />
welding rods, protective coatings, separators, sealants, and other miscellaneous items<br />
as required for a complete ro<strong>of</strong>ing system and as recommended by fabricator for sheet<br />
metal ro<strong>of</strong>ing.<br />
1. Field cutting <strong>of</strong> sheet metal ro<strong>of</strong>ing by torch is not permitted.<br />
2. Provide metal closures at peaks, rake edges, rake walls, eaves and each side <strong>of</strong><br />
ridge and hip caps.<br />
3. Flash and seal sheet metal ro<strong>of</strong>ing with closure strips at eaves, rakes, and<br />
perimeter <strong>of</strong> all openings. Fasten with self-tapping screws.<br />
4. Locate and space fastenings in uniform vertical and horizontal alignment. Predrill<br />
panels for fasteners.<br />
5. Install ridge and hip caps as sheet metal ro<strong>of</strong>ing work proceeds.<br />
6. Locate ro<strong>of</strong>ing splices over, but not attached to, structural supports. Stagger<br />
ro<strong>of</strong>ing splices and end laps to avoid a four-panel lap splice condition.<br />
7. Install sealant tape where indicated.<br />
8. Lap metal flashing over sheet metal ro<strong>of</strong>ing to allow moisture to run over and <strong>of</strong>f<br />
the material.<br />
B. Thermal Movement. Rigidly fasten metal ro<strong>of</strong> panels to structure at only one location<br />
for each panel. Allow remainder <strong>of</strong> panel to move freely for thermal expansion and<br />
contraction.<br />
1. Point <strong>of</strong> Fixity: Fasten each panel along a single line <strong>of</strong> fixing located at location<br />
recommended by the manufacturer.<br />
2. Avoid attaching accessories through ro<strong>of</strong> panels in a manner that will inhibit<br />
thermal movement.<br />
07411-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
METAL ROOF PANELS<br />
C. Fasteners: Use fasteners <strong>of</strong> sizes that will penetrate metal decking not less than<br />
recommended by fastener manufacturer to achieve maximum pull-out resistance.<br />
D. Metal Protection: Where dissimilar metals will contact each other or corrosive<br />
substrates, protect against galvanic action by painting contact surfaces with bituminous<br />
coating, by applying self-adhering sheet underlayment to each contact surface, or by<br />
other permanent separation as recommended by SMACNA.<br />
1. Coat back side <strong>of</strong> uncoated aluminum and stainless-steel sheet metal ro<strong>of</strong>ing<br />
with bituminous coating where ro<strong>of</strong>ing will contact wood, ferrous metal, or<br />
cementitious construction.<br />
E. Conceal fasteners and expansion provisions where possible in exposed work and<br />
locate to minimize possibility <strong>of</strong> leakage. Cover and seal fasteners and anchors as<br />
required for a tight installation.<br />
3.4 CUSTOM-FABRICATED SHEET METAL ROOFING INSTALLATION<br />
A. Fabricate and install work with lines and corners <strong>of</strong> exposed units true and accurate.<br />
Form exposed faces flat and free <strong>of</strong> buckles, excessive waves, and avoidable tool<br />
marks, considering temper and reflectivity <strong>of</strong> metal. Provide uniform, neat seams with<br />
minimum exposure <strong>of</strong> solder, welds, and sealant. Fold back sheet metal to form a hem<br />
on concealed side <strong>of</strong> exposed edges unless otherwise indicated.<br />
1. Install cleats to hold sheet metal panels in position. Attach each cleat with two<br />
fasteners to prevent rotation.<br />
2. Fasten cleats not more than 12 inches (300 mm) o.c. Bend tabs over fastener<br />
head.<br />
3. Provide expansion-type cleats and clips for ro<strong>of</strong> panels that exceed 30 feet (9.1<br />
m) in length.<br />
B. Seal joints as shown and as required for <strong>water</strong>tight construction. For ro<strong>of</strong>ing with 3:12<br />
slopes or less, use cleats at transverse seams. Prepare joints and apply sealants to<br />
comply with requirements in Section 079200 "Joint Sealants."<br />
C. Soldered Joints: Clean surfaces to be soldered, removing oils and foreign matter. Pretin<br />
edges <strong>of</strong> sheets to be soldered to a width <strong>of</strong> 1-1/2 inches (38 mm), except reduce<br />
pre-tinning where pre-tinned surface would show in completed Work.<br />
1. Do not solder aluminum sheet.<br />
D. Rivets: Rivet joints in uncoated aluminum where indicated and where necessary for<br />
strength.<br />
E. Standing-Seam Ro<strong>of</strong>ing: Attach standing-seam metal panels to substrate with cleats,<br />
double fastened at spacing as recommended by manufacturer for wind resistance<br />
indicated. Install panels reaching from eave to ridge before moving to adjacent panels.<br />
Before panels are interlocked, apply continuous bead <strong>of</strong> sealant to top <strong>of</strong> flange <strong>of</strong><br />
lower panel. Lock standing seams by folding over twice so cleat and panel edges are<br />
completely engaged.<br />
1. Loose-lock panels at eave edges to continuous cleats and flanges at ro<strong>of</strong> edge at<br />
gutters.<br />
2. Fold over seams after locking at ridges and hips.<br />
07411-6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
METAL ROOF PANELS<br />
3.5 ACCESSORY INSTALLATION<br />
A. General: Install accessories with positive anchorage to building and weathertight<br />
mounting and provide for thermal expansion. Coordinate installation with flashings and<br />
other components.<br />
1. Install components required for a complete sheet metal ro<strong>of</strong>ing assembly<br />
including trim, copings, seam covers, flashings, sealants, gaskets, fillers, metal<br />
closures, closure strips, and similar items.<br />
2. Install accessories integral to sheet metal ro<strong>of</strong>ing that are specified in<br />
Section 076200 "Sheet Metal Flashing and Trim" to comply with that Section's<br />
requirements.<br />
B. Flashing and Trim: Comply with performance requirements, manufacturer's written<br />
installation instructions, and SMACNA's "Architectural Sheet Metal Manual." Provide<br />
concealed fasteners where possible, and set units true to line and level as indicated.<br />
Install work with laps, joints, and seams that will be permanently <strong>water</strong>tight and<br />
weather resistant.<br />
3.6 CLEANING AND PROTECTION<br />
A. Clean exposed metal surfaces <strong>of</strong> substances that interfere with uniform oxidation and<br />
weathering.<br />
B. Clean and neutralize flux materials. Clean <strong>of</strong>f excess solder and sealants.<br />
C. Remove temporary protective coverings and strippable films as sheet metal ro<strong>of</strong>ing is<br />
installed unless otherwise indicated in manufacturer's written installation instructions.<br />
END OF SECTION 076100<br />
07411-7<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 07552<br />
SBS-MODIFIED BITUMINOUS MEMBRANE ROOFING<br />
PART 1 - GENERAL<br />
1.1 RELATED DOCUMENTS<br />
A. Drawings and general provisions <strong>of</strong> the Contract, including General and<br />
Supplementary Conditions and Division 1 Specification Sections, apply to this Section.<br />
1.2 SUMMARY<br />
A. This Section includes the following:<br />
1. SBS-modified bituminous <strong>membrane</strong> ro<strong>of</strong>ing.<br />
B. Related Sections include the following:<br />
1. Division 7 Section "Sheet Metal Flashing and Trim" for metal ro<strong>of</strong> penetration<br />
flashings, flashings, and counterflashings.<br />
1.3 DEFINITIONS<br />
A. Ro<strong>of</strong>ing Terminology: Refer to ASTM D 1079 and glossary <strong>of</strong> NRCA's "The NRCA<br />
Ro<strong>of</strong>ing and Waterpro<strong>of</strong>ing Manual" for definition <strong>of</strong> terms related to ro<strong>of</strong>ing work in this<br />
Section.<br />
B. Hot Ro<strong>of</strong>ing Asphalt: Ro<strong>of</strong>ing asphalt heated to its equiviscous temperature, the<br />
temperature at which its viscosity is 125 centipoise for mop-applied ro<strong>of</strong>ing asphalt and<br />
75 centipoise for mechanical spreader-applied ro<strong>of</strong>ing asphalt, within a range <strong>of</strong> plus or<br />
minus 25 deg F (14 deg C), measured at the mop cart or mechanical spreader<br />
immediately before application.<br />
1.4 DESCRIPTION OF WORK<br />
A. ASSEMBLIES - Basis <strong>of</strong> Design: Siplast; Irving, TX<br />
1. Project type: New Construction.<br />
2. Specification Number: 2030 CBA<br />
3. Deck: Metal<br />
4. Slope: 1/4 inch min.<br />
5. Substrate: ZIC Lightweight Insulating Concrete System. See Specification<br />
Section 07220<br />
6. Base Sheet: Parabase FS, mechanically attached<br />
7. Ro<strong>of</strong> System: Paradiene 20, applied in PA-311 M adhesive; Paradiene 30 CR<br />
FR, applied in PA-311 M adhesive.<br />
8. Flashing System: Veral Aluminum, torch applied.<br />
07552-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SBS-MODIFIED BITUMINOUS MEMBRANE ROOFING<br />
1.5 PERFORMANCE REQUIREMENTS<br />
A. General: Provide installed ro<strong>of</strong>ing <strong>membrane</strong> and base flashings that remain<br />
<strong>water</strong>tight; do not permit the passage <strong>of</strong> <strong>water</strong>; and resist specified uplift pressures,<br />
thermally induced movement, and exposure to weather without failure.<br />
B. Material Compatibility: Provide ro<strong>of</strong>ing materials that are compatible with one another<br />
under conditions <strong>of</strong> service and application required, as demonstrated by ro<strong>of</strong>ing<br />
manufacturer based on testing and field experience.<br />
C. Underwriters Laboratories: Provide an Underwriters Laboratories Class A accepted<br />
ro<strong>of</strong>ing system (including mopping asphalt or cold adhesive) without additional<br />
requirements for gravel or coatings.<br />
D. Local Regulations: Conform to regulations <strong>of</strong> public agencies, including the Florida<br />
Building Code and any specific requirements <strong>of</strong> the <strong>city</strong> and/or state <strong>of</strong> jurisdiction.<br />
E. Manufacturer Requirements: Ensure that the primary ro<strong>of</strong>ing materials manufacturer<br />
provides direct trained company personnel to attend necessary job meetings, perform<br />
periodic inspections as necessary, and conducts a final inspection upon successful<br />
completion <strong>of</strong> the project.<br />
1.6 SUBMITTALS<br />
A. Product Data: For each type <strong>of</strong> product indicated.<br />
B. Shop Drawings: For ro<strong>of</strong>ing system. <strong>Inc</strong>lude plans, elevations, sections, details, and<br />
attachments to other Work.<br />
1. Base flashings, cants, and <strong>membrane</strong> terminations.<br />
2. Tapered insulation, including slopes.<br />
3. Crickets, saddles, and tapered edge strips, including slopes.<br />
C. Installer Certificates: Signed by ro<strong>of</strong>ing system manufacturer certifying that Installer is<br />
approved, authorized, or licensed by manufacturer to install ro<strong>of</strong>ing system.<br />
D. Manufacturer Certificates: Signed by ro<strong>of</strong>ing manufacturer certifying that ro<strong>of</strong>ing<br />
system complies with requirements specified in "Performance Requirements" Article.<br />
1. Submit evidence <strong>of</strong> meeting performance requirements.<br />
E. Qualification Data: For Installer and manufacturer.<br />
F. Product Test Reports: Based on evaluation <strong>of</strong> comprehensive tests performed by<br />
manufacturer and witnessed by a qualified testing agency, for components <strong>of</strong> ro<strong>of</strong>ing<br />
system.<br />
G. Research/Evaluation Reports: For components <strong>of</strong> ro<strong>of</strong>ing system.<br />
H. Maintenance Data: For ro<strong>of</strong>ing system to include in maintenance manuals.<br />
I. Warranties: Special warranties specified in this Section.<br />
07552-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SBS-MODIFIED BITUMINOUS MEMBRANE ROOFING<br />
J. Inspection Report: Copy <strong>of</strong> ro<strong>of</strong>ing system manufacturer's inspection report <strong>of</strong><br />
completed ro<strong>of</strong>ing installation.<br />
1.7 QUALITY ASSURANCE<br />
A. Installer Qualifications: A qualified firm that is approved, authorized, or licensed by<br />
ro<strong>of</strong>ing system manufacturer to install manufacturer's product and that is eligible to<br />
receive manufacturer's warranty. Installer shall have a minimum <strong>of</strong> five (5) years<br />
experience in successfully installing the same ro<strong>of</strong>ing materials.<br />
B. Manufacturer Qualifications: A qualified manufacturer that has UL listing for ro<strong>of</strong>ing<br />
system identical to that used for this Project. Primary ro<strong>of</strong>ing products, including each<br />
type <strong>of</strong> sheet, all manufactured in the United States, shall be supplied by a single<br />
manufacturer which has been successfully producing the specified types <strong>of</strong> primary<br />
products for not less than 10 years. The primary ro<strong>of</strong>ing products shall have<br />
maintained a consistent composition for a minimum <strong>of</strong> five years.<br />
C. Scope <strong>of</strong> Work: The work to be performed under this specification shall include but is<br />
not limited to the following: Attend necessary job meetings and furnish competent and<br />
full time supervision, experienced ro<strong>of</strong> mechanics, all materials, tools, and equipment<br />
necessary to complete, in an acceptable manner, the ro<strong>of</strong> installation in accordance<br />
with this specification. Comply with the latest written application instructions <strong>of</strong> the<br />
manufacturer <strong>of</strong> the primary ro<strong>of</strong>ing products. In addition, application practice shall<br />
comply with requirements and recommendations contained in the latest edition <strong>of</strong> the<br />
Handbook <strong>of</strong> Accepted Ro<strong>of</strong>ing Knowledge (HARK) as published by the National<br />
Ro<strong>of</strong>ing Contractor’s Association, amended to include the acceptance <strong>of</strong> a phased ro<strong>of</strong><br />
system installation.<br />
D. Local Regulations: Conform to regulations <strong>of</strong> public agencies, including any specific<br />
requirements <strong>of</strong> the <strong>city</strong> and/or state <strong>of</strong> jurisdiction.<br />
E. Manufacturer’s Requirements: Ensure that the primary ro<strong>of</strong>ing materials manufacturer<br />
provides direct trained company personnel to attend necessary job meetings, perform<br />
periodic inspections as necessary, and conducts a final inspection upon successful<br />
completion <strong>of</strong> the project.<br />
F. Product Quality Assurance Program: Primary ro<strong>of</strong>ing materials shall be manufactured<br />
under a quality management system that is monitored regularly by a third party auditor<br />
under the ISO 9001:2000 audit process. A certificate <strong>of</strong> analysis for reporting /<br />
confirming the tested values <strong>of</strong> the actual material being supplied for the project will be<br />
required prior to project close-out.<br />
G. Source Limitations: Obtain components for ro<strong>of</strong>ing system approved by ro<strong>of</strong>ing system<br />
manufacturer.<br />
H. Fire-Test-Response Characteristics: Provide ro<strong>of</strong>ing materials with the fire-testresponse<br />
characteristics indicated as determined by testing identical products per test<br />
method below by UL another testing and inspecting agency acceptable to authorities<br />
having jurisdiction. Materials shall be identified with appropriate markings <strong>of</strong> applicable<br />
testing and inspecting agency.<br />
1. Fire-Resistance Ratings: ASTM E 119, for fire-resistance-rated ro<strong>of</strong> assemblies<br />
<strong>of</strong> which ro<strong>of</strong>ing system is a part.<br />
07552-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SBS-MODIFIED BITUMINOUS MEMBRANE ROOFING<br />
2. Underwriters Laboratories Class A acceptance <strong>of</strong> the proposed ro<strong>of</strong>ing system<br />
(including mopping asphalt or cold adhesive) without additional requirements for<br />
gravel or coatings.<br />
I. Preinstallation Conference: Conduct conference at Project site. Comply with<br />
requirements in Division 1 Section "Project Management and Coordination." Review<br />
methods and procedures related to ro<strong>of</strong>ing system including, but not limited to, the<br />
following:<br />
1. Meet with Owner, Architect, Owner's insurer if applicable, testing and inspecting<br />
agency representative, ro<strong>of</strong>ing Installer, ro<strong>of</strong>ing system manufacturer's<br />
representative, deck Installer, and installers whose work interfaces with or affects<br />
ro<strong>of</strong>ing including installers <strong>of</strong> ro<strong>of</strong> accessories and ro<strong>of</strong>-mounted equipment.<br />
2. Review methods and procedures related to ro<strong>of</strong>ing installation, including<br />
manufacturer's written instructions.<br />
3. Review and finalize construction schedule and verify availability <strong>of</strong> materials,<br />
Installer's personnel, equipment, and facilities needed to make progress and<br />
avoid delays.<br />
4. Examine deck substrate conditions and finishes for compliance with<br />
requirements, including flatness and fastening.<br />
5. Review structural loading limitations <strong>of</strong> ro<strong>of</strong> deck during and after ro<strong>of</strong>ing.<br />
6. Review base flashings, special ro<strong>of</strong>ing details, ro<strong>of</strong> drainage, ro<strong>of</strong> penetrations,<br />
equipment curbs, and condition <strong>of</strong> other construction that will affect ro<strong>of</strong>ing<br />
system.<br />
7. Review governing regulations and requirements for insurance and certificates if<br />
applicable.<br />
8. Review temporary protection requirements for ro<strong>of</strong>ing system during and after<br />
installation.<br />
9. Review ro<strong>of</strong> observation and repair procedures after ro<strong>of</strong>ing installation.<br />
1.8 DELIVERY, STORAGE, AND HANDLING<br />
A. Deliver ro<strong>of</strong>ing materials to Project site in original containers with seals unbroken and<br />
labeled with manufacturer's name, product brand name and type, date <strong>of</strong> manufacture,<br />
and directions for storage.<br />
B. Store liquid materials in their original undamaged containers in a clean, dry, protected<br />
location and within the temperature range required by ro<strong>of</strong>ing system manufacturer.<br />
Protect stored liquid material from direct sunlight, moisture, soiling, and other sources.<br />
Comply with insulation manufacturer's written instructions for handling, storing, and<br />
protecting during installation.<br />
1. Discard and legally dispose <strong>of</strong> liquid material that cannot be applied within its<br />
stated shelf life.<br />
C. Storage: Store materials out <strong>of</strong> direct exposure to the elements. Store roll goods on a<br />
clean, flat and dry surface. All material stored on the ro<strong>of</strong> overnight shall be stored on<br />
pallets. Rolls <strong>of</strong> ro<strong>of</strong>ing must be stored on ends. Store materials on the ro<strong>of</strong> in a<br />
manner so as to preclude overloading <strong>of</strong> deck and building structure. Protect materials<br />
such as solvents, adhesives and asphalt cutback products away from open flames,<br />
sparks or excessive heat. Cover all material using a breathable cover. Polyethylene or<br />
other non-breathable plastic coverings are not acceptable.<br />
07552-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SBS-MODIFIED BITUMINOUS MEMBRANE ROOFING<br />
D. Handling: Handle all materials in such a manner as to preclude damage and<br />
contamination with moisture or foreign matter. Handle rolled goods to prevent damage<br />
to edges or ends.<br />
E. Damaged Material: Any materials that are found to be damaged or stored in any<br />
manner other than stated above will be automatically rejected, removed and replaced<br />
at the Contractor’s expense.<br />
1.9 PROJECT CONDITIONS<br />
A. Requirements Prior to Job Start<br />
1. Notification: Give a minimum <strong>of</strong> 5 days notice to the Owner and manufacturer<br />
prior to commencing any work and notify both parties on a daily basis <strong>of</strong> any<br />
change in work schedule.<br />
2. Permits: Obtain all permits required by local agencies and pay all fees which<br />
may be required for the performance <strong>of</strong> the work.<br />
3. Safety: Familiarize every member <strong>of</strong> the application crew with all fire and safety<br />
regulations recommended by OSHA, NRCA and other industry or local<br />
government groups.<br />
B. Environmental Requirements<br />
1. Weather Limitations: Do not apply ro<strong>of</strong>ing materials during precipitation or in the<br />
event there is a probability <strong>of</strong> precipitation during application. Take adequate<br />
precautions to ensure that materials, applied ro<strong>of</strong>ing, and building interiors are<br />
protected from possible moisture damage or contamination. Proceed with<br />
installation only when existing and forecasted weather conditions permit ro<strong>of</strong>ing<br />
system to be installed according to manufacturer's written instructions and<br />
warranty requirements.<br />
2. Cold Adhesives Temperature Restrictions: Apply cold adhesive at temperatures<br />
acceptable to the ro<strong>of</strong>ing manufacturer. If temperatures are below the<br />
manufacturer’s optimal application temperature, prepare adhesive in accordance<br />
with manufacturer’s written instructions as necessary for application.<br />
C. Protection Requirements<br />
1. Membrane Protection: Provide protection against staining and mechanical<br />
damage for newly applied ro<strong>of</strong>ing and adjacent surfaces throughout this project.<br />
2. Torch Safety: Crew members handling torches shall be trained by an Authorized<br />
Certified Ro<strong>of</strong>ing Torch Applicator (CERTA) Trainer, be certified according to<br />
CERTA torch safety guidelines as published by the National Ro<strong>of</strong>ing Contractor’s<br />
Association (NCRA), and comply with torch safety practices as required by the<br />
contractor’s insurance carrier. Designate one person on each crew to perform a<br />
daily fire watch. The designated crew member shall watch for fires or smoldering<br />
materials on all areas <strong>of</strong> ro<strong>of</strong> construction activity, and for the minimum period<br />
required by CERTA guidelines after ro<strong>of</strong>ing material application has been<br />
suspended for the day.<br />
3. Limited Access: Prevent access by the public to materials, tools and equipment<br />
during the course <strong>of</strong> the project.<br />
4. Debris Removal: Remove all debris daily from the project site and take to a legal<br />
dumping area authorized to receive such materials.<br />
07552-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SBS-MODIFIED BITUMINOUS MEMBRANE ROOFING<br />
5. Site Condition: Complete, to the owner’s satisfaction, all job site clean-up<br />
including building interior, exterior and landscaping where affected by the<br />
construction.<br />
1.10 WARRANTY<br />
A. Ro<strong>of</strong> System Guarantee: Upon successful completion <strong>of</strong> the project, and after all post<br />
installation procedures have been completed, furnish the Owner with the ro<strong>of</strong> system<br />
manufacturer’s 20 year labor and materials ro<strong>of</strong> system guarantee. The ro<strong>of</strong> system<br />
guarantee shall include the ro<strong>of</strong>ing and flashing <strong>membrane</strong>s, base sheet, and base<br />
sheet fasteners. All repair or replacement cost covered under the guarantee shall be<br />
borne by the ro<strong>of</strong> <strong>membrane</strong> / flashing manufacturer. The guarantee shall be a term<br />
type, without deductibles or limitations on coverage amount, and be issued at no cost<br />
to the Owner. Specific items covered under the ro<strong>of</strong> system guarantee include:<br />
1. The ro<strong>of</strong> system guarantee will not limit, by geographic location, the Owner’s<br />
right for claims, actions, and/or proceedings.<br />
2. The warranty shall be equivalent to: Siplast 20 Year Ro<strong>of</strong> System Guarantee.<br />
PART 2 - PRODUCTS<br />
2.1 MANUFACTURERS<br />
A. Basis-<strong>of</strong>-Design Product: The specified ro<strong>of</strong>ing system is based on the Siplast, <strong>Inc</strong>.<br />
Subject to compliance with the requirements; provide either the named product or a<br />
comparable product by one <strong>of</strong> the other manufacturers specified.<br />
1. SBS-Modified Bituminous Membrane Ro<strong>of</strong>ing:<br />
a. Siplast, <strong>Inc</strong>.<br />
b. Soprema<br />
c. Johns-Manville<br />
2.2 ROOFING SYSTEM ASSEMBLY/PRODUCTS<br />
A. Base Sheet For ZIC Lightweight Insulating Concrete System Substrates<br />
1. Base Sheet: A fiberglass reinforced, asphalt coated sheet with a polyolefin film<br />
backing, having a minimum weight <strong>of</strong> 20 lb/sq. The sheet shall conform to ASTM<br />
D4601, Type II requirements. Acceptable types are as follows:<br />
a. Siplast Parabase FS.<br />
2. Gypsum Sheathing Panel for Wood / Plywood Substrates to Receive Flashing<br />
Coverage:<br />
a. Basis-<strong>of</strong>-Design – DensDeck Prime Gypsum Ro<strong>of</strong> Board. Refer to<br />
specification section 61600 Sheathing.<br />
B. ZIC Lightweight Insulating Concrete Ro<strong>of</strong> System: See specification Section 07220.<br />
07552-6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SBS-MODIFIED BITUMINOUS MEMBRANE ROOFING<br />
2.3 DESCRIPTION OF SYSTEMS<br />
A. Ro<strong>of</strong>ing Membrane Assembly: A ro<strong>of</strong> <strong>membrane</strong> assembly consisting <strong>of</strong> two piles <strong>of</strong> a<br />
prefabricated, reinforced, homogeneous Styrene-Butadiene-Styrene (SBS) block<br />
copolymer modified asphalt <strong>membrane</strong> applied over a prepared substrate. Both<br />
reinforcement mats shall be impregnated / saturated and coated each side with an<br />
SBS modified bitumen blend. The ro<strong>of</strong> system shall pass 500 cycles <strong>of</strong> ASTM D 5849<br />
Resistance to Cyclic Joint Displacement (fatigue) at 14ºF (-10ºC). Passing results<br />
show no signs <strong>of</strong> <strong>membrane</strong> cracking or interply delamination after 500 cycles. The<br />
ro<strong>of</strong> system shall pass 200 cycles <strong>of</strong> ASTM D 5849 after heat conditioning performed in<br />
accordance with ASTM D 5147. The assembly shall possess <strong>water</strong>pro<strong>of</strong>ing capability,<br />
such that a phased ro<strong>of</strong> application, with only the modified bitumen base ply in place,<br />
can be achieved for prolonged periods <strong>of</strong> time without detriment to the <strong>water</strong>tight<br />
integrity <strong>of</strong> the entire ro<strong>of</strong> system.<br />
1. Siplast Paradiene 20 / 30 CR FR ro<strong>of</strong> system<br />
2. Modified Bitumen Base, Stripping and Flashing Reinforcing Ply<br />
a. Thickness (avg): 91 mils (2.3 mm) (ASTM D 5147)<br />
b. Thickness (min): 87 mils (2.2 mm) (ASTM D 5147)<br />
c. Weight (min per 100 ft² <strong>of</strong> coverage): 62 lb (3.0 kg/m²)<br />
d. Maximum filler content in elastomeric blend: 35% by weight<br />
e. Low temperature flexibility @ -13ºF (-25ºC) – PASS (ASTM D 5147)<br />
f. Maximum Load (avg) @ 73ºF (23ºC): 30 lbf/inch (5.3 kN/m) (ASTM D<br />
5147)<br />
g. Maximum Load (avg) @ 0ºF (-18ºC): 70 lbf/inch (12.3 kN/m) (ASTM D<br />
5147)<br />
h. Elongation @ 5% Maximum Load (avg.) @ 73ºF (23ºC): 50% (ASTM D<br />
5147)<br />
i. Dimensional Stability (max): 0.1% (ASTM D 5147)<br />
j. High Temperature Stability (min): 250ºF (121ºC) (ASTM D 5147)<br />
k. Approvals: UL Class listed (products shall bear seals <strong>of</strong> approval)<br />
l. Reinforcement: fiberglass mat or other meeting the performance and<br />
dimensional stability criteria<br />
1) Siplast Paradiene 20<br />
3. Modified Bitumen Finish Ply<br />
a. Thickness (avg): 110 mils (2.8 mm) (ASTM 5147)<br />
b. Thickness at selvage (coating thickness) (avg): 98 mils (2.5 mm) (ASTM D<br />
5147)<br />
c. Thickness at selvage (coating thickness) (min): 94 mils (2.4 mm) (ASTM D<br />
5147)<br />
d. Weight (min per 100 ft² <strong>of</strong> coverage): 75 lb (3.6 kg/m²)<br />
e. Maximum filler content in elastomeric blend: 35% by weight<br />
f. Low temperature flexibility @ -13ºF (-25°C): PASS (ASTM D 5147)<br />
g. Maximum Load (avg) @ 73°F (23ºC): 30 lbf/inch (5.3 kN/m) (ASTM D<br />
5147)<br />
h. Maximum Load (avg) @ 0°F (-18ºC): 75 lbf/inch (13.2 kN/m) (ASTM D<br />
5147)<br />
i. Elongation @ 5% Maximum Load (avg.) @ 73ºF (23ºC): 55% (ASTM D<br />
5147)<br />
j. Dimensional Stability (max): 0.1% (ASTM D 5147)<br />
07552-7<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SBS-MODIFIED BITUMINOUS MEMBRANE ROOFING<br />
k. High Temperature Stability (min): 250°F (121°C) (ASTM D 5147)<br />
l. Solar Reflectance: Greater than or equal to 0.70% (ASTM D 1549)<br />
m. Thermal Emittance: Greater than or equal to 0.80% (ASTM D 1371)<br />
n. Approvals: UL Class listed (products shall bear seals <strong>of</strong> approval)<br />
o. Reinforcement: fiberglass mat or other meeting the performance and<br />
dimensional stability criteria<br />
p. Surfacing: White synthetic chips<br />
1) Siplast Paradiene 30 CR FR<br />
B. Flashing Membrane Assembly: A flashing <strong>membrane</strong> assembly consisting <strong>of</strong> a<br />
prefabricated, reinforced, Styrene-Butadiene-Styrene (SBS) block copolymer modified<br />
asphalt <strong>membrane</strong> with a continuous, channel-embossed metal-foil surfacing. The<br />
finish ply shall conform to ASTM D 6298 and the following physical and mechanical<br />
property requirements.<br />
1. Siplast Veral flashing system, aluminum finish<br />
2. Cant Backing Sheet for Wood / Plywood Surfaces to Receive Flashing Coverage<br />
a. Thickness (avg): 102 mils (2.6 mm) (ASTM D 5147)<br />
b. Thickness (min): 98 mils (2.5 mm) (ASTM D 5147)<br />
c. Weight (min per 100 ft² <strong>of</strong> coverage): 72 lb (3.5 kg/m²)<br />
d. Maximum filler content in elastomeric blend: 35% by weight<br />
e. Low temperature flexibility @ -13°F (-25°C): PASS (ASTM D 5147)<br />
f. Maximum Load (avg) @ 73ºF (23°C): 30 lbf/inch (5.3 kN/m) (ASTM D<br />
5147)<br />
g. Maximum Load (avg) @ 0ºF (-18°C): 75 lbf/inch (13.2 kN/m) (ASTM D<br />
5147)<br />
h. Elongation @ 5% Maximum Load (avg) @ 73ºF (23°C): 50% (ASTM D<br />
5147)<br />
i. Dimensional Stability (max): 0.1% (ASTM D 5147)<br />
j. High Temperature Stability (min - sheet): 250ºF (121°C) (ASTM D 5147)<br />
k. High Temperature Stability (min – adhesive coating): 212ºF (100°C)<br />
(ASTM D 5147)<br />
l. Approvals: UL Approved (products shall bear seals <strong>of</strong> approval)<br />
m. Reinforcement: fiberglass mat or other meeting the performance and<br />
dimensional stability criteria<br />
n. Back Surfacing: polyolefin film<br />
1) Siplast Paradiene 20 SA<br />
3. Metal-Clad Modified Bitumen Flashing Sheet<br />
a. Thickness (avg): 142 mils (3.6 mm) (ASTM D 5147)<br />
b. Thickness (min): 138 mils (3.5 mm) (ASTM D 5147)<br />
c. Weight (min per 100 ft² <strong>of</strong> coverage): 92 lb (4.5 kg/m²)<br />
d. Coating Thickness – back surface (min): 40 mils (1 mm) (ASTM D 5147)<br />
e. Maximum filler content in elastomeric blend: 35% by weight<br />
f. Low temperature flexibility @ 0°F (-18°C): PASS (ASTM D 5147)<br />
g. Maximum Load (avg) @ 73ºF (23°C): 85 lbf/inch (15 kN/m) (ASTM D<br />
5147)<br />
h. Maximum Load (avg) @ 0ºF (-18°C): 180 lbf/inch (31.7 kN/m) (ASTM D<br />
5147)<br />
i. Elongation @ 5% Maximum Load (avg) @ 73ºF (23°C): 45% (ASTM D<br />
5147)<br />
07552-8<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SBS-MODIFIED BITUMINOUS MEMBRANE ROOFING<br />
j. Tear-Strength (avg): 120 lbf (0.54 kN) (ASTM D 5147)<br />
k. Dimensional Stability (max): 0.2% (ASTM D 5147)<br />
l. High Temperature Stability (min): 225ºF (107°C) (ASTM D 5147)<br />
m. Cyclic Thermal Shock Stability (maximum): 0.2% (ASTM D 6298)<br />
n. Approvals: UL Approved (products shall bear seals <strong>of</strong> approval)<br />
o. Reinforcement: fiberglass scrim mat or other meeting the performance and<br />
dimensional stability criteria<br />
p. Surfacing: aluminum metal foil<br />
1) Siplast Veral Aluminum<br />
4. Catalyzed Acrylic Resin Flashing System: A specialty flashing system consisting<br />
<strong>of</strong> a liquid applied, fully reinforced, multi-component acrylic <strong>membrane</strong> installed<br />
over a prepared or primed substrate. The flashing system consists <strong>of</strong> a catalyzed<br />
acrylic resin primer, basecoat and topcoat, combined with a non-woven polyester<br />
fleece. The resin and catalyst are pre-mixed immediately prior to installation. The<br />
use <strong>of</strong> the specialty flashing system shall be specifically approved in advance by<br />
the <strong>membrane</strong> manufacturer for each application.<br />
1) Parapro 123 Flashing System by Siplast; Irving, TX.<br />
2.4 ROOFING ACCESSORIES<br />
A. Ro<strong>of</strong>ing Adhesives<br />
1. Membrane Cold Adhesive: An asphalt, solvent blend conforming to ASTM D<br />
4479, Type II requirements.<br />
a. Siplast PA-311 M Adhesive by Siplast; Irving, TX<br />
B. Bituminous Cutback Materials<br />
1. Primer: An asphalt, solvent blend conforming to ASTM D 41 requirements.<br />
a. Siplast PA-1125 Asphalt Primer by Siplast; Irving, TX<br />
2. Mastics: An asphalt cutback mastic, reinforced with non-asbestos fibers, used as<br />
a base for setting metal flanges conforming to ASTM D 4586 Type II<br />
requirements.<br />
a. Siplast PA-1021 Plastic Cement by Siplast; Irving, TX<br />
C. Sealant: A moisture-curing, non-slump elastomeric sealant designed for ro<strong>of</strong>ing<br />
applications. The sealant shall be approved by the ro<strong>of</strong> <strong>membrane</strong> manufacturer for<br />
use in conjunction with the ro<strong>of</strong> <strong>membrane</strong> materials. Acceptable types are as follows:<br />
1. Siplast PS-304 Elastomeric Sealant by Siplast; Irving, TX<br />
D. Synthetic Chips: Synthetic chips to match the factory applied reflective surfacing <strong>of</strong> the<br />
finish ply.<br />
E. Metallic Powder: A finely graded metal dust as supplied or approved by the <strong>membrane</strong><br />
manufacturer, used for covering <strong>of</strong> bitumen overruns over the foil surfaced <strong>membrane</strong>.<br />
07552-9<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SBS-MODIFIED BITUMINOUS MEMBRANE ROOFING<br />
F. Perlite Cant Strips: A cant strip composed <strong>of</strong> expanded volcanic minerals combined<br />
with <strong>water</strong>pro<strong>of</strong>ing binders. The top surface shall be pre-treated with an asphalt based<br />
coating. The face <strong>of</strong> the cant shall have a nominal 4 inch dimension.<br />
G. Fasteners<br />
1. Base Sheet Fasteners: Base sheet fasteners shall be approved by the<br />
manufacturer <strong>of</strong> the primary ro<strong>of</strong>ing products. Acceptable base sheet fasteners<br />
for specific substrate types are listed below.<br />
a. Lightweight Concrete Substrates:<br />
1) A single unit, precision formed, electro zinc coated steel fastener<br />
having a 2.7 inch diameter rib reinforced cap and 1.7 inch long<br />
rectangular legs, designed to expand when fully driven into the<br />
lightweight concrete. Fasteners for lightweight concrete shall meet<br />
FM Standard 4470 requirements for corrosion resistance.<br />
a) Zonotite Base Sheet Fasteners by Siplast; Irving, TX<br />
2. Gypsum Sheathing Panel Fasteners for Wood / Plywood Substrates to Receive<br />
Flashing Coverage: Gypsum sheathing panel fasteners and plates shall be<br />
approved by the manufacturer <strong>of</strong> the primary ro<strong>of</strong>ing products. The fastening<br />
pattern for each panel to be used shall be as recommended by the panel<br />
manufacturer and approved by the manufacturer <strong>of</strong> the primary ro<strong>of</strong>ing products.<br />
Acceptable panel fastener manufacturers for specific substrate types are listed<br />
below.<br />
1) Wood / Plywood Substrates to Receive Flashing Coverage: Gypsum<br />
sheathing panel mechanical fasteners shall be factory coated for<br />
corrosion resistance. The fastener shall conform, meet or exceed<br />
Factory Mutual Standard 4470 and when subjected to 30 Kesternich<br />
cycles, show less than 15% red rust. Acceptable fastener types for<br />
wood / plywood substrates are listed below. A fluorocarbon coated<br />
screw type ro<strong>of</strong>ing fastener having a minimum 0.220 inch thread<br />
diameter. Plates used in conjunction with the fastener shall be a<br />
metal type having a minimum 3 inch diameter, as supplied by the<br />
fastener manufacturer.<br />
a) Parafast Fastener by Siplast; Irving, TX<br />
b) Ro<strong>of</strong>grip with Buldex Metal Plates by ITW Buildex; Itasca, IL<br />
c) Dekfast #12 with Dekfast Steel Hexagonal Plates by<br />
Construction Fasteners, <strong>Inc</strong>. Wyomissing, PA<br />
d) Standard Ro<strong>of</strong>ing Fasteners by OMG; Agawam, MA<br />
3. Flashing Reinforcing Sheet Fasteners for Wood / Plywood Substrates to Receive<br />
Flashing Coverage: Fasteners shall be approved by the manufacturer <strong>of</strong> the<br />
primary ro<strong>of</strong>ing products. Acceptable fastener types for specific substrates are<br />
listed below.<br />
07552-10<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SBS-MODIFIED BITUMINOUS MEMBRANE ROOFING<br />
1) Wood / Plywood Substrates: A 12 gauge, spiral or annular threaded<br />
shank, zinc coated steel ro<strong>of</strong>ing fastener having a minimum 1 inch<br />
head. Acceptable fastener types for wood / plywood substrates are<br />
listed below.<br />
a) Square Cap by W.H. Maze Co.; Peru, IL<br />
b) 12 Gauge Simplex Nail by the Simplex Nail and Manufacturing<br />
Co., Americus, GA.<br />
H. Walktread: A prefabricated, puncture resistant polyester core reinforced, polymer<br />
modified bitumen sheet material topped with a ceramic-coated granule wearing<br />
surface.<br />
1. Thickness: 0.217 in (5.5 mm)<br />
2. Weight: 1.8 lb/ft² (8.8 kg/m²)<br />
3. Width: 30 in (76.2 cm)<br />
a. Paratread Ro<strong>of</strong> Protection Material by Siplast; Irving, TX<br />
PART 3 - EXECUTION<br />
3.1 EXAMINATION<br />
A. Examine substrates, areas, and conditions, with Installer present, for compliance with<br />
the following requirements and other conditions affecting performance <strong>of</strong> ro<strong>of</strong>ing<br />
system:<br />
1. Verify that ro<strong>of</strong> openings and penetrations are in place and set and braced and<br />
that ro<strong>of</strong> drains are securely clamped in place.<br />
2. Verify that cants, blocking, curbs, and nailers are securely anchored to ro<strong>of</strong> deck<br />
at penetrations and terminations and that nailers match thicknesses <strong>of</strong> insulation.<br />
3. Verify that surface plane flatness and fastening <strong>of</strong> steel ro<strong>of</strong> deck complies with<br />
requirements in Division 5 Section "Steel Deck."<br />
4. Verify that deck is securely fastened with no projecting fasteners and with no<br />
adjacent units in excess <strong>of</strong> 1/16 inch (1.6 mm) out <strong>of</strong> plane relative to adjoining<br />
deck.<br />
5. Proceed with installation only after unsatisfactory conditions have been<br />
corrected.<br />
3.2 PREPARATION<br />
A. Clean substrate <strong>of</strong> dust, debris, moisture, and other substances detrimental to ro<strong>of</strong>ing<br />
installation according to ro<strong>of</strong>ing system manufacturer's written instructions. Remove<br />
sharp projections.<br />
B. Prevent materials from entering and clogging ro<strong>of</strong> drains and conductors and from<br />
spilling or migrating onto surfaces <strong>of</strong> other construction. Remove ro<strong>of</strong>-drain plugs<br />
when no work is taking place or when rain is forecast.<br />
07552-11<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SBS-MODIFIED BITUMINOUS MEMBRANE ROOFING<br />
3.3 SUBSTRATE PREPARATION<br />
A. Preparation <strong>of</strong> Wood / Plywood Substrates to Receive Flashing Coverage:<br />
Mechanically attach the gypsum sheathing panels to all wood / plywood substrates that<br />
will be covered with the specified flashing <strong>membrane</strong>, using the specified screws /<br />
plates, at 12 inches o.c. staggered. Cut the cant backing sheet into 12 inch widths and<br />
peel the release film from the back <strong>of</strong> the sheet. Set the sheet into place extending 6<br />
inches onto the field <strong>of</strong> the ro<strong>of</strong> area and 6 inches up the gypsum sheathing panel<br />
surface utilizing minimum 3 inch side laps. Set the cant into place prior to installation <strong>of</strong><br />
the ro<strong>of</strong> <strong>membrane</strong> base ply.<br />
B. ZIC Lightweight Insulating Concrete Ro<strong>of</strong> System: See Specification Section 07220.<br />
C. Base Sheet Securement to Prepared Substrate: Lay the base sheet over the entire<br />
area to be ro<strong>of</strong>ed, lapping sides 3 inches and ends 6 inches. Using the specified<br />
fasteners, fasten each sheet every 7 1/2 inches through laps and stagger fasten the<br />
remainder <strong>of</strong> the sheet in two rows on nominal 12 inch centers with fasteners in each<br />
row on 10 inch centers. <strong>Inc</strong>rease the fastening pattern by 70% at the perimeter <strong>of</strong> the<br />
ro<strong>of</strong> and 160% at the corners.<br />
3.4 ROOFING MEMBRANE INSTALLATION<br />
A. Install ro<strong>of</strong>ing <strong>membrane</strong> system according to ro<strong>of</strong>ing system manufacturer's written<br />
instructions and applicable recommendations <strong>of</strong> ARMA/NRCA's "Quality Control<br />
Guidelines for the Application <strong>of</strong> Modified Bitumen Ro<strong>of</strong>ing."<br />
B. Cooperate with testing and inspecting agencies engaged or required to perform<br />
services for installing ro<strong>of</strong>ing system.<br />
C. Coordinate installing ro<strong>of</strong>ing system so insulation and other components <strong>of</strong> the ro<strong>of</strong>ing<br />
<strong>membrane</strong> system not permanently exposed are not subjected to precipitation or left<br />
uncovered at the end <strong>of</strong> the workday or when rain is forecast.<br />
1. Provide tie-<strong>of</strong>fs at end <strong>of</strong> each day's work to cover exposed ro<strong>of</strong>ing <strong>membrane</strong><br />
sheets and insulation with a course <strong>of</strong> coated felt set in ro<strong>of</strong>ing cement or hot<br />
ro<strong>of</strong>ing asphalt with joints and edges sealed.<br />
2. Complete terminations and base flashings and provide temporary seals to<br />
prevent <strong>water</strong> from entering completed sections <strong>of</strong> ro<strong>of</strong>ing system.<br />
3. Remove and discard temporary seals before beginning work on adjoining ro<strong>of</strong>ing.<br />
D. Substrate-Joint Penetrations: Prevent ro<strong>of</strong>ing asphalt from penetrating substrate joints,<br />
entering building, or damaging ro<strong>of</strong>ing system components or adjacent building<br />
construction.<br />
E. Membrane Application: Apply ro<strong>of</strong>ing in accordance with ro<strong>of</strong>ing system manufacturer’s<br />
instructions and the following requirements. Application <strong>of</strong> ro<strong>of</strong>ing <strong>membrane</strong><br />
components shall immediately follow application <strong>of</strong> base sheet and / or insulation as a<br />
continuous operation.<br />
F. Aesthetic Considerations: An aesthetically pleasing overall appearance <strong>of</strong> the finished<br />
ro<strong>of</strong> application is a standard requirement for this project. Make necessary<br />
preparations, utilize recommended application techniques, apply the specified<br />
07552-12<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SBS-MODIFIED BITUMINOUS MEMBRANE ROOFING<br />
materials including synthetic chips and metallic powder, and exercise care in ensuring<br />
that the finished application is acceptable to the Owner.<br />
G. Priming: Prime metal and concrete and masonry surfaces with a uniform coating <strong>of</strong> the<br />
specified asphalt primer.<br />
H. Bitumen Consistency: Cutting or alterations <strong>of</strong> bitumen, primer, and sealants will not<br />
be permitted.<br />
I. Membrane Adhesive Application: Membrane adhesive can be applied by roller,<br />
squeegee or spray unit. Apply cold adhesive in a smooth, even continuous layer<br />
without breaks or voids. Utilize an application rate <strong>of</strong> 2 to 2 ½ gal/sq over irregular or<br />
porous substrates. Utilize an application rate <strong>of</strong> 1 ½ to 2 gal/sq for interplay<br />
applications. Double the adhesive application rate at the end laps <strong>of</strong> granule surfaced<br />
sheets. In the areas surrounding details that are to receive the catalyzed acrylic resin<br />
primer and flashing system, apply <strong>membrane</strong> plies in a full coating <strong>of</strong> the specified<br />
elastomeric sealant in lieu <strong>of</strong> the solvent based adhesive a minimum 8 inches from the<br />
base <strong>of</strong> the penetration or curb.<br />
J. Ro<strong>of</strong>ing Application: Apply all layers <strong>of</strong> ro<strong>of</strong>ing free <strong>of</strong> wrinkles, creases or fishmouths.<br />
Exert sufficient pressure on the roll during application to ensure prevention <strong>of</strong> air<br />
pockets.<br />
1. Apply all layers <strong>of</strong> ro<strong>of</strong>ing perpendicular to the slope <strong>of</strong> the deck.<br />
2. Fully bond the base ply to the prepared substrate, utilizing minimum 3 inch side<br />
and end laps. Apply each sheet directly behind the cold adhesive applicator.<br />
Cut a dog ear angle at the end laps on overlapping selvage edges. Using a<br />
clean trowel, apply top pressure to top seal T-laps immediately following sheet<br />
application. Stagger end laps a minimum <strong>of</strong> 3 feet.<br />
3. Fully bond the finish ply to the base ply, utilizing minimum 3 inch side and end<br />
laps. Apply each sheet directly behind the cold adhesive applicator. Stagger<br />
end laps <strong>of</strong> the finish ply a minimum 3 feet. Cut a dog ear angle at the end laps<br />
on overlapping selvage edges. Using a clean trowel, apply top pressure to top<br />
seal T-laps immediately following sheet application. Stagger side laps <strong>of</strong> the<br />
finish ply a minimum 12 inches from side laps in the underlying base ply.<br />
Stagger end laps <strong>of</strong> the finish ply a minimum 3 feet from end laps in the<br />
underlying base ply.<br />
4. Maximum sheet lengths and special fastening <strong>of</strong> the specified ro<strong>of</strong> <strong>membrane</strong><br />
system may be required at various slope increments where the ro<strong>of</strong> deck slope<br />
exceeds ½ inch per foot. The manufacturer shall provide acceptable sheet<br />
lengths and the required fastening schedule for all ro<strong>of</strong>ing sheet applications to<br />
applicable ro<strong>of</strong> slopes.<br />
K. Synthetic Chip Embedment: Broadcast synthetic chips over all bitumen / adhesive<br />
overruns to the finish ply surface. Ensure a monolithic surface color.<br />
L. Flashing Application – masonry surfaces: Flash masonry parapet walls and curbs<br />
using the reinforcing sheet and the metal foil flashing <strong>membrane</strong>. After the base ply<br />
has been applied to the top <strong>of</strong> the cant, fully adhere the reinforcing sheet, utilizing<br />
minimum 3 inch side laps and extend a minimum <strong>of</strong> 3 inches onto the base ply surface<br />
and 3 inches up the parapet wall above the cant. After the final ro<strong>of</strong>ing ply has been<br />
applied to the top <strong>of</strong> the cant, prepare the surface area that is to receive flashing<br />
coverage by torch heating granular surfaces or by application <strong>of</strong> asphalt primer;<br />
allowing primer to dry thoroughly. Torch apply the metal foil-faced flashing into place<br />
07552-13<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SBS-MODIFIED BITUMINOUS MEMBRANE ROOFING<br />
using three foot widths (cut <strong>of</strong>f the end <strong>of</strong> roll) always lapping the factory selvage edge.<br />
Stagger the laps <strong>of</strong> the metal foil flashing layer from lap seams in the reinforcing layer.<br />
Extend the flashing sheet a minimum <strong>of</strong> 4 inches beyond the toe <strong>of</strong> the cant onto the<br />
prepared surface <strong>of</strong> the finished ro<strong>of</strong> and up the wall to the desired flashing height.<br />
Exert pressure on the flashing sheet during application to ensure complete contact with<br />
the wall/ro<strong>of</strong> surfaces, preventing air pockets; this can be accomplished by using a<br />
damp sponge or shop rag. Check and seal all loose laps and edges. Nail the top edge<br />
<strong>of</strong> the flashing on 9 inch centers. (See manufacturer’s schematic for visual<br />
interpretation).<br />
M. Flashing Application – surfaces sheathed with gypsum sheathing panels: After the<br />
gypsum sheathing panel and cant backing sheet have been installed, flash parapet<br />
walls and curbs with the specified reinforcing sheet and the metal foil flashing<br />
<strong>membrane</strong>. The reinforcing sheet shall have minimum 3 inch side laps and extend a<br />
minimum <strong>of</strong> 3 inches onto the base ply surface and to the top <strong>of</strong> the parapet wall or<br />
curb. Using the specified fasteners, mechanically attach the reinforcing sheet through<br />
the field <strong>of</strong> the sheet to the vertical flashing surface on 12 inch centers from the top <strong>of</strong><br />
the cant to the top <strong>of</strong> the wall or curb. Fully adhere the remainder <strong>of</strong> the flashing<br />
reinforcing sheet that extends over the cant and ro<strong>of</strong> level. Using a Leister Hand<br />
Welding Tool, seal the laps between flashing reinforcing sheets. After the final ro<strong>of</strong>ing<br />
ply has been applied to the top <strong>of</strong> the cant, prepare the surface area that is to receive<br />
flashing coverage by torch heating granular surfaces or by application <strong>of</strong> asphalt<br />
primer; allowing primer to dry thoroughly. Torch apply the metal foil-faced flashing into<br />
place using three foot widths (cut <strong>of</strong>f the end <strong>of</strong> roll) always lapping the factory selvage<br />
edge. Stagger the laps <strong>of</strong> the metal foil flashing layer from lap seams in the reinforcing<br />
layer. Extend the flashing sheet a minimum <strong>of</strong> 4 inches beyond the toe <strong>of</strong> the cant onto<br />
the prepared surface <strong>of</strong> the finished ro<strong>of</strong> and up the wall to the desired flashing height.<br />
Exert pressure on the flashing sheet during application to ensure complete contact with<br />
the wall/ro<strong>of</strong> surfaces, preventing air pockets; this can be accomplished by using a<br />
damp sponge or shop rag. Check and seal all loose laps and edges. Nail the top edge<br />
<strong>of</strong> the flashing on 9 inch centers. (See manufacturer’s schematic for visual<br />
interpretation).<br />
N. Catalyzed Acrylic Resin Flashing System: Install the liquid-applied primer and flashing<br />
system in accordance with the <strong>membrane</strong> system manufacturer’s printed guidelines<br />
and other applicable written recommendations as provided by the manufacturer.<br />
O. Use <strong>of</strong> Metallic Powder: Broadcast metallic powder over all bitumen overruns on the<br />
metal foil <strong>membrane</strong> surface while the bitumen is still hot to ensure a monolithic<br />
surface color.<br />
P. Water Cut-Off: At end <strong>of</strong> day’s work, or when precipitation is imminent, construct a<br />
<strong>water</strong> cut-<strong>of</strong>f at all open edges. Cut-<strong>of</strong>fs can be built using asphalt or plastic cement<br />
and ro<strong>of</strong>ing felts, constructed to withstand protracted periods <strong>of</strong> service. Cut-<strong>of</strong>fs must<br />
be completely removed prior to the resumption <strong>of</strong> ro<strong>of</strong>ing.<br />
3.5 ROOF SYSTEM INTERFACE WITH RELATED COMPONENTS<br />
A. Edge Metal: Completely prime metal flanges and allow to dry prior to installation. Turn<br />
the base ply down 2 inches past the ro<strong>of</strong> edge and over the nailer. After the base ply<br />
and continuous cleat have been installed, set the flange in mastic and stagger nail<br />
every 3 inches on center. Strip-in the flange using the stripping-ply material, extending<br />
07552-14<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SBS-MODIFIED BITUMINOUS MEMBRANE ROOFING<br />
a minimum <strong>of</strong> 4 inches beyond the edge <strong>of</strong> the flange. Terminate the finish ply at the<br />
gravel-stop rise <strong>of</strong> the edge metal. SEE ITEM: SEALANT, for finish <strong>of</strong> this detail.<br />
B. Lead Pipe Flashings: Completely prime the lead flanges and allow to dry prior to<br />
installation. After the base ply has been applied, set the flange in mastic and strip-in<br />
the flange using the stripping-ply material, extending a minimum <strong>of</strong> 4 inches beyond<br />
the edge <strong>of</strong> the flange. Terminate the finish ply at the flange-sleeve juncture <strong>of</strong> the<br />
pipe flashing. SEE ITEM: SEALANT for finish <strong>of</strong> this detail.<br />
C. Lead Drain Flashings: Completely prime the lead drain flashing and allow to dry prior<br />
to installation. After the base ply has been applied, set the lead flashing sheet in<br />
mastic and form to turn down inside <strong>of</strong> the drain bowl. Ply-in the perimeter <strong>of</strong> the lead<br />
flashing using an additional layer <strong>of</strong> the base ply material, overlapping the perimeter <strong>of</strong><br />
the lead a minimum <strong>of</strong> 4 inches. Terminate the finish ply to extend beneath the<br />
clamping ring seal. Install the clamping ring with all bolts in place.<br />
D. Metal Pipe Flashings: Completely prime the metal pipe flanges and allow to dry prior<br />
to installation. After the base ply has been applied, set the flanges in mastic and stripin<br />
the flange using the stripping-ply material, extending a minimum <strong>of</strong> 4 inches beyond<br />
the edge <strong>of</strong> the flange. Terminate the finish ply at the flange-sleeve juncture <strong>of</strong> the<br />
pipe flashing. Install a <strong>water</strong>tight umbrella to the penetration, completely covering the<br />
opening <strong>of</strong> the pipe flashing. SEE ITEM: SEALANT for finish <strong>of</strong> this detail.<br />
E. Walktread: Cut the walktread into maximum 5 foot lengths and allow to relax until flat.<br />
Adhere the sheet using the specified plastic cement. Apply the specified cement in a<br />
3/8 inch thickness to the back <strong>of</strong> the product in 5 inch by 5 inch spots in accordance<br />
with the pattern as supplied by the walkthread manufacturer. Walk-in each sheet after<br />
application to ensure proper adhesion. Use a minimum spacing <strong>of</strong> 2 inches between<br />
sheets to allow for proper drainage.<br />
F. Sealant: Apply a smooth continuous bead <strong>of</strong> the specified sealant at the exposed<br />
finish ply edge transition to metal flashings incorporated into the ro<strong>of</strong> system.<br />
G. Ro<strong>of</strong> Moisture Relief Vents – non-vented lightweight insulating concrete substrates:<br />
Completely prime the metal flanges and allow to dry prior to installation. After the base<br />
ply has been applied, mark the venting designations. Cut a 2 diameter core from the<br />
ro<strong>of</strong> assembly down to the top surface <strong>of</strong> the embedded Insulperm expanded<br />
polystyrene panels. Fill the resulting void with fiberglass insulation. Set the vent flange<br />
in mastic, centered over the core cut. Strip-in the flange using the stripping-ply<br />
material, extending a minimum <strong>of</strong> 4 inches beyond the edge <strong>of</strong> the flange. Terminate<br />
the finish ply at the flange-throat juncture <strong>of</strong> the vent. SEE ITEM: SEALANT, for finish<br />
<strong>of</strong> this detail.<br />
3.6 FIELD QUALITY CONTROL<br />
A. Final Ro<strong>of</strong> Inspection: Arrange for ro<strong>of</strong>ing system manufacturer's technical personnel<br />
to inspect ro<strong>of</strong>ing installation on completion and submit report to Architect.<br />
1. Notify Architect or Owner 48 hours in advance <strong>of</strong> date and time <strong>of</strong> inspection.<br />
B. Repair or remove and replace components <strong>of</strong> ro<strong>of</strong>ing system where test results or<br />
inspections indicate that they do not comply with specified requirements.<br />
07552-15<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SBS-MODIFIED BITUMINOUS MEMBRANE ROOFING<br />
C. Additional testing and inspecting, at Contractor's expense, will be performed to<br />
determine compliance <strong>of</strong> replaced or additional work with specified requirements.<br />
3.7 PROTECTING AND CLEANING<br />
A. Protect ro<strong>of</strong>ing system from damage and wear during remainder <strong>of</strong> construction period.<br />
When remaining construction will not affect or endanger ro<strong>of</strong>ing, inspect ro<strong>of</strong>ing for<br />
deterioration and damage, describing its nature and extent in a written report, with<br />
copies to Architect and Owner.<br />
B. Correct deficiencies in or remove ro<strong>of</strong>ing system that does not comply with<br />
requirements, repair substrates, and repair or reinstall ro<strong>of</strong>ing system to a condition<br />
free <strong>of</strong> damage and deterioration at time <strong>of</strong> Substantial Completion and according to<br />
warranty requirements.<br />
C. Clean overspray and spillage from adjacent construction using cleaning agents and<br />
procedures recommended by manufacturer <strong>of</strong> affected construction.<br />
3.8 FIELD QUALITY CONTROL AND INSPECTIONS<br />
A. Site Condition: Leave all areas around job site free <strong>of</strong> debris, ro<strong>of</strong>ing materials,<br />
equipment and related items after completion <strong>of</strong> job.<br />
B. Notification Of Completion: Notify the manufacturer by means <strong>of</strong> manufacturer’s printed<br />
Notification <strong>of</strong> Completion form <strong>of</strong> job completion in order to schedule a final inspection<br />
date.<br />
C. Final Inspection:<br />
1. Post-Installation Meeting: Hold a meeting at the completion <strong>of</strong> the project,<br />
attended by all parties that were present at the pre-job conference. A punch list<br />
<strong>of</strong> items required for completion shall be complied by the Contractor and the<br />
manufacturer’s representative. Complete, sign and mail the punch list form to the<br />
manufacturer’s headquarters.<br />
D. Issuance Of The Guarantee: Complete all post installation procedures and meet the<br />
manufacturer’s final endorsement for issuance <strong>of</strong> the specified guarantee.<br />
END OF SECTION 07552<br />
07552-16<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 07620<br />
SHEET METAL FLASHING AND TRIM<br />
PART 1 - GENERAL<br />
1.1 RELATED DOCUMENTS<br />
A. Drawings and general provisions <strong>of</strong> the Contract, including General and<br />
Supplementary Conditions and Division 1 Specification Sections, apply to this Section.<br />
1.2 SUMMARY<br />
A. This Section includes the following sheet metal flashing and trim:<br />
1. Formed low-slope ro<strong>of</strong> flashing and trim.<br />
2. Formed wall flashing and trim.<br />
B. Related Sections include the following:<br />
1. Division 6 Section "Miscellaneous Carpentry" for wood nailers, curbs, and<br />
blocking.<br />
2. Division 7 Section "S.B.S. Modified Bitumen Ro<strong>of</strong>ing system" for installing sheet<br />
metal flashing and trim integral with ro<strong>of</strong>ing <strong>membrane</strong>.<br />
3. Division 7 Section "Joint Sealants" for field-applied sheet metal flashing and trim<br />
sealants.<br />
1.3 PERFORMANCE REQUIREMENTS<br />
A. General: Install sheet metal flashing and trim to withstand wind loads, structural<br />
movement, thermally induced movement, and exposure to weather without failing,<br />
rattling, leaking, and fastener disengagement.<br />
B. Fabricate and install ro<strong>of</strong> edge flashing and copings capable <strong>of</strong> resisting the forces<br />
detailed in the structural drawings and according to recommendations in FMG Loss<br />
Prevention Data Sheet 1-49.<br />
C. Thermal Movements: Provide sheet metal flashing and trim that allow for thermal<br />
movements resulting from the following maximum change (range) in ambient and<br />
surface temperatures by preventing buckling, opening <strong>of</strong> joints, hole elongation,<br />
overstressing <strong>of</strong> components, failure <strong>of</strong> joint sealants, failure <strong>of</strong> connections, and other<br />
detrimental effects. Provide clips that resist rotation and avoid shear stress as a result<br />
<strong>of</strong> sheet metal and trim thermal movements. Base engineering calculation on surface<br />
temperatures <strong>of</strong> materials due to both solar heat gain and nighttime-sky heat loss.<br />
1. Temperature Change (Range): 120 deg F (67 deg C), ambient; 180 deg F (100<br />
deg C), material surfaces.<br />
D. Water Infiltration: Provide sheet metal flashing and trim that do not allow <strong>water</strong><br />
infiltration to building interior.<br />
07620-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SHEET METAL FLASHING AND TRIM<br />
1.4 SUBMITTALS<br />
A. Shop Drawings: Show layouts <strong>of</strong> sheet metal flashing and trim, including plans and<br />
elevations. Distinguish between shop- and field-assembled work. <strong>Inc</strong>lude the<br />
following:<br />
1. Identify material, thickness, weight, and finish for each item and location in<br />
Project.<br />
2. Details for forming sheet metal flashing and trim, including pr<strong>of</strong>iles, shapes,<br />
seams, and dimensions.<br />
3. Details for fastening, joining, supporting, and anchoring sheet metal flashing and<br />
trim, including fasteners, clips, cleats, and attachments to adjoining work.<br />
4. Indicate locations <strong>of</strong> seams.<br />
B. Samples for Verification: For each type <strong>of</strong> exposed finish required, prepared on<br />
Samples <strong>of</strong> size indicated below:<br />
1. Sheet Metal Flashing: 12 inches (300 mm) long. <strong>Inc</strong>lude fasteners, cleats, clips,<br />
closures, and other attachments.<br />
2. Trim: 12 inches (300 mm) long. <strong>Inc</strong>lude fasteners and other exposed<br />
accessories.<br />
1.5 QUALITY ASSURANCE<br />
A. Sheet Metal Flashing and Trim Standard: Comply with SMACNA's "Architectural Sheet<br />
Metal Manual." Conform to dimensions and pr<strong>of</strong>iles shown unless more stringent<br />
requirements are indicated.<br />
1.6 DELIVERY, STORAGE, AND HANDLING<br />
A. Deliver sheet metal flashing materials and fabrications undamaged. Protect sheet<br />
metal flashing and trim materials and fabrications during transportation and handling.<br />
B. Unload, store, and install sheet metal flashing materials and fabrications in a manner to<br />
prevent bending, warping, twisting, and surface damage.<br />
C. Stack materials on platforms or pallets, covered with suitable weathertight and<br />
ventilated covering. Do not store sheet metal flashing and trim materials in contact with<br />
other materials that might cause staining, denting, or other surface damage.<br />
1.7 COORDINATION<br />
A. Coordinate installation <strong>of</strong> sheet metal flashing and trim with interfacing and adjoining<br />
construction to provide a leakpro<strong>of</strong>, secure, and noncorrosive installation.<br />
07620-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SHEET METAL FLASHING AND TRIM<br />
PART 2 - PRODUCTS<br />
2.1 MANUFACTURERS<br />
A. In other Part 2 articles where titles below introduce lists, the following requirements<br />
apply to product selection:<br />
1. Available Products: Subject to compliance with requirements, products that may<br />
be incorporated into the Work include, but are not limited to, products specified.<br />
2.2 SHEET METALS<br />
A. Aluminum Sheet: ASTM B 209 (ASTM B 209M), Alloy 3003, 3004, 3105, or 5005,<br />
Temper suitable for forming and structural performance required, but not less than<br />
H14, finished as follows:<br />
a. High-Performance Organic Finish: Prepare, pretreat, and apply coating to<br />
exposed metal surfaces to comply with coating and resin manufacturers'<br />
written instructions. Fluoropolymer 2-Coat System: Manufacturer's<br />
standard 2-coat, thermocured system consisting <strong>of</strong> specially formulated<br />
inhibitive primer and fluoropolymer color topcoat containing not less than<br />
70 percent polyvinylidene fluoride resin by weight; complying with<br />
AAMA 2604.<br />
b. Color: Custom Color to match the ro<strong>of</strong> color. Refer to sheet metal items<br />
below for locations<br />
c. Class I, Clear Anodic Finish: AA-M12C22A41 (Mechanical Finish:<br />
nonspecular as fabricated; Chemical Finish: etched, medium matte;<br />
Anodic Coating: Architectural Class I, clear coating 0.018 mm or thicker)<br />
complying with AAMA 611.<br />
2.3 UNDERLAYMENT MATERIALS<br />
A. Self-Adhering, Polyethylene-Faced Sheet: ASTM D 1970, 40 mils (1.0 mm) thick<br />
minimum, consisting <strong>of</strong> slip-resisting polyethylene-film reinforcing and top surface<br />
laminated to SBS-modified asphalt adhesive, with release-paper backing; cold applied.<br />
1. Available Products:<br />
a. Grace, W. R. & Co.; Grace Ice and Water Shield.<br />
b. Johns Manville International, <strong>Inc</strong>.; Ro<strong>of</strong> Defender.<br />
c. Owens Corning; WeatherLock.<br />
B. Slip Sheet: Rosin-sized paper, minimum 3 lb/100 sq. ft. (0.16 kg/sq. m).<br />
2.4 MISCELLANEOUS MATERIALS<br />
A. General: Provide materials and types <strong>of</strong> fasteners, solder, welding rods, protective<br />
coatings, separators, sealants, and other miscellaneous items as required for complete<br />
sheet metal flashing and trim installation.<br />
B. Fasteners: Screws, annular threaded nails, self-tapping screws, self-locking rivets and<br />
bolts, and other suitable fasteners designed to withstand design loads.<br />
07620-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SHEET METAL FLASHING AND TRIM<br />
1. Exposed Fasteners: Heads matching color <strong>of</strong> sheet metal by means <strong>of</strong> plastic<br />
caps or factory-applied coating.<br />
2. Fasteners for Flashing and Trim: Blind fasteners or self-drilling screws,<br />
gasketed, with hex washer head.<br />
3. Blind Fasteners: High-strength aluminum or stainless-steel rivets.<br />
C. Sealing Tape: Pressure-sensitive, 100 percent solids, polyisobutylene compound<br />
sealing tape with release-paper backing. Provide permanently elastic, nonsag,<br />
nontoxic, nonstaining tape.<br />
D. Elastomeric Sealant: ASTM C 920, elastomeric silicone polymer sealant; <strong>of</strong> type,<br />
grade, class, and use classifications required to seal joints in sheet metal flashing and<br />
trim and remain <strong>water</strong>tight.<br />
E. Epoxy Seam Sealer: Two-part, noncorrosive, aluminum seam-cementing compound,<br />
recommended by aluminum manufacturer for exterior nonmoving joints, including<br />
riveted joints.<br />
F. Bituminous Coating: Cold-applied asphalt mastic, SSPC-Paint 12, compounded for 15-<br />
mil (0.4-mm) dry film thickness per coat. Provide inert-type noncorrosive compound<br />
free <strong>of</strong> asbestos fibers, sulfur components, and other deleterious impurities.<br />
G. Asphalt Ro<strong>of</strong>ing Cement: ASTM D 4586, asbestos free, <strong>of</strong> consistency required for<br />
application.<br />
2.5 FABRICATION, GENERAL<br />
A. General: Custom fabricate sheet metal flashing and trim to comply with<br />
recommendations in SMACNA's "Architectural Sheet Metal Manual" that apply to<br />
design, dimensions, metal, and other characteristics <strong>of</strong> item indicated. Shop fabricate<br />
items where practicable. Obtain field measurements for accurate fit before shop<br />
fabrication.<br />
B. Fabricate sheet metal flashing and trim in thickness or weight needed to comply with<br />
performance requirements, but not less than that specified for each application and<br />
metal.<br />
C. Fabricate sheet metal flashing and trim without excessive oil canning, buckling, and<br />
tool marks and true to line and levels indicated, with exposed edges folded back to<br />
form hems.<br />
1. Seams for Aluminum: Fabricate nonmoving seams with flat-lock seams. Form<br />
seams and seal with epoxy seam sealer. Rivet joints for additional strength.<br />
D. Sealed Joints: Form nonexpansion but movable joints in metal to accommodate<br />
elastomeric sealant to comply with SMACNA recommendations.<br />
E. Expansion Provisions: Where lapped or bayonet-type expansion provisions in the<br />
Work cannot be used, form expansion joints <strong>of</strong> intermeshing hooked flanges, not less<br />
than 1 inch (25 mm) deep, filled with elastomeric sealant concealed within joints.<br />
F. Conceal fasteners and expansion provisions where possible on exposed-to-view sheet<br />
metal flashing and trim, unless otherwise indicated.<br />
07620-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SHEET METAL FLASHING AND TRIM<br />
G. Fabricate cleats and attachment devices from same material as accessory being<br />
anchored or from compatible, noncorrosive metal.<br />
1. Thickness: As recommended by SMACNA's "Architectural Sheet Metal<br />
Manual" and FMG Loss Prevention Data Sheet 1-49 for application but not less<br />
than thickness <strong>of</strong> metal being secured.<br />
2.6 ROOF DRAINAGE SHEET METAL FABRICATIONS<br />
A. Hanging Gutters: Fabricate to cross section indicated, complete with end pieces, outlet<br />
tubes, and other accessories as required. Fabricate in minimum 96-inch- (2400-mm-)<br />
long sections. Furnish flat-stock gutter spacers and gutter brackets fabricated from<br />
same metal as gutters, <strong>of</strong> size recommended by SMACNA but not less than twice the<br />
gutter thickness. Fabricate expansion joints, expansion-joint covers, gutter bead<br />
reinforcing bars, and gutter accessories from same metal as gutters.<br />
1. Accessories: Continuous removable leaf screen with sheet metal frame and<br />
hardware cloth screen.<br />
2. Fabricate from the following material:<br />
a. Aluminum: 0.040 inch (1.0 mm) thick.<br />
b. Finish: Fluoropolymer 2-Coat System.<br />
B. Downspouts: Fabricate rectangular downspouts complete with mitered elbows.<br />
Furnish with metal hangers, from same material as downspouts, and anchors.<br />
1. Manufactured Hanger Style: Refer to drawings.<br />
2. Fabricate downspouts from the following material:<br />
a. Aluminum: 0.024 inch (0.6 mm) thick.<br />
b. Finish: Fluoropolymer 2-Coat System at upper ro<strong>of</strong> and clear anondized at<br />
conductor heads.<br />
C. Parapet Scuppers: Fabricate scuppers <strong>of</strong> dimensions required with closure flange trim<br />
to exterior, 4-inch- (100-mm-) wide wall flanges to interior, and base extending 4 inches<br />
(100 mm) beyond cant or tapered strip into field <strong>of</strong> ro<strong>of</strong>. Fabricate from the following<br />
materials:<br />
1. Aluminum: 0.032 inch (0.81 mm) thick.<br />
2. Finish: Clear Anondized.<br />
D. Conductor Heads: Fabricate conductor heads with flanged back and stiffened top<br />
edge and <strong>of</strong> dimensions and shape indicated complete with outlet tubes, exterior flange<br />
trim, and built-in overflows. Fabricate from the following materials:<br />
1. Aluminum: 0.032 inch (0.81 mm) thick.<br />
2. Finish: Clear Anondized.<br />
E. Splash Pans: Fabricate from the following materials:<br />
1. Aluminum: 0.040 inch (1.02 mm) thick.<br />
2. Finish: Mill Finish.<br />
2.7 LOW-SLOPE ROOF SHEET METAL FABRICATIONS<br />
A. Copings: Fabricate in minimum 96-inch- (2400-mm-) long, but not exceeding 10-foot-<br />
(3-m-) long, sections. Fabricate joint plates <strong>of</strong> same thickness as copings. Furnish<br />
07620-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SHEET METAL FLASHING AND TRIM<br />
with continuous cleats to support edge <strong>of</strong> external leg and drill elongated holes for<br />
fasteners on interior leg. Miter corners, seal, and solder or weld <strong>water</strong>tight.<br />
1. Coping Pr<strong>of</strong>ile: Refer to construction drawings.<br />
2. Joint Style: Butt, with 12-inch- (300-mm-) wide, concealed backup plate and 6-<br />
inch- (150-mm-) wide, exposed cover plates.<br />
3. Fabricate from the following materials:<br />
a. Aluminum: 0.050 inch (1.27 mm) thick.<br />
b. Finish: Clear Anondized finish.<br />
B. Counterflashing: Fabricate from the following material:<br />
1. Aluminum: 0.0320 inch (0.8 mm) thick.<br />
2. Finish: Mill finish.<br />
C. Flashing Receivers: Fabricate from the following material:<br />
1. Aluminum: 0.0320 inch (0.8 mm) thick.<br />
2. Finish: Mill finish<br />
D. Ro<strong>of</strong>-Penetration Flashing: Fabricate from the following material:<br />
1. Lead: 4.0 lb/sq. ft. (1.6 mm thick), hard tempered.<br />
2.8 FINISHES<br />
A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products"<br />
for recommendations for applying and designating finishes.<br />
B. Protect mechanical and painted finishes on exposed surfaces from damage by<br />
applying a strippable, temporary protective covering before shipping.<br />
C. Appearance <strong>of</strong> Finished Work: Variations in appearance <strong>of</strong> abutting or adjacent pieces<br />
are acceptable if they are within one-half <strong>of</strong> the range <strong>of</strong> approved Samples.<br />
Noticeable variations in the same piece are not acceptable. Variations in appearance<br />
<strong>of</strong> other components are acceptable if they are within the range <strong>of</strong> approved Samples<br />
and are assembled or installed to minimize contrast.<br />
PART 3 - EXECUTION<br />
3.1 EXAMINATION<br />
A. Examine substrates, areas, and conditions, with Installer present, to verify actual<br />
locations, dimensions and other conditions affecting performance <strong>of</strong> work.<br />
1. Verify that substrate is sound, dry, smooth, clean, sloped for drainage, and<br />
securely anchored.<br />
2. Proceed with installation only after unsatisfactory conditions have been<br />
corrected.<br />
07620-6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SHEET METAL FLASHING AND TRIM<br />
3.2 INSTALLATION, GENERAL<br />
A. General: Anchor sheet metal flashing and trim and other components <strong>of</strong> the Work<br />
securely in place, with provisions for thermal and structural movement. Use fasteners,<br />
solder, welding rods, protective coatings, separators, sealants, and other<br />
miscellaneous items as required to complete sheet metal flashing and trim system.<br />
1. Torch cutting <strong>of</strong> sheet metal flashing and trim is not permitted.<br />
B. Metal Protection: Where dissimilar metals will contact each other or corrosive<br />
substrates, protect against galvanic action by painting contact surfaces with bituminous<br />
coating or by other permanent separation as recommended by fabricator or<br />
manufacturers <strong>of</strong> dissimilar metals.<br />
1. Coat side <strong>of</strong> uncoated aluminum and lead sheet metal flashing and trim with<br />
bituminous coating where flashing and trim will contact wood, ferrous metal, or<br />
cementitious construction.<br />
2. Underlayment: Where installing metal flashing directly on cementitious or wood<br />
substrates, install a course <strong>of</strong> felt underlayment and cover with a slip sheet or<br />
install a course <strong>of</strong> polyethylene underlayment.<br />
3. Bed flanges in thick coat <strong>of</strong> asphalt ro<strong>of</strong>ing cement where required for <strong>water</strong>pro<strong>of</strong><br />
performance.<br />
C. Install exposed sheet metal flashing and trim without excessive oil canning, buckling,<br />
and tool marks.<br />
D. Install sheet metal flashing and trim true to line and levels indicated. Provide uniform,<br />
neat seams with minimum exposure <strong>of</strong> solder, welds, and elastomeric sealant.<br />
E. Install sheet metal flashing and trim to fit substrates and to result in <strong>water</strong>tight<br />
performance. Verify shapes and dimensions <strong>of</strong> surfaces to be covered before<br />
fabricating sheet metal.<br />
1. Space cleats not more than 12 inches (300 mm) apart. Anchor each cleat with<br />
two fasteners. Bend tabs over fasteners.<br />
F. Expansion Provisions: Provide for thermal expansion <strong>of</strong> exposed flashing and trim.<br />
Space movement joints at a maximum <strong>of</strong> 10 feet (3 m) with no joints allowed within 24<br />
inches (600 mm) <strong>of</strong> corner or intersection. Where lapped or bayonet-type expansion<br />
provisions cannot be used or would not be sufficiently <strong>water</strong>tight, form expansion joints<br />
<strong>of</strong> intermeshing hooked flanges, not less than 1 inch (25 mm) deep, filled with<br />
elastomeric sealant concealed within joints.<br />
G. Fasteners: Use fasteners <strong>of</strong> sizes that will penetrate substrate not less than 1-1/4<br />
inches (32 mm) for nails and not less than 3/4 inch (19 mm) for wood screws.<br />
1. Galvanized or Prepainted, Metallic-Coated Steel: Use stainless-steel fasteners.<br />
2. Aluminum: Use aluminum or stainless-steel fasteners.<br />
H. Seal joints with elastomeric sealant as required for <strong>water</strong>tight construction.<br />
1. Where sealant-filled joints are used, embed hooked flanges <strong>of</strong> joint members not<br />
less than 1 inch (25 mm) into sealant. Form joints to completely conceal sealant.<br />
When ambient temperature at time <strong>of</strong> installation is moderate, between 40 and<br />
07620-7<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SHEET METAL FLASHING AND TRIM<br />
70 deg F (4 and 21 deg C), set joint members for 50 percent movement either<br />
way. Adjust setting proportionately for installation at higher ambient<br />
temperatures. Do not install sealant-type joints at temperatures below 40 deg F<br />
(4 deg C).<br />
2. Prepare joints and apply sealants to comply with requirements in Division 7<br />
Section "Joint Sealants."<br />
I. Aluminum Flashing: Rivet or weld joints in uncoated aluminum where necessary for<br />
strength.<br />
3.3 ROOF DRAINAGE SYSTEM INSTALLATION<br />
A. General: Install sheet metal ro<strong>of</strong> drainage items to produce complete ro<strong>of</strong> drainage<br />
system according to SMACNA recommendations and as indicated. Coordinate<br />
installation <strong>of</strong> ro<strong>of</strong> perimeter flashing with installation <strong>of</strong> ro<strong>of</strong> drainage system.<br />
B. Scuppers: Install scuppers where indicated. Continuously support scupper, set to<br />
correct elevation, and under ro<strong>of</strong>ing <strong>membrane</strong>.<br />
3.4 ROOF FLASHING INSTALLATION<br />
A. General: Install sheet metal ro<strong>of</strong> flashing and trim to comply with performance<br />
requirements, sheet metal manufacturer's written installation instructions, and<br />
SMACNA's "Architectural Sheet Metal Manual." Provide concealed fasteners where<br />
possible, set units true to line, and level as indicated. Install work with laps, joints, and<br />
seams that will be permanently <strong>water</strong>tight.<br />
B. Ro<strong>of</strong> Edge Flashing: Anchor to resist uplift and outward forces according to<br />
recommendations in FMG Loss Prevention Data Sheet 1-49 for specified wind zone<br />
and as indicated.<br />
1. Interlock bottom edge <strong>of</strong> ro<strong>of</strong> edge flashing with continuous cleats anchored to<br />
substrate at 16-inch (400-mm) centers.<br />
C. Copings: Anchor to resist uplift and outward forces according to recommendations in<br />
FMG Loss Prevention Data Sheet 1-49 for specified wind zone and as indicated.<br />
1. Interlock exterior bottom edge <strong>of</strong> coping with continuous cleats anchored to<br />
substrate at 16-inch (400-mm) centers.<br />
2. Anchor interior leg <strong>of</strong> coping with screw fasteners and washers at 18-inch (450-<br />
mm) centers.<br />
D. Counterflashing: Coordinate installation <strong>of</strong> counterflashing with installation <strong>of</strong> base<br />
flashing. Insert counterflashing in reglets or receivers and fit tightly to base flashing.<br />
Extend counterflashing 4 inches (100 mm) over base flashing. Lap counterflashing<br />
joints a minimum <strong>of</strong> 4 inches (100 mm) and bed with elastomeric sealant.<br />
1. Secure in a <strong>water</strong>pro<strong>of</strong> manner by means <strong>of</strong> snap-in installation and sealant or<br />
lead wedges and sealant.<br />
E. Ro<strong>of</strong>-Penetration Flashing: Coordinate installation <strong>of</strong> ro<strong>of</strong>-penetration flashing with<br />
installation <strong>of</strong> ro<strong>of</strong>ing and other items penetrating ro<strong>of</strong>. Install flashing as follows:<br />
07620-8<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SHEET METAL FLASHING AND TRIM<br />
1. Turn lead flashing down inside vent piping, being careful not to block vent piping<br />
with flashing.<br />
2. Seal with elastomeric sealant and clamp flashing to pipes penetrating ro<strong>of</strong> except<br />
for lead flashing on vent piping.<br />
3.5 MISCELLANEOUS FLASHING INSTALLATION<br />
A. Equipment Support Flashing: Coordinate installation <strong>of</strong> equipment support flashing<br />
with installation <strong>of</strong> ro<strong>of</strong>ing and equipment. Weld or seal flashing with elastomeric<br />
sealant to equipment support member.<br />
3.6 CLEANING AND PROTECTION<br />
A. Clean exposed metal surfaces <strong>of</strong> substances that interfere with uniform oxidation and<br />
weathering.<br />
B. Remove temporary protective coverings and strippable films as sheet metal flashing<br />
and trim are installed. On completion <strong>of</strong> installation, clean finished surfaces, including<br />
removing unused fasteners, metal filings, pop rivet stems, and pieces <strong>of</strong> flashing.<br />
Maintain in a clean condition during construction.<br />
C. Replace sheet metal flashing and trim that have been damaged or that have<br />
deteriorated beyond successful repair by finish touchup or similar minor repair<br />
procedures.<br />
END OF SECTION 07620<br />
07620-9<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 07841<br />
THROUGH-PENETRATION FIRESTOP SYSTEMS<br />
PART 1 - GENERAL<br />
1.1 RELATED DOCUMENTS<br />
A. Drawings and general provisions <strong>of</strong> the Contract, including General and<br />
Supplementary Conditions and Division 1 Specification Sections, apply to this Section.<br />
1.2 SUMMARY<br />
A. This Section includes through-penetration firestop systems for penetrations through<br />
fire-resistance-rated constructions, including both empty openings and openings<br />
containing penetrating items.<br />
B. Related Sections include the following:<br />
1. Division 15 Sections specifying duct and piping penetrations.<br />
2. Division 16 Sections specifying cable and conduit penetrations.<br />
1.3 PERFORMANCE REQUIREMENTS<br />
A. General: For penetrations through fire-resistance-rated constructions, including both<br />
empty openings and openings containing penetrating items, provide throughpenetration<br />
firestop systems that are produced and installed to resist spread <strong>of</strong> fire<br />
according to requirements indicated, resist passage <strong>of</strong> smoke and other gases, and<br />
maintain original fire-resistance rating <strong>of</strong> construction penetrated.<br />
B. Rated Systems: Provide through-penetration firestop systems with the following<br />
ratings determined per UL 1479:<br />
1. F-Rated Systems: Provide through-penetration firestop systems with F-ratings<br />
indicated, but not less than that equaling or exceeding fire-resistance rating <strong>of</strong><br />
constructions penetrated.<br />
2. T-Rated Systems: For the following conditions, provide through-penetration<br />
firestop systems with T-ratings indicated, as well as F-ratings, where systems<br />
protect penetrating items exposed to potential contact with adjacent materials in<br />
occupiable floor areas:<br />
a. Penetrations located outside wall cavities.<br />
b. Penetrations located outside fire-resistance-rated shaft enclosures.<br />
3. L-Rated Systems: Where through-penetration firestop systems are indicated in<br />
smoke barriers, provide through-penetration firestop systems with L-ratings<br />
indicated <strong>of</strong> not more than 3.0 cfm/sq. ft (0.01524cu. m/s x sq. m) at both<br />
ambient temperatures and 400 deg F (204 deg C).<br />
07841-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
THROUGH-PENETRATION FIRESTOP SYSTEMS<br />
C. For through-penetration firestop systems exposed to view, traffic, moisture, and<br />
physical damage, provide products that, after curing, do not deteriorate when exposed<br />
to these conditions both during and after construction.<br />
1. For piping penetrations for plumbing and wet-pipe sprinkler systems, provide<br />
moisture-resistant through-penetration firestop systems.<br />
2. For floor penetrations with annular spaces exceeding 4 inches (100 mm) in width<br />
and exposed to possible loading and traffic, provide firestop systems capable <strong>of</strong><br />
supporting floor loads involved, either by installing floor plates or by other means.<br />
3. For penetrations involving insulated piping, provide through-penetration firestop<br />
systems not requiring removal <strong>of</strong> insulation.<br />
D. For through-penetration firestop systems exposed to view, provide products with flamespread<br />
and smoke-developed indexes <strong>of</strong> less than 25 and 450, respectively, as<br />
determined per ASTM E 84.<br />
1.4 SUBMITTALS<br />
A. Product Data: For each type <strong>of</strong> product indicated.<br />
B. Shop Drawings: For each through-penetration firestop system, show each type <strong>of</strong><br />
construction condition penetrated, relationships to adjoining construction, and type <strong>of</strong><br />
penetrating item. <strong>Inc</strong>lude firestop design designation <strong>of</strong> qualified testing and inspecting<br />
agency that evidences compliance with requirements for each condition indicated.<br />
1. Submit documentation, including illustrations, from a qualified testing and<br />
inspecting agency that is applicable to each through-penetration firestop system<br />
configuration for construction and penetrating items.<br />
2. Where Project conditions require modification to a qualified testing and<br />
inspecting agency's illustration for a particular through-penetration firestop<br />
condition, submit illustration, with modifications marked, approved by throughpenetration<br />
firestop system manufacturer's fire-protection engineer as an<br />
engineering judgment or equivalent fire-resistance-rated assembly.<br />
C. Through-Penetration Firestop System Schedule: Indicate locations <strong>of</strong> each throughpenetration<br />
firestop system, along with the following information:<br />
1. Types <strong>of</strong> penetrating items.<br />
2. Types <strong>of</strong> constructions penetrated, including fire-resistance ratings and, where<br />
applicable, thicknesses <strong>of</strong> construction penetrated.<br />
3. Through-penetration firestop systems for each location identified by firestop<br />
design designation <strong>of</strong> qualified testing and inspecting agency.<br />
D. Qualification Data: For Installer.<br />
E. Product Certificates: For through-penetration firestop system products, signed by<br />
product manufacturer.<br />
F. Product Test Reports: From a qualified testing agency indicating through-penetration<br />
firestop system complies with requirements, based on comprehensive testing <strong>of</strong> current<br />
products.<br />
07841-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
THROUGH-PENETRATION FIRESTOP SYSTEMS<br />
1.5 QUALITY ASSURANCE<br />
A. Installer Qualifications: A firm experienced in installing through-penetration firestop<br />
systems similar in material, design, and extent to that indicated for this Project, whose<br />
work has resulted in construction with a record <strong>of</strong> successful<br />
performance. Qualifications include having the necessary experience, staff, and<br />
training to install manufacturer's products per specified requirements. Manufacturer's<br />
willingness to sell its through-penetration firestop system products to Contractor or to<br />
Installer engaged by Contractor does not in itself confer qualification on buyer.<br />
B. Installation Responsibility: Assign installation <strong>of</strong> through-penetration firestop systems<br />
and fire-resistive joint systems in Project to a single qualified installer.<br />
C. Source Limitations: Obtain through-penetration firestop systems, for each kind <strong>of</strong><br />
penetration and construction condition indicated, through one source from a single<br />
manufacturer.<br />
D. Fire-Test-Response Characteristics: Provide through-penetration firestop systems that<br />
comply with the following requirements and those specified in Part 1 "Performance<br />
Requirements" Article:<br />
1. Firestopping tests are performed by a qualified testing and inspecting agency. A<br />
qualified testing and inspecting agency is UL, or another agency performing<br />
testing and follow-up inspection services for firestop systems acceptable to<br />
authorities having jurisdiction.<br />
2. Through-penetration firestop systems are identical to those tested per testing<br />
standard referenced in "Part 1 Performance Requirements" Article. Provide<br />
rated systems complying with the following requirements:<br />
a. Through-penetration firestop system products bear classification marking <strong>of</strong><br />
qualified testing and inspecting agency.<br />
b. Through-penetration firestop systems correspond to those indicated by<br />
reference to through-penetration firestop system designations listed by the<br />
following:<br />
1) UL in its "Fire Resistance Directory."<br />
1.6 DELIVERY, STORAGE, AND HANDLING<br />
A. Deliver through-penetration firestop system products to Project site in original,<br />
unopened containers or packages with intact and legible manufacturers' labels<br />
identifying product and manufacturer, date <strong>of</strong> manufacture, lot number, shelf life if<br />
applicable, qualified testing and inspecting agency's classification marking applicable to<br />
Project, curing time, and mixing instructions for multicomponent materials.<br />
B. Store and handle materials for through-penetration firestop systems to prevent their<br />
deterioration or damage due to moisture, temperature changes, contaminants, or other<br />
causes.<br />
07841-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
THROUGH-PENETRATION FIRESTOP SYSTEMS<br />
1.7 PROJECT CONDITIONS<br />
A. Environmental Limitations: Do not install through-penetration firestop systems when<br />
ambient or substrate temperatures are outside limits permitted by through-penetration<br />
firestop system manufacturers or when substrates are wet due to rain, frost,<br />
condensation, or other causes.<br />
B. Ventilate through-penetration firestop systems per manufacturer's written instructions<br />
by natural means or, where this is inadequate, forced-air circulation.<br />
1.8 COORDINATION<br />
A. Coordinate construction <strong>of</strong> openings and penetrating items to ensure that throughpenetration<br />
firestop systems are installed according to specified requirements.<br />
B. Coordinate sizing <strong>of</strong> sleeves, openings, core-drilled holes, or cut openings to<br />
accommodate through-penetration firestop systems.<br />
C. Notify Owner's inspecting agency at least seven days in advance <strong>of</strong> throughpenetration<br />
firestop system installations; confirm dates and times on days preceding<br />
each series <strong>of</strong> installations.<br />
D. Do not cover up through-penetration firestop system installations that will become<br />
concealed behind other construction until each installation has been examined by<br />
building inspector, if required by authorities having jurisdiction.<br />
PART 2 - PRODUCTS<br />
2.1 MANUFACTURERS<br />
A. Available Products: Subject to compliance with requirements, through-penetration<br />
firestop systems that may be incorporated into the Work include, but are not limited to,<br />
those systems indicated in the Through-Penetration Firestop System Specification that<br />
are produced by one <strong>of</strong> the following manufacturers:<br />
1. A/D Fire Protection Systems <strong>Inc</strong>.<br />
2. Grace, W. R. & Co. - Conn.<br />
3. Hilti, <strong>Inc</strong>.<br />
4. Johns Manville.<br />
5. Nelson Firestop Products.<br />
6. NUCO <strong>Inc</strong>.<br />
7. RectorSeal Corporation (The).<br />
8. Specified Technologies <strong>Inc</strong>.<br />
9. 3M; Fire Protection Products Division.<br />
10. Tremco; Sealant/Weatherpro<strong>of</strong>ing Division.<br />
11. USG Corporation.<br />
07841-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
THROUGH-PENETRATION FIRESTOP SYSTEMS<br />
2.2 FIRESTOPPING, GENERAL<br />
A. Compatibility: Provide through-penetration firestop systems that are compatible with<br />
one another; with the substrates forming openings; and with the items, if any,<br />
penetrating through-penetration firestop systems, under conditions <strong>of</strong> service and<br />
application, as demonstrated by through-penetration firestop system manufacturer<br />
based on testing and field experience.<br />
B. Accessories: Provide components for each through-penetration firestop system that<br />
are needed to install fill materials and to comply with Part 1 "Performance<br />
Requirements" Article. Use only components specified by through-penetration firestop<br />
system manufacturer and approved by qualified testing and inspecting agency for<br />
firestop systems indicated. Accessories include, but are not limited to, the following<br />
items:<br />
1. Permanent forming/damming/backing materials, including the following:<br />
a. Slag-/rock-wool-fiber insulation.<br />
b. Sealants used in combination with other forming/damming/backing<br />
materials to prevent leakage <strong>of</strong> fill materials in liquid state.<br />
c. Fire-rated form board.<br />
d. Fillers for sealants.<br />
2. Temporary forming materials.<br />
3. Substrate primers.<br />
4. Collars.<br />
5. Steel sleeves.<br />
2.3 FILL MATERIALS<br />
A. General: Provide through-penetration firestop systems containing the types <strong>of</strong> fill<br />
materials indicated in the Through-Penetration Firestop System Schedule at the end <strong>of</strong><br />
Part 3 by referencing the types <strong>of</strong> materials described in this Article. Fill materials are<br />
those referred to in directories <strong>of</strong> referenced testing and inspecting agencies as "fill,"<br />
"void," or "cavity" materials.<br />
B. Cast-in-Place Firestop Devices: Factory-assembled devices for use in cast-in-place<br />
concrete floors and consisting <strong>of</strong> an outer metallic sleeve lined with an intumescent<br />
strip, a radial extended flange attached to one end <strong>of</strong> the sleeve for fastening to<br />
concrete formwork, and a neoprene gasket.<br />
C. Latex Sealants: Single-component latex formulations that after cure do not re-emulsify<br />
during exposure to moisture.<br />
D. Firestop Devices: Factory-assembled collars formed from galvanized steel and lined<br />
with intumescent material sized to fit specific diameter <strong>of</strong> penetrant.<br />
E. Intumescent Composite Sheets: Rigid panels consisting <strong>of</strong> aluminum-foil-faced<br />
elastomeric sheet bonded to galvanized steel sheet.<br />
F. Intumescent Putties: Nonhardening dielectric, <strong>water</strong>-resistant putties containing no<br />
solvents, inorganic fibers, or silicone compounds.<br />
07841-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
THROUGH-PENETRATION FIRESTOP SYSTEMS<br />
G. Intumescent Wrap Strips: Single-component intumescent elastomeric sheets with<br />
aluminum foil on one side.<br />
H. Mortars: Prepackaged dry mixes consisting <strong>of</strong> a blend <strong>of</strong> inorganic binders, hydraulic<br />
cement, fillers, and lightweight aggregate formulated for mixing with <strong>water</strong> at Project<br />
site to form a nonshrinking, homogeneous mortar.<br />
I. Pillows/Bags: Reusable heat-expanding pillows/bags consisting <strong>of</strong> glass-fiber cloth<br />
cases filled with a combination <strong>of</strong> mineral-fiber, <strong>water</strong>-insoluble expansion agents, and<br />
fire-retardant additives.<br />
J. Silicone Foams: Multicomponent, silicone-based liquid elastomers that, when mixed,<br />
expand and cure in place to produce a flexible, nonshrinking foam.<br />
K. Silicone Sealants: Single-component, silicone-based, neutral-curing elastomeric<br />
sealants <strong>of</strong> grade indicated below:<br />
1. Grade: Pourable (self-leveling) formulation for openings in floors and other<br />
horizontal surfaces, and nonsag formulation for openings in vertical and other<br />
surfaces requiring a nonslumping, gunnable sealant, unless indicated firestop<br />
system limits use to nonsag grade for both opening conditions.<br />
2. Grade for Horizontal Surfaces: Pourable (self-leveling) formulation for openings<br />
in floors and other horizontal surfaces.<br />
3. Grade for Vertical Surfaces: Nonsag formulation for openings in vertical and<br />
other surfaces.<br />
2.4 MIXING<br />
A. For those products requiring mixing before application, comply with throughpenetration<br />
firestop system manufacturer's written instructions for accurate<br />
proportioning <strong>of</strong> materials, <strong>water</strong> (if required), type <strong>of</strong> mixing equipment, selection <strong>of</strong><br />
mixer speeds, mixing containers, mixing time, and other items or procedures needed to<br />
produce products <strong>of</strong> uniform quality with optimum performance characteristics for<br />
application indicated.<br />
PART 3 - EXECUTION<br />
3.1 EXAMINATION<br />
A. Examine substrates and conditions, with Installer present, for compliance with<br />
requirements for opening configurations, penetrating items, substrates, and other<br />
conditions affecting performance <strong>of</strong> work.<br />
1. Proceed with installation only after unsatisfactory conditions have been<br />
corrected.<br />
07841-6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
THROUGH-PENETRATION FIRESTOP SYSTEMS<br />
3.2 PREPARATION<br />
A. Surface Cleaning: Clean out openings immediately before installing throughpenetration<br />
firestop systems to comply with firestop system manufacturer's written<br />
instructions and with the following requirements:<br />
1. Remove from surfaces <strong>of</strong> opening substrates and from penetrating items foreign<br />
materials that could interfere with adhesion <strong>of</strong> through-penetration firestop<br />
systems.<br />
2. Clean opening substrates and penetrating items to produce clean, sound<br />
surfaces capable <strong>of</strong> developing optimum bond with through-penetration firestop<br />
systems. Remove loose particles remaining from cleaning operation.<br />
3. Remove laitance and form-release agents from concrete.<br />
B. Priming: Prime substrates where recommended in writing by through-penetration<br />
firestop system manufacturer using that manufacturer's recommended products and<br />
methods. Confine primers to areas <strong>of</strong> bond; do not allow spillage and migration onto<br />
exposed surfaces.<br />
C. Masking Tape: Use masking tape to prevent through-penetration firestop systems<br />
from contacting adjoining surfaces that will remain exposed on completion <strong>of</strong> Work and<br />
that would otherwise be permanently stained or damaged by such contact or by<br />
cleaning methods used to remove smears from firestop system materials. Remove<br />
tape as soon as possible without disturbing firestop system's seal with substrates.<br />
3.3 THROUGH-PENETRATION FIRESTOP SYSTEM INSTALLATION<br />
A. General: Install through-penetration firestop systems to comply with Part 1<br />
"Performance Requirements" Article and with firestop system manufacturer's written<br />
installation instructions and published drawings for products and applications indicated.<br />
B. Install forming/damming/backing materials and other accessories <strong>of</strong> types required to<br />
support fill materials during their application and in the position needed to produce<br />
cross-sectional shapes and depths required to achieve fire ratings indicated.<br />
1. After installing fill materials and allowing them to fully cure, remove combustible<br />
forming materials and other accessories not indicated as permanent components<br />
<strong>of</strong> firestop systems.<br />
C. Install fill materials for firestop systems by proven techniques to produce the following<br />
results:<br />
1. Fill voids and cavities formed by openings, forming materials, accessories, and<br />
penetrating items as required to achieve fire-resistance ratings indicated.<br />
2. Apply materials so they contact and adhere to substrates formed by openings<br />
and penetrating items.<br />
3. For fill materials that will remain exposed after completing Work, finish to produce<br />
smooth, uniform surfaces that are flush with adjoining finishes.<br />
07841-7<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
THROUGH-PENETRATION FIRESTOP SYSTEMS<br />
3.4 IDENTIFICATION<br />
A. Identify through-penetration firestop systems with preprinted metal or plastic labels.<br />
Attach labels permanently to surfaces adjacent to and within 6 inches (150 mm) <strong>of</strong><br />
edge <strong>of</strong> the firestop systems so that labels will be visible to anyone seeking to remove<br />
penetrating items or firestop systems. Use mechanical fasteners for metal labels. For<br />
plastic labels, use self-adhering type with adhesives capable <strong>of</strong> permanently bonding<br />
labels to surfaces on which labels are placed and, in combination with label material,<br />
will result in partial destruction <strong>of</strong> label if removal is attempted. <strong>Inc</strong>lude the following<br />
information on labels:<br />
1. The words "Warning - Through-Penetration Firestop System - Do Not Disturb.<br />
Notify Building Management <strong>of</strong> Any Damage."<br />
2. Contractor's name, address, and phone number.<br />
3. Through-penetration firestop system designation <strong>of</strong> applicable testing and<br />
inspecting agency.<br />
4. Date <strong>of</strong> installation.<br />
5. Through-penetration firestop system manufacturer's name.<br />
6. Installer's name.<br />
3.5 FIELD QUALITY CONTROL<br />
A. Inspecting Agency: Owner may engage a qualified, independent inspecting agency to<br />
inspect through-penetration firestops. Independent inspecting agency shall comply<br />
with ASTM E 2174 requirements including those related to qualifications, conducting<br />
inspections, and preparing test reports.<br />
B. Where deficiencies are found, repair or replace through-penetration firestop systems<br />
so they comply with requirements.<br />
C. Proceed with enclosing through-penetration firestop systems with other construction<br />
only after inspection reports are issued and firestop installations comply with<br />
requirements.<br />
3.6 CLEANING AND PROTECTING<br />
A. Clean <strong>of</strong>f excess fill materials adjacent to openings as Work progresses by methods<br />
and with cleaning materials that are approved in writing by through-penetration firestop<br />
system manufacturers and that do not damage materials in which openings occur.<br />
B. Provide final protection and maintain conditions during and after installation that ensure<br />
that through-penetration firestop systems are without damage or deterioration at time<br />
<strong>of</strong> Substantial Completion. If, despite such protection, damage or deterioration occurs,<br />
cut out and remove damaged or deteriorated through-penetration firestop systems<br />
immediately and install new materials to produce systems complying with specified<br />
requirements.<br />
END OF SECTION 07841<br />
07841-8<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 07920<br />
JOINT SEALANTS<br />
PART 1 - GENERAL<br />
1.1 RELATED DOCUMENTS<br />
A. Drawings and general provisions <strong>of</strong> the Contract, including General and<br />
Supplementary Conditions, apply to this Section.<br />
1.2 SUMMARY<br />
A. This Section includes joint sealants for the applications indicated in the Joint-Sealant<br />
Schedule at the end <strong>of</strong> Part 3.<br />
B. Related Sections include the following:<br />
1. Division 4 Section "Unit Masonry Assemblies" for masonry control and expansion<br />
joint fillers and gaskets.<br />
2. Division 8 Section "Glazing" for glazing sealants.<br />
3. Division 9 Section "Gypsum Board Assemblies" for sealing perimeter joints <strong>of</strong><br />
gypsum board partitions to reduce sound transmission.<br />
4. Division 9 Section "Ceramic Tile" for sealing tile joints.<br />
5. Division 9 Section "Acoustical Panel Ceilings" for sealing edge moldings at<br />
perimeters <strong>of</strong> acoustical ceilings.<br />
1.3 QUALITY ASSURANCE<br />
A. Installer Qualifications: Manufacturer's authorized Installer who is approved or licensed<br />
for installation <strong>of</strong> elastomeric sealants required for this Project.<br />
1.4 PROJECT CONDITIONS<br />
A. Do not proceed with installation <strong>of</strong> joint sealants under the following conditions:<br />
1. When ambient and substrate temperature conditions are outside limits permitted<br />
by joint-sealant manufacturer or are below 40 deg F (5 deg C).<br />
2. When joint substrates are wet.<br />
3. Where joint widths are less than those allowed by joint-sealant manufacturer for<br />
applications indicated.<br />
4. Contaminants capable <strong>of</strong> interfering with adhesion have not yet been removed<br />
from joint substrates.<br />
PART 2 - PRODUCTS<br />
2.1 MANUFACTURERS<br />
07920-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
JOINT SEALANTS<br />
A. Products: Subject to compliance with requirements, provide one <strong>of</strong> the products listed<br />
in other the joint sealant schedule.<br />
2.2 MATERIALS, GENERAL<br />
A. Compatibility: Provide joint sealants, backings, and other related materials that are<br />
compatible with one another and with joint substrates under conditions <strong>of</strong> service and<br />
application, as demonstrated by sealant manufacturer, based on testing and field<br />
experience.<br />
B. Colors <strong>of</strong> Exposed Joint Sealants: As selected by Architect from manufacturer's full<br />
range.<br />
2.3 ELASTOMERIC JOINT SEALANTS<br />
A. Elastomeric Sealants: Comply with ASTM C 920 and other requirements indicated for<br />
each liquid-applied chemically curing sealant specified, including those referencing<br />
ASTM C 920 classifications for type, grade, class, and uses related to exposure and<br />
joint substrates.<br />
B. Stain-Test-Response Characteristics: Where elastomeric sealants are specified to be<br />
nonstaining to porous substrates, provide products that have undergone testing<br />
according to ASTM C 1248 and have not stained porous joint substrates indicated for<br />
Project.<br />
2.4 JOINT-SEALANT BACKING<br />
A. General: Provide sealant backings <strong>of</strong> material and type that are nonstaining; are<br />
compatible with joint substrates, sealants, primers, and other joint fillers; and are<br />
approved for applications indicated by sealant manufacturer based on field experience<br />
and laboratory testing.<br />
B. Cylindrical Sealant Backings: ASTM C 1330, Type C (closed-cell material with a<br />
surface skin) or any <strong>of</strong> the preceding types, as approved in writing by joint-sealant<br />
manufacturer for joint application indicated, and <strong>of</strong> size and density to control sealant<br />
depth and otherwise contribute to producing optimum sealant performance:<br />
C. Bond-Breaker Tape: Polyethylene tape or other plastic tape recommended by sealant<br />
manufacturer for preventing sealant from adhering to rigid, inflexible joint-filler materials<br />
or joint surfaces at back <strong>of</strong> joint where such adhesion would result in sealant failure.<br />
Provide self-adhesive tape where applicable.<br />
2.5 MISCELLANEOUS MATERIALS<br />
A. Primer: Material recommended by joint-sealant manufacturer where required for<br />
adhesion <strong>of</strong> sealant to joint substrates indicated, as determined from preconstruction<br />
joint-sealant-substrate tests and field tests.<br />
B. Cleaners for Nonporous Surfaces: Chemical cleaners acceptable to manufacturers <strong>of</strong><br />
sealants and sealant backing materials, free <strong>of</strong> oily residues or other substances<br />
07920-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
JOINT SEALANTS<br />
capable <strong>of</strong> staining or harming joint substrates and adjacent nonporous surfaces in any<br />
way, and formulated to promote optimum adhesion <strong>of</strong> sealants to joint substrates.<br />
2.6 MATERIALS, GENERAL<br />
A. Compatibility: Provide joint sealants, backings, and other related materials that are<br />
compatible with one another and with joint substrates under conditions <strong>of</strong> service and<br />
application, as demonstrated by sealant manufacturer, based on testing and field<br />
experience.<br />
2.7 MISCELLANEOUS MATERIALS<br />
A. Primer: Material recommended by joint-sealant manufacturer where required for<br />
adhesion <strong>of</strong> sealant to joint substrates indicated.<br />
B. Cleaners for Nonporous Surfaces: Chemical cleaners acceptable to manufacturers <strong>of</strong><br />
sealants and sealant backing materials, free <strong>of</strong> oily residues or other substances<br />
capable <strong>of</strong> staining or harming joint substrates and adjacent nonporous surfaces in any<br />
way, and formulated to promote optimum adhesion <strong>of</strong> sealants to joint substrates.<br />
C. Masking Tape: Nonstaining, nonabsorbent material compatible with joint sealants and<br />
surfaces adjacent to joints.<br />
PART 3 - EXECUTION<br />
3.1 EXAMINATION<br />
A. Examine joints indicated to receive joint sealants, with Installer present, for compliance<br />
with requirements for joint configuration, installation tolerances, and other conditions<br />
affecting joint-sealant performance.<br />
B. Proceed with installation only after unsatisfactory conditions have been corrected.<br />
3.2 PREPARATION<br />
A. Surface Cleaning <strong>of</strong> Joints: Clean out joints immediately before installing joint sealants<br />
to comply with joint-sealant manufacturer's written instructions and the following<br />
requirements:<br />
1. Remove all foreign material from joint substrates that could interfere with<br />
adhesion <strong>of</strong> joint sealant, including dust, paints (except for permanent, protective<br />
coatings tested and approved for sealant adhesion and compatibility by sealant<br />
manufacturer), old joint sealants, oil, grease, <strong>water</strong>pro<strong>of</strong>ing, <strong>water</strong> repellents,<br />
<strong>water</strong>, surface dirt, and frost.<br />
2. Clean porous joint substrate surfaces by brushing, grinding, blast cleaning,<br />
mechanical abrading, or a combination <strong>of</strong> these methods to produce a clean,<br />
sound substrate capable <strong>of</strong> developing optimum bond with joint sealants.<br />
Remove loose particles remaining after cleaning operations above by vacuuming<br />
07920-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
JOINT SEALANTS<br />
or blowing out joints with oil-free compressed air. Porous joint substrates include<br />
the following:<br />
a. Concrete.<br />
b. Masonry.<br />
c. Unglazed surfaces <strong>of</strong> ceramic tile.<br />
3. Remove laitance and form-release agents from concrete.<br />
4. Clean nonporous surfaces with chemical cleaners or other means that do not<br />
stain, harm substrates, or leave residues capable <strong>of</strong> interfering with adhesion <strong>of</strong><br />
joint sealants. Nonporous joint substrates include the following:<br />
a. Metal.<br />
b. Glass.<br />
c. Porcelain enamel.<br />
d. Glazed surfaces <strong>of</strong> ceramic tile.<br />
B. Joint Priming: Prime joint substrates, where recommended in writing by joint-sealant<br />
manufacturer, based on prior experience. Apply primer to comply with joint-sealant<br />
manufacturer's written instructions. Confine primers to areas <strong>of</strong> joint-sealant bond; do<br />
not allow spillage or migration onto adjoining surfaces.<br />
C. Masking Tape: Use masking tape where required to prevent contact <strong>of</strong> sealant with<br />
adjoining surfaces that otherwise would be permanently stained or damaged by such<br />
contact or by cleaning methods required to remove sealant smears. Remove tape<br />
immediately after tooling without disturbing joint seal.<br />
3.3 INSTALLATION OF JOINT SEALANTS<br />
A. General: Comply with joint-sealant manufacturer's written installation instructions for<br />
products and applications indicated, unless more stringent requirements apply.<br />
B. Sealant Installation Standard: Comply with recommendations in ASTM C 1193 for use<br />
<strong>of</strong> joint sealants as applicable to materials, applications, and conditions indicated.<br />
C. Acoustical Sealant Application Standard: Comply with recommendations in<br />
ASTM C 919 for use <strong>of</strong> joint sealants in acoustical applications as applicable to<br />
materials, applications, and conditions indicated.<br />
D. Install sealant backings <strong>of</strong> type indicated to support sealants during application and at<br />
position required to produce cross-sectional shapes and depths <strong>of</strong> installed sealants<br />
relative to joint widths that allow optimum sealant movement capability.<br />
1. Do not leave gaps between ends <strong>of</strong> sealant backings.<br />
2. Do not stretch, twist, puncture, or tear sealant backings.<br />
3. Remove absorbent sealant backings that have become wet before sealant<br />
application and replace them with dry materials.<br />
E. Install bond-breaker tape behind sealants where sealant backings are not used<br />
between sealants and backs <strong>of</strong> joints.<br />
F. Install sealants using proven techniques that comply with the following and at the same<br />
time backings are installed:<br />
07920-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
JOINT SEALANTS<br />
1. Place sealants so they directly contact and fully wet joint substrates.<br />
2. Completely fill recesses in each joint configuration.<br />
3. Produce uniform, cross-sectional shapes and depths relative to joint widths that<br />
allow optimum sealant movement capability.<br />
G. Tooling <strong>of</strong> Nonsag Sealants: Immediately after sealant application and before skinning<br />
or curing begins, tool sealants according to requirements specified below to form<br />
smooth, uniform beads <strong>of</strong> configuration indicated; to eliminate air pockets; and to<br />
ensure contact and adhesion <strong>of</strong> sealant with sides <strong>of</strong> joint.<br />
1. Remove excess sealant from surfaces adjacent to joints.<br />
2. Use tooling agents that are approved in writing by sealant manufacturer and that<br />
do not discolor sealants or adjacent surfaces.<br />
3. Provide concave joint configuration per Figure 5A in ASTM C 1193, unless<br />
otherwise indicated.<br />
a. Use masking tape to protect surfaces adjacent to recessed tooled joints.<br />
H. Installation <strong>of</strong> Preformed Tapes: Install according to manufacturer's written<br />
instructions.<br />
3.4 CLEANING<br />
A. Clean <strong>of</strong>f excess sealant or sealant smears adjacent to joints as the Work progresses<br />
by methods and with cleaning materials approved in writing by manufacturers <strong>of</strong> joint<br />
sealants and <strong>of</strong> products in which joints occur.<br />
3.5 PROTECTION<br />
A. Protect joint sealants during and after curing period from contact with contaminating<br />
substances and from damage resulting from construction operations or other causes<br />
so sealants are without deterioration or damage at time <strong>of</strong> Substantial Completion. If,<br />
despite such protection, damage or deterioration occurs, cut out and remove damaged<br />
or deteriorated joint sealants immediately so installations with repaired areas are<br />
indistinguishable from original work.<br />
3.6 JOINT-SEALANT SCHEDULE<br />
A. Joint-Sealant Application JS-1: Exterior horizontal nontraffic and traffic isolation and<br />
contraction joints in cast-in-place concrete slabs.<br />
1. Joint Sealant: Product - Vulkem 245, Two-Part Pourable Polyurethane Sealant.<br />
2. Joint-Sealant Color: Match adjacent surface color..<br />
B. Joint-Sealant Application JS-2: Exterior vertical control and expansion joints in unit<br />
masonry.<br />
1. Joint Sealant: Product – Dymeric 240, Epoxidized Polyurethane Sealant.<br />
2. Joint-Sealant Color: Match masonry color.<br />
C. Joint-Sealant Application JS-3: Exterior butt joints between metal panels.<br />
07920-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
JOINT SEALANTS<br />
1. Joint Sealant: Product – Vulkem 116, One-Part High Performance Elastomer<br />
weatherpro<strong>of</strong>ing sealant.<br />
2. Joint-Sealant Color: Match intersecting metal color.<br />
D. Joint-Sealant Application JS-4: Exterior vertical joints between different materials listed<br />
above.<br />
1. Joint Sealant: Product - Dymeric 240, Epoxidized Polyurethane Sealant.<br />
2. Joint-Sealant Color: Match masonry color.<br />
E. Joint-Sealant Application JS-5: Exterior perimeter joints between masonry and frames<br />
<strong>of</strong> doors windows and louvers.<br />
1. Joint Sealant: Product - Vulkem 116, One-Part High Performance Elastomer<br />
weatherpro<strong>of</strong>ing sealant.<br />
2. Joint-Sealant Color: Match masonry color.<br />
F. Joint-Sealant Application JS-6: Exterior control and expansion joints in ceilings and<br />
other overhead surfaces.<br />
1. Joint Sealant: Product - Dymeric 240, Epoxidized Polyurethane Sealant.<br />
2. Joint-Sealant Color: Match ceiling color.<br />
G. Joint-Sealant Application JS-7: Vertical control and expansion joints on exposed<br />
interior surfaces <strong>of</strong> exterior walls.<br />
1. Joint Sealant: Product - Dymeric 240, Epoxidized Polyurethane Sealant.<br />
2. Joint-Sealant Color: Match ceiling color.<br />
H. Joint-Sealant Application JS-8: Interior perimeter joints <strong>of</strong> exterior openings.<br />
1. Joint Sealant: Product – Pecora AC-20 FTR, Fire and Temperature Rated<br />
Acoustical and Insulation Sealant.<br />
2. Joint-Sealant Color: Match metal color.<br />
I. Joint-Sealant Application JS-9: Interior ceramic tile expansion, control, contraction,<br />
and isolation joints in horizontal traffic surfaces.<br />
1. Joint Sealant: Product - Vulkem 245, Two-Part Pourable Polyurethane Sealant.<br />
2. Joint-Sealant Color: Match grout color.<br />
J. Joint-Sealant Application JS-10: Interior joints between plumbing fixtures and adjoining<br />
walls, floors, and counters.<br />
1. Joint Sealant: Product – Dow Corning, 786 Silicone Sealant<br />
2. Joint-Sealant Color: White.<br />
K. Joint-Sealant Application JS-11: Vertical joints on exposed surfaces <strong>of</strong> interior unit<br />
masonry and concrete walls and partitions.<br />
1. Joint Sealant: Product – Pecora AC-20 FTR, Fire and Temperature Rated<br />
Acoustical and Insulation Sealant.<br />
2. Joint-Sealant Color: White.<br />
07920-6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
JOINT SEALANTS<br />
L. Joint-Sealant Application JS-12: Perimeter joints between interior wall surfaces and<br />
frames <strong>of</strong> interior doors, and windows.<br />
1. Joint Sealant: Product – Pecora AC-20 FTR, Fire and Temperature Rated<br />
Acoustical and Insulation Sealant.<br />
2. Joint-Sealant Color: Match window frame and door frame color.<br />
END OF SECTION 07920<br />
07920-7<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 08111<br />
HOLLOW METAL DOORS AND FRAMES<br />
PART 1 - GENERAL<br />
1.1 SUMMARY<br />
A. Section <strong>Inc</strong>ludes:<br />
1. Standard hollow metal doors and frames.<br />
1.2 SUBMITTALS<br />
A. Product Data: For each type <strong>of</strong> product indicated.<br />
B. Shop Drawings: <strong>Inc</strong>lude elevations, door edge details, frame pr<strong>of</strong>iles, metal<br />
thicknesses, preparations for hardware, and other details.<br />
C. Schedule: Prepared by or under the supervision <strong>of</strong> supplier, using same reference<br />
numbers for details and openings as those on Drawings.<br />
1.3 QUALITY ASSURANCE<br />
A. Fire-Rated Door Assemblies: Assemblies complying with NFPA 80 that are listed and<br />
labeled by a qualified testing agency, for fire-protection ratings indicated, based on<br />
testing at positive pressure as close to neutral pressure as possible according to<br />
NFPA 252.<br />
1. Temperature-Rise Limit: At vertical exit enclosures and exit passageways,<br />
provide doors that have a maximum transmitted temperature end point <strong>of</strong> not<br />
more than 450 deg F (250 deg C) above ambient after 30 minutes <strong>of</strong> standard<br />
fire-test exposure.<br />
B. Fire-Rated, Borrowed-Light Frame Assemblies: Assemblies complying with NFPA 80<br />
that are listed and labeled, by a testing and inspecting agency acceptable to authorities<br />
having jurisdiction, for fire-protection ratings indicated, based on testing according to<br />
NFPA 257 or UL 9. Label each individual glazed lite.<br />
C. Smoke-Control Door Assemblies: Comply with NFPA 105 or UL 1784.<br />
PART 2 - PRODUCTS<br />
2.1 MANUFACTURERS<br />
A. Manufacturers: Subject to compliance with requirements, available manufacturers<br />
<strong>of</strong>fering products that may be incorporated into the Work include, but are not limited to,<br />
the following:<br />
08111-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HOLLOW METAL DOORS AND FRAMES<br />
1. Ceco Door Products; an Assa Abloy Group company.<br />
2. Curries Company; an Assa Abloy Group company.<br />
3. Steelcraft; an Ingersoll-Rand company.<br />
2.2 MATERIALS<br />
A. Cold-Rolled Steel Sheet: ASTM A 1008/A 1008M, CS, Type B; suitable for exposed<br />
applications.<br />
B. Hot-Rolled Steel Sheet: ASTM A 1011/A 1011M, CS, Type B.<br />
C. Metallic-Coated Steel Sheet: ASTM A 653/A 653M, Commercial Steel (CS), Type B;<br />
with minimum G90 (Z180) metallic coating.<br />
D. Frame Anchors: ASTM A 591/A 591M, Commercial Steel (CS), 40Z (12G) coating<br />
designation; mill phosphatized.<br />
1. For anchors built into exterior walls, steel sheet complying with<br />
ASTM A 1008/A 1008M or ASTM A 1011/A 1011M, hot-dip galvanized according<br />
to ASTM A 153/A 153M, Class B.<br />
E. Inserts, Bolts, and Fasteners: Hot-dip galvanized according to ASTM A 153/A 153M.<br />
F. Grout: ASTM C 476, except with a maximum slump <strong>of</strong> 4 inches (102 mm), as<br />
measured according to ASTM C 143/C 143M.<br />
G. Glazing: Division 08 Section "Glazing."<br />
2.3 STANDARD HOLLOW METAL DOORS<br />
A. General: Comply with ANSI/SDI A250.8.<br />
1. Design: Flush panel.<br />
2. Core Construction: Manufacturer's standard polystyrene, polyurethane, or<br />
vertical steel-stiffener core.<br />
a. Fire Door Core: As required to provide fire-protection ratings indicated.<br />
b. Thermal-Rated (Insulated) Doors: R-value <strong>of</strong> not less than 6.0 deg F x h x<br />
sq. ft./Btu (1.057 K x sq. m/W) when tested according to ASTM C 1363.<br />
3. Vertical Edges for Single-Acting Doors: Beveled edge.<br />
4. Vertical edges for Double Acting Doors: Radius.<br />
5. Top and Bottom Edges: Closed with flush or inverted 0.042-inch- (1.0-mm-)<br />
thick, end closures or channels <strong>of</strong> same material as face sheets.<br />
6. Tolerances: SDI 117, "Manufacturing Tolerances for Standard Steel Doors and<br />
Frames."<br />
B. Exterior Doors: Face sheets fabricated from metallic-coated steel sheet. Comply with<br />
ANSI/SDI A250.8 for level and model and ANSI/SDI A250.4 for physical performance<br />
level:<br />
08111-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HOLLOW METAL DOORS AND FRAMES<br />
1. Level 3 and Physical Performance Level A (Extra Heavy Duty), Model 2<br />
(Seamless).<br />
C. Interior Doors: Face sheets fabricated from metallic-coated steel sheet. Comply with<br />
ANSI/SDI A250.8 for level and model and ANSI/SDI A250.4 for physical performance<br />
level:<br />
1. Level 3 and Physical Performance Level A (Extra Heavy Duty), Model 2<br />
(Seamless).<br />
D. Hardware Reinforcement: ANSI/SDI A250.6.<br />
1. Closer reinforcements continuous sleeve: 12 gage.<br />
2. Hinge reinforcements: 7 gage.<br />
2.4 STANDARD HOLLOW METAL FRAMES<br />
A. General: Comply with ANSI/SDI A250.8.<br />
B. Exterior Frames: Fabricated from metallic-coated steel sheet.<br />
1. Fabricate frames with mitered or coped corners.<br />
2. Fabricate frames as full pr<strong>of</strong>ile welded unless otherwise indicated.<br />
3. Frames for Level 3 Steel Doors: 0.067-inch- (1.6-mm-) thick metallic coated<br />
steel sheet.<br />
C. Interior Frames: Fabricated from cold-rolled steel sheet unless metallic-coated sheet is<br />
indicated.<br />
1. Fabricate frames with mitered or coped corners.<br />
2. Fabricate frames as full pr<strong>of</strong>ile welded unless otherwise indicated.<br />
3. Frames for all openings over 36” width: 0.067-inch- (1.6-mm-) thick steel sheet.<br />
4. Frames for Wood Doors: 0.053-inch- (1.3-mm-) thick steel sheet.<br />
5. Frames for Borrowed Lights: Same as adjacent door frame.<br />
D. Hardware Reinforcement: ANSI/SDI A250.6.<br />
1. Closer reinforcements continuous sleeve: 12 gage.<br />
2. Hinge reinforcements: 7 gage.<br />
2.5 FRAME ANCHORS<br />
A. Jamb Anchors:<br />
1. Stud-Wall Type: Designed to engage stud, welded to back <strong>of</strong> frames; not less<br />
than 0.042 inch (1.0 mm) thick.<br />
2. Postinstalled Expansion Type for In-Place Concrete or Masonry: Minimum 3/8-<br />
inch- (9.5-mm-) diameter bolts with expansion shields or inserts. Provide pipe<br />
spacer from frame to wall, with throat reinforcement plate, welded to frame at<br />
each anchor location.<br />
08111-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HOLLOW METAL DOORS AND FRAMES<br />
B. Floor Anchors: Formed from same material as frames, not less than 0.042 inch (1.0<br />
mm) thick, and as follows:<br />
1. Monolithic Concrete Slabs: Clip-type anchors, with two holes to receive<br />
fasteners.<br />
2. Separate Topping Concrete Slabs: Adjustable-type anchors with extension clips,<br />
allowing not less than 2-inch (50-mm) height adjustment. Terminate bottom <strong>of</strong><br />
frames at finish floor surface.<br />
2.6 STOPS AND MOLDINGS<br />
A. Moldings for Glazed Lites in Doors: Minimum 0.032 inch (0.8 mm) thick, same material<br />
as door face sheet.<br />
B. Fixed Frame Moldings: Formed integral with hollow metal frames, a minimum <strong>of</strong> 5/8<br />
inch (16 mm) high unless otherwise indicated.<br />
C. Loose Stops for Glazed Lites in Frames: Minimum 0.032 inch (0.8 mm) thick, same<br />
material as frames.<br />
2.7 LOUVERS<br />
A. Provide sightpro<strong>of</strong> and lightpro<strong>of</strong> louvers for interior doors, where indicated, that<br />
comply with SDI 111C, with blades or baffles formed <strong>of</strong> 0.020-inch- (0.5-mm-) thick,<br />
cold-rolled steel sheet set into 0.032-inch- (0.8-mm-) thick steel frame.<br />
1. Fire-Rated Automatic Louvers: Movable blades closed by actuating fusible link,<br />
and listed and labeled for use in fire-rated door assemblies <strong>of</strong> type and fireresistance<br />
rating indicated.<br />
2.8 ACCESSORIES<br />
A. Mullions and Transom Bars: Join to adjacent members by welding or rigid mechanical<br />
anchors.<br />
B. Ceiling Struts: Minimum 1/4-inch-thick by 1-inch- (6.4-mm-thick by 25.4-mm-) wide<br />
steel.<br />
C. Grout Guards: Formed from same material as frames, not less than 0.016 inch (0.4<br />
mm) thick.<br />
2.9 FABRICATION<br />
A. Tolerances: Fabricate hollow metal work to tolerances indicated in SDI 117.<br />
B. Hollow Metal Doors:<br />
1. Exterior Doors: Provide weep-hole openings in bottom <strong>of</strong> exterior doors. Seal<br />
joints in top edges <strong>of</strong> doors against <strong>water</strong> penetration.<br />
2. Glazed Lites: Factory cut openings in doors.<br />
08111-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HOLLOW METAL DOORS AND FRAMES<br />
3. Astragals: Provide overlapping astragal on one leaf <strong>of</strong> pairs <strong>of</strong> doors where<br />
required by NFPA 80 for fire-performance rating or where indicated.<br />
C. Hollow Metal Frames: Where frames are fabricated in sections, provide alignment<br />
plates or angles at each joint, fabricated <strong>of</strong> same thickness metal as frames.<br />
1. Welded Frames: Weld flush face joints continuously; grind, fill, dress, and make<br />
smooth, flush, and invisible.<br />
2. Sidelight and Transom Bar Frames: Provide closed tubular members with no<br />
visible face seams or joints, fabricated from same material as door frame.<br />
Fasten members at crossings and to jambs by butt welding.<br />
3. Provide countersunk, flat- or oval-head exposed screws and bolts for exposed<br />
fasteners unless otherwise indicated.<br />
4. Grout Guards: Weld guards to frame at back <strong>of</strong> hardware mortises in frames to<br />
be grouted.<br />
5. Floor Anchors: Weld anchors to bottom <strong>of</strong> jambs and mullions with at least four<br />
spot welds per anchor.<br />
6. Jamb Anchors: Provide number and spacing <strong>of</strong> anchors as follows:<br />
a. Masonry Type: Locate anchors not more than 18 inches (457 mm) from<br />
top and bottom <strong>of</strong> frame. Space anchors not more than 32 inches (813<br />
mm) o.c. and as follows:<br />
1) Two anchors per jamb up to 60 inches (1524 mm) high.<br />
2) Three anchors per jamb from 60 to 90 inches (1524 to 2286 mm)<br />
high.<br />
3) Four anchors per jamb from 90 to 120 inches (2286 to 3048 mm)<br />
high.<br />
4) Four anchors per jamb plus 1 additional anchor per jamb for each 24<br />
inches (610 mm) or fraction there<strong>of</strong> above 120 inches (3048 mm)<br />
high.<br />
b. Stud-Wall Type: Locate anchors not more than 18 inches (457 mm) from<br />
top and bottom <strong>of</strong> frame. Space anchors not more than 32 inches (813<br />
mm) o.c. and as follows:<br />
1) Three anchors per jamb up to 60 inches (1524 mm) high.<br />
2) Four anchors per jamb from 60 to 90 inches (1524 to 2286 mm) high.<br />
3) Five anchors per jamb from 90 to 96 inches (2286 to 2438 mm) high.<br />
4) Five anchors per jamb plus 1 additional anchor per jamb for each 24<br />
inches (610 mm) or fraction there<strong>of</strong> above 96 inches (2438 mm) high.<br />
5) Two anchors per head for frames more than 42 inches (1066 mm)<br />
wide and mounted in metal-stud partitions.<br />
c. Postinstalled Expansion Type: Locate anchors not more than 6 inches<br />
(152 mm) from top and bottom <strong>of</strong> frame. Space anchors not more than 26<br />
inches (660 mm) o.c.<br />
7. Door Silencers: Except on weather-stripped doors, drill stops to receive door<br />
silencers.<br />
a. Single-Door Frames: Three door silencers.<br />
b. Double-Door Frames: Two door silencers.<br />
08111-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HOLLOW METAL DOORS AND FRAMES<br />
D. Hardware Preparation: Factory prepare hollow metal work to receive templated<br />
mortised hardware according to the Door Hardware Schedule and templates furnished<br />
as specified in Division 08 Section "Door Hardware."<br />
1. Locate hardware as indicated, or if not indicated, according to ANSI/SDI A250.8.<br />
2. Reinforce doors and frames to receive nontemplated, mortised and surfacemounted<br />
door hardware.<br />
3. Comply with applicable requirements in ANSI/SDI A250.6 and<br />
ANSI/DHI A115 Series specifications for preparation <strong>of</strong> hollow metal work for<br />
hardware.<br />
4. Coordinate locations <strong>of</strong> conduit and wiring boxes for electrical connections with<br />
Division 26 electrical Sections.<br />
E. Stops and Moldings: Provide stops and moldings around glazed lites where indicated.<br />
Form corners <strong>of</strong> stops and moldings with butted or mitered hairline joints.<br />
1. Single Glazed Lites: Provide fixed stops and moldings welded on secure side <strong>of</strong><br />
hollow metal work.<br />
2. Multiple Glazed Lites: Provide fixed and removable stops and moldings so that<br />
each glazed lite is capable <strong>of</strong> being removed independently.<br />
3. Provide fixed frame moldings on outside <strong>of</strong> exterior and on secure side <strong>of</strong> interior<br />
doors and frames.<br />
4. Provide loose stops and moldings on inside <strong>of</strong> hollow metal work.<br />
5. Coordinate rabbet width between fixed and removable stops with type <strong>of</strong> glazing<br />
and type <strong>of</strong> installation indicated.<br />
2.10 STEEL FINISHES<br />
A. Prime Finish: Apply manufacturer's standard primer immediately after cleaning and<br />
pretreating.<br />
1. Shop Primer: ANSI/SDI A250.10.<br />
PART 3 - EXECUTION<br />
3.1 INSTALLATION<br />
A. Hollow Metal Frames: Comply with ANSI/SDI A250.11.<br />
1. Set frames accurately in position, plumbed, aligned, and braced securely until<br />
permanent anchors are set. After wall construction is complete, remove<br />
temporary braces, leaving surfaces smooth and undamaged.<br />
a. At fire-protection-rated openings, install frames according to NFPA 80.<br />
b. Where frames are fabricated in sections because <strong>of</strong> shipping or handling<br />
limitations, field splice at approved locations by welding face joint<br />
continuously; grind, fill, dress, and make splice smooth, flush, and invisible<br />
on exposed faces.<br />
c. Install frames with removable glazing stops located on secure side <strong>of</strong><br />
opening.<br />
d. Install door silencers in frames before grouting.<br />
08111-6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HOLLOW METAL DOORS AND FRAMES<br />
e. Remove temporary braces necessary for installation only after frames have<br />
been properly set and secured.<br />
f. Check plumbness, squareness, and twist <strong>of</strong> frames as walls are<br />
constructed. Shim as necessary to comply with installation tolerances.<br />
2. Floor Anchors: Provide floor anchors for each jamb and mullion that extends to<br />
floor, and secure with postinstalled expansion anchors.<br />
a. Floor anchors may be set with powder-actuated fasteners instead <strong>of</strong><br />
postinstalled expansion anchors if so indicated and approved on Shop<br />
Drawings.<br />
3. Metal-Stud Partitions: Solidly pack mineral-fiber insulation behind frames.<br />
4. In-Place Concrete or Masonry Construction: Secure frames in place with<br />
postinstalled expansion anchors. Countersink anchors, and fill and make<br />
smooth, flush, and invisible on exposed faces.<br />
5. Ceiling Struts: Extend struts vertically from top <strong>of</strong> frame at each jamb to<br />
overhead structural supports or substrates above frame unless frame is<br />
anchored to masonry or to other structural support at each jamb. Bend top <strong>of</strong><br />
struts to provide flush contact for securing to supporting construction. Provide<br />
adjustable wedged or bolted anchorage to frame jamb members.<br />
6. Installation Tolerances: Adjust hollow metal door frames for squareness,<br />
alignment, twist, and plumb to the following tolerances:<br />
a. Squareness: Plus or minus 1/16 inch (1.6 mm), measured at door rabbet<br />
on a line 90 degrees from jamb perpendicular to frame head.<br />
b. Alignment: Plus or minus 1/16 inch (1.6 mm), measured at jambs on a<br />
horizontal line parallel to plane <strong>of</strong> wall.<br />
c. Twist: Plus or minus 1/16 inch (1.6 mm), measured at opposite face<br />
corners <strong>of</strong> jambs on parallel lines, and perpendicular to plane <strong>of</strong> wall.<br />
d. Plumbness: Plus or minus 1/16 inch (1.6 mm), measured at jambs at floor.<br />
B. Hollow Metal Doors: Fit hollow metal doors accurately in frames, within clearances<br />
specified below. Shim as necessary.<br />
1. Non-Fire-Rated Standard Steel Doors:<br />
a. Jambs and Head: 1/8 inch (3 mm) plus or minus 1/16 inch (1.6 mm).<br />
b. Between Edges <strong>of</strong> Pairs <strong>of</strong> Doors: 1/8 inch (3 mm) plus or minus 1/16 inch<br />
(1.6 mm).<br />
c. Between Bottom <strong>of</strong> Door and Top <strong>of</strong> Threshold: Maximum 3/8 inch (9.5<br />
mm).<br />
d. Between Bottom <strong>of</strong> Door and Top <strong>of</strong> Finish Floor (No Threshold):<br />
Maximum 3/4 inch (19 mm).<br />
2. Fire-Rated Doors: Install doors with clearances according to NFPA 80.<br />
3. Smoke-Control Doors: Install doors according to NFPA 105.<br />
C. Glazing: Comply with installation requirements in Division 08 Section "Glazing" and<br />
with hollow metal manufacturer's written instructions.<br />
1. Secure stops with countersunk flat- or oval-head machine screws spaced<br />
uniformly not more than 9 inches (230 mm) o.c. and not more than 2 inches (50<br />
mm) o.c. from each corner.<br />
08111-7<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HOLLOW METAL DOORS AND FRAMES<br />
3.2 ADJUSTING AND CLEANING<br />
A. Final Adjustments: Check and readjust operating hardware items immediately before<br />
final inspection. Leave work in complete and proper operating condition. Remove and<br />
replace defective work, including hollow metal work that is warped, bowed, or<br />
otherwise unacceptable.<br />
B. Prime-Coat Touchup: Immediately after erection, sand smooth rusted or damaged<br />
areas <strong>of</strong> prime coat and apply touchup <strong>of</strong> compatible air-drying, rust-inhibitive primer.<br />
C. Metallic-Coated Surfaces: Clean abraded areas and repair with galvanizing repair<br />
paint according to manufacturer's written instructions.<br />
END OF SECTION 08111<br />
08111-8<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 08211<br />
FLUSH WOOD DOORS<br />
PART 1 - GENERAL<br />
1.1 RELATED DOCUMENTS<br />
A. Drawings and general provisions <strong>of</strong> the Contract, including General and<br />
Supplementary Conditions and Division 1 Specification Sections, apply to this Section.<br />
1.2 SUMMARY<br />
A. This Section includes the following:<br />
1. Solid-core doors with wood-veneer faces.<br />
2. Factory finishing flush wood doors.<br />
3. Louvers for flush wood doors.<br />
B. Related Sections include the following:<br />
1. Division 8 Section "Glazing" for glass view panels in flush wood doors.<br />
1.3 SUBMITTALS<br />
A. Product Data: For each type <strong>of</strong> door. <strong>Inc</strong>lude details <strong>of</strong> core and edge construction,<br />
louvers, and trim for openings. <strong>Inc</strong>lude factory-finishing specifications.<br />
B. Shop Drawings: Indicate location, size, and hand <strong>of</strong> each door; elevation <strong>of</strong> each kind<br />
<strong>of</strong> door; construction details not covered in Product Data; location and extent <strong>of</strong><br />
hardware blocking; and other pertinent data.<br />
1. Indicate fire ratings for fire doors.<br />
C. Samples for Initial Selection: Color charts consisting <strong>of</strong> actual materials in small<br />
sections for the following:<br />
1. Faces <strong>of</strong> Factory-Finished Doors: Show the full range <strong>of</strong> colors available for<br />
stained finishes.<br />
1.4 QUALITY ASSURANCE<br />
A. Source Limitations: Obtain flush wood doors through one source from a single<br />
manufacturer.<br />
B. Quality Standard: Comply with AWI's "Architectural Woodwork Quality Standards<br />
Illustrated."<br />
1. Provide AWI Quality Certification Labels or an AWI letter <strong>of</strong> licensing for Project<br />
indicating that doors comply with requirements <strong>of</strong> grades specified.<br />
08211-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
FLUSH WOOD DOORS<br />
C. Fire-Rated Wood Doors: Doors complying with NFPA 80 that are listed and labeled by<br />
a testing and inspecting agency acceptable to authorities having jurisdiction, for fire<br />
ratings indicated, based on testing according to NFPA 252.<br />
1.5 DELIVERY, STORAGE, AND HANDLING<br />
A. Comply with requirements <strong>of</strong> referenced standard and manufacturer's written<br />
instructions.<br />
B. Package doors individually in plastic bags or cardboard cartons.<br />
C. Mark each door on top and bottom rail with opening number used on Shop Drawings.<br />
1.6 PROJECT CONDITIONS<br />
A. Environmental Limitations: Do not deliver or install doors until building is enclosed, wet<br />
work is complete, and HVAC system is operating and will maintain temperature and<br />
relative humidity at occupancy levels during the remainder <strong>of</strong> the construction period.<br />
1.7 WARRANTY<br />
A. Special Warranty: Manufacturer's standard form, signed by manufacturer, Installer, and<br />
Contractor, in which manufacturer agrees to repair or replace doors that are defective<br />
in materials or workmanship, have warped (bow, cup, or twist) more than 1/4 inch (6.4<br />
mm) in a 42-by-84-inch (1067-by-2134-mm) section, or show telegraphing <strong>of</strong> core<br />
construction in face veneers exceeding 0.01 inch in a 3-inch (0.25 mm in a 75-mm)<br />
span.<br />
1. Warranty shall be in effect during the following period <strong>of</strong> time from date <strong>of</strong><br />
Substantial Completion:<br />
a. Solid-Core Interior Doors: Life <strong>of</strong> installation.<br />
PART 2 - PRODUCTS<br />
2.1 MANUFACTURERS<br />
A. Manufacturers: Subject to compliance with requirements, provide products by one <strong>of</strong><br />
the following:<br />
1. Flush Wood Doors:<br />
a. Algoma Hardwoods <strong>Inc</strong>.<br />
b. Eggers Industries; Architectural Door Division.<br />
c. Graham Door Company<br />
d. Marshfield Door Company.<br />
2. Metal Louvers for Doors:<br />
a. Air Louvers, <strong>Inc</strong>.<br />
b. Anemostat Door Products.<br />
c. Hiawatha, <strong>Inc</strong>.<br />
08211-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
FLUSH WOOD DOORS<br />
d. Leslie-Locke, <strong>Inc</strong>.<br />
2.2 DOOR CONSTRUCTION, GENERAL<br />
A. Low-Emitting Materials: Provide doors made with adhesives and composite wood<br />
products that do not contain urea formaldehyde.<br />
B. Doors for Transparent Finish:<br />
1. Grade: Premium, with Grade AA faces.<br />
2. Species and Cut: White Maple, Plain Sliced.<br />
3. Match between Veneer Leaves: Book match.<br />
4. Assembly <strong>of</strong> Veneer Leaves on Door Faces: Balance match.<br />
5. Pair and Set Match: Provide for doors hung in same opening or separated only<br />
by mullions.<br />
2.3 SOLID-CORE DOORS<br />
1. Provide doors with glued-block cores.<br />
2. Construction: Five plies with stiles and rails bonded to core, then entire unit<br />
abrasive planed before veneering.<br />
B. Fire-Rated Doors:<br />
1. Construction: Construction and core specified above for type <strong>of</strong> face indicated or<br />
manufacturer's standard mineral-core construction as needed to provide fire<br />
rating indicated.<br />
a. Blocking: For mineral-core doors, provide composite blocking with<br />
improved screw-holding capability approved for use in doors <strong>of</strong> fire ratings<br />
indicated<br />
2. Edge Construction: At hinge stiles, provide manufacturer's standard laminatededge<br />
construction with improved screw-holding capability and split resistance<br />
and with outer stile matching face veneer.<br />
3. Pairs: Furnish formed-steel edges and astragals for pairs <strong>of</strong> fire-rated doors,<br />
unless otherwise indicated.<br />
a. Finish steel edges and astragals with baked enamel same color as doors.<br />
2.4 LOUVERS AND LIGHT FRAMES<br />
A. Metal Louvers:<br />
1. Blade Type: Vision-pro<strong>of</strong>, inverted V.<br />
2. Metal and Finish: Galvanized steel, 0.0396 inch (1.0 mm) thick, hot-dip zinc<br />
coated and factory primed for paint finish.<br />
B. Fire Door Louvers: Metal louvers with fusible link and closing device, listed and<br />
labeled for use in doors with fire rating <strong>of</strong> one and one-half hours and less.<br />
08211-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
FLUSH WOOD DOORS<br />
1. Metal and Finish: Galvanized steel, 0.0396 inch (1.0 mm) thick, hot-dip zinc<br />
coated and factory primed for paint finish.<br />
C. Metal Frames for Light Openings in Fire Doors: Manufacturer's standard frame formed<br />
<strong>of</strong> 0.0478-inch- (1.2-mm-) thick, cold-rolled steel sheet; factory primed and approved<br />
for use in doors <strong>of</strong> fire rating indicated.<br />
2.5 FABRICATION<br />
A. Fabricate doors in sizes indicated for Project-site fitting.<br />
B. Factory fit doors to suit frame-opening sizes indicated, with the following uniform<br />
clearances and bevels, unless otherwise indicated:<br />
1. Comply with clearance requirements <strong>of</strong> referenced quality standard for fitting.<br />
Comply with requirements in NFPA 80 for fire-rated doors.<br />
C. Factory machine doors for hardware that is not surface applied. Locate hardware to<br />
comply with DHI-WDHS-3. Comply with final hardware schedules, door frame Shop<br />
Drawings, DHI A115-W series standards, and hardware templates.<br />
1. Coordinate measurements <strong>of</strong> hardware mortises in metal frames to verify<br />
dimensions and alignment before factory machining.<br />
2. Metal Astragals: Premachine astragals and formed-steel edges for hardware for<br />
pairs <strong>of</strong> fire-rated doors.<br />
D. Openings: Cut and trim openings through doors to comply with applicable<br />
requirements <strong>of</strong> referenced standards for kind(s) <strong>of</strong> door(s) required.<br />
1. Light Openings: Trim openings with moldings <strong>of</strong> material and pr<strong>of</strong>ile indicated.<br />
2. Louvers: Factory install louvers in prepared openings.<br />
2.6 FACTORY FINISHING<br />
A. General: Comply with AWI's "Architectural Woodwork Quality Standards Illustrated"<br />
for factory finishing.<br />
B. Finish doors at factory.<br />
C. Transparent Finish:<br />
1. Grade: Premium.<br />
2. Finish: Manufacturer's standard finish with performance comparable to AWI<br />
System TR-6 catalyzed polyurethane.<br />
3. Staining: As selected by Architect from manufacturer's full range.<br />
4. Effect: Open-grain finish.<br />
5. Sheen: Satin.<br />
PART 3 - EXECUTION<br />
3.1 EXAMINATION<br />
08211-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
FLUSH WOOD DOORS<br />
A. Examine doors and installed door frames before hanging doors.<br />
1. Verify that frames comply with indicated requirements for type, size, location, and<br />
swing characteristics and have been installed with level heads and plumb jambs.<br />
2. Reject doors with defects.<br />
B. Proceed with installation only after unsatisfactory conditions have been corrected.<br />
3.2 INSTALLATION<br />
A. Hardware: For installation, see Division 8 Section "Door Hardware."<br />
B. Manufacturer's Written Instructions: Install doors to comply with manufacturer's written<br />
instructions, referenced quality standard, and as indicated.<br />
1. Install fire-rated doors in corresponding fire-rated frames according to NFPA 80.<br />
C. Job-Fitted Doors: Align and fit doors in frames with uniform clearances and bevels as<br />
indicated below; do not trim stiles and rails in excess <strong>of</strong> limits set by manufacturer or<br />
permitted for fire-rated doors. Machine doors for hardware. Seal cut surfaces after<br />
fitting and machining.<br />
1. Clearances: Provide 1/8 inch (3.2 mm) at heads, jambs, and between pairs <strong>of</strong><br />
doors. Provide 1/8 inch (3.2 mm) from bottom <strong>of</strong> door to top <strong>of</strong> decorative floor<br />
finish or covering. Where threshold is shown or scheduled, provide 1/4 inch (6.4<br />
mm) from bottom <strong>of</strong> door to top <strong>of</strong> threshold.<br />
a. Comply with NFPA 80 for fire-rated doors.<br />
2. Bevel non-fire-rated doors 1/8 inch in 2 inches (3-1/2 degrees) at lock and hinge<br />
edges.<br />
3. Bevel fire-rated doors 1/8 inch in 2 inches (3-1/2 degrees) at lock edge; trim stiles<br />
and rails only to extent permitted by labeling agency.<br />
D. Factory-Fitted Doors: Align in frames for uniform clearance at each edge.<br />
E. Factory-Finished Doors: Restore finish before installation if fitting or machining is<br />
required at Project site.<br />
3.3 ADJUSTING<br />
A. Operation: Rehang or replace doors that do not swing or operate freely.<br />
B. Finished Doors: Replace doors that are damaged or do not comply with requirements.<br />
Doors may be repaired or refinished if work complies with requirements and shows no<br />
evidence <strong>of</strong> repair or refinishing.<br />
END OF SECTION 08211<br />
08211-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 08311<br />
ACCESS DOORS AND FRAMES<br />
PART 1 - GENERAL<br />
1.1 SUMMARY<br />
A. This Section includes access doors and frames for ceilings.<br />
1.2 SUBMITTALS<br />
A. Product Data: For each type <strong>of</strong> access door and frame indicated.<br />
B. Shop Drawings: <strong>Inc</strong>lude plans, elevations, sections, details, and attachments to other<br />
work.<br />
1.3 COORDINATION<br />
A. Verification: Determine specific locations and sizes for access doors needed to gain<br />
access to concealed plumbing, mechanical, or other concealed work, and indicate in<br />
the schedule specified in "Submittals" Article.<br />
PART 2 - PRODUCTS<br />
2.1 ALUMINUM MATERIALS<br />
A. Aluminum Extrusions: ASTM B 221 (ASTM B 221M), Alloy 6063-T6, mill finish.<br />
B. Aluminum-Alloy Rolled Tread Plate: ASTM B 632/B 632M, Alloy 6061-T6, mill finish.<br />
C. Aluminum Sheet: ASTM B 209 (ASTM B 209M).<br />
1. Mill finish.<br />
2. Baked-Enamel Finish: Manufacturer's standard.<br />
2.2 ACCESS DOORS AND FRAMES FOR WALLS AND CEILINGS<br />
A. Available Manufacturers: Subject to compliance with requirements, manufacturers<br />
<strong>of</strong>fering products that may be incorporated into the Work include, but are not limited to,<br />
the following:<br />
1. Acudor Products, <strong>Inc</strong>.<br />
2. Babcock-Davis; A Cierra Products Co.<br />
08311 - 1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
3. Bar-Co, <strong>Inc</strong>. Div.; Alfab, <strong>Inc</strong>.<br />
4. Cendrex <strong>Inc</strong>.<br />
5. Dur-Red Products.<br />
6. Elmdor/Stoneman; Div. <strong>of</strong> Acorn Engineering Co.<br />
7. Jensen Industries.<br />
8. J. L. Industries, <strong>Inc</strong>.<br />
9. Karp Associates, <strong>Inc</strong>.<br />
10. Larsen's Manufacturing Company.<br />
11. MIFAB, <strong>Inc</strong>.<br />
12. Milcor <strong>Inc</strong>.<br />
13. Nystrom, <strong>Inc</strong>.<br />
14. Williams Bros. Corporation <strong>of</strong> America (The).<br />
B. Aluminum Flush Access Doors and Frames with Exposed Trim: Fabricated from<br />
aluminum sheet and extruded-aluminum shapes.<br />
1. Locations: Ceiling surfaces.<br />
2. Door: Minimum 0.080-inch- (2.0-mm-) thick aluminum sheet.<br />
3. Frame: Minimum 0.060-inch- (1.5-mm-) thick extruded aluminum with 1-1/4-inch-<br />
(32-mm-) wide rolled flange.<br />
4. Hinges: Concealed continuous aluminum.<br />
5. Latch: Screwdriver-operated cam latch.<br />
2.3 FABRICATION<br />
A. General: Provide access door and frame assemblies manufactured as integral units<br />
ready for installation.<br />
B. Metal Surfaces: For metal surfaces exposed to view, provide materials with smooth,<br />
flat surfaces without blemishes.<br />
C. Doors and Frames: Grind exposed welds smooth and flush with adjacent surfaces.<br />
Furnish attachment devices and fasteners <strong>of</strong> type required to secure access panels to<br />
types <strong>of</strong> supports indicated.<br />
D. Latching Mechanisms: Furnish number required to hold doors in flush, smooth plane<br />
when closed.<br />
E. Extruded Aluminum: After fabrication, apply manufacturer's standard protective<br />
coating on aluminum that will come in contact with concrete.<br />
PART 3 - EXECUTION<br />
3.1 INSTALLATION<br />
A. Comply with manufacturer's written instructions for installing access doors and frames.<br />
08311 - 2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
B. Set frames accurately in position and attach securely to supports with plane <strong>of</strong> face<br />
panels aligned with adjacent finish surfaces.<br />
C. Install doors flush with adjacent finish surfaces or recessed to receive finish material.<br />
3.2 ADJUSTING AND CLEANING<br />
A. Adjust doors and hardware after installation for proper operation.<br />
B. Remove and replace doors and frames that are warped, bowed, or otherwise<br />
damaged.<br />
END OF SECTION 08311<br />
08311 - 3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 08332<br />
OVERHEAD COILING DOORS<br />
PART 1 - PRODUCTS<br />
PART 2 - GENERAL<br />
2.1 SUMMARY<br />
A. Section includes:<br />
1. Insulated service doors.<br />
B. Related Section:<br />
1. Section 055000 "Metal Fabrications" for miscellaneous steel supports.<br />
2.2 PERFORMANCE REQUIREMENTS<br />
A. Structural Performance, Exterior Doors: Exterior overhead coiling doors shall<br />
withstand the wind loads, the effects <strong>of</strong> gravity loads, and loads and stresses within<br />
limits and under conditions indicated according to SEI/ASCE 7.<br />
1. Wind Loads: As indicated on Drawings.<br />
B. Windborne-Debris-Impact-Resistance Performance: Provide impact-protective<br />
overhead coiling doors that pass missile-impact and cyclic-pressure tests when tested<br />
according to ASTM E 1886 and ASTM E 1996.<br />
1. Large Missile Test: For overhead coiling doors located within 30 feet (9.144 m)<br />
<strong>of</strong> grade.<br />
2.3 ACTION SUBMITTALS<br />
A. Product Data: For each type and size <strong>of</strong> overhead coiling door and accessory.<br />
B. Shop Drawings: For each installation and for special components not dimensioned or<br />
detailed in manufacturer's product data. <strong>Inc</strong>lude plans, elevations, sections, details,<br />
and attachments to other work.<br />
C. Samples: For each exposed product and for each color and texture specified.<br />
08332 - 1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
2.4 INFORMATIONAL SUBMITTALS<br />
A. Oversize Construction Certification: For door assemblies required to be fire-rated and<br />
that exceed size limitations <strong>of</strong> labeled assemblies.<br />
2.5 CLOSEOUT SUBMITTALS<br />
A. Maintenance Data.<br />
2.6 QUALITY ASSURANCE<br />
A. Installer Qualifications: Manufacturer's authorized representative who is trained and<br />
approved for both installation and maintenance <strong>of</strong> units required for this Project.<br />
PART 3 - PRODUCTS<br />
3.1 DOOR CURTAIN MATERIALS AND CONSTRUCTION<br />
A. Door Curtains: Fabricate overhead coiling-door curtain <strong>of</strong> interlocking metal slats,<br />
designed to withstand wind loading indicated, in a continuous length for width <strong>of</strong> door<br />
without splices. Unless otherwise indicated, provide slats <strong>of</strong> thickness and mechanical<br />
properties recommended by door manufacturer for performance, size, and type <strong>of</strong> door<br />
indicated, and as follows:<br />
1. Insulation: Fill slats for insulated doors with manufacturer's standard thermal<br />
insulation complying with maximum flame-spread and smoke-developed indexes<br />
<strong>of</strong> 75 and 450, respectively, according to ASTM E 84. Enclose insulation<br />
completely within slat faces.<br />
2. Metal Interior Curtain-Slat Facing: Match metal <strong>of</strong> exterior curtain-slat face.<br />
B. Bottom Bar for Service Doors: Consisting <strong>of</strong> two angles, each not less than 1-1/2 by 1-<br />
1/2 by 1/8 inch (38 by 38 by 3 mm) thick; fabricated from metal to match curtain slats<br />
and finish.<br />
C. Curtain Jamb Guides: Manufacturer's standard angles or channels and angles <strong>of</strong><br />
same material and finish as curtain slats unless otherwise indicated, with sufficient<br />
depth and strength to retain curtain, to allow curtain to operate smoothly, and to<br />
withstand loading. Slot bolt holes for guide adjustment. Provide removable stops on<br />
guides to prevent overtravel <strong>of</strong> curtain.<br />
1. Removable Posts and Jamb Guides for Counter Doors: Manufacturer's<br />
standard.<br />
3.2 HOOD<br />
A. General: Form sheet metal hood to entirely enclose coiled curtain and operating<br />
mechanism at opening head. Contour to fit end brackets to which hood is attached.<br />
08332 - 2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
Roll and reinforce top and bottom edges for stiffness. Form closed ends for surfacemounted<br />
hoods and fascia for any portion <strong>of</strong> between-jamb mounting that projects<br />
beyond wall face. Equip hood with intermediate support brackets as required to<br />
prevent sagging.<br />
3.3 LOCKING DEVICES<br />
A. Locking Device Assembly: Fabricate with cylinder lock, spring-loaded dead bolt,<br />
operating handle, cam plate, and adjustable locking bars to engage through slots in<br />
tracks.<br />
1. Lock Cylinders: Provide cylinders standard with manufacturer and keyed to<br />
building keying system.<br />
2. Keys: Provide three for each cylinder.<br />
B. Chain Lock Keeper: Suitable for padlock.<br />
C. Safety Interlock Switch: Equip power-operated doors with safety interlock switch to<br />
disengage power supply when door is locked.<br />
3.4 CURTAIN ACCESSORIES<br />
A. Weatherseals: Equip each exterior door with weather-stripping gaskets fitted to entire<br />
perimeter <strong>of</strong> door for a weathertight installation, unless otherwise indicated.<br />
3.5 COUNTERBALANCING MECHANISM<br />
A. General: Counterbalance doors by means <strong>of</strong> manufacturer's standard mechanism with<br />
an adjustable-tension, steel helical torsion spring mounted around a steel shaft and<br />
contained in a spring barrel connected to top <strong>of</strong> curtain with barrel rings. Use greasesealed<br />
bearings or self-lubricating graphite bearings for rotating members.<br />
B. Brackets: Manufacturer's standard mounting brackets <strong>of</strong> either cast iron or cold-rolled<br />
steel plate.<br />
3.6 MANUAL DOOR OPERATORS<br />
A. Equip door with manufacturer's recommended manual door operator unless another<br />
type <strong>of</strong> door operator is indicated.<br />
B. Chain-Hoist Operator: Consisting <strong>of</strong> endless steel hand chain, chain-pocket wheel and<br />
guard, and gear-reduction unit with a maximum 25 lbf (111 N) force for door operation.<br />
Provide alloy-steel hand chain with chain holder secured to operator guide.<br />
08332 - 3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
3.7 DOOR ASSEMBLY<br />
A. Insulated Service Door: Overhead coiling door formed with curtain <strong>of</strong> interlocking<br />
metal slats.<br />
1. Basis-<strong>of</strong>-Design Product: Subject to compliance with requirements, provide<br />
Cornell Thermiser Insulated Rolling Service Door or comparable product by one<br />
<strong>of</strong> the following:<br />
a. ACME Rolling Doors.<br />
b. Alpine Overhead Doors, <strong>Inc</strong>.<br />
c. AlumaTek, <strong>Inc</strong>.<br />
d. C.H.I. Overhead Doors.<br />
e. City-Gates.<br />
f. Cookson Company.<br />
g. Cornell Iron Works, <strong>Inc</strong>.<br />
h. Dynamic Closures Corp.<br />
i. Lawrence Roll-Up Doors, <strong>Inc</strong>.<br />
j. Mahon Door Corporation.<br />
k. McKeon Rolling Steel Door Company, <strong>Inc</strong>.<br />
l. Metro Door.<br />
m. Overhead Door Corporation.<br />
n. QMI Security Solutions.<br />
o. Raynor.<br />
p. Southwestern Steel Rolling Door Co.<br />
q. Wayne-Dalton Corp.<br />
r. Windsor Door.<br />
B. Operation Cycles: Not less than 10,000.<br />
C. Curtain R-Value: 4.5 deg F x h x sq. ft./Btu (0.792 K x sq. m/W)].<br />
D. Door Curtain Material: Galvanized steel.<br />
E. Door Curtain Slats: Flat pr<strong>of</strong>ile slats <strong>of</strong> 15/16-inch.<br />
1. Insulated-Slat Interior Facing: Metal.<br />
F. Curtain Jamb Guides: Galvanized steel with exposed finish matching curtain<br />
slats. Provide continuous integral wear strips to prevent metal-to-metal contact and to<br />
minimize operational noise. Provide removable post(s) and jamb guides where shown<br />
on Drawings.<br />
G. Hood: Match curtain material and finish.<br />
1. Shape: Round.<br />
2. Mounting: Face <strong>of</strong> wall.<br />
H. Locking Devices: Equip door with locking device assembly.<br />
1. Locking Device Assembly: Cremone type, both jamb sides locking bars,<br />
operable from inside with thumb turn, outside with cylinder.<br />
08332 - 4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
I. Manual Door Operator: Chain-hoist operator.<br />
J. Door Finish:<br />
1. Baked-Enamel or Powder-Coated Finish: Color as selected by Architect from<br />
manufacturer's full range.<br />
PART 4 - EXECUTION<br />
4.1 INSTALLATION<br />
A. Install overhead coiling doors and operating equipment complete with necessary<br />
hardware, anchors, inserts, hangers, and equipment supports; according to<br />
manufacturer's written instructions and as specified.<br />
B. Adjust hardware and moving parts to function smoothly so that doors operate easily,<br />
free <strong>of</strong> warp, twist, or distortion. Lubricate bearings and sliding parts as recommended<br />
by manufacturer. Adjust seals to provide weathertight fit around entire perimeter.<br />
4.2 DEMONSTRATION<br />
A. Engage a factory-authorized service representative to train Owner's maintenance<br />
personnel to adjust, operate, and maintain overhead coiling doors.<br />
END OF SECTION 08332<br />
08332 - 5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 08412<br />
IMPACT RESISTANT ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS<br />
PART 1 - GENERAL<br />
1.1 RELATED DOCUMENTS<br />
A. Drawings and general provisions <strong>of</strong> the Contract, including General and<br />
Supplementary Conditions and Division 1 Specification Sections, apply to this Section.<br />
1.2 SUMMARY<br />
A. This Section includes the following:<br />
1. Exterior large missile impact aluminum-framed entrance systems with flush<br />
glazing.<br />
1.3 PERFORMANCE REQUIREMENTS<br />
A. General: Provide aluminum-framed systems, including anchorage, capable <strong>of</strong><br />
withstanding, without failure, the effects <strong>of</strong> the following:<br />
1. Structural loads.<br />
2. Thermal movements.<br />
3. Movements <strong>of</strong> supporting structure indicated on Drawings including, but not<br />
limited to, story drift and deflection from uniformly distributed and concentrated<br />
live loads.<br />
4. Dimensional tolerances <strong>of</strong> building frame and other adjacent construction.<br />
5. Failure includes the following:<br />
a. Deflection exceeding specified limits.<br />
b. Thermal stresses transferred to building structure.<br />
c. Framing members transferring stresses, including those caused by thermal<br />
and structural movements, to glazing.<br />
d. Glazing-to-glazing contact.<br />
e. Noise or vibration created by wind and thermal and structural movements.<br />
f. Loosening or weakening <strong>of</strong> fasteners, attachments, and other components.<br />
g. Sealant failure.<br />
h. Failure <strong>of</strong> operating units to function properly.<br />
B. Structural Sealant: Provide only the sealants used during testing <strong>of</strong> approved impacted<br />
specimens.<br />
C. Structural-Sealant Joints: Designed to produce tensile or shear stress in<br />
structural-sealant joints <strong>of</strong> less than 20 psi138 kPa.<br />
08412-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
IMPACT RESISTANT ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS<br />
D. Structural Loads:<br />
1. Wind Loads: Provide aluminum-framed entrance and storefront systems capable<br />
<strong>of</strong> withstanding wind pressures associated with basic wind speed <strong>of</strong> 130 mph.<br />
a. Importance Factor = 1.00.<br />
b. Exposure Category “C”.<br />
E. Structural-Test Performance: Provide aluminum-framed systems tested according to<br />
ASTM E 330 as follows:<br />
1. When tested at positive and negative wind-load design pressures, systems do<br />
not evidence deflection exceeding specified limits.<br />
F. Windborne-Debris-Impact-Resistance-Test Performance: Provide aluminum-framed<br />
systems that pass large missile-impact tests and cyclic-pressure tests according to<br />
protocols required by the authorities having jurisdiction.<br />
G. Thermal Movements: Provide aluminum-framed systems that allow for thermal<br />
movements resulting from the following maximum change (range) in ambient and<br />
surface temperatures. Base engineering calculation on surface temperatures <strong>of</strong><br />
materials due to both solar heat gain and nighttime-sky heat loss.<br />
1. Temperature Change (Range): 180 deg F100 deg C, material surfaces.<br />
H. Air Infiltration: Provide aluminum-framed systems with maximum air leakage through<br />
fixed glazing and framing areas <strong>of</strong> 0.06 cfm/sq. <strong>of</strong> fixed wall area when tested<br />
according to ASTM E 283 at a minimum static-air-pressure difference <strong>of</strong> 6.24 lbf/sq.<br />
ft.300 Pa.<br />
I. Water Penetration Under Static Pressure: Provide aluminum-framed systems that<br />
have been tested according to ASTM E 331 and meet SBCCI large missile impact<br />
testing standards <strong>of</strong> 10 lb/sq. ft. minimum.<br />
1.4 SUBMITTALS<br />
A. General: Submit the following in accordance with Conditions <strong>of</strong> the Contract.<br />
1. Product data for each aluminum entrance and storefront system required,<br />
including:<br />
a. Manufacturer's published data sheets, signed, sealed (raised seal) and<br />
dated by Florida registered architect/engineer. Data sheets shall indicate<br />
size, materials, glazing system, type <strong>of</strong> anchors, spacing, and placement <strong>of</strong><br />
anchors, details <strong>of</strong> head, jambs, and sill conditions for opening type (frame,<br />
masonry, etc.).<br />
b. Conformance test report from an industry recognized independent testing<br />
laboratory, attesting that the unit tested meets or exceeds the allowable<br />
structural loads and other performance conditions for which the unit was<br />
tested.<br />
c. Data on finishing, hardware and accessories.<br />
08412-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
IMPACT RESISTANT ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS<br />
2. Shop drawings for each aluminum entrance and storefront system required,<br />
including:<br />
a. Layout and installation details, including relationship to adjacent work.<br />
b. Elevations at 1/4-inch scale.<br />
c. Detail sections <strong>of</strong> typical composite members.<br />
d. Anchors and reinforcement.<br />
e. Hardware mounting heights.<br />
f. Provisions for expansion and contraction.<br />
g. Glazing details.<br />
3. Samples for Verification: For each type <strong>of</strong> exposed finish required, in<br />
manufacturer’s standard sizes.<br />
4. Maintenance Data: For aluminum-framed systems to include in maintenance<br />
manuals.<br />
5. Warranties: Special warranties specified in this Section.<br />
1.5 QUALITY ASSURANCE<br />
A. Installer Qualifications: Engage an experienced installer to assume engineering<br />
responsibility and perform work <strong>of</strong> this Section who has specialized in installing<br />
entrance and storefront systems similar to those required for this Project and who is<br />
acceptable to manufacturer.<br />
1. Engineering Responsibility: Prepare data for entrance and storefront systems,<br />
including Shop Drawings, based on testing and engineering analysis <strong>of</strong><br />
manufacturer's standard units in assemblies similar to those indicated for this<br />
Project.<br />
B. Manufacturer's Qualifications: Provide aluminum entrances and storefront systems<br />
produced by a firm experienced in manufacturing systems that are similar to those<br />
indicated for this project and that have a record <strong>of</strong> successful in-service performance.<br />
C. Source Limitations: Obtain each type <strong>of</strong> entrance and storefront system through one<br />
source from a single manufacturer.<br />
D. Design Criteria: The drawings indicate the size, pr<strong>of</strong>ile, and dimensional requirements<br />
<strong>of</strong> aluminum entrance and storefront work required and are based on the specific types<br />
and models indicated. Aluminum entrance and storefront by other manufacturers may<br />
be considered, provided deviations in dimensions and pr<strong>of</strong>iles are minor and do not<br />
change the design concept as judged by the Architect. The burden <strong>of</strong> pro<strong>of</strong> <strong>of</strong> equality<br />
is on the proposer.<br />
1.6 PROJECT CONDITIONS<br />
A. Field Measurements: Verify dimensions by field measurements before fabrication and<br />
indicate measurements on Shop Drawings. Coordinate fabrication schedule with<br />
construction progress to avoid delaying the Work.<br />
1.7 WARRANTY<br />
08412-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
IMPACT RESISTANT ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS<br />
A. General Warranty: The special warranty specified in this Article shall not deprive the<br />
Owner <strong>of</strong> other rights the Owner may have under other provisions <strong>of</strong> the Contract<br />
Documents and shall be in addition to, and run concurrent with, other warranties made<br />
by the Contractor under requirements <strong>of</strong> the Contract Documents.<br />
B. Special Warranty: Submit a written warranty executed by the manufacturer agreeing to<br />
repair or replace components <strong>of</strong> entrance and storefront systems that fail in materials<br />
or workmanship within the specified warranty period or periods listed below. Failures<br />
include, but are not limited to, the following:<br />
1. Deterioration <strong>of</strong> metals, metal finishes, and other materials beyond normal<br />
weathering<br />
2. Failure <strong>of</strong> operating components to function normally.<br />
3. Entrance door corner construction: lifetime.<br />
C. Warranty Period:<br />
1. 2 years from date <strong>of</strong> Substantial Completion.<br />
PART 2 - PART - PRODUCTS<br />
2.1 MANUFACTURERS<br />
A. Available Manufacturers: Subject to compliance with requirements, manufacturers<br />
<strong>of</strong>fering products that may be incorporated into the Work include, but are not limited to,<br />
the following:<br />
B. Manufacturers: Subject to compliance with requirements, provide products by one <strong>of</strong><br />
the following:<br />
1. U.S. Aluminum Corporation<br />
2. Kawneer Company, <strong>Inc</strong>.<br />
3. EFCO Corporation.<br />
C. Products: Equal to Kawneer IR 501 Framing System – large missile impact insulated<br />
storefront system, with Kawneer 350 IR Entrances; Medium stile, 3-1/2 inch vertical<br />
face dimension, 1-3/4 inch depth, Interior structural silicone glazed, High traffic/impact<br />
resistant.<br />
2.2 MATERIALS<br />
A. Aluminum: Alloy and temper recommended by manufacturer for type <strong>of</strong> use and finish<br />
indicated.<br />
1. Sheet and Plate: ASTM B209.<br />
2. Extruded Bars, Rods, Pr<strong>of</strong>iles, and Tubes: ASTM B 211.<br />
3. Extruded Structural Pipe and Tubes: ASTM B 429.<br />
4. Structural Pr<strong>of</strong>iles: ASTM B 308/B 308M.<br />
5. Welding Rods and Bare Electrodes: AWS A5.10/A5.10M.<br />
08412-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
IMPACT RESISTANT ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS<br />
B. Steel Reinforcement: Provide steel when required and as determined by wind loads<br />
and the architectural aluminum manufacturer as per their tested/approved specimens<br />
and drawings.<br />
2.3 FRAMING SYSTEMS<br />
A. Framing Members: Manufacturer’s standard extruded-aluminum framing members <strong>of</strong><br />
thickness required and reinforced as required to support imposed loads.<br />
B. Brackets and Reinforcements: Manufacturer’s standard high-strength aluminum with<br />
nonstaining, nonferrous shims for aligning system components.<br />
C. Fasteners and Accessories: Manufacturer’s standard corrosion-resistant, non-staining,<br />
nonbleeding fasteners and accessories compatible with adjacent materials.<br />
1. Where fasteners are subject to loosening or turning out from thermal and<br />
structural movements, wind loads, or vibration, use self-locking fasteners.<br />
2. Reinforce members as required to receive fastener threads.<br />
3. Do not use exposed fasteners, except for hardware application. For hardware<br />
application, use countersunk Phillips flat-head machine screws finished to match<br />
framing members or hardware being fastened, unless otherwise indicated.<br />
D. Concrete and Masonry Inserts: Hot-dip galvanized cast-iron, malleable-iron, or steel<br />
inserts complying with ASTM A 123 or ASTM A 153 requirements.<br />
E. Flashing: Manufacturer’s standard corrosion-resistant, nonstaining, nonbleeding<br />
flashing, compatible with adjacent materials. Form exposed flashing from sheet<br />
aluminum finished to match framing and <strong>of</strong> sufficient thickeness to maintain a flat<br />
appearance without visible deflection.<br />
F. Framing System Gaskets and Sealants: Manufacturer’s standard recommended by<br />
manufacturer for joint type.<br />
2.4 GLAZING SYSTEMS<br />
A. Glazing: Refer to Glazing Specification 8800.<br />
B. Glazing Gaskets: Manufacturer’s standard compression types, replaceable, molded or<br />
extruded, that maintain uniform pressure and <strong>water</strong>tight seal.<br />
C. Spacers and Setting Blocks: Manufacturer’s standard elastomeric types.<br />
D. Bond Breaker Tape: Manufacturer’s standard TFE-fluorocarbon or polyethelyne<br />
material to which sealants will not develop adhesion.<br />
E. Glazing Sealants: For structural-sealant-glazed systems, as recommended by<br />
manufacturer for joint type and as follows:<br />
1. Structural Sealant: ASTM C 1184, neutral-curing silicone formulation compatible<br />
with system components with which it comes in contact, specifically formulated<br />
and tested for use as structural sealant, and approved by structural-sealant<br />
manufacturer for use in aluminum-framed systems as indicated.<br />
08412-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
a. Color: Black.<br />
IMPACT RESISTANT ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS<br />
2. Weatherseal Sealant: ASTM C 920 for Type S, Grade NS, Class 25, Uses NT, G,<br />
A, and O; neutral-curing silicone formulation compatible with structural sealant<br />
and other system components with which it comes in contact; recommended by<br />
structural- and weatherseal-sealant and aluminum-framed system manufacturers<br />
for this use.Color: Matching structural sealant.<br />
2.5 DOORS<br />
A. Doors: Provide manufacturer’s standard glazed medium stile large missile impact door<br />
for manual swing operation. Equivalent to: Kawneer 350 IR Entrances; Medium stile, 3-<br />
1/2 inch vertical face dimension, 1-3/4 inch depth, Interior structural silicone glazed,<br />
High traffic / impact resistant.<br />
1. Door Construction: Doors shall have extruded tubular rail and stile members<br />
designed to meet specified performance requirements.<br />
2. Door Design: Medium stile large missile impact.<br />
3. Glazing Stops and Gaskets: Manufacturer’s standard stops and gaskets for<br />
assemblies designed to meet specified performance requirements. Exposed<br />
fasteners shall not be permitted on Exposed fasteners shall not be permitted on<br />
glass stops.<br />
2.6 HARDWARE<br />
A. General: Refer to Door Hardware specification 8711.<br />
B. Door Bottom Rail: Manufacturer's door bottom rail with an E.P.D.M. blade gasket<br />
sweep strip applied with concealed fasteners.<br />
C. Weatherstripping: Butt hung doors shall have weather-stripped door stops at frame<br />
jambs and header.<br />
2.7 ACCESSORY MATERIALS<br />
A. Joint Sealants: For installation at perimeter <strong>of</strong> aluminum-framed systems, as specified<br />
in Division 7 Section “Joint Sealants”.<br />
B. Bituminous Paint: Cold-applied asphaltic-mastic paint complying with SSPC-Paint 12<br />
requirements except containing no asbestos, formulated for 30-mil thickness per coat.<br />
2.8 FABRICATION<br />
A. Glazing contractor must install all components <strong>of</strong> the project’s storefront and entrances<br />
per the manufacturer’s installation instructions.<br />
B. Form aluminum shapes before finishing.<br />
C. Weld in concealed locations to greatest extent possible to minimize distortion or<br />
discoloration <strong>of</strong> finish. Remove weld spatter and welding oxides from exposed<br />
surfaces by descaling or grinding.<br />
08412-6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
IMPACT RESISTANT ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS<br />
D. Framing Members, General: Fabricate components that, when assembled, have the<br />
following characteristics:<br />
1. Pr<strong>of</strong>iles that are sharp, straight, and free <strong>of</strong> defects or deformations.<br />
2. Accurately fitted joints with ends coped or mitered.<br />
3. Means to drain <strong>water</strong> passing joints, condensation occurring within framing<br />
members, and moisture migrating within the system to exterior.<br />
4. Physical and thermal isolation <strong>of</strong> glazing from framing members.<br />
5. Accommodations for thermal and mechanical movements <strong>of</strong> glazing and framing<br />
to maintain required glazing edge clearances.<br />
6. Provisions for field replacement <strong>of</strong> glazing from exterior.<br />
7. Fasteners, anchors, and connection devices that are concealed from view to<br />
greatest extent possible.<br />
E. Mechanically Glazed Framing Members: Fabricate for flush glazing (without projecting<br />
stops).<br />
F. Structural-Sealant-Glazed Framing Members: <strong>Inc</strong>lude accommodations for using<br />
temporary support device (dutchman) to retain glazing in place while structural sealant<br />
cures.<br />
G. Storefront Framing: Fabricate components for assembly per manufacturer’s<br />
requirements to meet specified performance requirements.<br />
H. Door Frames: Reinforce as required to support loads imposed by door operation and<br />
for installing hardware.<br />
1. At exterior doors, provide compression weather stripping at fixed stops.<br />
I. Doors: Reinforce doors as required for installing hardware.<br />
1. At exterior doors, provide weather sweeps applied to door bottoms.<br />
J. Hardware Installation: Factory install hardware to the greatest extent possible. Cut,<br />
drill, and tap for factory-installed hardware before applying finishes. After fabrication,<br />
clearly mark components to identify their locations in Project according to Shop<br />
Drawings.<br />
K. After fabrication, clearly mark components to identify their locations in Project<br />
according to Shop Drawings.<br />
2.9 ALUMINUM FINISHES<br />
A. General: Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal<br />
Products" for recommendations relative to applying and designating finishes.<br />
B. Appearance <strong>of</strong> Finished Work: Variations in appearance <strong>of</strong> abutting or adjacent pieces<br />
are acceptable if they are within one-half <strong>of</strong> the range <strong>of</strong> approved Samples.<br />
Noticeable variations in the same piece are not acceptable. Variations in appearance<br />
<strong>of</strong> other components are acceptable if they are within the range <strong>of</strong> approved Samples<br />
and are assembled or installed to minimize contrast.<br />
08412-7<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
IMPACT RESISTANT ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS<br />
C. Finish designations prefixed by AA conform to the system established by the Aluminum<br />
Association for designating aluminum finishes.<br />
D. Clear Anodic Finish: Class II, clear anodic coating complying with AAMA 611.<br />
PART 3 - EXECUTION<br />
3.1 EXAMINATION<br />
A. Examine areas, with Installer present, for compliance with requirements for installation<br />
tolerances and other conditions affecting performance <strong>of</strong> entrance and storefront<br />
systems. Do not proceed with installation until unsatisfactory conditions have been<br />
corrected.<br />
3.2 INSTALLATION<br />
A. General:<br />
1. Install all components <strong>of</strong> large missile impact storefront and entrance systems<br />
per manufacturer’s installation instructions and impact resistant test criteria.<br />
2. Do not install damaged components.<br />
3. Fit joints to produce hairline joints free <strong>of</strong> burrs and distortion.<br />
4. Rigidly secure nonmovement joints.<br />
5. Install anchors with separators and isolators to prevent metal corrosion and<br />
electrolytic deterioration.<br />
6. Seal joints <strong>water</strong>tight, unless otherwise indicated.<br />
B. Metal Protection:<br />
1. Where aluminum will contact dissimilar metals, protect against galvanic action by<br />
painting contact surfaces with primer or by applying sealant or tape or installing<br />
nonconductive spacers as recommended by manufacturer for this purpose.<br />
2. Where aluminum will contact concrete or masonry, protect against corrosion by<br />
painting contact surfaces with bituminous paint.<br />
C. Install components to drain <strong>water</strong> passing joints, condensation occurring within framing<br />
members, and moisture migrating within the system to exterior.<br />
D. Set continuous sill members and flashing in full sealant bed as specified in Division 7<br />
Section "Joint Sealants" and to produce weathertight installation.<br />
E. Install components plumb and true in alignment with established lines and grades,<br />
without warp or rack.<br />
F. Install glazing per manufacturer’s requirements to meet the specified performance<br />
requirements.<br />
1. Structural-Sealant Glazing:<br />
08412-8<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
IMPACT RESISTANT ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS<br />
a. Prepare surfaces that will contact structural sealant according to sealant<br />
manufacturer's written instructions to ensure compatibility and adhesion.<br />
Preparation includes, but is not limited to, cleaning and priming surfaces.<br />
b. Install weatherseal sealant according to sealant manufacturer's written<br />
instructions to produce weatherpro<strong>of</strong> joints. Install joint filler behind sealant<br />
as recommended by sealant manufacturer.<br />
G. Entrances: Install to produce smooth operation and tight fit at contact points.<br />
1. Exterior Entrances: Install to produce tight fit at weather stripping and<br />
weathertight closure.<br />
2. Field-Installed Hardware: Install surface-mounted hardware according to<br />
hardware manufacturers' written instructions using concealed fasteners to<br />
greatest extent possible.<br />
H. Install perimeter joint sealants as specified in Division 7 Section "Joint Sealants" and to<br />
produce weathertight installation.<br />
I. Erection Tolerances: Install aluminum-framed systems to comply with the following<br />
maximum tolerances:<br />
1. Location and Plane: Limit variation from true location and plane to 1/8 inch in 12<br />
feet, 3 mm in 3.7 m; 1/4 inch over total length.<br />
2. Alignment:<br />
a. Where surfaces abut in line, limit <strong>of</strong>fset from true alignment to 1/16 inch1.5<br />
mm.<br />
b. Where surfaces meet at corners, limit <strong>of</strong>fset from true alignment to 1/32<br />
inch0.8 mm.<br />
3. Diagonal Measurements: Limit difference between diagonal measurement to 1/8<br />
inch3 mm.<br />
3.3 ADJUSTING<br />
A. Entrances: Adjust operating hardware for smooth operation according to hardware<br />
manufacturers' written instructions.<br />
1. For doors accessible to people with disabilities, adjust closers to provide a<br />
3-second closer sweep period for doors to move from a 70-degree open position<br />
to 3 inches from the latch measured to the leading door edge.<br />
3.4 CLEANING<br />
A. Clean the completed system, inside and out, promptly after installation, exercising care<br />
to avoid damage to coatings.<br />
B. Clean glass surfaces after installation, complying with requirements contained in the<br />
"Glass and Glazing" Section for cleaning and maintenance. Remove excess glazing<br />
and sealant compounds, dirt and other substances from aluminum surfaces.<br />
3.5 PROTECTION<br />
08412-9<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
IMPACT RESISTANT ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS<br />
A. Institute protective measures required throughout the remainder <strong>of</strong> the construction<br />
period to ensure that aluminum entrances and storefronts will be without damage or<br />
deterioration, other than normal weathering, at time <strong>of</strong> acceptance.<br />
END OF SECTION 08411<br />
08412-10<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 08710<br />
DOOR HARDWARE<br />
PART 1 - GENERAL<br />
1.1 WORK INCLUDES:<br />
A. Finish Hardware<br />
Aluminum Door Hardware<br />
Thresholds<br />
Weather-stripping<br />
1.2 RELATED WORK<br />
A. Steel Doors and Frames Section 08100<br />
Flush Wood Doors Section 08210<br />
Aluminum Storefront Doors Section 08400<br />
1.3 QUALITY ASSURANCE<br />
A. STANDARDS: Manufacturers and model numbers listed are to establish<br />
a standard <strong>of</strong> quality. Similar items by approved manufacturers, unless<br />
otherwise noted, that are equal in design, finish and quality will be<br />
accepted upon prior approval <strong>of</strong> the architect and provided required data<br />
and physical samples are submitted at least ten (10) days prior to date <strong>of</strong><br />
bid. Products listed as “No Substitute” are specified as such to match<br />
existing or by the Owners request.<br />
B. SUPPLIER QUALIFICATIONS: Hardware supplier must be engaged<br />
regularly in contracting work and be staffed to expedite work, the firm<br />
shall have been furnishing hardware on similar projects for not less than<br />
five years. The supplier must have in his employ a certified Architectural<br />
Hardware Consultant (AHC) to periodically inspect and direct detailing,<br />
setting, applying <strong>of</strong> all hardware items.<br />
C. INSTALLER QUALIFICATIONS: Hardware for the project shall be<br />
installed by factory authorized personnel who have successfully<br />
completed factory training courses and shall be certified for the<br />
installation <strong>of</strong> locksets, door closers and exit devices. Prior to installation,<br />
the installer shall inspect all door frames for proper plum and square<br />
condition. General Contractor shall be notified <strong>of</strong> frames found out <strong>of</strong><br />
square, plum or unsuitable for door installation at the installation meeting.<br />
D. PREINSTALLATION CONFERENCE FOR MECHANICAL HARDWARE:<br />
08710 - 1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
Conduct conference at Project site to comply with requirements in<br />
Division 1 Section “Project Meeting.” Review methods and procedures<br />
related to mechanical door hardware, including but not limited to the<br />
following:<br />
1. Review and finalize construction schedule and verify availability <strong>of</strong><br />
materials, installer’s personnel, equipment and facilities needed to make<br />
progress an avoid delays.<br />
2. Present General Contractor with a written report <strong>of</strong> the condition <strong>of</strong><br />
door frames in terms <strong>of</strong> squareness and any other condition that may<br />
impede the installation and operation <strong>of</strong> the doors and hardware.<br />
3. Review installer’s responsibilities for testing, inspecting and adjusting<br />
doors and hardware in accordance with 08710 Part 3 EXECUTION.<br />
1.4 REFERENCES<br />
A. ANSI/BHMA designations where used in schedules to describe hardware<br />
items or to define quality or function are derived from the following<br />
standards and requirements specified elsewhere in this section.<br />
1. Butts and Hinges: ANSI A156.1 (BHMA 101)<br />
2. Locks and Lock Trim: ANSI A156.2 (BHMA 601)<br />
3. Exit Devices: ANSI A156.3 (BHMA 701)<br />
4. Door Controls: Closers: ANSI A156.4 (BHMA 301)<br />
5. Auxiliary Locks: ANSI A156.5 (BHMA 501)<br />
6. Architectural Door Trim: ANSI A156.6 (BHMA 1001)<br />
7. Template Hinge Dimensions: ANSI A156.7<br />
8. Door Controls: Overhead Holders: ANSI A156.8 (BHMA 311)<br />
9. Interconnected Locks & Latches: ANSI A156.12 (BHMA 311)<br />
10. Mortise Locks & Latches: ANSI A156.14 (BHMA 401)<br />
11. Sliding & Folding Door Hardware: ANSI A156.14 (BHMA 401)<br />
12. Closer Holder Release Devices: ANSI A156.16(BHMA 1201)<br />
13. Self Closing Hinges & Pivots: ANSI A156.17(BHMA 1101)<br />
14. Materials and Finishes: ANSI A156.18(BHMA 1301)<br />
1.5 SUBMITTALS<br />
A. GENERAL REQUIREMENTS: Submit manufacturer’s product data for<br />
each item <strong>of</strong> hardware. <strong>Inc</strong>lude whatever information may be necessary<br />
to show compliance with requirements, and instructions for installation<br />
and maintenance <strong>of</strong> operating parts and exposed finishes.<br />
B. SCHEDULES: Submit six (6) copies <strong>of</strong> the finish hardware schedule for<br />
approval. Schedule format shall be similar to the one included at the end<br />
<strong>of</strong> Part 3 <strong>of</strong> this section.<br />
C. TEMPLATES: Whenever required, furnish templates to the necessary<br />
08710 - 2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
fabricators <strong>of</strong> other related work, which is to receive finish hardware, such<br />
as door and steel door frames and or aluminum doors and frames.<br />
E. CATALOG CUTS: Submit six (6) copies <strong>of</strong> catalog cuts <strong>of</strong> all products<br />
listed in the finish hardware schedule.<br />
F. KEYING SCHEDULE: The specific keying requirements should be noted<br />
elsewhere in this schedule. If these requirements are not noted then, it is<br />
the supplier’s responsibility to submit a keying schedule based on the<br />
format listed in the DHI annual Keying Procedures, Systems and<br />
Nomenclature.<br />
1.6 DELIVERY STORAGE AND HANDLING<br />
A. MARKING & PACKAGING: Hardware should be required to be sent to<br />
the job site in the manufacturers original packages marked to correspond<br />
with the approved hardware schedule.<br />
B. Some items <strong>of</strong> hardware may have to be delivered to fabricators for<br />
factory installation. (i.e.: Aluminum Storefront).<br />
C. Storage and protection <strong>of</strong> the materials is the responsibility <strong>of</strong> the General<br />
Contractor. Proper storage methods are advised as protection <strong>of</strong> the<br />
material and finish as necessary.<br />
1.7 WARRANTIES<br />
A. All door closers shall have a ten (10) year warranty against defects in<br />
material and workmanship from the date <strong>of</strong> occupancy <strong>of</strong> the project.<br />
B. Exit hardware shall be warranted for a period <strong>of</strong> three (3) years against<br />
defects material and workmanship.<br />
C. All other products shall have a one (1) year warranty against defects in the<br />
material and workmanship from the date <strong>of</strong> occupancy <strong>of</strong> the project.<br />
PART 2 - PRODUCTS<br />
2.1 ACCEPTABLE PRODUCTS<br />
A. The following is a list <strong>of</strong> acceptable products:<br />
Products: Specified Manufacturers: Acceptable Manufacturers:<br />
HINGES MCKINNEY HAGER, LAWERENCE<br />
PIVOTS RIXON LCN<br />
08710 - 3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
FLUSH BOLTS ROCKWOOD HAGER, TRIMCO<br />
EXIT DEVICES CORBIN-RUSSWIN YALE, SARGENT<br />
CYLINDERS CORBIN-RUSSWIN YALE, SARGENT<br />
LOCKS CORBIN-RUSSWIN YALE, SARGENT<br />
ELECTRIC STRIKES FOLGER ADAM NO SUBSTITUTE<br />
POWER SUPPLIES SECURITRON FOLGER ADAM<br />
MAGNETIC LOCKS SECURITRON FOLGER ADAM<br />
PUSH-PULLS ROCKWOOD McKINNEY, TRIMCO<br />
DOOR CLOSERS YALE NORTON<br />
KICK PLATES ROCKWOOD McKINNEY, TRIMCO<br />
DOOR STOPS ROCKWOOD McKINNEY, TRIMCO<br />
THRESHOLDS PEMKO NAT. GUARD, McKINNEY<br />
W / S SETS PEMKO NAT. GUARD, McKINNEY<br />
DOOR BOTTOMS PEMKO NAT. GUARD, McKINNEY<br />
B. To the greatest extent possible, obtain materials from one manufacturer.<br />
Manufacturers listed above are intended to insure quality and design <strong>of</strong><br />
the project. Other manufacturers submitted will be acceptable, provided<br />
they are equal or exceed standard <strong>of</strong> quality proposed for this project.<br />
2.2 MATERIALS<br />
A. SCREWS & FASTENERS: All screws and fasteners required for the<br />
hardware items are listed in the individual hardware sets. Any omission<br />
<strong>of</strong> these items should be reflected in the schedule submitted for approval.<br />
B. HINGES: Where hinges are specified unless otherwise noted they shall<br />
be <strong>of</strong> types and sizes as required by ANSI A156.1. SIZE HINGES<br />
ACCORDING TO MANUFACTURERS RECOMMENDATIONS. Provide<br />
stainless steel continuous hinges as listed in the hardware sets.<br />
C. PIVOTS: All pivots and/or pivot sets shall be the product <strong>of</strong> one (1)<br />
manufacturer. Sets as noted in the hardware groups shall be matching in<br />
design for aluminum storefront doors. The doors as noted in the<br />
hardware sets are to have intermediate pivots as well as top pivots. All<br />
pivot sets are required to meet ANSI Grade One standards as standard<br />
listed in ANSI A156.4, 1980.<br />
D. FLUSH BOLTS: Provide annual and automatic flush bolts as noted in the<br />
hardware sets. All flush bolts are required to meet ANSI A156.3.<br />
E. COORDINATOR & CARRY BARS: Provide coordinator and carry bars as<br />
noted in the hardware sets. Coordinators and carry bars are required to<br />
meet ANSI A156.2 TYPE 21.<br />
F. LOCKSETS & CYLINDERS: Provide lock sets and cylinders as noted in<br />
08710 - 4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
hardware sets. Lock sets shall meet ANSI A156.13, Grade One<br />
operational, Grade Two security, UL listed. Lock cases shall be field<br />
reversible without disassembly <strong>of</strong> lock case. Cylinders shall be 7 pin.<br />
G. LOCK TRIM: The design criteria selected for the lock set is as noted in<br />
the hardware sets. This is the acceptable design selected by the owner<br />
and intended for this project.<br />
H. EXIT DEVICES: Provide the series and type <strong>of</strong> exit devices as noted in<br />
the hardware sets. These exit devices are required to meet ANSI A156.3<br />
Grade One. All exit devices shall be <strong>of</strong> one manufacturer.<br />
I. DOOR CLOSERS: Provide the series and type <strong>of</strong> door closers as noted<br />
in the hardware sets. These door closers are required to meet ANSI<br />
A156.4 Grade One. All closers and power actuated closers shall be <strong>of</strong><br />
one manufacturer. Plated finish door closers shall have plated arms and<br />
brackets. Painted finish door closers shall be powder coated.<br />
J. PUSH, PULL & KICK PLATE: Provide the type and size <strong>of</strong> these plates<br />
as noted in the hardware sets. These items are intended for the use and<br />
accessibility as protection <strong>of</strong> the openings indicated in the hardware<br />
schedule.<br />
K. DOOR STOPS & HOLDERS: Provide the types as noted in the hardware<br />
sets. Any variation in the job site conditions could change the type as<br />
specified. This should be reflected in the schedule submitted for<br />
approval. Install all floor stops so as not to interfere with pedestrian or cart<br />
traffic. Floor stops shall be installed within 12 inches <strong>of</strong> the pivot point <strong>of</strong><br />
the door and frame assembly.<br />
L. THRESHOLD & WEATHER-STRIPPING: Provide the types as noted in<br />
the hardware sets. All exterior openings and interior fire rated openings<br />
shall have the necessary items to meet the local building code standards.<br />
Provide stainless steel screws at all locations.<br />
M. SILENCERS: Provide the type required to accommodate the hollow<br />
metal frames and wood frames fabricated for the project.<br />
2.3 FINISHES<br />
A. Provide the finishes as specified in the hardware schedule. Otherwise,<br />
provide matching finishes for the hardware items at each door opening to<br />
the greatest extent possible. Refer to the ANSI A156.18 for the<br />
identification <strong>of</strong> these finishes.<br />
08710 - 5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
2.4 KEYING<br />
A. Establish a new 7 pin removable core grand master key system at the<br />
direction <strong>of</strong> the Architect. Cylinders shall be restricted for use within a 150<br />
mile radius <strong>of</strong> the project. Provide temporary master keyed construction<br />
for use during construction. Coordinate replacement <strong>of</strong> construction cores<br />
with the designated representative <strong>of</strong> The City <strong>of</strong> LaBelle, Florida.<br />
B. Review with the Architect and/or owner all keying requirements. Submit<br />
key schedule in DHI written format for approval by the Architect and the<br />
Owner prior to factory order.<br />
C. Each key shall be marked and identified as directed by the Owner using<br />
the mechanical impact method <strong>of</strong> transferring the numerical impression to<br />
the key bow. Characters shall be consistent and uniform in their<br />
placement, alignment and depth <strong>of</strong> impression. Mark each key “DO NOT<br />
DUPLICATE”.<br />
D. Provide 3 factory cut change keys per lock, 2 master keys per group, 10<br />
pre-combinated cores and 10 key blanks. All factory cut and blank keys<br />
shall be restricted for use in the geographic area and be <strong>of</strong> nickel silver.<br />
Ship all permanent factory cut keys, key blanks and cylinders direct via<br />
registered US Mail to: the designated owners representative <strong>of</strong>: The City<br />
<strong>of</strong> LaBelle, Florida.<br />
2.5 KEY CONTROL<br />
A. KEY CABINET: Provide a key control system including envelopes, labels<br />
tags, with self locking key clips, receipt forms, three-way visible card<br />
index, temporary markers and standard metal cabinet. Provide all <strong>of</strong> this<br />
material from one manufacturer and per that manufacturer’s system<br />
standard. Provide a system with the capa<strong>city</strong> for 150% <strong>of</strong> the number <strong>of</strong><br />
cylinders and lock sets required for the project.<br />
PART 3 - EXECUTION<br />
3.1 INSPECTION<br />
A. After installation has been completed, the hardware supplier shall have a<br />
qualified Architectural Hardware Consultant (AHC); check the job to<br />
determine the proper application <strong>of</strong> hardware according to the approved<br />
08710 - 6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
hardware schedule and keying schedule. AHC shall also check the<br />
operation and adjustment <strong>of</strong> all hardware items. AHC shall submit a<br />
written report <strong>of</strong> specification compliance to the Architect with the close<br />
out documents required in 08710.3.4.A.<br />
3.2 INSTALLATION<br />
A. Refer to the DHI manual publication for Recommended Locations for<br />
Builders Hardware, FLA ACCESSIBILITY CODE AND ADA<br />
REQUIREMENTS for instruction. Also, coordinate with the door suppliers<br />
for these locations. Install all hardware in compliance with manufacturer’s<br />
instruction and recommendations. Drill and countersink all items which<br />
are not factory prepared for fasteners. Cut and fit all thresholds and<br />
weather-stripping to pr<strong>of</strong>ile <strong>of</strong> door frames. Set threshold in accordance<br />
with the application condition.<br />
3.3 OPERATIONS, MAINTENANCE AND TRAINING<br />
A. At completion <strong>of</strong> the project, provide the owner with a manual containing<br />
the following information:<br />
1. Final (as built) copy <strong>of</strong> hardware schedule.<br />
2. Final copy <strong>of</strong> keying schedule.<br />
3. Copy <strong>of</strong> product data sheets as submitted including all Warranty<br />
data.<br />
4. Parts list for Locksets, Door Closers and Exit Devices.<br />
5. Copy <strong>of</strong> installation instructions for each type <strong>of</strong> hardware used.<br />
6. Name, address and phone number <strong>of</strong> each manufacturer and<br />
local representative.<br />
7. Complete set <strong>of</strong> any specialized tools.<br />
8. Complete set <strong>of</strong> manufacturer warranty information for each<br />
hardware type.<br />
9. Written AHC compliance report as described in 08710.3.1.A<br />
B. At the completion <strong>of</strong> the project the supplier shall engage a factory<br />
authorized service representative to train the Owner’s maintenance<br />
personnel to adjust, operate and maintain door hardware, and lock<br />
systems provided in this section.<br />
3.2 PROTECTION<br />
A. The general contractor is responsible for the proper protection <strong>of</strong> all items<br />
<strong>of</strong> hardware until final acceptance <strong>of</strong> the project by the owner and the<br />
08710 - 7<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HARDWARE SET 1<br />
DOOR: 100<br />
architect.<br />
3.3 HARDWARE SCHEDULE<br />
A. Hardware sets are as follows:<br />
3 ea HINGES T4A3386 4.5 X 4.5 NRP 630<br />
1 ea EXIT DEVICE ED5860B PR955 630<br />
1 ea CYLINDER 630<br />
1 ea CLOSER PR3501 689<br />
1 ea DOOR STOP 471 630<br />
NOTES<br />
1. BALANCE OF HARDWARE BY DOOR SUPPLIER.<br />
HARDWARE SET 2<br />
DOOR: 101<br />
4 ea HINGES T4A3786 4.5 X 4.5 630<br />
1 ea LOCK ML 2055 LC PSA 630<br />
1 ea CYLINDER 630<br />
1 ea CLOSER 3501 / PR3501 689<br />
1ea KICK PLATE K1050 8 X 2 LDW 630<br />
1 ea DOOR STOP 441CU 630<br />
Notes:<br />
1. SUPPLY AND INSTALL CLOSER ON NON PUBLIC SIDE OF DOOR.<br />
HARDWARE SET 3<br />
DOORS: 102, 103, 107A<br />
4 ea HINGES TA2714 4.5 X 4.5 630<br />
1 ea LOCK ML 2055 LC PSA 630<br />
1 ea CYLINDER 630<br />
1 ea DOOR STOP 441CU 630<br />
Notes:<br />
1. COORDINATE WOOD DOOR HARDWARE WITH ALUMINUM STOREFRONT FRAMING.<br />
HARDWARE SET 4<br />
DOORS: 104, 105, 106<br />
4 ea HINGES T4A3386 4.5 X 4.5 630<br />
1 ea LOCK ML 2057 LC PSA 630<br />
1 ea CYLINDER 630<br />
1 ea CLOSER 3501 689<br />
1 ea KICK PLATE K1050 B4E 8 X 2 LDW 630<br />
1 ea DOOR STOP 441CU 630<br />
HARDWARE SET 5<br />
DOOR: 107B<br />
08710 - 8<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
4 ea HINGES T4A3786 4.5 X 4.5 630<br />
1 ea LOCK ML 2055 LC PSA 630<br />
1 ea CYLINDER 630<br />
1 ea CLOSER 3501 / PR3501 689<br />
2ea KICK PLATE K1050 18” X 2 LDW 630<br />
1 ea DOOR STOP 441CU 630<br />
1 ea W/S SET 315 CN LAR AL<br />
1 ea DOOR BOTTOMS 303 AS LAR AL<br />
1 ea THRESHOLD 2001AV LAR AL<br />
Notes:<br />
1. SUPPLY AND INSTALL CLOSER ON NON PUBLIC SIDE OF DOOR.<br />
HARDWARE SET 6<br />
DOORS: 108, 109<br />
3 ea HINGES T4A3386 4.5 X 4.5 630<br />
1 ea LOCKSET ML2020 PSA 630<br />
1 ea CLOSER PR3521 689<br />
1 ea KICK PLATE K1050 B4E 8 X 2 LDW 630<br />
1 ea MOP PLATE K1050 B4E 4 X 2 LDW 630<br />
HARDWARE SET 7<br />
DOORS:111A, 112A<br />
8 ea HINGES T4A3386 5 X 4.5 NRP 630<br />
1 ea LOCKSET ML 2057 LC PSA 630<br />
1 ea CYLINDER 630<br />
1 ea FLUSHBOLT 1845 630<br />
2 ea CLOSER PR3501 689<br />
4 ea KICK PLATE K1050 B4E 8 X 2 LDW 630<br />
1 ea THRESHOLD 171A LAR AL<br />
2 ea DOOR BOTTOMS 430CRL LAR AL<br />
1 ea W/S SET 303 AS LAR AL<br />
2 ea DOOR STOP 471 630<br />
HARDWARE SET 8<br />
DOORS: 111B, 113A, 113B<br />
4 ea HINGES T4A3386 4.5 X 4.5 NRP 630<br />
1 ea EXIT DEVICE ED5200S PR955 630<br />
1 ea CYLINDER 630<br />
1 ea CLOSER PR3501 689<br />
1 ea KICK PLATE K1050 B4E 8 X 2 LDW 630<br />
1 ea THRESHOLD 2001 AV LAR AL<br />
1 ea DOOR BOTTOM 315 CN LAR AL<br />
1 ea W/S SET 303 AS LAR AL<br />
1 ea DOOR STOP 471 630<br />
HARDWARE SET 9<br />
DOOR: 112B<br />
8 ea HINGES T4A3386 5 X 4.5 NRP 630<br />
2 ea EXIT DEVICE ED 5470A PR955 630<br />
2 ea CYLINDER<br />
2 ea CLOSER PR3521 689<br />
2 ea KICK PLATE K1050 B4E 8 X 2 LDW 630<br />
08710 - 9<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
2 ea MOP PLATE K1050 B4E 4 X 2 LDW 630<br />
1 ea THRESHOLD 2001AV LAR AL<br />
1 ea W/S SET 303 AS LAR AL<br />
2 ea DOOR BOTTOM 315 CN LAR AL<br />
2 ea DOOR STOP 471 630<br />
HARDWARE SET 10<br />
DOORS: 113 C, D, E<br />
1 ea CYLINDER<br />
Notes:<br />
1. COORI<strong>DN</strong>ATE CYLINDER WITH COILING OVERHEAD DOORS.<br />
END OF SECTION 08710<br />
08710 - 10<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 08800<br />
GLAZING<br />
PART 1 - GENERAL<br />
1.1 SUMMARY<br />
A. Section includes glazing for the following products and applications, including those<br />
specified in other Sections where glazing requirements are specified by reference to<br />
this Section:<br />
1. Windows.<br />
2. Storefront framing.<br />
3. Glazed entrances.<br />
4. Interior borrowed lites.<br />
1.2 PERFORMANCE REQUIREMENTS<br />
A. Delegated Design: Design glass, including comprehensive engineering analysis<br />
according to the Florida Building Code Current Edition by a qualified pr<strong>of</strong>essional<br />
engineer, using the following design criteria:<br />
1. Design Wind Pressures: As indicated on Drawings.<br />
2. Vertical Glazing: For glass surfaces sloped 15 degrees or less from vertical,<br />
design glass to resist design wind pressure based on glass type factors for shortduration<br />
load.<br />
3. Differential Shading: Design glass to resist thermal stresses induced by<br />
differential shading within individual glass lites.<br />
1.3 PRECONSTRUCTION TESTING<br />
A. Preconstruction Adhesion and Compatibility Testing: Test each glazing material type,<br />
tape sealant, gasket, glazing accessory, and glass-framing member for adhesion to<br />
and compatibility with elastomeric glazing sealants.<br />
1. Testing will not be required if data are submitted based on previous testing <strong>of</strong><br />
current sealant products and glazing materials matching those submitted.<br />
1.4 SUBMITTALS<br />
A. Product Data: For each glass product and glazing material indicated.<br />
B. LEED Submittals:<br />
1. Product Data for Credit EQ 4.1: For glazing sealants used inside <strong>of</strong> the<br />
weatherpro<strong>of</strong>ing system, including printed statement <strong>of</strong> VOC content.<br />
08800-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
GLAZING<br />
C. Glass Samples: For each type <strong>of</strong> glass product other than clear monolithic vision<br />
glass; 12 inches (300 mm) square.<br />
D. Glazing Schedule: List glass types and thicknesses for each size opening and<br />
location. Use same designations indicated on Drawings.<br />
E. Delegated-Design Submittal: For glass indicated to comply with performance<br />
requirements and design criteria, including analysis data signed and sealed by the<br />
qualified pr<strong>of</strong>essional engineer responsible for their preparation.<br />
F. Preconstruction adhesion and compatibility test report.<br />
1.5 QUALITY ASSURANCE<br />
A. Glazing Publications: Comply with published recommendations <strong>of</strong> glass product<br />
manufacturers and organizations below, unless more stringent requirements are<br />
indicated. Refer to these publications for glazing terms not otherwise defined in this<br />
Section or in referenced standards.<br />
1. GANA Publications: GANA's "Laminated Glazing Reference Manual"<br />
and GANA's "Glazing Manual."<br />
2. IGMA Publication for Insulating Glass: SIGMA TM-3000, "North American<br />
Glazing Guidelines for Sealed Insulating Glass Units for Commercial and<br />
Residential Use."<br />
B. Safety Glazing Labeling: Where safety glazing labeling is indicated, permanently mark<br />
glazing with certification label <strong>of</strong> the SGCC or another certification agency acceptable<br />
to authorities having jurisdiction or the manufacturer. Label shall indicate<br />
manufacturer's name, type <strong>of</strong> glass, thickness, and safety glazing standard with which<br />
glass complies.<br />
C. Insulating-Glass Certification Program: Permanently marked either on spacers or on at<br />
least one component lite <strong>of</strong> units with appropriate certification label <strong>of</strong> IGCC.<br />
1.6 WARRANTY<br />
A. Manufacturer's Special Warranty for Coated-Glass Products: Manufacturer's standard<br />
form in which coated-glass manufacturer agrees to replace coated-glass units that<br />
deteriorate within specified warranty period. Deterioration <strong>of</strong> coated glass is defined as<br />
defects developed from normal use that are not attributed to glass breakage or to<br />
maintaining and cleaning coated glass contrary to manufacturer's written instructions.<br />
Defects include peeling, cracking, and other indications <strong>of</strong> deterioration in coating.<br />
1. Warranty Period: 10 years from date <strong>of</strong> Substantial Completion.<br />
B. Manufacturer's Special Warranty on Laminated Glass: Manufacturer's standard form in<br />
which laminated-glass manufacturer agrees to replace laminated-glass units that<br />
deteriorate within specified warranty period. Deterioration <strong>of</strong> laminated glass is defined<br />
as defects developed from normal use that are not attributed to glass breakage or to<br />
maintaining and cleaning laminated glass contrary to manufacturer's written<br />
instructions. Defects include edge separation, delamination materially obstructing<br />
08800-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
GLAZING<br />
vision through glass, and blemishes exceeding those allowed by referenced laminatedglass<br />
standard.<br />
1. Warranty Period: Five years from date <strong>of</strong> Substantial Completion.<br />
C. Manufacturer's Special Warranty on Insulating Glass: Manufacturer's standard form in<br />
which insulating-glass manufacturer agrees to replace insulating-glass units that<br />
deteriorate within specified warranty period. Deterioration <strong>of</strong> insulating glass is defined<br />
as failure <strong>of</strong> hermetic seal under normal use that is not attributed to glass breakage or<br />
to maintaining and cleaning insulating glass contrary to manufacturer's written<br />
instructions. Evidence <strong>of</strong> failure is the obstruction <strong>of</strong> vision by dust, moisture, or film on<br />
interior surfaces <strong>of</strong> glass.<br />
1. Warranty Period: 10 years from date <strong>of</strong> Substantial Completion.<br />
PART 2 - PRODUCTS<br />
2.1 GLASS PRODUCTS, GENERAL<br />
A. Thickness: Where glass thickness is indicated, it is a minimum. Provide glass lites in<br />
thicknesses as needed to comply with requirements indicated.<br />
B. Strength: Where float glass is indicated, provide annealed float glass, Kind HS heattreated<br />
float glass, or Kind FT heat-treated float glass as needed to comply with<br />
"Performance Requirements" Article. Where heat-strengthened glass is indicated,<br />
provide Kind HS heat-treated float glass or Kind FT heat-treated float glass as needed<br />
to comply with "Performance Requirements" Article. Where fully tempered glass is<br />
indicated, provide Kind FT heat-treated float glass.<br />
C. Windborne-Debris-Impact Resistance: Provide exterior glazing that passes enhancedprotection<br />
testing requirements <strong>of</strong> SSTD 12, ASTM E 1886 and ASTM E1996,<br />
ANSI/DASMA 115 (for garage doors and rolling doors) or Miami-Dade TAS 201, 202<br />
and 203 or AAMA 506.<br />
Test specimens shall be no smaller in width and length than glazing indicated for use on the<br />
Project and shall be installed in same manner as glazing indicated for use on the Project.<br />
1. Large-Missile Test: For all glazing, regardless <strong>of</strong> height above grade.<br />
D. Thermal and Optical Performance Properties: Provide glass with performance<br />
properties specified, as indicated in manufacturer's published test data, based on<br />
procedures indicated below:<br />
1. U-Factors: Center-<strong>of</strong>-glazing values, according to NFRC 100 and based on<br />
LBL's WINDOW 5.2 computer program, expressed as Btu/sq. ft. x h x deg F<br />
(W/sq. m x K).<br />
2. Solar Heat-Gain Coefficient and Visible Transmittance: Center-<strong>of</strong>-glazing values,<br />
according to NFRC 200 and based on LBL's WINDOW 5.2 computer program.<br />
3. Visible Reflectance: Center-<strong>of</strong>-glazing values, according to NFRC 300.<br />
08800-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
GLAZING<br />
2.2 GLASS PRODUCTS<br />
A. Float Glass: ASTM C 1036, Type I, Quality-Q3, Class I (clear) unless otherwise<br />
indicated.<br />
B. Heat-Treated Float Glass: ASTM C 1048; Type I; Quality-Q3; Class I (clear) unless<br />
otherwise indicated; <strong>of</strong> kind and condition indicated.<br />
2.3 LAMINATED GLASS<br />
A. Windborne-Debris-Impact-Resistant Laminated Glass: ASTM C 1172, and complying<br />
with testing requirements in 16 CFR 1201 for Category II materials, with "Windborne-<br />
Debris-Impact Resistance" Paragraph in "Glass Products, General" Article, and with<br />
other requirements specified. Use materials that have a proven record <strong>of</strong> no tendency<br />
to bubble, discolor, or lose physical and mechanical properties after fabrication and<br />
installation.<br />
1. Construction: Laminate glass with the following to comply with interlayer<br />
manufacturer's written recommendations:<br />
a. Polyvinyl butyral interlayer.<br />
2. Interlayer Thickness: Provide thickness not less than that indicated and as<br />
needed to comply with requirements.<br />
3. Interlayer Color: Clear unless otherwise indicated.<br />
2.4 INSULATING GLASS<br />
A. Insulating-Glass Units: Factory-assembled units consisting <strong>of</strong> sealed lites <strong>of</strong> glass<br />
separated by a dehydrated interspace, qualified according to ASTM E 2190, and<br />
complying with other requirements specified.<br />
1. Sealing System: Dual seal.<br />
2. Spacer: Manufacturer's standard spacer material and construction.<br />
2.5 GLAZING GASKETS<br />
A. Dense Compression Gaskets: Molded or extruded gaskets <strong>of</strong> pr<strong>of</strong>ile and hardness<br />
required to maintain <strong>water</strong>tight seal, made from one <strong>of</strong> the following:<br />
1. Neoprene complying with ASTM C 864.<br />
2. EPDM complying with ASTM C 864.<br />
3. Silicone complying with ASTM C 1115.<br />
4. Thermoplastic polyolefin rubber complying with ASTM C 1115.<br />
B. S<strong>of</strong>t Compression Gaskets: Extruded or molded, closed-cell, integral-skinned<br />
neoprene, EPDM, silicone or thermoplastic polyolefin rubber gaskets complying with<br />
ASTM C 509, Type II, black; <strong>of</strong> pr<strong>of</strong>ile and hardness required to maintain <strong>water</strong>tight<br />
seal.<br />
08800-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
GLAZING<br />
1. Application: Use where s<strong>of</strong>t compression gaskets will be compressed by<br />
inserting dense compression gaskets on opposite side <strong>of</strong> glazing or pressure<br />
applied by means <strong>of</strong> pressure-glazing stops on opposite side <strong>of</strong> glazing.<br />
2.6 GLAZING SEALANTS<br />
A. General:<br />
1. Compatibility: Provide glazing sealants that are compatible with one another and<br />
with other materials they will contact, including glass products, seals <strong>of</strong><br />
insulating-glass units, and glazing channel substrates, under conditions <strong>of</strong><br />
service and application, as demonstrated by sealant manufacturer based on<br />
testing and field experience.<br />
2. Suitability: Comply with sealant and glass manufacturers' written instructions for<br />
selecting glazing sealants suitable for applications indicated and for conditions<br />
existing at time <strong>of</strong> installation.<br />
3. VOC Content: For sealants used inside <strong>of</strong> the weatherpro<strong>of</strong>ing system, not more<br />
than 250 g/L when calculated according to 40 CFR 59, Subpart D.<br />
4. Colors <strong>of</strong> Exposed Glazing Sealants: As indicated by manufacturer's<br />
designations.<br />
B. Glazing Sealant: Neutral-curing silicone glazing sealant complying with ASTM C 920,<br />
Type S, Grade NS, Class as recommended by the manufacturer for the specific<br />
application.<br />
2.7 GLAZING TAPES<br />
A. Back-Bedding Mastic Glazing Tapes: Preformed, butyl-based, 100 percent solids<br />
elastomeric tape; nonstaining and nonmigrating in contact with nonporous surfaces;<br />
with or without spacer rod as recommended in writing by tape and glass manufacturers<br />
for application indicated; and complying with ASTM C 1281 and AAMA 800 for<br />
products indicated below:<br />
1. AAMA 804.3 tape, where indicated.<br />
2. AAMA 806.3 tape, for glazing applications in which tape is subject to continuous<br />
pressure.<br />
3. AAMA 807.3 tape, for glazing applications in which tape is not subject to<br />
continuous pressure.<br />
B. Expanded Cellular Glazing Tapes: Closed-cell, PVC foam tapes; factory coated with<br />
adhesive on both surfaces; and complying with AAMA 800 for the following types:<br />
1. AAMA 810.1, Type 1, for glazing applications in which tape acts as the primary<br />
sealant.<br />
2. AAMA 810.1, Type 2, for glazing applications in which tape is used in<br />
combination with a full bead <strong>of</strong> liquid sealant.<br />
2.8 MISCELLANEOUS GLAZING MATERIALS<br />
A. Cleaners, Primers, and Sealers: Types recommended by sealant or gasket<br />
manufacturer.<br />
08800-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
GLAZING<br />
B. Setting Blocks: Elastomeric material with a Shore, Type A durometer hardness <strong>of</strong> 85,<br />
plus or minus 5.<br />
C. Spacers: Elastomeric blocks or continuous extrusions <strong>of</strong> hardness required by glass<br />
manufacturer to maintain glass lites in place for installation indicated.<br />
D. Edge Blocks: Elastomeric material <strong>of</strong> hardness needed to limit glass lateral movement<br />
(side walking).<br />
E. Cylindrical Glazing Sealant Backing: ASTM C 1330, Type O (open-cell material), <strong>of</strong><br />
size and density to control glazing sealant depth and otherwise produce optimum<br />
glazing sealant performance.<br />
2.9 MONOLITHIC-GLASS TYPES – INTERIOR GLAZING<br />
A. Glass Type: Clear float glass or heat-strengthened float glass or fully tempered float<br />
glass.<br />
1. Thickness: 6.0 mm.<br />
2. Provide safety glazing labeling.<br />
2.10 INSULATING-LAMINATED-GLASS TYPES – EXTERIOR GLAZING<br />
A. Glass Type: Low-e-coated, clear insulating laminated glass.<br />
1. Overall Unit Thickness: 1-5/16 inch.<br />
2. Thickness <strong>of</strong> Outdoor Lite: 6.0 mm.<br />
3. Outdoor Lite: Heat-strengthened float glass.<br />
4. Interspace Content: Air.<br />
5. Indoor Lite: Clear laminated glass with two plies <strong>of</strong> heat-strengthened float glass.<br />
a. Thickness <strong>of</strong> Each Glass Ply: 6.0 mm.<br />
b. Interlayer Thickness: 0.090 inch (2.29 mm).<br />
6. Low-E Coating: Sputtered on second surface.<br />
7. Visible Light Transmittance: 62 percent minimum.<br />
8. Winter Nighttime U-Factor: .29 maximum.<br />
9. Summer Daytime U-Factor: .27 maximum.<br />
10. Solar Heat Gain Coefficient: .35 maximum.<br />
11. Visible Light Refelctance Out: 10 percent maximum.<br />
12. Provide safety glazing labeling.<br />
13. Product Basis-<strong>of</strong>-Design – AGC Flat Glass North America – Exterior Lite – 1/4”<br />
Clear Comfort Ti-AC36#2, 1/2” Airspace, Interior Lite – 1/4” Clear/.090” PVB/1/4”<br />
Clear.<br />
08800-6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
GLAZING<br />
PART 3 - EXECUTION<br />
3.1 GLAZING, GENERAL<br />
A. Comply with combined written instructions <strong>of</strong> manufacturers <strong>of</strong> glass, sealants,<br />
gaskets, and other glazing materials, unless more stringent requirements are indicated,<br />
including those in referenced glazing publications.<br />
B. Adjust glazing channel dimensions as required by Project conditions during installation<br />
to provide necessary bite on glass, minimum edge and face clearances, and adequate<br />
sealant thicknesses, with reasonable tolerances.<br />
C. Protect glass edges from damage during handling and installation. Remove damaged<br />
glass from Project site and legally dispose <strong>of</strong> <strong>of</strong>f Project site. Damaged glass is glass<br />
with edge damage or other imperfections that, when installed, could weaken glass and<br />
impair performance and appearance.<br />
D. Apply primers to joint surfaces where required for adhesion <strong>of</strong> sealants, as determined<br />
by preconstruction testing.<br />
E. Install setting blocks in sill rabbets, sized and located to comply with referenced glazing<br />
publications, unless otherwise required by glass manufacturer. Set blocks in thin<br />
course <strong>of</strong> compatible sealant suitable for heel bead.<br />
F. Do not exceed edge pressures stipulated by glass manufacturers for installing glass<br />
lites.<br />
G. Provide spacers for glass lites where length plus width is larger than 50 inches (1270<br />
mm).<br />
H. Provide edge blocking where indicated or needed to prevent glass lites from moving<br />
sideways in glazing channel, as recommended in writing by glass manufacturer and<br />
according to requirements in referenced glazing publications.<br />
3.2 TAPE GLAZING<br />
A. Position tapes on fixed stops so that, when compressed by glass, their exposed edges<br />
are flush with or protrude slightly above sightline <strong>of</strong> stops.<br />
B. Install tapes continuously, but not necessarily in one continuous length. Do not stretch<br />
tapes to make them fit opening.<br />
C. Cover vertical framing joints by applying tapes to heads and sills first and then to<br />
jambs. Cover horizontal framing joints by applying tapes to jambs and then to heads<br />
and sills.<br />
D. Place joints in tapes at corners <strong>of</strong> opening with adjoining lengths butted together, not<br />
lapped. Seal joints in tapes with compatible sealant approved by tape manufacturer.<br />
E. Apply heel bead <strong>of</strong> elastomeric sealant.<br />
08800-7<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
GLAZING<br />
F. Center glass lites in openings on setting blocks and press firmly against tape by<br />
inserting dense compression gaskets formed and installed to lock in place against<br />
faces <strong>of</strong> removable stops. Start gasket applications at corners and work toward<br />
centers <strong>of</strong> openings.<br />
G. Apply cap bead <strong>of</strong> elastomeric sealant over exposed edge <strong>of</strong> tape.<br />
3.3 GASKET GLAZING (DRY)<br />
A. Cut compression gaskets to lengths recommended by gasket manufacturer to fit<br />
openings exactly, with allowance for stretch during installation.<br />
B. Insert s<strong>of</strong>t compression gasket between glass and frame or fixed stop so it is securely<br />
in place with joints miter cut and bonded together at corners.<br />
C. Installation with Drive-in Wedge Gaskets: Center glass lites in openings on setting<br />
blocks and press firmly against s<strong>of</strong>t compression gasket by inserting dense<br />
compression gaskets formed and installed to lock in place against faces <strong>of</strong> removable<br />
stops. Start gasket applications at corners and work toward centers <strong>of</strong> openings.<br />
Compress gaskets to produce a weathertight seal without developing bending stresses<br />
in glass. Seal gasket joints with sealant recommended by gasket manufacturer.<br />
D. Installation with Pressure-Glazing Stops: Center glass lites in openings on setting<br />
blocks and press firmly against s<strong>of</strong>t compression gasket. Install dense compression<br />
gaskets and pressure-glazing stops, applying pressure uniformly to compression<br />
gaskets. Compress gaskets to produce a weathertight seal without developing<br />
bending stresses in glass. Seal gasket joints with sealant recommended by gasket<br />
manufacturer.<br />
E. Install gaskets so they protrude past face <strong>of</strong> glazing stops.<br />
3.4 SEALANT GLAZING (WET)<br />
A. Install continuous spacers, or spacers combined with cylindrical sealant backing,<br />
between glass lites and glazing stops to maintain glass face clearances and to prevent<br />
sealant from extruding into glass channel and blocking weep systems until sealants<br />
cure. Secure spacers or spacers and backings in place and in position to control depth<br />
<strong>of</strong> installed sealant relative to edge clearance for optimum sealant performance.<br />
B. Force sealants into glazing channels to eliminate voids and to ensure complete wetting<br />
or bond <strong>of</strong> sealant to glass and channel surfaces.<br />
C. Tool exposed surfaces <strong>of</strong> sealants to provide a substantial wash away from glass.<br />
3.5 CLEANING AND PROTECTION<br />
A. Protect exterior glass from damage immediately after installation by attaching crossed<br />
streamers to framing held away from glass. Do not apply markers to glass surface.<br />
Remove nonpermanent labels and clean surfaces.<br />
08800-8<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
GLAZING<br />
B. Protect glass from contact with contaminating substances resulting from construction<br />
operations. If, despite such protection, contaminating substances do come into contact<br />
with glass, remove substances immediately as recommended in writing by glass<br />
manufacturer.<br />
C. Examine glass surfaces adjacent to or below exterior concrete and other masonry<br />
surfaces at frequent intervals during construction, but not less than once a month, for<br />
buildup <strong>of</strong> dirt, scum, alkaline deposits, or stains; remove as recommended in writing<br />
by glass manufacturer.<br />
D. Remove and replace glass that is broken, chipped, cracked, or abraded or that is<br />
damaged from natural causes, accidents, and vandalism, during construction period.<br />
END OF SECTION 08800<br />
08800-9<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 09111<br />
NON-STRUCTURAL METAL FRAMING<br />
PART 1 - GENERAL<br />
1.1 SUMMARY<br />
A. This Section includes non-load-bearing steel framing members for the following<br />
applications:<br />
1. Interior framing systems (e.g., supports for partition walls, framed s<strong>of</strong>fits, furring,<br />
etc.).<br />
2. Interior suspension systems (e.g., supports for ceilings, suspended s<strong>of</strong>fits, etc.).<br />
1.2 SUBMITTALS<br />
A. Product Data: For each type <strong>of</strong> product indicated.<br />
1.3 QUALITY ASSURANCE<br />
A. Fire-Test-Response Characteristics: For fire-resistance-rated assemblies that<br />
incorporate non-load-bearing steel framing, provide materials and construction identical<br />
to those tested in assembly indicated according to ASTM E 119 by an independent<br />
testing agency.<br />
B. Sound Transmission Characteristics: For STC-rated assemblies that incorporate nonload-bearing<br />
steel framing, provide materials and construction identical to those tested<br />
in assembly indicated according to ASTM E 90 and classified according to<br />
ASTM E 413 by an independent testing agency.<br />
PART 2 - PRODUCTS<br />
2.1 NON-LOAD-BEARING STEEL FRAMING, GENERAL<br />
A. Framing Members, General: Comply with ASTM C 754 for conditions indicated.<br />
1. Steel Sheet Components: Comply with ASTM C 645 requirements for metal,<br />
unless otherwise indicated.<br />
2. Protective Coating: manufacturer's standard corrosion-resistant zinc coating,<br />
unless otherwise indicated.<br />
2.2 SUSPENSION SYSTEM COMPONENTS<br />
A. Tie Wire: ASTM A 641/A 641M, Class 1 zinc coating, s<strong>of</strong>t temper, 0.0625-inch- (1.59-<br />
mm-) diameter wire, or double strand <strong>of</strong> 0.0475-inch- (1.21-mm-) diameter wire.<br />
09111-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
NON-STRUCTURAL METAL FRAMING<br />
B. Hanger Attachments to Concrete:<br />
1. Anchors: Fabricated from corrosion-resistant materials with holes or loops for<br />
attaching wire hangers and capable <strong>of</strong> sustaining, without failure, a load equal to<br />
5 times that imposed by construction as determined by testing according to<br />
ASTM E 488 by an independent testing agency.<br />
a. Type: Postinstalled, chemical anchor.<br />
2. Powder-Actuated Fasteners: Suitable for application indicated, fabricated from<br />
corrosion-resistant materials with clips or other devices for attaching hangers <strong>of</strong><br />
type indicated, and capable <strong>of</strong> sustaining, without failure, a load equal to 10 times<br />
that imposed by construction as determined by testing according to<br />
ASTM E 1190 by an independent testing agency.<br />
C. Wire Hangers: ASTM A 641/A 641M, Class 1 zinc coating, s<strong>of</strong>t temper, 0.162-inch<br />
(4.12-mm) diameter.<br />
1. Hat-Shaped, Rigid Furring Channels: ASTM C 645, 7/8 inch (22.2 mm) deep.<br />
a. Minimum Base Metal Thickness: 0.0312 inch (0.79 mm).<br />
2. Resilient Furring Channels: 1/2-inch- (12.7-mm-) deep members designed to<br />
reduce sound transmission.<br />
a. Configuration: Asymmetrical or hat shaped.<br />
D. Grid Suspension System for Ceilings: ASTM C 645, direct-hung system composed <strong>of</strong><br />
main beams and cross-furring members that interlock.<br />
1. Available Products: Subject to compliance with requirements, products that may<br />
be incorporated into the Work include, but are not limited to, the following:<br />
2. Products: Subject to compliance with requirements, provide one <strong>of</strong> the following:<br />
a. Armstrong World Industries, <strong>Inc</strong>.; Drywall Grid Systems.<br />
b. USG Corporation; Drywall Suspension System.<br />
2.3 STEEL FRAMING FOR FRAMED ASSEMBLIES<br />
A. Steel Studs and Runners: ASTM C 645.<br />
1. Minimum Base-Metal Thickness: 0.0179 inch (0.45 mm) and 0.0312 inch (0.79<br />
mm) studs nested at door jambs and for supporting ceramic tile substrates.<br />
B. Slip-Type Head Joints: Where indicated, provide the following:<br />
1. Deflection Track: Steel sheet top runner manufactured to prevent cracking <strong>of</strong><br />
finishes applied to interior partition framing resulting from deflection <strong>of</strong> structure<br />
above; in thickness not less than indicated for studs and in width to<br />
accommodate depth <strong>of</strong> studs.<br />
C. Flat Strap and Backing Plate: Steel sheet for blocking and bracing in length and width<br />
indicated.<br />
09111-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
NON-STRUCTURAL METAL FRAMING<br />
1. Minimum Base-Metal Thickness: 0.0312 inch (0.79 mm).<br />
D. Cold-Rolled Channel Bridging: 0.0538-inch (1.37-mm) bare-steel thickness, with<br />
minimum 1/2-inch- (12.7-mm-) wide flanges.<br />
1. Depth: 1-1/2 inches (38.1 mm).<br />
2. Clip Angle: Not less than 1-1/2 by 1-1/2 inches (38.1 by 38.1 mm), 0.068-inch-<br />
(1.73-mm-) thick, galvanized steel.<br />
E. Hat-Shaped, Rigid Furring Channels: ASTM C 645.<br />
1. Minimum Base Metal Thickness: 0.0312 inch (0.79 mm).<br />
2. Depth: As indicated on Drawings.<br />
F. Resilient Furring Channels: 1/2-inch- (12.7-mm-) deep, steel sheet members designed<br />
to reduce sound transmission.<br />
1. Configuration: Asymmetrical or hat shaped.<br />
G. Cold-Rolled Furring Channels: 0.0538-inch (1.37-mm) bare-steel thickness, with<br />
minimum 1/2-inch- (12.7-mm-) wide flanges.<br />
1. Depth: As indicated on Drawings.<br />
2. Furring Brackets: Adjustable, corrugated-edge type <strong>of</strong> steel sheet with minimum<br />
bare-steel thickness <strong>of</strong> 0.0312 inch (0.79 mm).<br />
3. Tie Wire: ASTM A 641/A 641M, Class 1 zinc coating, s<strong>of</strong>t temper, 0.0625-inch-<br />
(1.59-mm-) diameter wire, or double strand <strong>of</strong> 0.0475-inch- (1.21-mm-) diameter<br />
wire.<br />
H. Z-Shaped Furring: With slotted or nonslotted web, face flange <strong>of</strong> 1-1/4 inches (31.8<br />
mm), wall attachment flange <strong>of</strong> 7/8 inch (22.2 mm), minimum bare-metal thickness <strong>of</strong><br />
0.0179 inch (0.45 mm), and depth required to fit insulation thickness indicated.<br />
2.4 AUXILIARY MATERIALS<br />
A. Fasteners for Metal Framing: Of type, material, size, corrosion resistance, holding<br />
power, and other properties required to fasten steel members to substrates.<br />
B. Isolation Strip at Exterior Walls: Provide one <strong>of</strong> the following:<br />
1. Asphalt-Saturated Organic Felt: ASTM D 226, Type I (No. 15 asphalt felt),<br />
nonperforated.<br />
2. Foam Gasket: Adhesive-backed, closed-cell vinyl foam strips that allow fastener<br />
penetration without foam displacement, 1/8 inch (3.2 mm) thick, in width to suit<br />
steel stud size.<br />
PART 3 - EXECUTION<br />
3.1 INSTALLATION, GENERAL<br />
A. Installation Standard: ASTM C 754.<br />
09111-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
NON-STRUCTURAL METAL FRAMING<br />
1. Gypsum Board Assemblies: Also comply with requirements in ASTM C 840 that<br />
apply to framing installation.<br />
3.2 INSTALLING SUSPENSION SYSTEMS<br />
A. Isolate suspension systems from building structure where they abut or are penetrated<br />
by building structure to prevent transfer <strong>of</strong> loading imposed by structural movement.<br />
B. Suspend hangers from building structure as follows:<br />
1. Install hangers plumb and free from contact with insulation or other objects within<br />
ceiling plenum that are not part <strong>of</strong> supporting structural or suspension system.<br />
a. Splay hangers only where required to miss obstructions and <strong>of</strong>fset resulting<br />
horizontal forces by bracing, countersplaying, or other equally effective<br />
means.<br />
2. Where width <strong>of</strong> ducts and other construction within ceiling plenum produces<br />
hanger spacings that interfere with locations <strong>of</strong> hangers required to support<br />
standard suspension system members, install supplemental suspension<br />
members and hangers in the form <strong>of</strong> trapezes or equivalent devices.<br />
a. Size supplemental suspension members and hangers to support ceiling<br />
loads within performance limits established by referenced installation<br />
standards.<br />
3. Do not connect or suspend steel framing from ducts, pipes, or conduit.<br />
C. Fire-Resistance-Rated Assemblies: Wire tie furring channels to supports.<br />
D. Grid Suspension Systems: Attach perimeter wall track or angle where grid suspension<br />
systems meet vertical surfaces. Mechanically join main beam and cross-furring<br />
members to each other and butt-cut to fit into wall track.<br />
E. Installation Tolerances: Install suspension systems that are level to within 1/8 inch in<br />
12 feet (3 mm in 3.6 m) measured lengthwise on each member that will receive<br />
finishes and transversely between parallel members that will receive finishes.<br />
3.3 INSTALLING FRAMED ASSEMBLIES<br />
A. Where studs are installed directly against exterior masonry walls or dissimilar metals at<br />
exterior walls, install isolation strip between studs and exterior wall.<br />
B. Install tracks (runners) at floors and overhead supports. Extend framing full height to<br />
structural supports or substrates above suspended ceilings, except where partitions<br />
are indicated to terminate at suspended ceilings. Continue framing around ducts<br />
penetrating partitions above ceiling.<br />
1. Slip-Type Head Joints: Where framing extends to overhead structural supports,<br />
install to produce joints at tops <strong>of</strong> framing systems that prevent axial loading <strong>of</strong><br />
finished assemblies.<br />
09111-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
NON-STRUCTURAL METAL FRAMING<br />
2. Door Openings: Screw vertical studs at jambs to jamb anchor clips on door<br />
frames; install runner track section (for cripple studs) at head and secure to jamb<br />
studs.<br />
a. Install two studs at each jamb, unless otherwise indicated.<br />
b. Install cripple studs at head adjacent to each jamb stud, with a minimum<br />
1/2-inch (12.7-mm) clearance from jamb stud to allow for installation <strong>of</strong><br />
control joint in finished assembly.<br />
c. Extend jamb studs through suspended ceilings and attach to underside <strong>of</strong><br />
overhead structure.<br />
3. Other Framed Openings: Frame openings other than door openings the same as<br />
required for door openings, unless otherwise indicated. Install framing below sills<br />
<strong>of</strong> openings to match framing required above door heads.<br />
4. Fire-Resistance-Rated Partitions: Install framing to comply with fire-resistancerated<br />
assembly indicated and support closures and to make partitions continuous<br />
from floor to underside <strong>of</strong> solid structure.<br />
5. Sound-Rated Partitions: Install framing to comply with sound-rated assembly<br />
indicated.<br />
6. Curved Partitions:<br />
C. Direct Furring:<br />
a. Bend track to uniform curve and locate straight lengths so they are tangent<br />
to arcs.<br />
b. Begin and end each arc with a stud, and space intermediate studs equally<br />
along arcs. On straight lengths <strong>of</strong> not less than 2 studs at ends <strong>of</strong> arcs,<br />
place studs 6 inches (150 mm) o.c.<br />
1. Screw to wood framing.<br />
2. Attach to concrete or masonry with stub nails, screws designed for masonry<br />
attachment, or powder-driven fasteners spaced 24 inches (610 mm) o.c.<br />
D. Z-Furring Members:<br />
1. Erect insulation (specified in Division 07 Section "Thermal Insulation") vertically<br />
and hold in place with Z-furring members spaced 24 inches (610 mm) o.c.<br />
2. Except at exterior corners, securely attach narrow flanges <strong>of</strong> furring members to<br />
wall with concrete stub nails, screws designed for masonry attachment, or<br />
powder-driven fasteners spaced 24 inches (600 mm) o.c.<br />
3. At exterior corners, attach wide flange <strong>of</strong> furring members to wall with short<br />
flange extending beyond corner; on adjacent wall surface, screw-attach short<br />
flange <strong>of</strong> furring channel to web <strong>of</strong> attached channel. At interior corners, space<br />
second member no more than 12 inches (300 mm) from corner and cut insulation<br />
to fit.<br />
E. Installation Tolerance: Install each framing member so fastening surfaces vary not<br />
more than 1/8 inch (3 mm) from the plane formed by faces <strong>of</strong> adjacent framing.<br />
END OF SECTION 09111<br />
09111-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 09220<br />
PORTLAND CEMENT PLASTER<br />
PART 1 - GENERAL<br />
1.1 RELATED DOCUMENTS<br />
A. Drawings and general provisions <strong>of</strong> the Contract, including General and<br />
Supplementary Conditions and Division 1 Specification Sections, apply to this Section.<br />
1.2 SUMMARY<br />
A. This Section includes the following:<br />
1. Exterior portland cement plasterwork (stucco) on metal lath and solid-plaster<br />
bases.<br />
B. Related Sections include the following:<br />
1. Division 7 Section "Joint Sealants" for sealants installed with exterior portland<br />
cement plaster (stucco).<br />
1.3 SUBMITTALS<br />
A. Product Data: For each type <strong>of</strong> product indicated.<br />
1.4 DELIVERY, STORAGE, AND HANDLING<br />
A. Store materials inside under cover and keep them dry and protected against damage<br />
from weather, direct sunlight, surface contamination, corrosion, construction traffic, and<br />
other causes.<br />
1.5 PROJECT CONDITIONS<br />
A. Comply with ASTM C 926 requirements.<br />
B. Exterior Plasterwork:<br />
1. Apply and cure plaster to prevent plaster drying out during curing period. Use<br />
procedures required by climatic conditions, including moist curing, providing<br />
coverings, and providing barriers to deflect sunlight and wind.<br />
2. Apply plaster when ambient temperature is greater than 40 deg F (4.4 deg C).<br />
3. Protect plaster coats from freezing for not less than 48 hours after set <strong>of</strong> plaster<br />
coat has occurred.<br />
PART 2 - PRODUCTS<br />
09220-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PORTLAND CEMENT PLASTER<br />
2.1 MANUFACTURERS<br />
1. Manufacturers: Subject to compliance with requirements, provide products by<br />
one <strong>of</strong> the manufacturers specified.<br />
2.2 METAL LATH<br />
A. Expanded-Metal Lath: ASTM C 847 with ASTM A 653/A 653M, G60 (Z180), hot-dip<br />
galvanized zinc coating.<br />
1. Available Manufacturers:<br />
a. Alabama Metal Industries Corporation (AMICO).<br />
b. Dale/<strong>Inc</strong>or.<br />
c. Marino/Ware; Division <strong>of</strong> Ware Industries, <strong>Inc</strong>.<br />
d. Phillips Manufacturing Co.<br />
e. Unimast, <strong>Inc</strong>.<br />
2. Diamond-Mesh Lath: Flat and Flat Self-furring Diamond.<br />
a. Weight: 2.5 lb/sq. yd. (1.4 kg/sq. m).<br />
B. Paper Backing: FS UU-B-790, Type I Grade D, Style 2 vapor-permeable paper.<br />
1. Provide paper-backed lath in locations indicated on Drawings.<br />
2.3 ACCESSORIES<br />
A. General: Comply with ASTM C 1063 and coordinate depth <strong>of</strong> trim and accessories<br />
with thicknesses and number <strong>of</strong> plaster coats required.<br />
B. Extruded Aluminum Accessories:<br />
1. Channel Screed: Fabricated from aluminum alloy 6063-T5 with a clear<br />
anondized finish. Equivalent to “Fry Reglet Channel Screed”.<br />
2. “Corner Key: Fabricated from aluminum alloy 6063-T5 with a clear anondized<br />
finish. Equivalent to “Fry Reglet Corner Key”.<br />
C. Plastic Trim: Fabricated from high-impact PVC.<br />
1. Casing Beads: With perforated flanges in depth required to suit plaster bases<br />
indicated and flange length required to suit applications indicated.<br />
a. Square-edge style; use unless otherwise indicated.<br />
2.4 MISCELLANEOUS MATERIALS<br />
A. Water for Mixing: Potable and free <strong>of</strong> substances capable <strong>of</strong> affecting plaster set or <strong>of</strong><br />
damaging plaster, lath, or accessories.<br />
B. Bonding Compound: ASTM C 932.<br />
09220-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PORTLAND CEMENT PLASTER<br />
C. Fasteners for Attaching Metal Lath to Substrates: Complying with ASTM C 1063.<br />
2.5 PLASTER MATERIALS<br />
A. Portland Cement: ASTM C 150, Type I.<br />
1. Color for Finish Coats: Manufacturer’s standard.<br />
B. Lime: ASTM C 206, Type S; or ASTM C 207, Type S.<br />
C. Sand Aggregate: ASTM C 897.<br />
1. Color for Job-Mixed Finish Coats: White.<br />
2.6 PLASTER MIXES<br />
A. General: Comply with ASTM C 926 for applications indicated.<br />
B. Base-Coat Mixes for Use over Metal Lath: Scratch and brown coats for three-coat<br />
plasterwork as follows:<br />
1. Portland Cement Mixes:<br />
a. Scratch Coat: For cementitious material, mix 1 part portland cement and<br />
3/4 to 1-1/2 parts lime. Use 2-1/2 to 4 parts aggregate per part <strong>of</strong><br />
cementitious material (sum <strong>of</strong> separate volumes <strong>of</strong> each component<br />
material).<br />
b. Brown Coat: For cementitious material, mix 1 part portland cement and 3/4<br />
to 1-1/2 parts lime. Use 3 to 5 parts aggregate per part <strong>of</strong> cementitious<br />
material (sum <strong>of</strong> separate volumes <strong>of</strong> each component material).<br />
C. Base-Coat Mixes for Use over Concrete Unit Masonry: Single base coats for two-coat<br />
plasterwork as follows:<br />
1. Portland Cement Mix: For cementitious material, mix 1 part portland cement and<br />
3/4 to 1-1/2 parts lime. Use 2-1/2 to 4 parts aggregate per part <strong>of</strong> cementitious<br />
material (sum <strong>of</strong> separate volumes <strong>of</strong> each component material).<br />
D. Job-Mixed Finish-Coat Mixes:<br />
1. Portland Cement Mix: For cementitious materials, mix 1 part portland cement<br />
and 3/4 to 1-1/2 parts lime. Use 1-1/2 to 3 parts aggregate per part <strong>of</strong><br />
cementitious material (sum <strong>of</strong> separate volumes <strong>of</strong> each component material).<br />
PART 3 - EXECUTION<br />
3.1 EXAMINATION<br />
A. Examine areas and substrates, with Installer present, for compliance with requirements<br />
and other conditions affecting performance.<br />
09220-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PORTLAND CEMENT PLASTER<br />
1. Proceed with installation only after unsatisfactory conditions have been<br />
corrected.<br />
3.2 PREPARATION<br />
A. Protect adjacent work from soiling, spattering, moisture deterioration, and other harmful<br />
effects caused by plastering.<br />
B. Prepare solid-plaster bases that are smooth or that do not have the suction capability<br />
required to bond with plaster according to ASTM C 926.<br />
3.3 INSTALLATION, GENERAL<br />
A. Install supplementary framing, blocking, and bracing at terminations in plaster<br />
assemblies to support fixtures, equipment services, heavy trim, grab bars, toilet<br />
accessories, furnishings, or similar construction.<br />
3.4 INSTALLING METAL LATH<br />
A. Expanded-Metal Lath: Install according to ASTM C 1063.<br />
1. S<strong>of</strong>fit Framing: Install flat diamond-mesh lath.<br />
2. On Solid Surfaces, Not Otherwise Furred: Install Flat-self-furring diamond-mesh<br />
lath.<br />
3.5 INSTALLING ACCESSORIES<br />
A. Install according to ASTM C 1063 and at locations indicated on Drawings.<br />
B. Reinforcement for External Corners:<br />
1. Install corner keys at exterior locations.<br />
C. Control Joints: Install channel screed for control joints at locations indicated on<br />
Drawings.<br />
3.6 PLASTER APPLICATION<br />
A. General: Comply with ASTM C 926.<br />
1. Do not deviate more than plus or minus 1/4 inch in 10 feet (6.4 mm in 3 m) from<br />
a true plane in finished plaster surfaces, as measured by a 10-foot (3-m)<br />
straightedge placed on surface.<br />
2. Finish plaster flush with metal frames and other built-in metal items or<br />
accessories that act as a plaster ground, unless otherwise indicated. Where<br />
casing bead does not terminate plaster at metal frame, cut base coat free from<br />
metal frame before plaster sets and groove finish coat at junctures with metal.<br />
3. Provide plaster surfaces that are ready to receive field-applied finishes indicated.<br />
B. Bonding Compound: Apply on unit masonry and concrete plaster bases.<br />
09220-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PORTLAND CEMENT PLASTER<br />
C. Plaster Finish Coats: Apply to provide float finish.<br />
3.7 CUTTING AND PATCHING<br />
A. Cut, patch, replace, and repair plaster as necessary to accommodate other work and to<br />
restore cracks, dents, and imperfections. Repair or replace work to eliminate blisters,<br />
buckles, crazing and check cracking, dry outs, efflorescence, sweat outs, and similar<br />
defects and where bond to substrate has failed.<br />
3.8 CLEANING AND PROTECTION<br />
A. Protect the metal finishes <strong>of</strong> the plaster reveal trim for exposed finish.<br />
B. Remove temporary protection and enclosure <strong>of</strong> other work. Promptly remove plaster<br />
from doorframes, windows, and other surfaces not indicated to be plastered. Repair<br />
floors, walls, and other surfaces stained, marred, or otherwise damaged during<br />
plastering.<br />
END OF SECTION 09220<br />
09220-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 09250<br />
GYPSUM BOARD<br />
PART 1 - GENERAL<br />
1.1 RELATED DOCUMENTS<br />
A. Drawings and general provisions <strong>of</strong> the Contract, including General and<br />
Supplementary Conditions and Division 01 Specification Sections, apply to this<br />
Section.<br />
1.2 SUMMARY<br />
A. This Section includes the following:<br />
1. Interior gypsum board.<br />
2. Tile backing panels.<br />
B. Related Sections include the following:<br />
1. Division 07 Section "Thermal Insulation" for insulation installed in assemblies that<br />
incorporate gypsum board.<br />
2. Division 09 Section "Non-Structural Metal Framing" for non-structural framing<br />
and suspension systems that support gypsum board.<br />
3. Division 09 painting Sections for primers applied to gypsum board surfaces.<br />
1.3 SUBMITTALS<br />
A. Product Data: For each type <strong>of</strong> product indicated.<br />
1.4 QUALITY ASSURANCE<br />
A. Fire-Resistance-Rated Assemblies: For fire-resistance-rated assemblies, provide<br />
materials and construction identical to those tested in assembly indicated according to<br />
ASTM E 119 by an independent testing agency.<br />
1.5 STORAGE AND HANDLING<br />
A. Store materials inside under cover and keep them dry and protected against damage<br />
from weather, condensation, direct sunlight, construction traffic, and other causes.<br />
Stack panels flat to prevent sagging.<br />
1.6 PROJECT CONDITIONS<br />
A. Environmental Limitations: Comply with ASTM C 840 requirements or gypsum board<br />
manufacturer's written recommendations, whichever are more stringent.<br />
09250-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
GYPSUM BOARD<br />
B. Do not install interior products until installation areas are enclosed and conditioned.<br />
C. Do not install panels that are wet, those that are moisture damaged, and those that are<br />
mold damaged.<br />
1. Indications that panels are wet or moisture damaged include, but are not limited<br />
to, discoloration, sagging, or irregular shape.<br />
2. Indications that panels are mold damaged include, but are not limited to, fuzzy or<br />
splotchy surface contamination and discoloration.<br />
PART 2 - PRODUCTS<br />
2.1 PANELS, GENERAL<br />
A. Recycled Content: Provide gypsum panel products with recycled content such that<br />
postconsumer recycled content plus one-half <strong>of</strong> preconsumer recycled content<br />
constitutes a minimum <strong>of</strong> 20 percent by weight.<br />
B. Size: Provide in maximum lengths and widths available that will minimize joints in each<br />
area and that correspond with support system indicated.<br />
2.2 INTERIOR GYPSUM BOARD<br />
A. General: Complying with ASTM C 36/C 36M or ASTM C 1396/C 1396M, as applicable<br />
to type <strong>of</strong> gypsum board indicated and whichever is more stringent.<br />
1. Available Manufacturers: Subject to compliance with requirements,<br />
manufacturers <strong>of</strong>fering products that may be incorporated into the Work include,<br />
but are not limited to, the following:<br />
a. American Gypsum Co.<br />
b. BPB America <strong>Inc</strong>.<br />
c. G-P Gypsum.<br />
d. Lafarge North America <strong>Inc</strong>.<br />
e. National Gypsum Company.<br />
f. PABCO Gypsum.<br />
g. Temple.<br />
h. USG Corporation.<br />
B. Moisture- and Mold-Resistant Type: With moisture- and mold-resistant core and<br />
surfaces.<br />
1. Core: 5/8 inch (15.9 mm), Type X.<br />
2. Long Edges: Tapered.<br />
2.3 TILE BACKING PANELS<br />
A. Cementitious Backer Units: ANSI A118.9.<br />
1. Available Products: Subject to compliance with requirements, products that may<br />
be incorporated into the Work include, but are not limited to, the following:<br />
09250-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
GYPSUM BOARD<br />
2. Products: Subject to compliance with requirements, provide one <strong>of</strong> the following:<br />
a. Custom Building Products; Wonderboard.<br />
b. FinPan, <strong>Inc</strong>.; Util-A-Crete Concrete Backer Board.<br />
c. USG Corporation; DUROCK Cement Board.<br />
3. Thickness: As indicated on Drawings.<br />
2.4 TRIM ACCESSORIES<br />
A. Interior Trim: ASTM C 1047.<br />
1. Material: Galvanized or aluminum-coated steel sheet or rolled zinc.<br />
2. Shapes:<br />
a. Cornerbead.<br />
b. LC-Bead: J-shaped; exposed long flange receives joint compound.<br />
c. L-Bead: L-shaped; exposed long flange receives joint compound.<br />
d. U-Bead: J-shaped; exposed short flange does not receive joint compound.<br />
e. Expansion (control) joint.<br />
2.5 JOINT TREATMENT MATERIALS<br />
A. General: Comply with ASTM C 475/C 475M.<br />
B. Joint Tape:<br />
1. Interior Gypsum Wallboard: Paper.<br />
2. Tile Backing Panels: As recommended by panel manufacturer.<br />
C. Joint Compound for Interior Gypsum Wallboard: For each coat use formulation that is<br />
compatible with other compounds applied on previous or for successive coats.<br />
1. Prefilling: At open joints, rounded or beveled panel edges, and damaged surface<br />
areas, use setting-type taping compound.<br />
2. Embedding and First Coat: For embedding tape and first coat on joints,<br />
fasteners, and trim flanges, use setting-type taping compound.<br />
a. Use setting-type compound for installing paper-faced metal trim<br />
accessories.<br />
3. Fill Coat: For second coat, use setting-type, sandable topping compound.<br />
4. Finish Coat: For third coat, use drying-type, all-purpose compound.<br />
5. Skim Coat: For final coat <strong>of</strong> Level 5 finish, use setting-type, sandable topping<br />
compound or drying-type, or all-purpose compound high-build interior coating<br />
product designed for application by airless sprayer and to be used instead <strong>of</strong><br />
skim coat to produce Level 5 finish.<br />
D. Joint Compound for Tile Backing Panels:<br />
1. Cementitious Backer Units: As recommended by backer unit manufacturer.<br />
09250-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
GYPSUM BOARD<br />
2.6 AUXILIARY MATERIALS<br />
A. General: Provide auxiliary materials that comply with referenced installation standards<br />
and manufacturer's written recommendations.<br />
B. Laminating Adhesive: Adhesive or joint compound recommended for directly adhering<br />
gypsum panels to continuous substrate.<br />
1. Use adhesives that have a VOC content <strong>of</strong> 50 g/L or less when calculated<br />
according to 40 CFR 59, Subpart D (EPA Method 24).<br />
C. Steel Drill Screws: ASTM C 1002, unless otherwise indicated.<br />
1. Use screws complying with ASTM C 954 for fastening panels to steel members<br />
from 0.033 to 0.112 inch (0.84 to 2.84 mm) thick.<br />
2. For fastening cementitious backer units, use screws <strong>of</strong> type and size<br />
recommended by panel manufacturer.<br />
D. Acoustical Sealant: As specified in Division 07 Section "Joint Sealants."<br />
1. Provide sealants that have a VOC content <strong>of</strong> 250 g/L or less when calculated<br />
according to 40 CFR 59, Subpart D (EPA Method 24).<br />
PART 3 - EXECUTION<br />
3.1 EXAMINATION<br />
A. Examine areas and substrates, with Installer present, and including welded hollowmetal<br />
frames and framing, for compliance with requirements and other conditions<br />
affecting performance.<br />
B. Examine panels before installation. Reject panels that are wet, moisture damaged,<br />
and mold damaged.<br />
C. Proceed with installation only after unsatisfactory conditions have been corrected.<br />
3.2 APPLYING AND FINISHING PANELS, GENERAL<br />
A. Comply with ASTM C 840.<br />
B. Install ceiling panels across framing to minimize the number <strong>of</strong> abutting end joints and<br />
to avoid abutting end joints in central area <strong>of</strong> each ceiling. Stagger abutting end joints<br />
<strong>of</strong> adjacent panels not less than one framing member.<br />
C. Install panels with face side out. Butt panels together for a light contact at edges and<br />
ends with not more than 1/16 inch (1.5 mm) <strong>of</strong> open space between panels. Do not<br />
force into place.<br />
D. Locate edge and end joints over supports, except in ceiling applications where<br />
intermediate supports or gypsum board back-blocking is provided behind end joints.<br />
Do not place tapered edges against cut edges or ends. Stagger vertical joints on<br />
09250-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
GYPSUM BOARD<br />
opposite sides <strong>of</strong> partitions. Do not make joints other than control joints at corners <strong>of</strong><br />
framed openings.<br />
E. Form control and expansion joints with space between edges <strong>of</strong> adjoining gypsum<br />
panels.<br />
F. Cover both faces <strong>of</strong> support framing with gypsum panels in concealed spaces (above<br />
ceilings, etc.), except in chases braced internally.<br />
1. Unless concealed application is indicated or required for sound, fire, air, or<br />
smoke ratings, coverage may be accomplished with scraps <strong>of</strong> not less than 8 sq.<br />
ft. (0.7 sq. m) in area.<br />
2. Fit gypsum panels around ducts, pipes, and conduits.<br />
3. Where partitions intersect structural members projecting below underside <strong>of</strong><br />
floor/ro<strong>of</strong> slabs and decks, cut gypsum panels to fit pr<strong>of</strong>ile formed by structural<br />
members; allow 1/4- to 3/8-inch- (6.4- to 9.5-mm-) wide joints to install sealant.<br />
G. Isolate perimeter <strong>of</strong> gypsum board applied to non-load-bearing partitions at structural<br />
abutments, except floors. Provide 1/4- to 1/2-inch- (6.4- to 12.7-mm-) wide spaces at<br />
these locations, and trim edges with edge trim where edges <strong>of</strong> panels are exposed.<br />
Seal joints between edges and abutting structural surfaces with acoustical sealant.<br />
H. Attachment to Steel Framing: Attach panels so leading edge or end <strong>of</strong> each panel is<br />
attached to open (unsupported) edges <strong>of</strong> stud flanges first.<br />
I. STC-Rated Assemblies: Seal construction at perimeters, behind control joints, and at<br />
openings and penetrations with a continuous bead <strong>of</strong> acoustical sealant. Install<br />
acoustical sealant at both faces <strong>of</strong> partitions at perimeters and through penetrations.<br />
Comply with ASTM C 919 and with manufacturer's written recommendations for<br />
locating edge trim and closing <strong>of</strong>f sound-flanking paths around or through assemblies,<br />
including sealing partitions above acoustical ceilings.<br />
3.3 APPLYING INTERIOR GYPSUM BOARD<br />
A. Install interior gypsum board in the following locations:<br />
1. Mold and Moisture Resistant Type: As indicated on Drawings.<br />
B. Single-Layer Application:<br />
1. On ceilings, apply gypsum panels before wall/partition board application to<br />
greatest extent possible and at right angles to framing, unless otherwise<br />
indicated.<br />
2. On partitions/walls, apply gypsum panels vertically (parallel to framing), unless<br />
otherwise indicated or required by fire-resistance-rated assembly, and minimize<br />
end joints.<br />
a. Stagger abutting end joints not less than one framing member in alternate<br />
courses <strong>of</strong> panels.<br />
3. Fastening Methods: Apply gypsum panels to supports with steel drill screws.<br />
C. Laminating to Substrate: Where gypsum panels are indicated as directly adhered to a<br />
substrate (other than studs, joists, furring members, or base layer <strong>of</strong> gypsum board),<br />
09250-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
GYPSUM BOARD<br />
comply with gypsum board manufacturer's written recommendations and temporarily<br />
brace or fasten gypsum panels until fastening adhesive has set.<br />
3.4 APPLYING TILE BACKING PANELS<br />
A. Cementitious Backer Units: ANSI A108.11, at locations indicated to receive tile.<br />
B. Where tile backing panels abut other types <strong>of</strong> panels in same plane, shim surfaces to<br />
produce a uniform plane across panel surfaces.<br />
3.5 INSTALLING TRIM ACCESSORIES<br />
A. General: For trim with back flanges intended for fasteners, attach to framing with same<br />
fasteners used for panels. Otherwise, attach trim according to manufacturer's written<br />
instructions.<br />
B. Control Joints: Install control joints according to ASTM C 840 and in specific locations<br />
approved by Architect for visual effect.<br />
C. Interior Trim: Install in the following locations:<br />
1. Cornerbead: Use at outside corners, unless otherwise indicated.<br />
2. LC-Bead: Install in locations indicated on Drawings.<br />
3. L-Bead: Install in locations indicated on drawings.<br />
4. U-Bead: Install in locations indicated on drawings.<br />
3.6 FINISHING GYPSUM BOARD<br />
A. General: Treat gypsum board joints, interior angles, edge trim, control joints,<br />
penetrations, fastener heads, surface defects, and elsewhere as required to prepare<br />
gypsum board surfaces for decoration. Promptly remove residual joint compound from<br />
adjacent surfaces.<br />
B. Prefill open joints, rounded or beveled edges, and damaged surface areas.<br />
C. Apply joint tape over gypsum board joints, except those with trim having flanges not<br />
intended for tape.<br />
D. Gypsum Board Finish Levels: Finish panels to levels indicated below and according to<br />
ASTM C 840:<br />
1. Level 1: Ceiling plenum areas, concealed areas, and where indicated.<br />
2. Level 2: Panels that are substrate for tile.<br />
3. Level 4: At panel surfaces that will be exposed to view, unless otherwise<br />
indicated.<br />
4. Level 5: Apply this level <strong>of</strong> finish to areas exposed to view which cannot<br />
adequately conceal imperfections with a Level 4 finish.<br />
E. Cementitious Backer Units: Finish according to manufacturer's written instructions.<br />
09250-6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
GYPSUM BOARD<br />
3.7 PROTECTION<br />
A. Protect installed products from damage from weather, condensation, direct sunlight,<br />
construction, and other causes during remainder <strong>of</strong> the construction period.<br />
B. Remove and replace panels that are wet, moisture damaged, and mold damaged.<br />
1. Indications that panels are wet or moisture damaged include, but are not limited<br />
to, discoloration, sagging, or irregular shape.<br />
2. Indications that panels are mold damaged include, but are not limited to, fuzzy or<br />
splotchy surface contamination and discoloration.<br />
END OF SECTION 09250<br />
09250-7<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 09310<br />
TILING<br />
PART 1 - GENERAL<br />
1.1 SUMMARY<br />
A. This Section includes the following:<br />
1. Porcelain floor tile.<br />
2. Ceramic wall tile.<br />
3. Stone thresholds installed as part <strong>of</strong> tile installations.<br />
1.2 SUBMITTALS<br />
A. Product Data: For each product indicated.<br />
B. Samples:<br />
1. Each type, composition, color, and finish <strong>of</strong> tile.<br />
2. Assembled samples with grouted joints for each type, composition, color, and<br />
finish <strong>of</strong> tile.<br />
PART 2 - PRODUCTS<br />
2.1 MANUFACTURERS<br />
A. In other Part 2 articles where titles below introduce lists, the following requirements<br />
apply for product selection:<br />
1. Basis-<strong>of</strong>-Design Product: The design for each tile type is based on the product<br />
named. Subject to compliance with requirements, provide either the named<br />
product or a comparable product by one <strong>of</strong> the other manufacturers specified.<br />
2.2 TILE PRODUCTS<br />
A. ANSI Ceramic Tile Standard: Provide Standard grade tile that complies with<br />
ANSI A137.1, "Specifications for Ceramic Tile," for types, compositions, and other<br />
characteristics indicated.<br />
B. Glazed Ceramic Wall Tile:<br />
1. Manufacturer: American Olean – Pr<strong>of</strong>iles - 8”x10” Glazed Ceramic Wall tile, color<br />
“Biscuit” 091.<br />
C. Unglazed Porcelain Floor Tile:<br />
1. Manufacturer: American Olean – St. Germain - 12”x24” Colorbody Porcelain<br />
Floor tile, color “Noir” SE 68.<br />
09310-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
TILING<br />
2.3 ACCESSORY MATERIALS<br />
A. Thresholds: Fabricate to provide transition between adjacent floor finishes. Bevel<br />
edges at 1:2 slope, limit height <strong>of</strong> bevel to 1/2 inch (12.7 mm) or less, and finish bevel<br />
to match face <strong>of</strong> threshold.<br />
1. Stone Thresholds: ASTM C 503 with a minimum abrasion resistance <strong>of</strong> 12 per<br />
ASTM C 1353 or ASTM C 241 and with honed finish.<br />
a. Description: Closely color match the color <strong>of</strong> the floor tile.<br />
2.4 SETTING AND GROUTING MATERIALS<br />
A. Basis <strong>of</strong> Design Products:<br />
1. Grouting Materials: Water cleanable, reactive resin grout with chemical stain<br />
resistance. ANSI A118.3. Equivalent to Mapei “Opticolor Stain Free Grout”.<br />
2. Wall setting and floor setting materials - Thin-Set Mortar: Rapid setting, flexible,<br />
polymer modified thin set mortar ANSI-A118.4 and ANSI-A118.11. Equivalent to<br />
Mapei “Granirapid”.<br />
2.5 MISCELLANEOUS MATERIALS<br />
A. Trowelable Underlayments and Patching Compounds: Latex-modified, portland<br />
cement-based formulation provided or approved by manufacturer <strong>of</strong> tile-setting<br />
materials.<br />
PART 3 - EXECUTION<br />
3.1 PREPARATION<br />
A. Remove coatings, including curing compounds and other substances that contain<br />
soap, wax, oil, or silicone, that are incompatible with tile-setting materials.<br />
B. Fill cracks, holes, and depressions with trowelable leveling and patching compound<br />
according to tile-setting material manufacturer's written instructions.<br />
C. Remove protrusions, bumps, and ridges by sanding or grinding.<br />
D. Blending: For tile exhibiting color variations, use factory blended tile or blend tiles at<br />
Project site before installing.<br />
E. Field-Applied Temporary Protective Coating: Where indicated under tile type or<br />
needed to prevent grout from staining or adhering to exposed tile surfaces, precoat<br />
them with continuous film <strong>of</strong> temporary protective coating, taking care not to coat<br />
unexposed tile surfaces.<br />
09310-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
TILING<br />
3.2 INSTALLATION, GENERAL<br />
A. ANSI Tile Installation Standards: Comply with parts <strong>of</strong> ANSI A108 Series<br />
"Specifications for Installation <strong>of</strong> Ceramic Tile" that apply to types <strong>of</strong> setting and<br />
grouting materials and to methods indicated in ceramic tile installation schedules.<br />
B. TCA Installation Guidelines: TCA's "Handbook for Ceramic Tile Installation." Comply<br />
with TCA installation methods indicated in ceramic tile installation schedules.<br />
C. Extend tile work into recesses and under or behind equipment and fixtures to form<br />
complete covering without interruptions, unless otherwise indicated. Terminate work<br />
neatly at obstructions, edges, and corners without disrupting pattern or joint<br />
alignments.<br />
D. Accurately form intersections and returns. Perform cutting and drilling <strong>of</strong> tile without<br />
marring visible surfaces. Grind cut edges <strong>of</strong> tile abutting trim, finish, or built-in items.<br />
Fit tile closely to electrical outlets, piping, fixtures, and other penetrations so plates,<br />
collars, or covers overlap tile.<br />
E. Jointing Pattern: Lay tile in patterns indicated in drawings, unless otherwise indicated.<br />
Align joints when adjoining tiles on floor, base, walls, and trim are same size. Lay out<br />
tile work and center tile fields in both directions in each space or on each wall area.<br />
Adjust to minimize tile cutting. Provide uniform joint widths, unless otherwise indicated.<br />
F. Expansion Joints: Locate expansion joints and other sealant-filled joints during<br />
installation <strong>of</strong> setting materials, mortar beds, and tile. Do not saw-cut joints after<br />
installing tiles.<br />
1. Locate joints in tile surfaces directly above joints in concrete substrates.<br />
2. Prepare joints and apply sealants to comply with requirements in Division 07<br />
Section "Joint Sealants."<br />
G. Grout tile to comply with requirements <strong>of</strong> ANSI A108.10, unless otherwise indicated.<br />
H. Install tile on floors with the following joint widths:<br />
1. Porcelain Tile: 1/8 inch.<br />
I. Stone Thresholds: Install stone thresholds at locations indicated; set in same type <strong>of</strong><br />
setting bed as abutting field tile, unless otherwise indicated.<br />
1. Set thresholds in latex-portland cement mortar for locations where mortar bed<br />
would otherwise be exposed above adjacent nontile floor finish.<br />
J. Install tile on walls with the following joint widths:<br />
1. 1/16 inch installed with the 8 inch tile dimension installed vertically and all joints<br />
aligned.<br />
3.3 FLOOR TILE INSTALLATION SCHEDULE<br />
A. Interior floor installation over concrete; thin-set mortar; TCA F-113-03.<br />
1. Unglazed porcelain floor tile: Porcelain floor tile. Equivalent to American Olean –<br />
St. Germain – 12” x 24” – color: “Noir” SE68.<br />
09310-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
TILING<br />
2. Thin-Set Mortar: Rapid setting, flexible, polymer modified thin set mortar ANSI-<br />
A118.4 and ANSI-A118.11. Equivalent to Mapei “Granirapid”.<br />
3. Grout: Water cleanable, reactive resin grout with chemical stain resistance.<br />
ANSI A118.3. Equivalent to Mapei “Opticolor Stain Free Grout”. Color 47<br />
“Charcoal”.<br />
3.4 WALL TILE INSTALLATION SCHEDULE<br />
A. Interior wall tile installation over cementitious backer board on metal stud framing; thinset<br />
mortar; TCA B-412 except as modified below with the mortar and grout products.<br />
1. Glazed wall tile: 8” x 10” glazed ceramic wall tile. Equivalent to American Olean –<br />
Pr<strong>of</strong>iles – 8” x 10” – color “Biscuit” 091.<br />
2. Thin-Set Mortar: Rapid setting, flexible, polymer modified thin set mortar ANSI-<br />
A118.4 and ANSI-A118.11. Equivalent to Mapei “Granirapid”.<br />
3. Grout: Water cleanable, reactive resin grout with chemical stain resistance.<br />
ANSI A118.3. Equivalent to Mapei “Opticolor Stain Free Grout”. Color 14<br />
“Biscuit”.<br />
END OF SECTION 09310<br />
09310-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 09511<br />
ACOUSTICAL PANEL CEILINGS<br />
PART 1 - GENERAL<br />
1.1 RELATED DOCUMENTS<br />
A. Drawings and general provisions <strong>of</strong> the Contract, including General and<br />
Supplementary Conditions and Division 1 Specification Sections, apply to this Section.<br />
1.2 SUMMARY<br />
A. This Section includes acoustical panels and exposed suspension systems for ceilings.<br />
1.3 DEFINITIONS<br />
A. AC: Articulation Class.<br />
B. CAC: Ceiling Attenuation Class.<br />
C. LR: Light Reflectance coefficient.<br />
D. NRC: Noise Reduction Coefficient.<br />
1.4 SUBMITTALS<br />
A. Product Data: For each type <strong>of</strong> product indicated.<br />
1.5 QUALITY ASSURANCE<br />
A. Source Limitations:<br />
1. Acoustical Ceiling Panel: Obtain each type through one source from a single<br />
manufacturer.<br />
2. Suspension System: Obtain each type through one source from a single<br />
manufacturer.<br />
a. Source Limitations: Obtain each type <strong>of</strong> acoustical ceiling panel and<br />
supporting suspension system through one source from a single<br />
manufacturer.<br />
1.6 DELIVERY, STORAGE, AND HANDLING<br />
A. Deliver acoustical panels, suspension system components, and accessories to Project<br />
site in original, unopened packages and store them in a fully enclosed, conditioned<br />
09511-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
ACOUSTICAL PANEL CEILINGS<br />
space where they will be protected against damage from moisture, humidity,<br />
temperature extremes, direct sunlight, surface contamination, and other causes.<br />
B. Before installing acoustical panels, permit them to reach room temperature and a<br />
stabilized moisture content.<br />
C. Handle acoustical panels carefully to avoid chipping edges or damaging units in any<br />
way.<br />
1.7 PROJECT CONDITIONS<br />
A. Environmental Limitations: Do not install acoustical panel ceilings until spaces are<br />
enclosed and weatherpro<strong>of</strong>, wet work in spaces is complete and dry, work above<br />
ceilings is complete, and ambient temperature and humidity conditions are maintained<br />
at the levels indicated for Project when occupied for its intended use.<br />
1.8 COORDINATION<br />
A. Coordinate layout and installation <strong>of</strong> acoustical panels and suspension system with<br />
other construction that penetrates ceilings or is supported by them, including light<br />
fixtures, HVAC equipment, fire-suppression system, and partition assemblies.<br />
1.9 EXTRA MATERIALS<br />
A. Furnish extra materials described below that match products installed and that are<br />
packaged with protective covering for storage and identified with labels describing<br />
contents.<br />
1. Acoustical Ceiling Panels: Full-size panels equal to 2.0 percent <strong>of</strong> quantity<br />
installed.<br />
2. Suspension System Components: Quantity <strong>of</strong> each exposed component equal<br />
to 2.0 percent <strong>of</strong> quantity installed.<br />
PART 2 - PRODUCTS<br />
2.1 MANUFACTURERS<br />
1. Manufacturers: Subject to compliance with requirements, provide products by<br />
the manufacturers specified.<br />
2.2 ACOUSTICAL PANELS, GENERAL<br />
A. Acoustical Panel Standard: Provide manufacturer's standard panels <strong>of</strong> configuration<br />
indicated that comply with ASTM E 1264 classifications as designated by types,<br />
patterns, acoustical ratings, and light reflectances, unless otherwise indicated.<br />
B. Acoustical Panel Colors and Patterns: Match appearance characteristics indicated for<br />
each product type.<br />
09511-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
ACOUSTICAL PANEL CEILINGS<br />
1. Where appearance characteristics <strong>of</strong> acoustical panels are indicated by<br />
referencing pattern designations in ASTM E 1264 and not manufacturers'<br />
proprietary product designations, provide products selected by Architect from<br />
each manufacturer's full range that comply with requirements indicated for type,<br />
pattern, color, light reflectance, acoustical performance, edge detail, and size.<br />
2.3 MINERAL-BASE ACOUSTICAL PANELS FOR ACOUSTICAL PANEL CEILING<br />
A. Available Products:<br />
1. Armstrong World Industries, <strong>Inc</strong>. – “Cirrus” Pattern<br />
2. USG Corporation – “Eclipse ClimaPlus”<br />
B. Classification: Provide panels complying with ASTM E 1264 for type, form, and pattern<br />
as follows:<br />
1. Type and Form: Type III, Form 1.<br />
2. Pattern: E (lightly textured) I (embossed) As indicated by manufacturer's<br />
designation.<br />
C. Color: White.<br />
D. LR: Not less than 0.80.<br />
E. NRC: Not less than 0.65.<br />
F. CAC: Not less than 35.<br />
G. AC: Not less than 170.<br />
H. Edge Detail: Square.<br />
I. Thickness: 3/4 inch (19 mm).<br />
J. Size: 24 by 24 inches (610 by 610 mm).<br />
K. Antimicrobial Treatment: Provide if available.<br />
2.4 METAL SUSPENSION SYSTEMS, GENERAL<br />
A. Metal Suspension System Standard: Provide manufacturer's standard direct-hung<br />
metal suspension systems <strong>of</strong> types, structural classifications, and finishes indicated<br />
that comply with applicable requirements in ASTM C 635.<br />
B. Finishes and Colors, General: Comply with NAAMM's "Metal Finishes Manual for<br />
Architectural and Metal Products" for recommendations for applying and designating<br />
finishes. Provide manufacturer's standard factory-applied finish for type <strong>of</strong> system<br />
indicated.<br />
C. Attachment Devices: Size for five times the design load indicated in ASTM C 635,<br />
Table 1, "Direct Hung," unless otherwise indicated.<br />
09511-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
ACOUSTICAL PANEL CEILINGS<br />
1. Power-Actuated Fasteners in Concrete: Fastener system <strong>of</strong> type suitable for<br />
application indicated, fabricated from corrosion-resistant materials, with clips or<br />
other accessory devices for attaching hangers <strong>of</strong> type indicated, and with<br />
capability to sustain, without failure, a load equal to 10 times that imposed by<br />
ceiling construction, as determined by testing per ASTM E 1190, conducted by a<br />
qualified testing and inspecting agency.<br />
D. Wire Hangers, Braces, and Ties: Provide wires complying with the following<br />
requirements:<br />
1. Zinc-Coated Carbon-Steel Wire: ASTM A 641/A 641M, Class 1 zinc coating, s<strong>of</strong>t<br />
temper.<br />
2. Size: Select wire diameter so its stress at three times hanger design load<br />
(ASTM C 635, Table 1, "Direct Hung") will be less than yield stress <strong>of</strong> wire, but<br />
provide not less than 0.106-inch- (2.69-mm-) diameter wire.<br />
E. Hanger Rods: Mild steel, zinc coated or protected with rust-inhibitive paint.<br />
F. Angle Hangers: Angles with legs not less than 7/8 inch (22 mm) wide; formed with<br />
0.04-inch- (1-mm-) thick, galvanized steel sheet complying with ASTM A 653/A 653M,<br />
G90 (Z275) coating designation; with bolted connections and 5/16-inch- (8-mm-)<br />
diameter bolts.<br />
2.5 METAL SUSPENSION SYSTEM FOR ACOUSTICAL PANEL CEILING<br />
A. Wide-Face, Capped, Double-Web, Steel Suspension System: Main and cross runners<br />
roll formed from cold-rolled steel sheet, prepainted, electrolytically zinc coated, or hotdip<br />
galvanized according to ASTM A 653/A 653M, not less than G30 (Z90) coating<br />
designation, with prefinished 15/16-inch- (24-mm-) wide metal caps on flanges.<br />
1. Structural Classification: Intermediate -duty system.<br />
2. End Condition <strong>of</strong> Cross Runners: Override (stepped) or butt-edge type.<br />
3. Face Design: Flat, flush.<br />
4. Cap Material: Steel cold-rolled sheet.<br />
5. Cap Finish: Painted white.<br />
2.6 METAL EDGE MOLDINGS AND TRIM<br />
A. Available Manufacturers:<br />
1. Armstrong World Industries, <strong>Inc</strong>.<br />
2. USG Interiors, <strong>Inc</strong>.<br />
B. Roll-Formed Sheet-Metal Edge Moldings and Trim: Type and pr<strong>of</strong>ile indicated or, if not<br />
indicated, manufacturer's standard moldings for edges and penetrations that fit<br />
acoustical panel edge details and suspension systems indicated; formed from sheet<br />
metal <strong>of</strong> same material, finish, and color as that used for exposed flanges <strong>of</strong><br />
suspension system runners.<br />
PART 3 - EXECUTION<br />
09511-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
ACOUSTICAL PANEL CEILINGS<br />
3.1 EXAMINATION<br />
A. Examine substrates, areas, and conditions, including structural framing to which<br />
acoustical panel ceilings attach or abut, with Installer present, for compliance with<br />
requirements specified in this and other Sections that affect ceiling installation and<br />
anchorage and with requirements for installation tolerances and other conditions<br />
affecting performance <strong>of</strong> acoustical panel ceilings.<br />
B. Proceed with installation only after unsatisfactory conditions have been corrected.<br />
3.2 PREPARATION<br />
A. Measure each ceiling area and establish layout <strong>of</strong> acoustical panels to balance border<br />
widths at opposite edges <strong>of</strong> each ceiling. Avoid using less-than-half-width panels at<br />
borders, and comply with layout shown on reflected ceiling plans.<br />
3.3 INSTALLATION, GENERAL<br />
A. General: Install acoustical panel ceilings to comply with ASTM C 636 per<br />
manufacturer's written instructions and CISCA's "Ceiling Systems Handbook."<br />
B. Suspend ceiling hangers from building's structural members and as follows:<br />
1. Install hangers plumb and free from contact with insulation or other objects within<br />
ceiling plenum that are not part <strong>of</strong> supporting structure or <strong>of</strong> ceiling suspension<br />
system.<br />
2. Splay hangers only where required to miss obstructions; <strong>of</strong>fset resulting<br />
horizontal forces by bracing, countersplaying, or other equally effective means.<br />
3. Where width <strong>of</strong> ducts and other construction within ceiling plenum produces<br />
hanger spacings that interfere with location <strong>of</strong> hangers at spacings required to<br />
support standard suspension system members, install supplemental suspension<br />
members and hangers in form <strong>of</strong> trapezes or equivalent devices. Size<br />
supplemental suspension members and hangers to support ceiling loads within<br />
performance limits established by referenced standards and publications.<br />
4. Secure wire hangers to ceiling suspension members and to supports above with<br />
a minimum <strong>of</strong> three tight turns. Connect hangers directly either to structures or to<br />
inserts, eye screws, or other devices that are secure and appropriate for<br />
substrate and that will not deteriorate or otherwise fail due to age, corrosion, or<br />
elevated temperatures.<br />
5. Space hangers not more than 48 inches (1200 mm) o.c. along each member<br />
supported directly from hangers, unless otherwise indicated; provide hangers not<br />
more than 8 inches (200 mm) from ends <strong>of</strong> each member.<br />
C. Install edge moldings and trim <strong>of</strong> type indicated at perimeter <strong>of</strong> acoustical ceiling area<br />
and where necessary to conceal edges <strong>of</strong> acoustical panels.<br />
1. Screw attach moldings to substrate at intervals not more than 16 inches (400<br />
mm) o.c. and not more than 3 inches (75 mm) from ends, leveling with ceiling<br />
suspension system to a tolerance <strong>of</strong> 1/8 inch in 12 feet (3.2 mm in 3.66 m). Miter<br />
corners accurately and connect securely.<br />
D. Install suspension system runners so they are square and securely interlocked with<br />
one another. Remove and replace dented, bent, or kinked members.<br />
09511-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
ACOUSTICAL PANEL CEILINGS<br />
E. Install acoustical panels with undamaged edges and fit accurately into suspension<br />
system runners and edge moldings. Scribe and cut panels at borders and penetrations<br />
to provide a neat, precise fit.<br />
1. For square-edged panels, install panels with edges fully hidden from view by<br />
flanges <strong>of</strong> suspension system runners and moldings.<br />
3.4 CLEANING<br />
A. Clean exposed surfaces <strong>of</strong> acoustical panel ceilings, including trim, edge moldings,<br />
and suspension system members. Comply with manufacturer's written instructions for<br />
cleaning and touchup <strong>of</strong> minor finish damage. Remove and replace ceiling<br />
components that cannot be successfully cleaned and repaired to permanently eliminate<br />
evidence <strong>of</strong> damage.<br />
END OF SECTION 09511<br />
09511-6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 09912<br />
PAINTING (PROFESSIONAL LINE PRODUCTS)<br />
PART 1 - GENERAL<br />
1.1 RELATED DOCUMENTS<br />
A. Drawings and general provisions <strong>of</strong> the Contract, including General and Supplementary<br />
Conditions and Division 1 Specification Sections, apply to this Section.<br />
1.2 SUMMARY<br />
A. This Section includes surface preparation and field painting <strong>of</strong> exposed exterior and<br />
interior items and surfaces.<br />
1. Surface preparation, priming, and finish coats specified in this Section are in<br />
addition to shop priming and surface <strong>treatment</strong> specified in other Sections.<br />
B. Paint exposed surfaces, except where these Specifications indicate that the surface or<br />
material is not to be painted or is to remain natural. If an item or a surface is not<br />
specifically mentioned, paint the item or surface the same as similar adjacent materials<br />
or surfaces. If a color <strong>of</strong> finish is not indicated, Architect will select from standard<br />
colors and finishes available.<br />
1. Painting includes field painting <strong>of</strong> exposed bare and covered pipes and ducts<br />
(including color coding), hangers, exposed steel and iron supports, and surfaces<br />
<strong>of</strong> mechanical and electrical equipment that do not have a factory-applied final<br />
finish.<br />
C. Do not paint prefinished items, concealed surfaces, finished metal surfaces, operating<br />
parts, and labels.<br />
1. Prefinished items include the following factory-finished components:<br />
a. Architectural woodwork.<br />
b. Acoustical wall panels.<br />
c. Metal toilet enclosures.<br />
d. Metal lockers.<br />
e. Unit kitchens.<br />
f. Elevator entrance doors and frames.<br />
g. Elevator equipment.<br />
h. Finished mechanical and electrical equipment.<br />
i. Light fixtures.<br />
2. Concealed surfaces include walls or ceilings in the following generally<br />
inaccessible spaces:<br />
a. Foundation spaces.<br />
b. Furred areas.<br />
09912-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PAINTING (PROFESSIONAL LINE PRODUCTS)<br />
c. Ceiling plenums.<br />
d. Utility tunnels.<br />
e. Pipe spaces.<br />
f. Duct shafts.<br />
g. Elevator shafts.<br />
3. Finished metal surfaces include the following:<br />
a. Anodized aluminum.<br />
b. Stainless steel.<br />
c. Chromium plate.<br />
d. Copper and copper alloys.<br />
e. Bronze and brass.<br />
4. Operating parts include moving parts <strong>of</strong> operating equipment and the following:<br />
a. Valve and damper operators.<br />
b. Linkages.<br />
c. Sensing devices.<br />
d. Motor and fan shafts.<br />
5. Labels: Do not paint over UL, FMG, or other code-required labels or equipment<br />
name, identification, performance rating, or nomenclature plates.<br />
D. Related Sections include the following:<br />
1. Division 8 Section "Steel Doors and Frames" for factory priming steel doors and<br />
frames.<br />
2. Division 9 Section "Gypsum Board Assemblies" for surface preparation <strong>of</strong><br />
gypsum board.<br />
1.3 DEFINITIONS<br />
A. General: Standard coating terms defined in ASTM D 16 apply to this Section.<br />
1. Flat refers to a lusterless or matte finish with a gloss range below 15 when<br />
measured at an 85-degree meter.<br />
2. Eggshell refers to low-sheen finish with a gloss range between 20 and 35 when<br />
measured at a 60-degree meter.<br />
3. Semigloss refers to medium-sheen finish with a gloss range between 35 and 70<br />
when measured at a 60-degree meter.<br />
4. Full gloss refers to high-sheen finish with a gloss range more than 70 when<br />
measured at a 60-degree meter.<br />
1.4 SUBMITTALS<br />
A. Product Data: For each paint system indicated. <strong>Inc</strong>lude block fillers and primers.<br />
1. Material List: An inclusive list <strong>of</strong> required coating materials. Indicate each<br />
material and cross-reference specific coating, finish system, and application.<br />
Identify each material by manufacturer's catalog number and general<br />
classification.<br />
09912-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PAINTING (PROFESSIONAL LINE PRODUCTS)<br />
2. Manufacturer's Information: Manufacturer's technical information, including label<br />
analysis and instructions for handling, storing, and applying each coating<br />
material.<br />
B. Samples for Initial Selection: For each type <strong>of</strong> finish-coat material indicated.<br />
1. After color selection, Architect will furnish color chips for surfaces to be coated.<br />
1.5 QUALITY ASSURANCE<br />
A. Applicator Qualifications: A firm or individual experienced in applying paints and coatings<br />
similar in material, design, and extent to those indicated for this Project, whose work<br />
has resulted in applications with a record <strong>of</strong> successful in-service performance.<br />
B. Source Limitations: Obtain block fillers and primers for each coating system from the<br />
same manufacturer as the finish coats.<br />
C. Benchmark Samples (Mockups): Provide a full-coat benchmark finish sample for each<br />
type <strong>of</strong> coating and substrate required. Comply with procedures specified in PDCA P5.<br />
Duplicate finish <strong>of</strong> approved sample Submittals.<br />
1. Architect will select one room or surface to represent surfaces and conditions for<br />
application <strong>of</strong> each type <strong>of</strong> coating and substrate.<br />
a. Wall Surfaces: Provide up to four (4) samples on at least 100 sq. ft. (9 sq.<br />
m).<br />
b. Small Areas and Items: Architect will designate items or areas required.<br />
2. Apply benchmark samples, according to requirements for the completed Work,<br />
after permanent lighting and other environmental services have been activated.<br />
Provide required sheen, color, and texture on each surface.<br />
a. After finishes are accepted, Architect will use the room or surface to<br />
evaluate coating systems <strong>of</strong> a similar nature.<br />
3. Final approval <strong>of</strong> colors will be from benchmark samples.<br />
1.6 DELIVERY, STORAGE, AND HANDLING<br />
A. Deliver materials to Project site in manufacturer's original, unopened packages and<br />
containers bearing manufacturer's name and label and the following information:<br />
1. Product name or title <strong>of</strong> material.<br />
2. Product description (generic classification or binder type).<br />
3. Manufacturer's stock number and date <strong>of</strong> manufacture.<br />
4. Contents by volume, for pigment and vehicle constituents.<br />
5. Thinning instructions.<br />
6. Application instructions.<br />
7. Color name and number.<br />
8. VOC content.<br />
09912-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PAINTING (PROFESSIONAL LINE PRODUCTS)<br />
B. Store materials not in use in tightly covered containers in a well-ventilated area at a<br />
minimum ambient temperature <strong>of</strong> 45 deg F (7 deg C). Maintain storage containers in a<br />
clean condition, free <strong>of</strong> foreign materials and residue.<br />
1. Protect from freezing. Keep storage area neat and orderly. Remove oily rags<br />
and waste daily.<br />
1.7 PROJECT CONDITIONS<br />
A. Apply <strong>water</strong>borne paints only when temperatures <strong>of</strong> surfaces to be painted and<br />
surrounding air are between 50 and 90 deg F (10 and 32 deg C).<br />
B. Apply solvent-thinned paints only when temperatures <strong>of</strong> surfaces to be painted and<br />
surrounding air are between 45 and 95 deg F (7 and 35 deg C).<br />
C. Do not apply paint in snow, rain, fog, or mist; or when relative humidity exceeds 85<br />
percent; or at temperatures less than 5 deg F (3 deg C) above the dew point; or to<br />
damp or wet surfaces.<br />
1. Painting may continue during inclement weather if surfaces and areas to be<br />
painted are enclosed and heated within temperature limits specified by<br />
manufacturer during application and drying periods.<br />
1.8 EXTRA MATERIALS<br />
A. Furnish extra paint materials from the same production run as the materials applied and<br />
in the quantities described below. Package with protective covering for storage and<br />
identify with labels describing contents. Deliver extra materials to Owner.<br />
1. Quantity: Furnish Owner with an additional 3 percent, but not less than 1 gal.<br />
(3.8 L) or 1 case, as appropriate, <strong>of</strong> each material and color applied.<br />
PART 2 - PRODUCTS<br />
2.1 MANUFACTURERS<br />
A. Products: Subject to compliance with requirements, provide one <strong>of</strong> the products listed in<br />
other Part 2 articles.<br />
B. Manufacturers' Names: Shortened versions (shown in parentheses) <strong>of</strong> the following<br />
manufacturers' names are used in other Part 2 articles:<br />
1. Benjamin Moore & Co. (Benjamin Moore).<br />
2. ICI Dulux Paint Centers (ICI Dulux Paints).<br />
3. Sherwin-Williams Co. (Sherwin-Williams).<br />
2.2 PAINT MATERIALS, GENERAL<br />
A. Material Compatibility: Provide block fillers, primers, and finish-coat materials that are<br />
compatible with one another and with the substrates indicated under conditions <strong>of</strong><br />
09912-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PAINTING (PROFESSIONAL LINE PRODUCTS)<br />
service and application, as demonstrated by manufacturer based on testing and field<br />
experience.<br />
B. Material Quality: Provide manufacturer's best-quality paint material <strong>of</strong> the various coating<br />
types specified that are factory formulated and recommended by manufacturer for<br />
application indicated. Paint-material containers not displaying manufacturer's product<br />
identification will not be acceptable.<br />
1. Proprietary Names: Use <strong>of</strong> manufacturer's proprietary product names to<br />
designate colors or materials is not intended to imply that products named are<br />
required to be used to the exclusion <strong>of</strong> equivalent products <strong>of</strong> other<br />
manufacturers. Furnish manufacturer's material data and certificates <strong>of</strong><br />
performance for proposed substitutions.<br />
C. Colors: As selected by Architect from manufacturer's full range.<br />
2.3 CONCRETE UNIT MASONRY BLOCK FILLERS<br />
A. Concrete Unit Masonry Block Filler: Factory-formulated high-performance latex block<br />
fillers.<br />
1. Benjamin Moore; Moore's IMC Latex Block Filler No. M88: Applied at a dry film<br />
thickness <strong>of</strong> not less than 8.1 mils (0.206 mm).<br />
2. ICI Dulux Paints; Bloxfil 4000-1000 Interior/Exterior Heavy Duty Acrylic Block<br />
Filler: Applied at a dry film thickness <strong>of</strong> not less than 7.0 to 14.5 mils (0.178 to<br />
0.368 mm).<br />
3. Sherwin-Williams; PrepRite Interior/Exterior Block Filler B25W25: Applied at a<br />
dry film thickness <strong>of</strong> not less than 8.0 mils (0.203 mm).<br />
2.4 EXTERIOR PRIMERS<br />
A. Exterior Concrete and Masonry Primer: Factory-formulated alkali-resistant acrylic-latex<br />
primer for exterior application.<br />
1. Benjamin Moore; Moore's Alkyd Masonry Sealer No. 077: Applied at a dry film<br />
thickness <strong>of</strong> not less than 2.7 mils (0.069 mm).<br />
2. ICI Dulux Paints; 2000-1200 Dulux Pr<strong>of</strong>essional Exterior 100 Percent Acrylic<br />
Latex Primer: Applied at a dry film thickness <strong>of</strong> not less than 1.6 mils (0.041<br />
mm).<br />
3. Sherwin-Williams; Loxon Exterior Masonry Acrylic Primer A24W300: Applied at<br />
a dry film thickness <strong>of</strong> not less than 3.0 mils (0.076 mm).<br />
B. Exterior Ferrous-Metal Primer: Factory-formulated rust-inhibitive metal primer for exterior<br />
application.<br />
1. Benjamin Moore; Moore's IMC Alkyd Metal Primer No. M06: Applied at a dry film<br />
thickness <strong>of</strong> not less than 2.0 mils (0.051 mm).<br />
2. ICI Dulux Paints; 4160-XXXX Devguard Multi-Purpose Tank & Structural Primer.<br />
Applied at a dry film thickness <strong>of</strong> not less than 2.0 mils (0.051 mm).<br />
3. Sherwin-Williams; Kem Kromik Universal Metal Primer B50NZ6/B50WZ1:<br />
Applied at a dry film thickness <strong>of</strong> not less than 3.0 mils (0.076 mm).<br />
C. Exterior Galvanized Metal Primer: Factory-formulated galvanized metal primer for<br />
exterior application.<br />
09912-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PAINTING (PROFESSIONAL LINE PRODUCTS)<br />
1. Benjamin Moore; Moore's IMC Acrylic Metal Primer No. M04: Applied at a dry<br />
film thickness <strong>of</strong> not less than 2.0 mils (0.051 mm).<br />
2. ICI Dulux Paints; 4160-XXXX Devguard Multi-Purpose Tank & Structural Primer:<br />
Applied at a dry film thickness <strong>of</strong> not less than 2.0 mils (0.051 mm).<br />
3. Sherwin-Williams; Galvite HS Paint B50WZ3: Applied at a dry film thickness <strong>of</strong><br />
not less than 2.0 mils (0.051 mm).<br />
4. Thickness <strong>of</strong> not less than 1.8 mils (0.046 mm).<br />
2.5 INTERIOR PRIMERS<br />
A. Interior Concrete and Masonry Primer: Factory-formulated alkali-resistant acrylic-latex<br />
interior primer for interior application.<br />
1. Benjamin Moore; Moorcraft Super Spec Latex Enamel Undercoater & Primer<br />
Sealer No. 253: Applied at a dry film thickness <strong>of</strong> not less than 1.2 mils (0.030<br />
mm).<br />
2. ICI Dulux Paints; 3030-1200 Bond-Prep Interior/Exterior Waterborne Pigmented<br />
Bonding Primer: Applied at a dry film thickness <strong>of</strong> not less than 1.8 mils (0.046<br />
mm).<br />
3. Sherwin-Williams; PrepRite Masonry Primer B28W300: Applied at a dry film<br />
thickness <strong>of</strong> not less than 3.0 mils (0.076 mm).<br />
B. Interior Gypsum Board Primer: Factory-formulated latex-based primer for interior<br />
application.<br />
1. Benjamin Moore; Moorcraft Super Spec Latex Enamel Undercoater & Primer<br />
Sealer No. 253: Applied at a dry film thickness <strong>of</strong> not less than 1.2 mils (0.030<br />
mm).<br />
2. ICI Dulux Paints; 1000-1200 Dulux Ultra Basecoat Interior Latex Wall Primer:<br />
Applied at a dry film thickness <strong>of</strong> not less than 1.2 mils (0.031 mm).<br />
3. Sherwin-Williams; PrepRite 200 Latex Wall Primer B28W200 Series: Applied at<br />
a dry film thickness <strong>of</strong> not less than 1.6 mils (0.041 mm).<br />
C. Interior Ferrous-Metal Primer: Factory-formulated quick-drying rust-inhibitive alkydbased<br />
metal primer.<br />
1. Benjamin Moore; Moore's IMC Alkyd Metal Primer No. M06: Applied at a dry film<br />
thickness <strong>of</strong> not less than 2.0 mils (0.051 mm).<br />
2. ICI Dulux Paints; 4130-6130 Devshield Rust Penetrating Metal Primer: Applied<br />
at a dry film thickness <strong>of</strong> not less than 2.2 mils (0.056 mm).<br />
3. Sherwin-Williams; Kem Kromik Universal Metal Primer B50NZ6/B50WZ1:<br />
Applied at a dry film thickness <strong>of</strong> not less than 3.0 mils (0.076 mm).<br />
2.6 EXTERIOR FINISH COATS<br />
A. Exterior Elastomeric: Factory-formulated Elastomeric Coating System for exterior<br />
application. Basis <strong>of</strong> Design as follows:<br />
1. ICI Dulux Paints; 2260 Smooth “Decra-flex Elastomeric Coating System: Applied<br />
at a dry film thickness <strong>of</strong> not less than 7.0 dry mils.<br />
B. Exterior Semigloss Acrylic Enamel: Factory-formulated semigloss <strong>water</strong>borne acryliclatex<br />
enamel for exterior application.<br />
09912-6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PAINTING (PROFESSIONAL LINE PRODUCTS)<br />
1. Benjamin Moore; Moorcraft Super Spec Latex House & Trim Paint No. 170:<br />
Applied at a dry film thickness <strong>of</strong> not less than 1.1 mils (0.028 mm).<br />
2. ICI Dulux Paints; 2406-XXXX Dulux Pr<strong>of</strong>essional Exterior 100 Percent Acrylic<br />
Semi-Gloss Finish: Applied at a dry film thickness <strong>of</strong> not less than 1.3 mils (0.033<br />
mm).<br />
3. Sherwin-Williams; A-100 Latex Gloss A8 Series: Applied at a dry film thickness<br />
<strong>of</strong> not less than 1.3 mils (0.033 mm).<br />
2.7 INTERIOR FINISH COATS<br />
A. Interior Flat Acrylic Paint: Factory-formulated flat acrylic-emulsion latex paint for interior<br />
application.<br />
1. Benjamin Moore; Moorecraft Super Spec Latex Flat No. 275: Applied at a dry<br />
film thickness <strong>of</strong> not less than 1.2 mils (0.031 mm).<br />
2. ICI Dulux Paints; 1200-XXXX Dulux Pr<strong>of</strong>essional Velvet Matte Interior Flat Latex<br />
Wall & Trim Finish: Applied at a dry film thickness <strong>of</strong> not less than 1.4 mils<br />
(0.036 mm).<br />
3. Sherwin-Williams; ProMar 200 Interior Latex Flat Wall Paint B30W200 Series:<br />
Applied at a dry film thickness <strong>of</strong> not less than 1.4 mils (0.036 mm).<br />
B. Interior Low-Luster Acrylic Enamel: Factory-formulated eggshell acrylic-latex interior<br />
enamel.<br />
1. Benjamin Moore; Moorcraft Super Spec Latex Eggshell Enamel No. 274:<br />
Applied at a dry film thickness <strong>of</strong> not less than 1.3 mils (0.033 mm).<br />
2. ICI Dulux Paints; 1402-XXXX Dulux Pr<strong>of</strong>essional Acrylic Eggshell Interior Wall &<br />
Trim Enamel: Applied at a dry film thickness <strong>of</strong> not less than 1.4 mils (0.036<br />
mm).<br />
3. Sherwin-Williams; ProMar 200 Interior Latex Egg-Shell Enamel B20W200 Series:<br />
Applied at a dry film thickness <strong>of</strong> not less than 1.6 mils (0.041 mm).<br />
C. Interior Semigloss Acrylic Enamel: Factory-formulated semigloss acrylic-latex enamel for<br />
interior application.<br />
1. Benjamin Moore; Moorcraft Super Spec Latex Semi-Gloss Enamel No. 276:<br />
Applied at a dry film thickness <strong>of</strong> not less than 1.2 mils (0.031 mm).<br />
2. ICI Dulux Paints; 1406-XXXX Dulux Pr<strong>of</strong>essional Acrylic Semi-Gloss Interior Wall<br />
& Trim Enamel: Applied at a dry film thickness <strong>of</strong> not less than 1.5 mils (0.038<br />
mm).<br />
3. Sherwin-Williams; ProMar 200 Interior Latex Semi-Gloss Enamel<br />
B31W200 Series: Applied at a dry film thickness <strong>of</strong> not less than 1.3 mils (0.033<br />
mm).<br />
PART 3 - EXECUTION<br />
3.1 EXAMINATION<br />
A. Examine substrates, areas, and conditions, with Applicator present, for compliance with<br />
requirements for paint application.<br />
09912-7<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PAINTING (PROFESSIONAL LINE PRODUCTS)<br />
1. Proceed with paint application only after unsatisfactory conditions have been<br />
corrected and surfaces receiving paint are thoroughly dry.<br />
2. Start <strong>of</strong> painting will be construed as Applicator's acceptance <strong>of</strong> surfaces and<br />
conditions within a particular area.<br />
B. Coordination <strong>of</strong> Work: Review other Sections in which primers are provided to ensure<br />
compatibility <strong>of</strong> the total system for various substrates. On request, furnish information<br />
on characteristics <strong>of</strong> finish materials to ensure use <strong>of</strong> compatible primers.<br />
1. Notify Architect about anticipated problems when using the materials specified<br />
over substrates primed by others.<br />
3.2 PREPARATION<br />
A. General: Remove hardware and hardware accessories, plates, machined surfaces,<br />
lighting fixtures, and similar items already installed that are not to be painted. If<br />
removal is impractical or impossible because <strong>of</strong> size or weight <strong>of</strong> the item, provide<br />
surface-applied protection before surface preparation and painting.<br />
1. After completing painting operations in each space or area, reinstall items<br />
removed using workers skilled in the trades involved.<br />
B. Cleaning: Before applying paint or other surface <strong>treatment</strong>s, clean substrates <strong>of</strong><br />
substances that could impair bond <strong>of</strong> the various coatings. Remove oil and grease<br />
before cleaning.<br />
1. Schedule cleaning and painting so dust and other contaminants from the<br />
cleaning process will not fall on wet, newly painted surfaces.<br />
C. Surface Preparation: Clean and prepare surfaces to be painted according to<br />
manufacturer's written instructions for each particular substrate condition and as<br />
specified.<br />
1. Provide barrier coats over incompatible primers or remove and reprime.<br />
2. Cementitious Materials: Prepare concrete, concrete unit masonry, surfaces to be<br />
painted. Remove efflorescence, chalk, dust, dirt, grease, oils, and release<br />
agents. Roughen as required to remove glaze. If hardeners or sealers have<br />
been used to improve curing, use mechanical methods <strong>of</strong> surface preparation.<br />
a. Determine alkalinity and moisture content <strong>of</strong> surfaces by performing<br />
appropriate tests. If surfaces are sufficiently alkaline to cause the finish<br />
paint to blister and burn, correct this condition before application. Do not<br />
paint surfaces if moisture content exceeds that permitted in manufacturer's<br />
written instructions.<br />
3. Ferrous Metals: Clean ungalvanized ferrous-metal surfaces that have not been<br />
shop coated; remove oil, grease, dirt, loose mill scale, and other foreign<br />
substances. Use solvent or mechanical cleaning methods that comply with<br />
SSPC's recommendations.<br />
a. Treat bare and sandblasted or pickled clean metal with a metal <strong>treatment</strong><br />
wash coat before priming.<br />
b. Touch up bare areas and shop-applied prime coats that have been<br />
damaged. Wire-brush, clean with solvents recommended by paint<br />
manufacturer, and touch up with same primer as the shop coat.<br />
09912-8<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PAINTING (PROFESSIONAL LINE PRODUCTS)<br />
4. Galvanized Surfaces: Clean galvanized surfaces with nonpetroleum-based<br />
solvents so surface is free <strong>of</strong> oil and surface contaminants. Remove<br />
pre<strong>treatment</strong> from galvanized sheet metal fabricated from coil stock by<br />
mechanical methods.<br />
D. Material Preparation: Mix and prepare paint materials according to manufacturer's<br />
written instructions.<br />
1. Maintain containers used in mixing and applying paint in a clean condition, free <strong>of</strong><br />
foreign materials and residue.<br />
2. Stir material before application to produce a mixture <strong>of</strong> uniform density. Stir as<br />
required during application. Do not stir surface film into material. If necessary,<br />
remove surface film and strain material before using.<br />
3. Use only thinners approved by paint manufacturer and only within recommended<br />
limits.<br />
E. Tinting: Tint each undercoat a lighter shade to simplify identification <strong>of</strong> each coat when<br />
multiple coats <strong>of</strong> same material are applied. Tint undercoats to match the color <strong>of</strong> the<br />
finish coat, but provide sufficient differences in shade <strong>of</strong> undercoats to distinguish each<br />
separate coat.<br />
3.3 APPLICATION<br />
A. General: Apply paint according to manufacturer's written instructions. Use applicators<br />
and techniques best suited for substrate and type <strong>of</strong> material being applied.<br />
1. Paint colors, surface <strong>treatment</strong>s, and finishes are indicated in the paint<br />
schedules.<br />
2. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or<br />
conditions detrimental to formation <strong>of</strong> a durable paint film.<br />
3. Provide finish coats that are compatible with primers used.<br />
4. The term "exposed surfaces" includes areas visible when permanent or built-in<br />
fixtures, grilles, convector covers, covers for finned-tube radiation, and similar<br />
components are in place. Extend coatings in these areas, as required, to<br />
maintain system integrity and provide desired protection.<br />
5. Paint surfaces behind movable equipment and furniture the same as similar<br />
exposed surfaces. Before final installation <strong>of</strong> equipment, paint surfaces behind<br />
permanently fixed equipment or furniture with prime coat only.<br />
6. Paint interior surfaces <strong>of</strong> ducts with a flat, nonspecular black paint where visible<br />
through registers or grilles.<br />
7. Paint back sides <strong>of</strong> access panels and removable or hinged covers to match<br />
exposed surfaces.<br />
8. Finish exterior doors on tops, bottoms, and side edges the same as exterior<br />
faces.<br />
9. Sand lightly between each succeeding enamel or varnish coat.<br />
B. Scheduling Painting: Apply first coat to surfaces that have been cleaned, pretreated, or<br />
otherwise prepared for painting as soon as practicable after preparation and before<br />
subsequent surface deterioration.<br />
1. The number <strong>of</strong> coats and film thickness required are the same regardless <strong>of</strong><br />
application method. Do not apply succeeding coats until previous coat has cured<br />
as recommended by manufacturer. If sanding is required to produce a smooth,<br />
09912-9<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PAINTING (PROFESSIONAL LINE PRODUCTS)<br />
even surface according to manufacturer's written instructions, sand between<br />
applications.<br />
2. Omit primer over metal surfaces that have been shop primed and touchup<br />
painted.<br />
3. If undercoats, stains, or other conditions show through final coat <strong>of</strong> paint, apply<br />
additional coats until paint film is <strong>of</strong> uniform finish, color, and appearance. Give<br />
special attention to ensure that edges, corners, crevices, welds, and exposed<br />
fasteners receive a dry film thickness equivalent to that <strong>of</strong> flat surfaces.<br />
4. Allow sufficient time between successive coats to permit proper drying. Do not<br />
recoat surfaces until paint has dried to where it feels firm, and does not deform or<br />
feel sticky under moderate thumb pressure, and until application <strong>of</strong> another coat<br />
<strong>of</strong> paint does not cause undercoat to lift or lose adhesion.<br />
C. Application Procedures: Apply paints and coatings by brush, roller, spray, or other<br />
applicators according to manufacturer's written instructions.<br />
1. Brushes: Use brushes best suited for type <strong>of</strong> material applied. Use brush <strong>of</strong><br />
appropriate size for surface or item being painted.<br />
2. Rollers: Use rollers <strong>of</strong> carpet, velvet-back, or high-pile sheep's wool as<br />
recommended by manufacturer for material and texture required.<br />
3. Spray Equipment: Use airless spray equipment with orifice size as<br />
recommended by manufacturer for material and texture required.<br />
D. Minimum Coating Thickness: Apply paint materials no thinner than manufacturer's<br />
recommended spreading rate to achieve dry film thickness indicated. Provide total dry<br />
film thickness <strong>of</strong> the entire system as recommended by manufacturer.<br />
E. Mechanical and Electrical Work: Painting <strong>of</strong> mechanical and electrical work is limited to<br />
items exposed in equipment rooms and occupied spaces.<br />
F. Mechanical items to be painted include, but are not limited to, the following:<br />
1. Uninsulated metal piping.<br />
2. Uninsulated plastic piping.<br />
3. Pipe hangers and supports.<br />
4. Tanks that do not have factory-applied final finishes.<br />
5. Visible portions <strong>of</strong> internal surfaces <strong>of</strong> metal ducts, without liner, behind air inlets<br />
and outlets.<br />
6. Duct, equipment, and pipe insulation having "all-service jacket" or other paintable<br />
jacket material.<br />
7. Mechanical equipment that is indicated to have a factory-primed finish for field<br />
painting.<br />
G. Electrical items to be painted include, but are not limited to, the following:<br />
1. Switchgear.<br />
2. Panelboards.<br />
3. Electrical equipment that is indicated to have a factory-primed finish for field<br />
painting.<br />
4. Exposed Conduit.<br />
H. Block Fillers: Apply block fillers to concrete masonry block at a rate to ensure complete<br />
coverage with pores filled.<br />
09912-10<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PAINTING (PROFESSIONAL LINE PRODUCTS)<br />
I. Prime Coats: Before applying finish coats, apply a prime coat, as recommended by<br />
manufacturer, to material that is required to be painted or finished and that has not<br />
been prime coated by others. Recoat primed and sealed surfaces where evidence <strong>of</strong><br />
suction spots or unsealed areas in first coat appears, to ensure a finish coat with no<br />
burn-through or other defects due to insufficient sealing.<br />
J. Pigmented (Opaque) Finishes: Completely cover surfaces as necessary to provide a<br />
smooth, opaque surface <strong>of</strong> uniform finish, color, appearance, and coverage.<br />
Cloudiness, spotting, holidays, laps, brush marks, runs, sags, ropiness, or other<br />
surface imperfections will not be acceptable.<br />
K. Stipple Enamel Finish: Roll and redistribute paint to an even and fine texture. Leave no<br />
evidence <strong>of</strong> rolling, such as laps, irregularity in texture, skid marks, or other surface<br />
imperfections.<br />
L. Completed Work: Match approved samples for color, texture, and coverage. Remove,<br />
refinish, or repaint work not complying with requirements.<br />
3.4 CLEANING<br />
A. Cleanup: At the end <strong>of</strong> each workday, remove empty cans, rags, rubbish, and other<br />
discarded paint materials from Project site.<br />
1. After completing painting, clean glass and paint-spattered surfaces. Remove<br />
spattered paint by washing and scraping without scratching or damaging<br />
adjacent finished surfaces.<br />
3.5 PROTECTION<br />
A. Protect work <strong>of</strong> other trades, whether being painted or not, against damage from<br />
painting. Correct damage by cleaning, repairing or replacing, and repainting, as<br />
approved by Architect.<br />
B. Provide "Wet Paint" signs to protect newly painted finishes. After completing painting<br />
operations, remove temporary protective wrappings provided by others to protect their<br />
work.<br />
1. After work <strong>of</strong> other trades is complete, touch up and restore damaged or defaced<br />
painted surfaces. Comply with procedures specified in PDCA P1.<br />
3.6 EXTERIOR PAINT SCHEDULE<br />
A. Portland Cement Plaster and Exposed Concrete Masonry Units: Provide the following<br />
finish systems over properly cured exterior Portland cement plaster:<br />
1. Elastomeric Finish: Two finish coats over a primer.<br />
2. Primer: As recommended by the paint manufacturer.<br />
3. Finish Coats: Elastomeric Coating System: Applied at a dry film thickness <strong>of</strong> not<br />
less than 7.0 dry mils.<br />
09912-11<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PAINTING (PROFESSIONAL LINE PRODUCTS)<br />
B. Ferrous Metal: Provide the following finish systems over exterior ferrous metal. Primer is<br />
not required on shop-primed items.<br />
1. Semigloss Acrylic-Enamel Finish: Two finish coats over a rust-inhibitive primer.<br />
a. Primer: Exterior ferrous-metal primer.<br />
b. Finish Coats: Exterior semigloss acrylic enamel.<br />
C. Zinc-Coated Metal: Provide the following finish systems over exterior zinc-coated metal<br />
surfaces:<br />
1. Semigloss Acrylic-Enamel Finish: Two finish coats over a galvanized metal<br />
primer.<br />
a. Primer: Exterior galvanized metal primer.<br />
b. Finish Coats: Exterior semigloss acrylic enamel.<br />
3.7 INTERIOR PAINT SCHEDULE<br />
A. Concrete Unit Masonry: Provide the following finish systems over interior concrete<br />
masonry:<br />
1. Semigloss Acrylic-Enamel Finish: Two finish coats over block filler.<br />
a. Block Filler: Concrete unit masonry block filler.<br />
b. Finish Coats: Interior semigloss acrylic enamel.<br />
B. Gypsum Board Ceilings: Provide the following finish systems over interior gypsum board<br />
ceilings surfaces:<br />
1. Interior Latex Flat: Two finish coats over a primer.<br />
a. Primer: Interior gypsum board primer.<br />
b. Finish Coats: Interior latex flat.<br />
C. Gypsum Board Walls: Provide the following finish systems over interior gypsum board<br />
surfaces:<br />
1. Low-Luster Acrylic-Enamel Finish: Two finish coats over a primer.<br />
a. Primer: Interior gypsum board primer.<br />
b. Finish Coats: Interior low-luster acrylic enamel.<br />
D. Ferrous Metal: Provide the following finish systems over ferrous metal:<br />
1. Semigloss Acrylic-Enamel Finish: Two finish coats over a primer.<br />
a. Primer: Interior ferrous-metal primer.<br />
b. Finish Coats: Interior semigloss acrylic enamel.<br />
E. Zinc-Coated Metal: Provide the following finish systems over interior zinc-coated metal<br />
surfaces:<br />
1. Semigloss Acrylic-Enamel Finish: Two finish coats over a primer.<br />
09912-12<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
a. Primer: Interior zinc-coated metal primer.<br />
b. Finish Coats: Interior semigloss acrylic enamel.<br />
PAINTING (PROFESSIONAL LINE PRODUCTS)<br />
END OF SECTION 09912<br />
09912-13<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 09960<br />
HIGH-PERFORMANCE COATINGS<br />
PART 1 - GENERAL<br />
1.1 SUMMARY<br />
A. This section includes the following:<br />
1. High-performance coating systems for above grade exterior surfaces applied to<br />
the Portland Cement Plaster (Stucco).<br />
2. High-performance coating systems for the below grade interior pipe trench<br />
concrete walls.<br />
1.2 SUBMITTALS<br />
A. Product Data: For each type <strong>of</strong> product indicated.<br />
B. Samples for Initial Selection: For each type <strong>of</strong> finish-coat product indicated.<br />
C. Qualification Data: For Installer and manufacturer.<br />
D. Warranties: Special warranties specified in this Section.<br />
E. Installer Certificates: Signed by coating system manufacturer certifying that Installer is<br />
approved, authorized, or licensed by manufacturer to install the coating system.<br />
F. Manufacturer Certificates: Signed by coating manufacturer certifying that coating<br />
system complies with requirements specified in "Performance Requirements" Article.<br />
1. Submit evidence <strong>of</strong> meeting performance requirements.<br />
1.3 QUALITY ASSURANCE<br />
A. Installer Qualifications: A qualified firm that is approved, authorized, or licensed by the<br />
coating system manufacturer to install manufacturer's product and that is eligible to<br />
receive manufacturer's warranty. Installer shall have a minimum <strong>of</strong> five (5) years<br />
experience in successfully installing the same coating materials.<br />
B. Manufacturer Qualifications: A qualified manufacturer that has a coating system<br />
identical to that used for this Project. Coating system materials shall be supplied by a<br />
single manufacturer which has been successfully producing the specified types <strong>of</strong> primary<br />
products for not less than 5 years.<br />
09960 - 1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
C. Preparation and Workmanship: Comply with the manufacturer’s written instructions for<br />
handling and application <strong>of</strong> the specified coating system.<br />
D. Material Compatibility: Provide coating materials that are compatible with the proposed<br />
substrate and under conditions <strong>of</strong> service and application required, as demonstrated by<br />
coating manufacturer based on testing and field experience.<br />
E. Manufacturer Requirements: Ensure that the primary coating materials manufacturer<br />
provides direct trained company personnel to attend necessary job meetings, perform<br />
periodic inspections as necessary, and conducts a final inspection upon successful<br />
completion <strong>of</strong> the project.<br />
F. Mockups: Apply benchmark samples <strong>of</strong> each coating system indicated to verify<br />
preliminary selections made under sample submittals and to demonstrate aesthetic effects<br />
and set quality standards for materials and execution.<br />
1. Architect will select one surface to represent surfaces and conditions for<br />
application <strong>of</strong> each type <strong>of</strong> coating and substrate.<br />
a. Wall Surfaces: Provide samples <strong>of</strong> at least 100 sq. ft. (9 sq. m).<br />
2. Final approval <strong>of</strong> color selections will be based on benchmark samples.<br />
a. If preliminary color selections are not approved, apply additional<br />
benchmark samples <strong>of</strong> additional colors selected by Architect at no added<br />
cost to Owner.<br />
1.4 WARRANTY<br />
A. Exterior Coating System Manufacturer’s Warranty: Submit manufacturer’s Standard<br />
Warranty Form for coating system products, including affirmation <strong>of</strong> coating system<br />
inspection by manufacturer required by warranty provisions. Approval by manufacturer for<br />
warranty is required prior to system application. This warranty is in addition to, and not a<br />
limitation <strong>of</strong>, other rights Owner may have under the contract.<br />
1. Beneficiary: Issue warranty in legal name <strong>of</strong> project owner.<br />
2. Warranty Period: 10 years commencing on date <strong>of</strong> substantial completion.<br />
3. Warranty Areas: All surfaces receiving the specified exterior coating system.<br />
1.5 DELIVERY, STORAGE, AND HANDLING<br />
A. Store materials not in use in tightly covered containers in well-ventilated areas with<br />
ambient temperatures continuously maintained at not less than the manufacturer’s written<br />
requirements.<br />
1. Maintain containers in clean condition, free <strong>of</strong> foreign materials and residue.<br />
2. Remove rags and waste from storage areas daily.<br />
09960 - 2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
1.6 PROJECT CONDITIONS<br />
A. Apply coatings only when temperature <strong>of</strong> surfaces to be coated and ambient air<br />
temperatures are within the acceptable temperature limits defined by the coating<br />
manufacturer’s written guidelines.<br />
B. Do not apply coatings in snow, rain, fog, or mist; and when relative humidity exceeds<br />
the limits defined by the coating manufacturer’s written guidelines.<br />
1.7 EXTRA MATERIALS<br />
A. Furnish extra materials described below that are from same production run (batch mix)<br />
as materials applied and that are packaged for storage and identified with labels<br />
describing contents.<br />
1. Quantity: Furnish an additional 5 percent, but not less than 1 gal. (3.8 L) <strong>of</strong> each<br />
material and color applied.<br />
PART 2 - PRODUCTS<br />
2.1 HIGH-PERFORMANCE COATINGS, GENERAL<br />
A. Material Compatibility:<br />
1. Provide materials for use within each coating system that are compatible with<br />
one another and substrates indicated, under conditions <strong>of</strong> service and application<br />
as demonstrated by manufacturer, based on testing and field experience.<br />
2. Provide products <strong>of</strong> same manufacturer for each coat in a coating system.<br />
B. Colors: As selected by Architect from manufacturer's full range matching Architect's<br />
samples.<br />
2.2 HIGH BUILD ACRYLIC COATINGS PRIMER (EXTERIOR PORTLAND CEMENT<br />
PLASTER)<br />
A. Basis-<strong>of</strong>-Design Product: Subject to compliance with requirements, provide Thoro<br />
Primer 2K Surface Conditioner / Primer as manufactured by BASF or a comparable<br />
product.<br />
2.3 HIGH BUILD ACRYLIC COATINGS SEALANTS (EXTERIOR PORTLAND CEMENT<br />
PLASTER)<br />
A. Basis-<strong>of</strong>-Design Product: Subject to compliance with requirements, provide Thorolastic<br />
Knife Grade Sealant as manufactured by BASF or a comparable product.<br />
B. Basis-<strong>of</strong>-Design Product: Subject to compliance with requirements, provide Thorolastic<br />
Brush Grade Sealant as manufactured by BASF or a comparable product.<br />
09960 - 3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
C. Basis-<strong>of</strong>-Design Product: Subject to compliance with requirements, provide Sikaflex 15<br />
LM Polyurethane Sealant, as manufactured by Sika Corporation or a comparable product.<br />
2.4 HIGH BUILD ACRYLIC COATINGS FINISH COAT (EXTERIOR PORTLAND CEMENT<br />
PLASTER)<br />
A. Basis-<strong>of</strong>-Design Product: Subject to compliance with requirements, provide Thorocoat<br />
100% Acrylic emulsion coating (fine texture) as manufactured by BASF or a comparable<br />
product.<br />
2.5 CEMENT BASED COATING FOR WATERPROOFING CONCRETE AND MASONRY<br />
(INTERIOR FACE OF PIPE TRENCH CONCRETE WALLS)<br />
A. Basis-<strong>of</strong>-Design Product: Subject to compliance with requirements, provide Thoroseal<br />
cement based <strong>water</strong>pro<strong>of</strong> coating as manufactured by BASF or a comparable product.<br />
B. Basis-<strong>of</strong>-Design Product: Subject to compliance with requirements, provide Waterplug<br />
Fast Setting Mortar as manufactured by BASF or a comparable product.<br />
PART 3 - EXECUTION<br />
3.1 EXAMINATION<br />
A. Examine substrates and conditions, with Applicator present, for compliance with<br />
requirements for maximum moisture content and other conditions affecting performance <strong>of</strong><br />
work.<br />
1. Maximum Moisture Content <strong>of</strong> Substrates: When measured with an electronic<br />
moisture meter as required by manufacturer’s written guidelines.<br />
2. Verify compatibility with and suitability <strong>of</strong> substrates, including compatibility with<br />
existing finishes or primers.<br />
3. Begin coating application only after unsatisfactory conditions have been<br />
corrected and surfaces are dry.<br />
4. Coating application indicates acceptance <strong>of</strong> surfaces and conditions.<br />
3.2 PREPARATION<br />
A. Comply with manufacturer's written instructions and recommendations applicable to<br />
substrates indicated.<br />
B. Remove plates, machined surfaces, and similar items already in place that are not to be<br />
coated. If removal is impractical or impossible because <strong>of</strong> size or weight <strong>of</strong> item, provide<br />
surface-applied protection before surface preparation and coating.<br />
1. After completing coating operations, reinstall items that were removed; use<br />
workers skilled in the trades involved.<br />
09960 - 4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
C. Clean substrates <strong>of</strong> substances that could impair bond <strong>of</strong> coatings, including dirt, oil,<br />
grease, and incompatible paints and encapsulants.<br />
1. Remove incompatible primers and reprime substrate with compatible primers as<br />
required to produce coating systems indicated.<br />
D. Concrete Substrates: Remove release agents, curing compounds, efflorescence, and<br />
chalk. Do not coat surfaces if moisture content or alkalinity <strong>of</strong> surfaces to be coated<br />
exceeds that permitted in manufacturer's written instructions.<br />
E. CMU Substrates: Remove efflorescence and chalk by pressure washing or other method<br />
recommended by coating manufacturer. Do not coat surfaces if moisture content or<br />
alkalinity <strong>of</strong> surfaces to be coated exceeds that permitted in manufacturer's written<br />
instructions.<br />
F. Cast-in-place Concrete Trench Wall: Repair voids, cracks and holes in the finished<br />
concrete walls with Thoro Waterplug ultra rapid setting repair mortar in accordance with<br />
the manufacturer’s written recommendations.<br />
3.3 APPLICATION, GENERAL<br />
A. Apply high-performance coatings according to manufacturer's written instructions.<br />
1. Use applicators and techniques suited for coating and substrate indicated.<br />
B. Apply coatings to produce surface films without cloudiness, spotting, holidays, laps, brush<br />
marks, runs, sags, ropiness, or other surface imperfections. Produce sharp glass lines<br />
and color breaks.<br />
3.4 APPLICATION OF SPECIFIED EXTERIOR COATING PRODUCT<br />
A. Prime all exterior above grade exposed split-face concrete masonry units with Thoro<br />
Primer 2K surface conditioner, applied at 200-300 sq.ft. per gallon.<br />
B. Seal all through wall penetrating items, mechanically fastened fixtures, louvers, etc., using<br />
specified polyurethane sealant, Sikaflec 15 LM.<br />
C. Clean and seal cracks over 1/16 inch in width with Thorlosatic Knife Grade Sealant<br />
applied in accordance with manufacturer’s instructions.<br />
D. Cracks less than 1/16 inch in width and all cracks previously sealed with Thorlosatic Knife<br />
Grade Sealant will be coated with 3 – 4 inch wide band <strong>of</strong> Thorolastic Buttering Grade<br />
Sealant at a maximum coverage <strong>of</strong> 100 lf / gallon, and in accordance with manufacturer’s<br />
instructions.<br />
E. For the first coat, apply by ¾ inch nap roller, or plaster type sprayer, at a rate <strong>of</strong> 80 to 100<br />
sq.ft. per gallon (dry mil thickness 7.75). If sprayed, backroll after application.<br />
F. Let first coat dry for the manufacturer’s recommended period, but not less than 24 hours.<br />
09960 - 5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
G. Apply the second coat in the same manner as the first coat. If sprayed, the second coat<br />
does not need to be backrolled. Coating should be applied at the rate <strong>of</strong> 80 to 100 sq.ft.<br />
per gallon (dry mil thickness 7.75).<br />
H. Dampen all tools to be used prior to application. When rolling aggregate textures, clean<br />
rollers periodically to eliminate build-up. Use roller screen to even the material on the<br />
roller cover.<br />
3.5 APPLICATION OF SPECIFIED INTERIOR PIPE TRENCH COATING PRODUCT<br />
A. Clean all surfaces. Remove all traces <strong>of</strong> formwork, release agents, previous coatings,<br />
laitance and any contaminants than may affect the bond adversely.<br />
B. Refer to manufacturer’s written instructions for suitable cleaning methods.<br />
C. Cracks and bolt holes must be cut out and filled solid with Thoro Waterplug.<br />
D. Blend Thoroseal ingredients as indicated in manufacturer’s written instructions.<br />
E. Apply two coats in accordance with manufacturer’s written instructions.<br />
3.6 CLEANING AND PROTECTION<br />
A. At end <strong>of</strong> each workday, remove rubbish, empty cans, rags, and other discarded materials<br />
from Project site.<br />
B. After completing coating application, clean spattered surfaces. Remove spattered<br />
coatings by washing, scraping, or other methods. Do not scratch or damage adjacent<br />
finished surfaces.<br />
C. Protect work <strong>of</strong> other trades against damage from coating operation. Correct damage by<br />
cleaning, repairing, replacing, and recoating, as approved by Architect, and leave in an<br />
undamaged condition.<br />
D. At completion <strong>of</strong> construction activities <strong>of</strong> other trades, touch up and restore damaged or<br />
defaced coated surfaces.<br />
END OF SECTION 09960<br />
09960 - 6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 10200<br />
LOUVERS AND VENTS<br />
GENERAL<br />
1.1 SUMMARY<br />
A. Section <strong>Inc</strong>ludes:<br />
1. Fixed aluminum louvers.<br />
B. See Division 08 Section "Hollow Metal Doors and Frames" for louvers in hollow-metal<br />
doors.<br />
C. See Division 23 Sections for louvers that are a part <strong>of</strong> mechanical equipment.<br />
1.2 PERFORMANCE REQUIREMENTS<br />
A. Delegated Design: Design louvers, including comprehensive engineering analysis by a<br />
qualified pr<strong>of</strong>essional engineer, using structural performance requirements and design<br />
criteria indicated.<br />
B. Structural Performance: Louvers shall withstand the effects <strong>of</strong> gravity loads and the<br />
following loads and stresses within limits and under conditions indicated without<br />
permanent deformation <strong>of</strong> louver components, noise or metal fatigue caused by louver<br />
blade rattle or flutter, or permanent damage to fasteners and anchors.<br />
1. Wind Loads: Determine loads based on pressures as indicated on Drawings.<br />
A. Louver Performance Ratings: Provide louvers complying with requirements specified,<br />
as demonstrated by testing manufacturer's stock units identical to those provided,<br />
except for length and width according to AMCA 500-L.<br />
B. Dade County Protocols:<br />
1. TAS-201: Large and small missile impact.<br />
2. TAS-202: Criteria for testing impact and not impact resistant building envelope<br />
components using static uniform air pressure.<br />
3. TAS-203: Criteria for testing products subject to cyclic wind pressure.<br />
6.2 SUBMITTALS<br />
A. Product Data: For each type <strong>of</strong> product indicated.<br />
1. For louvers specified to bear AMCA seal, include printed catalog pages showing<br />
specified models with appropriate AMCA Certified Ratings Seals.<br />
10200-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
LOUVERS AND VENTS<br />
B. Shop Drawings: For louvers and accessories. <strong>Inc</strong>lude plans, elevations, sections,<br />
details, and attachments to other work. Show frame pr<strong>of</strong>iles and blade pr<strong>of</strong>iles, angles,<br />
and spacing.<br />
C. Samples: For each type <strong>of</strong> metal finish required.<br />
A. Delegated-Design Submittal: For louvers indicated to comply with structural<br />
performance requirements and design criteria, including analysis data signed and<br />
sealed by the qualified pr<strong>of</strong>essional engineer responsible for their preparation.<br />
A. Product Test Reports: Based on tests performed according to AMCA 500-L.<br />
PRODUCTS<br />
9.2 MATERIALS<br />
A. Aluminum Extrusions: ASTM B 221 (ASTM B 221M), Alloy 6063-T5, T-52, or T6.<br />
B. Aluminum Sheet: ASTM B 209 (ASTM B 209M), Alloy 3003 or 5005 with temper as<br />
required for forming, or as otherwise recommended by metal producer for required<br />
finish.<br />
C. Fasteners: Use types and sizes to suit unit installation conditions.<br />
1. For fastening aluminum, use aluminum or 300 series stainless-steel fasteners.<br />
2. For color-finished louvers, use fasteners with heads that match color <strong>of</strong> louvers.<br />
D. Bituminous Paint: Cold-applied asphalt emulsion complying with ASTM D 1187.<br />
9.3 FABRICATION, GENERAL<br />
A. Fabricate frames, including integral sills, to fit in openings <strong>of</strong> sizes indicated, with<br />
allowances made for fabrication and installation tolerances, adjoining material<br />
tolerances, and perimeter sealant joints.<br />
B. Join frame members to each other and to fixed louver blades with fillet welds, threaded<br />
fasteners, or both, as standard with louver manufacturer unless otherwise indicated or<br />
size <strong>of</strong> louver assembly makes bolted connections between frame members<br />
necessary.<br />
9.4 FIXED, EXTRUDED-ALUMINUM LOUVERS<br />
A. Storm Resistive Louver:<br />
1. Basis-<strong>of</strong>-Design Product: Subject to compliance with requirements, provide<br />
Construction Specialties Model DC-5304 or comparable product by one <strong>of</strong> the<br />
following:<br />
a. Airolite Company, LLC (The).<br />
b. All-Lite Architectural Products.<br />
c. Greenheck Fan Corporation.<br />
d. Ruskin Company; Tomkins PLC.<br />
10200-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
LOUVERS AND VENTS<br />
2. Louver Depth: 5 inches.<br />
3. Frame and Blade Nominal Thickness: Not less than 0.060 inch for blades and<br />
0.081 inch for frames.<br />
4. AMCA Seal: Mark units with AMCA Certified Ratings Seal.<br />
10.2 LOUVER SCREENS<br />
A. General: Provide screen at each exterior louver.<br />
B. Louver Screen Frames: Same kind and form <strong>of</strong> metal as indicated for louver to which<br />
screens are attached.<br />
C. Louver Screening:<br />
1. Bird Screening: Flattened, expanded aluminum, 5/8 inch thick.<br />
10.3 ALUMINUM FINISHES<br />
A. High-Performance Organic Finish: 1 mil thick full strength 70 percent fluoropolymer<br />
coating complying with AAMA 2605. Prepare, pretreat, and apply coating to exposed<br />
metal surfaces to comply with coating and resin manufacturers' written instructions.<br />
1. Color and Gloss: As selected by Architect from manufacturer's full range.<br />
EXECUTION<br />
10.4 INSTALLATION<br />
A. Locate and place louvers and vents level, plumb, and at indicated alignment with<br />
adjacent work.<br />
B. Use concealed anchorages where possible. Provide brass or lead washers fitted to<br />
screws where required to protect metal surfaces and to make a weathertight<br />
connection.<br />
C. Provide perimeter reveals and openings <strong>of</strong> uniform width for sealants and joint fillers,<br />
as indicated.<br />
D. Repair damaged finishes so no evidence remains <strong>of</strong> corrective work. Return items that<br />
cannot be refinished in the field to the factory and refinish entire unit or provide new<br />
units.<br />
E. Protect galvanized and nonferrous-metal surfaces that will be in contact with concrete,<br />
masonry, or dissimilar metals from corrosion and galvanic action by applying a heavy<br />
coating <strong>of</strong> bituminous paint.<br />
END OF SECTION 10200<br />
10200-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 10431<br />
SIGNS<br />
PART 1 - GENERAL<br />
1.1 RELATED DOCUMENTS<br />
A. Drawings and general provisions <strong>of</strong> the Contract, including General and<br />
Supplementary Conditions and Division 1 Specification Sections, apply to this Section.<br />
1.2 SUMMARY<br />
A. This Section includes the following:<br />
1. Panel signs.<br />
2. Dimensional characters (letters and numbers) for exterior use.<br />
3. Cast-metal plaques.<br />
4. Signage accessories.<br />
5. Die-cut vinyl characters and graphic symbols. <strong>Inc</strong>lude representative samples <strong>of</strong><br />
available typestyles and graphic symbols.<br />
B. Related Sections include the following:<br />
1. Division 16 Section "Interior Lighting" for illuminated exit signs.<br />
1.3 SUBMITTALS<br />
A. Product Data: <strong>Inc</strong>lude construction details, material descriptions, dimensions <strong>of</strong><br />
individual components and pr<strong>of</strong>iles, and finishes for each type <strong>of</strong> sign.<br />
B. Shop Drawings: <strong>Inc</strong>lude plans, elevations, and large-scale sections <strong>of</strong> typical members<br />
and other components. Show mounting methods, grounds, mounting heights, layout,<br />
spacing, reinforcement, accessories, and installation details.<br />
1. Provide message list for each sign, including large-scale details <strong>of</strong> wording,<br />
lettering, artwork, and Braille layout.<br />
C. Samples for Initial Selection: For each type <strong>of</strong> sign material indicated that involves<br />
color selection.<br />
1. Panel Signs: Full-size Samples <strong>of</strong> each type <strong>of</strong> sign required.<br />
D. Maintenance Data: For signage cleaning and maintenance requirements to include in<br />
maintenance manuals.<br />
1.4 QUALITY ASSURANCE<br />
A. Regulatory Requirements: Comply with the Americans with Disabilities Act (ADA) and<br />
with code provisions as adopted by authorities having jurisdiction.<br />
10431-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SIGNS<br />
1. Interior Code Signage: Provide signage as required by accessibility regulations<br />
and requirements <strong>of</strong> authorities having jurisdiction. These include, but are not<br />
limited to, the following:<br />
a. Illuminated Exit Signs: Refer to Division 16.<br />
1.5 PROJECT CONDITIONS<br />
A. Field Measurements: Where sizes <strong>of</strong> signs are determined by dimensions <strong>of</strong> surfaces<br />
on which they are installed, verify dimensions by field measurement before fabrication<br />
and indicate measurements on Shop Drawings.<br />
1.6 COORDINATION<br />
A. For signs supported by or anchored to permanent construction, advise installers <strong>of</strong><br />
anchorage devices about specific requirements for placement <strong>of</strong> anchorage devices<br />
and similar items to be used for attaching signs.<br />
1. For signs supported by or anchored to permanent construction, furnish templates<br />
for installation <strong>of</strong> anchorage devices.<br />
PART 2 - PRODUCTS<br />
2.1 MANUFACTURERS<br />
A. In other Part 2 articles where titles below introduce lists, the following requirements<br />
apply for product selection:<br />
1. Basis-<strong>of</strong>-Design Product: The design for each sign is based on the product<br />
named. Subject to compliance with requirements, provide either the named<br />
product or a comparable product by one <strong>of</strong> the other manufacturers specified.<br />
2.2 PANEL SIGNS<br />
A. General: Provide panel signs that comply with requirements indicated for materials,<br />
thicknesses, finishes, colors, designs, shapes, sizes, and details <strong>of</strong> construction.<br />
1. Produce smooth panel sign surfaces constructed to remain flat under installed<br />
conditions within tolerance <strong>of</strong> plus or minus 1/16 inch (1.5 mm) measured<br />
diagonally.<br />
B. Basis-<strong>of</strong>-Design Product: Mohawk Signage Systems Series 200A-Sand Carved using<br />
format “D” or a comparable product <strong>of</strong> one <strong>of</strong> the following:<br />
C. Available Manufacturers:<br />
1. Allenite Signs; Allen Marking Products, <strong>Inc</strong>.<br />
2. American Graphics <strong>Inc</strong>.<br />
3. Andco Industries Corp.<br />
4. APCO Graphics, <strong>Inc</strong>.<br />
5. ASI Sign Systems, <strong>Inc</strong>.<br />
10431-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SIGNS<br />
6. Best Manufacturing Co.<br />
7. Grimco, <strong>Inc</strong>.<br />
8. Innerface Sign Systems, <strong>Inc</strong>.<br />
9. Kaltech Industries Group, <strong>Inc</strong>.<br />
10. Mills Manufacturing, <strong>Inc</strong>.<br />
11. Mohawk Sign Systems.<br />
12. Seton Identification Products.<br />
13. Signature Signs, <strong>Inc</strong>.<br />
14. Supersine Company (The).<br />
D. Melamine Plastic Laminate: Melamine plastic laminate, approximately 1/8” thick with<br />
contrasting core color. The melamine shall be non-static, fire-retardant and selfextinguishing.<br />
E. Letterform: Gil Sans or other sans serif or simple serif letterforms.<br />
F. Unframed Panel Signs: Fabricate signs with edges mechanically and smoothly<br />
finished to comply with the following requirements:<br />
1. Edge Condition: Square cut, edge color same as face.<br />
2. Corner Condition: Square.<br />
3. Copy position: Centered.<br />
4. Colors: To be selected from manufacturer’s full range <strong>of</strong> colors.<br />
G. Graphic Content and Style: Provide sign copy that complies with requirements<br />
indicated in the Sign Schedule for size, style, spacing, content, mounting height and<br />
location, material, finishes, and colors <strong>of</strong> signage.<br />
H. Tactile and Braille Copy: Manufacturer's standard process for producing copy<br />
complying with ADA Accessibility Guidelines and ICC/ANSI A117.1. Text shall be<br />
accompanied by Grade 2 braille. Produce precisely formed characters with square cut<br />
edges free from burrs and cut marks.<br />
2.3 DIMENSIONAL CHARACTERS<br />
A. Basis-<strong>of</strong>-Design Product: A.R.K. Ramos Signage Systems Standard Cast Letters<br />
“Optima Semi-bold” Font, 16 inch height, and “paw print” logo indicated on the<br />
drawings or a comparable product <strong>of</strong> one <strong>of</strong> the following:<br />
B. Available Manufacturers:<br />
1. American Graphics <strong>Inc</strong>.<br />
2. ASI Sign Systems, <strong>Inc</strong>.<br />
3. Charleston Industries, <strong>Inc</strong>.<br />
4. Gemini <strong>Inc</strong>orporated.<br />
5. Grimco, <strong>Inc</strong>.<br />
6. Innerface Sign Systems, <strong>Inc</strong>.<br />
7. Kaltech Industries Group, <strong>Inc</strong>.<br />
8. Metal Arts; Div. <strong>of</strong> L&H Mfg.<br />
9. Mills Manufacturing, <strong>Inc</strong>.<br />
10. Mohawk Sign Systems.<br />
11. Signature Sign Signs, <strong>Inc</strong>.<br />
12. Southwell Co. (The).<br />
10431-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SIGNS<br />
C. Cast Characters: Form individual letters, logos and numbers by casting. Produce<br />
characters with smooth flat faces, sharp corners, and precisely formed lines and<br />
pr<strong>of</strong>iles, free from pits, scale, sand holes, and other defects. Cast lugs into back <strong>of</strong><br />
characters and tap to receive threaded mounting studs. Comply with requirements<br />
indicated for finish, style, and size.<br />
1. Material: Aluminum.<br />
D. Applied Vinyl: Die-cut characters from vinyl film <strong>of</strong> nominal thickness <strong>of</strong> 3 mils (0.076<br />
mm) with pressure-sensitive adhesive backing, suitable for exterior applications.<br />
2.4 CAST-METAL PLAQUES<br />
A. General: Provide castings free from pits, scale, sand holes, and other defects.<br />
Comply with requirements specified for metal, border style, background texture, and<br />
finish and in required thickness, size, shape, and copy.<br />
B. Available Manufacturers:<br />
1. A.R.K. Ramos.<br />
2. American Graphics <strong>Inc</strong>.<br />
3. Gemini <strong>Inc</strong>orporated.<br />
4. Matthews International Corporation; Bronze Division.<br />
5. Metal Arts; Div. <strong>of</strong> L&H Mfg.<br />
6. Mills Manufacturing, <strong>Inc</strong>.<br />
7. Southwell Co. (The).<br />
C. Cast Plaques: Provide castings free <strong>of</strong> pits, scale, sand holes, and other defects, as<br />
follows:<br />
1. Plaque Material: Aluminum.<br />
2. Background Texture: Manufacturer's standard matte texture.<br />
3. Border Style: Raised flat band.<br />
4. Mounting: Concealed studs, noncorroding for substrates encountered.<br />
D. Aluminum Castings: Provide aluminum castings <strong>of</strong> alloy and temper recommended by<br />
sign manufacturer for casting process used and for use and finish indicated.<br />
E. Size: Building Dedication Plaque: 18 inches by 24 inches. Content to include up to 300<br />
characters in Optima Semi-bold Font.<br />
2.5 PANEL SIGN TYPES<br />
A. Restroom signs shall be ADA-4, size 8” x 8”, with a 4” accessibility symbol, gender<br />
symbol and the written description placed directly below by grade 2 braille.<br />
B. Warning signs shall be <strong>of</strong> a size required by the authorities having jurisdiction, but not<br />
less than 8” x 8”, with the written indication <strong>of</strong> the warning, and if required by the<br />
authorities having jurisdiction, a graphic symbol <strong>of</strong> the indicated warning.<br />
10431-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SIGNS<br />
2.6 ACCESSORIES<br />
A. Vinyl Film: Provide opaque nonreflective vinyl film, 0.0035-inch (0.089-mm) minimum<br />
thickness, with pressure-sensitive adhesive backing suitable for both exterior and<br />
interior applications.<br />
B. Mounting Methods: Use double-sided vinyl tape fabricated from materials that are not<br />
corrosive to sign material and mounting surface.<br />
C. Anchors and Inserts: Provide nonferrous-metal or hot-dip galvanized anchors and<br />
inserts for exterior installations and elsewhere as required for corrosion resistance.<br />
Use toothed steel or lead expansion-bolt devices for drilled-in-place anchors. Furnish<br />
inserts, as required, to be set into concrete or masonry work.<br />
2.7 FINISHES, GENERAL<br />
A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products"<br />
for recommendations for applying and designating finishes.<br />
B. Protect mechanical finishes on exposed surfaces from damage by applying strippable,<br />
temporary protective covering before shipping.<br />
C. Appearance <strong>of</strong> Finished Work: Variations in appearance <strong>of</strong> abutting or adjacent pieces<br />
are acceptable if they are within one-half <strong>of</strong> range <strong>of</strong> approved Samples. Noticeable<br />
variations in same piece are not acceptable. Variations in appearance <strong>of</strong> other<br />
components are acceptable if they are within range <strong>of</strong> approved Samples and are<br />
assembled or installed to minimize contrast.<br />
2.8 ALUMINUM FINISHES<br />
A. Clear Anodic Finish: Manufacturer's standard clear anodic coating, 0.018 mm or<br />
thicker, over a satin (directionally textured) mechanical finish.<br />
B. Cast-Metal Plaque Finishes:<br />
1. Raised Areas: Hand-tool and buff borders and raised copy to produce<br />
manufacturer's standard satin finish.<br />
2. Background Finish: Painted.<br />
PART 3 - EXECUTION<br />
3.1 EXAMINATION<br />
A. Examine substrates, areas, and conditions, with Installer present, for compliance with<br />
requirements for installation tolerances and other conditions affecting performance <strong>of</strong><br />
work.<br />
B. Verify that items, including anchor inserts, provided under other sections <strong>of</strong> Work are<br />
sized and located to accommodate signs.<br />
10431-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SIGNS<br />
C. Examine supporting members to ensure that surfaces are at elevations indicated or<br />
required to comply with authorities having jurisdiction and are free from dirt and other<br />
deleterious matter.<br />
D. Proceed with installation only after unsatisfactory conditions have been corrected.<br />
3.2 INSTALLATION<br />
A. General: Locate signs and accessories where indicated, using mounting methods <strong>of</strong><br />
types described and in compliance with manufacturer's written instructions.<br />
1. Install signs level, plumb, and at heights indicated, with sign surfaces free from<br />
distortion and other defects in appearance.<br />
2. Interior Wall Signs: Install signs on walls adjacent to latch side <strong>of</strong> door where<br />
applicable. Where not indicated or possible, such as double doors, install signs<br />
on nearest adjacent walls. Locate to allow approach within 3 inches (75 mm) <strong>of</strong><br />
sign without encountering protruding objects or standing within swing <strong>of</strong> door.<br />
B. Wall-Mounted Panel Signs: Attach panel signs to wall surfaces using methods<br />
indicated below:<br />
1. Vinyl-Tape Mounting: Use double-sided foam tape to mount signs to smooth,<br />
nonporous surfaces. Do not use this method for vinyl-covered or rough surfaces.<br />
C. Dimensional Characters: Mount characters using standard fastening methods<br />
recommended in writing by manufacturer for character form, type <strong>of</strong> mounting, wall<br />
construction, and condition <strong>of</strong> exposure indicated. Provide heavy paper template to<br />
establish character spacing and to locate holes for fasteners.<br />
1. Projected Mounting: Mount characters at projection distance from wall surface<br />
indicated.<br />
D. Cast-Metal Plaques: Mount plaques using standard fastening methods recommended<br />
in writing by manufacturer for type <strong>of</strong> wall surface indicated.<br />
1. Concealed Mounting: Mount plaques by inserting threaded studs into tapped<br />
lugs on back <strong>of</strong> plaque. Set in predrilled holes filled with quick-setting cement.<br />
3.3 CLEANING AND PROTECTION<br />
A. After installation, clean soiled sign surfaces according to manufacturer's written<br />
instructions. Protect signs from damage until acceptance by Owner.<br />
3.4 SIGN SCHEDULE<br />
A. Sign Type A: Adult Male Toilet Room Sign.<br />
1. Sign Size: 8” x 8”.<br />
2. Material: Melamine Plastic Laminate<br />
3. Background Finish/Color: As selected by Architect from manufacturer’s full range<br />
<strong>of</strong> colors.<br />
4. Character Finish/Color: White.<br />
10431-6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SIGNS<br />
5. Character Size: 1” unless otherwise required by authorities having jurisdiction.<br />
6. Text/Message/Symbol: MEN. International Symbol <strong>of</strong> Accessibility and Braille.<br />
Male Gender Symbol.<br />
7. Locations: Men’s Restrooms # 123.<br />
B. Sign Type B: Adult Female Toilet Room Sign.<br />
1. Sign Size: 8” x 8”.<br />
2. Material: Melamine Plastic Laminate<br />
3. Background Finish/Color: As selected by Architect from manufacturer’s full range<br />
<strong>of</strong> colors.<br />
4. Character Finish/Color: White.<br />
5. Character Size: 1” unless otherwise required by authorities having jurisdiction.<br />
6. Text/Message/Symbol: FEMALE. International Symbol <strong>of</strong> Accessibility and<br />
Braille. Female Gender Symbol.<br />
7. Locations: Women’s Restrooms # 124.<br />
8. Quantity: One.<br />
C. Sign Type C: Room Name and Number Signs.<br />
1. Sign Size: 4” x 8” or larger if required by authorities having jurisdiction or if<br />
required to fit content.<br />
2. Material: Melamine Plastic Laminate<br />
3. Background Finish/Color: As selected by Architect from manufacturer’s full range<br />
<strong>of</strong> colors.<br />
4. Character Finish/Color: White.<br />
5. Character Size: 1” unless otherwise required by authorities having jurisdiction.<br />
6. Locations: One per doorway into each room.<br />
D. Sign Type D: Hours <strong>of</strong> Operation Signage.<br />
1. Die-cut vinyl characters Material: Die-cut vinyl characters<br />
2. Character Finish/Color: As selected by Architect from manufacturer’s full range <strong>of</strong><br />
colors.<br />
3. Character Size: 1 inch tall<br />
4. Locations: On the glass adjacent to the handle side <strong>of</strong> the front door.<br />
E. Sign Type E: Exterior Building Signage.<br />
1. Sign Size: 16 inch tall cast characters – refer to drawings.<br />
2. Sign graphics – “City <strong>of</strong> LaBelle Water Works” - Refer to drawings.<br />
3. Material: Cast aluminum characters for the letters.<br />
4. Character Finish/Color: As selected by Architect from manufacturer’s full range <strong>of</strong><br />
colors.<br />
5. Locations: Refer to drawings.<br />
6. Mounting: Projected stud mounting.<br />
F. Sign Type F: Building Plaque.<br />
1. Sign Size: 4’-0” wide by 3’-0” tall.<br />
2. Sign graphics – Elliptical Shaped City <strong>of</strong> LaBelle municipal sign.<br />
3. Material: Cast aluminum.<br />
4. Character Finish/Color: To match the City <strong>of</strong> LaBelle municipal logo art work and<br />
colors.<br />
5. Locations: Refer to drawings.<br />
6. Mounting: Projected stud mounting.<br />
10431-7<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SIGNS<br />
G. Sign Type G: Building Dedication Plaque.<br />
1. Sign Size: 18 inch wide by 24 inch tall.<br />
2. Sign graphics – Provide up to 300 characters. Actual artwork to be provided by<br />
the Architect at a later date.<br />
3. Material: Cast aluminum.<br />
4. Locations: Adjacent to the front entrance doors.<br />
5. Mounting: Projected stud mounting.<br />
END OF SECTION 10431<br />
10431-8<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 10520<br />
FIRE-PROTECTION SPECIALTIES<br />
PART 1 - GENERAL<br />
1.1 RELATED DOCUMENTS<br />
A. Drawings and general provisions <strong>of</strong> the Contract, including General and<br />
Supplementary Conditions and Division 1 Specification Sections, apply to this Section.<br />
1.2 SUMMARY<br />
A. This Section includes the following:<br />
1. Portable fire extinguishers.<br />
2. Fire-protection cabinets for the following:<br />
a. Portable fire extinguishers.<br />
1.3 SUBMITTALS<br />
A. Product Data: <strong>Inc</strong>lude construction details, material descriptions, dimensions <strong>of</strong><br />
individual components and pr<strong>of</strong>iles, and finishes for fire-protection cabinets.<br />
1. Fire Extinguishers: <strong>Inc</strong>lude rating and classification.<br />
2. Fire-Protection Cabinets: <strong>Inc</strong>lude roughing-in dimensions, details showing<br />
mounting methods, relationships <strong>of</strong> box and trim to surrounding construction,<br />
door hardware, cabinet type, trim style, and panel style.<br />
B. Maintenance Data: For fire extinguishers and fire-protection cabinets to include in<br />
maintenance manuals.<br />
1.4 QUALITY ASSURANCE<br />
A. Source Limitations: Obtain fire extinguishers and fire-protection cabinets through one<br />
source from a single manufacturer.<br />
B. NFPA Compliance: Fabricate and label fire extinguishers to comply with NFPA 10,<br />
"Portable Fire Extinguishers."<br />
C. Fire Extinguishers: Listed and labeled for type, rating, and classification by an<br />
independent testing agency acceptable to authorities having jurisdiction.<br />
1. Provide fire extinguishers approved, listed, and labeled by FMG.<br />
1.5 COORDINATION<br />
10520-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
FIRE-PROTECTION SPECIALTIES<br />
A. Coordinate size <strong>of</strong> fire-protection cabinets to ensure that type and capa<strong>city</strong> <strong>of</strong> fire<br />
extinguishers indicated are accommodated.<br />
PART 2 - PRODUCTS<br />
2.1 MANUFACTURERS<br />
A. In other Part 2 articles where titles below introduce lists, the following requirements<br />
apply to product selection:<br />
1. Basis-<strong>of</strong>-Design Product: The design for each product is based on the product<br />
named. Subject to compliance with requirements, provide either the named<br />
product or a comparable product by one <strong>of</strong> the other manufacturers specified.<br />
2.2 MATERIALS<br />
A. Cold-Rolled Steel Sheet: ASTM A 1008/A 1008M, Commercial Steel (CS), Type B.<br />
B. Transparent Acrylic Sheet: ASTM D 4802, Category A-1 (cell-cast sheet), 1.5 mm<br />
thick, with Finish 1 (smooth or polished).<br />
C. Acrylic Bubble: One piece.<br />
2.3 PORTABLE FIRE EXTINGUISHERS<br />
A. Available Manufacturers:<br />
1. Amerex Corporation.<br />
2. Ansul <strong>Inc</strong>orporated.<br />
3. Badger Fire Protection.<br />
4. General Fire Extinguisher Corporation.<br />
5. JL Industries, <strong>Inc</strong>.<br />
6. Kidde Fyrnetics.<br />
7. Larsen's Manufacturing Company.<br />
8. Potter Roemer; Div. <strong>of</strong> Smith Industries, <strong>Inc</strong>.<br />
B. General: Provide fire extinguishers <strong>of</strong> type, size, and capa<strong>city</strong> for each fire-protection<br />
cabinet indicated.<br />
1. Valves: Manufacturer's standard.<br />
2. Handles and Levers: Manufacturer's standard.<br />
C. Multipurpose Dry-Chemical Type: UL-rated 10# nominal capa<strong>city</strong>, with<br />
monoammonium phosphate-based dry chemical in manufacturer's standard enameled<br />
container.<br />
2.4 FIRE-PROTECTION CABINET<br />
A. Basis-<strong>of</strong>-Design Product: Larsen’s Fire Extinguisher Cabinet, model FS C2409-6R-<br />
Semi-recessed or a comparable product by one <strong>of</strong> the following:<br />
10520-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
FIRE-PROTECTION SPECIALTIES<br />
B. Available Manufacturers:<br />
1. JL Industries, <strong>Inc</strong>.<br />
2. Kidde Fyrnetics.<br />
3. Larsen's Manufacturing Company.<br />
4. Potter Roemer; Div. <strong>of</strong> Smith Industries, <strong>Inc</strong>.<br />
C. Cabinet Type: Suitable for fire extinguisher.<br />
D. Cabinet Construction: Non-rated.<br />
E. Cabinet Material: Stainless-steel sheet.<br />
1. Shelf: Same metal and finish as cabinet.<br />
F. Semirecessed Cabinet: Cabinet box partially recessed in walls <strong>of</strong> shallow depth to suit<br />
style <strong>of</strong> trim indicated; with one-piece combination trim and perimeter door frame<br />
overlapping surrounding wall surface with exposed trim face and wall return at outer<br />
edge (backbend).<br />
1. Rolled-Edge Trim: 2-1/2-inch (64-mm) backbend depth.<br />
G. Cabinet Trim Material: Same material and finish as door.<br />
H. Door Material: Stainless-steel sheet.<br />
I. Door Style: Full bubble with frame.<br />
J. Door Glazing: Molded acrylic bubble.<br />
1. Acrylic Bubble Color: Clear, transparent.<br />
K. Door Hardware: Manufacturer's standard door-operating hardware <strong>of</strong> proper type for<br />
cabinet type, trim style, and door material and style indicated.<br />
1. Provide projecting door pull and friction latch, manufacturer's standard.<br />
2. Provide continuous hinge, <strong>of</strong> same material and finish as trim, permitting door to<br />
open 180 degrees.<br />
L. Finishes:<br />
1. Stainless Steel: No. 7 finish.<br />
2.5 FABRICATION<br />
A. Fire-Protection Cabinets: Provide manufacturer's standard box (tub), with trim, frame,<br />
door, and hardware to suit cabinet type, trim style, and door style indicated.<br />
1. Weld joints and grind smooth.<br />
2. Construct fire-rated cabinets with double walls fabricated from 0.0428-inch- (1.1-<br />
mm-) thick, cold-rolled steel sheet lined with minimum 5/8-inch- (16-mm-) thick,<br />
fire-barrier material.<br />
a. Provide factory-drilled mounting holes.<br />
B. Cabinet Doors: Fabricate doors according to manufacturer's standards, from materials<br />
indicated and coordinated with cabinet types and trim styles selected.<br />
10520-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
FIRE-PROTECTION SPECIALTIES<br />
1. Fabricate door frames with tubular stiles and rails and hollow-metal design,<br />
minimum 1/2 inch (13 mm) thick.<br />
2. Miter and weld perimeter door frames.<br />
C. Cabinet Trim: Fabricate cabinet trim in one piece with corners mitered, welded, and<br />
ground smooth.<br />
2.6 FINISHES, GENERAL<br />
A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products"<br />
for recommendations for applying and designating finishes.<br />
B. Finish fire-protection cabinets after assembly.<br />
C. Appearance <strong>of</strong> Finished Work: Variations in appearance <strong>of</strong> abutting or adjacent pieces<br />
are acceptable if they are within one-half <strong>of</strong> the range <strong>of</strong> approved Samples.<br />
Noticeable variations in the same piece are not acceptable. Variations in appearance<br />
<strong>of</strong> other components are acceptable if they are within the range <strong>of</strong> approved Samples<br />
and are assembled or installed to minimize contrast.<br />
2.7 STAINLESS-STEEL FINISHES<br />
A. General: Remove tool and die marks and stretch lines or blend into finish.<br />
1. Grind and polish surfaces to produce uniform, directionally textured, polished<br />
finish indicated, free <strong>of</strong> cross scratches. Run grain with long dimension <strong>of</strong> each<br />
piece.<br />
B. Satin, Reflective, Directional Polish: No. 7 finish.<br />
C. When polishing is completed, passivate and rinse surfaces. Remove embedded<br />
foreign matter and leave surfaces chemically clean.<br />
PART 3 - EXECUTION<br />
3.1 EXAMINATION<br />
A. Examine walls and partitions for suitable framing depth and blocking where<br />
semirecessed cabinets will be installed.<br />
B. Examine fire extinguishers for proper charging and tagging.<br />
1. Remove and replace damaged, defective, or undercharged units.<br />
C. Proceed with installation only after unsatisfactory conditions have been corrected.<br />
3.2 PREPARATION<br />
A. Prepare recesses for semirecessed fire-protection cabinets as required by type and<br />
size <strong>of</strong> cabinet and trim style.<br />
10520-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
FIRE-PROTECTION SPECIALTIES<br />
3.3 INSTALLATION<br />
A. General: Install fire-protection specialties in locations and at mounting heights<br />
indicated or, if not indicated, at heights acceptable to authorities having jurisdiction.<br />
B. Fire-Protection Cabinets: Fasten fire-protection cabinets to structure, square and<br />
plumb.<br />
1. Unless otherwise indicated, provide semirecessed fire-protection cabinets.<br />
C. Identification: Apply decals or vinyl lettering at locations indicated.<br />
D. Non-cabinet Mounted Extinguishers: Where extinguishers are not indicated to be<br />
mounted in cabinets, provide manufacturer’s standard bracket mounting assembly.<br />
3.4 ADJUSTING AND CLEANING<br />
A. Remove temporary protective coverings and strippable films, if any, as fire-protection<br />
specialties are installed, unless otherwise indicated in manufacturer's written<br />
installation instructions.<br />
B. Adjust fire-protection cabinet doors to operate easily without binding. Verify that<br />
integral locking devices operate properly.<br />
C. On completion <strong>of</strong> fire-protection cabinet installation, clean interior and exterior surfaces<br />
as recommended by manufacturer.<br />
D. Touch up marred finishes, or replace fire-protection cabinets that cannot be restored to<br />
factory-finished appearance. Use only materials and procedures recommended or<br />
furnished by fire-protection cabinet manufacturer.<br />
E. Replace fire-protection cabinets that have been damaged or have deteriorated beyond<br />
successful repair by finish touchup or similar minor repair procedures.<br />
END OF SECTION 10520<br />
10520-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 10530<br />
PREFABRICATED ALUMINUM WALKWAY COVERS<br />
PART 1 - GENERAL<br />
1.1 RELATED DOCUMENTS<br />
A. Drawings and general provisions <strong>of</strong> the Contract, including General and<br />
Supplementary Conditions and Division 1 Specification Sections, apply to this Section.<br />
1.2 SUMMARY<br />
A. This Section includes the following:<br />
1. Prefabricated aluminum walkway covers with internal drainage capabilities.<br />
B. Related Sections include the following:<br />
1. Division 3 Section “Cast-in-place Concrete” for concrete work associated with the<br />
canopy installation.<br />
2. Division 4 Section “Unit Masonry Assemblies” for masonry intersections with<br />
canopies.<br />
3. Division 7 Section "Flashing and Sheet Metal" for canopy flashing not provided<br />
by the canopy manufacturer.<br />
4. Division 7 Section "Joint Sealants" for field-applied sealants not otherwise<br />
specified in this Section.<br />
1.3 PERFORMANCE REQUIREMENTS<br />
A. General: Provide prefabricated walkway covers that comply with performance<br />
requirements specified as determined by testing manufacturers' standard assemblies<br />
similar to those indicated for this Project, by a qualified testing and inspecting agency.<br />
B. Structural Performance: Provide prefabricated walkway covers capable <strong>of</strong><br />
withstanding the effects <strong>of</strong> gravity loads and the following loads and stresses within<br />
limits and under conditions indicated on the structural drawings.<br />
C. Thermal Movements: Provide prefabricated walkway covers that allow for thermal<br />
movements resulting from the following maximum change (range) in ambient and<br />
surface temperatures by preventing buckling, opening <strong>of</strong> joints, overstressing <strong>of</strong><br />
components, failure <strong>of</strong> joint sealants, failure <strong>of</strong> connections, and other detrimental<br />
effects. Base engineering calculation on surface temperatures <strong>of</strong> materials due to both<br />
solar heat gain and nighttime-sky heat loss.<br />
1. Temperature Change (Range): 120 deg F (67 deg C), ambient; 180 deg F (100<br />
deg C), material surfaces.<br />
10530-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PREFABRICATED ALUMINUM WALKWAY COVERS<br />
1.4 SUBMITTALS<br />
A. Product Data: <strong>Inc</strong>lude construction details, material descriptions, dimensions <strong>of</strong><br />
individual components and pr<strong>of</strong>iles, and finishes for each type <strong>of</strong> prefabricated walkway<br />
covers and associated accessories.<br />
B. Shop Drawings: Submit shop drawings for fabrication and erection <strong>of</strong> prefabricated<br />
walkway covers and accessories. <strong>Inc</strong>lude plans, elevations and details <strong>of</strong> sections and<br />
connections to adjoining work. Indicate materials, finishes, fasteners, joinery and other<br />
information to determine compliance with specified requirements. For installed<br />
products indicated to comply with design loads, include structural analysis data signed<br />
and sealed by the qualified pr<strong>of</strong>essional engineer, registered in the State <strong>of</strong> Florida,<br />
responsible for their preparation. Submit design calculations confirming the<br />
prefabricated walkway covers meet or exceed all structural requirements <strong>of</strong> the<br />
authorities having jurisdiction.<br />
C. Warranties: Special warranties specified in this Section.<br />
D. Qualification Data: For Installer, manufacturer, pr<strong>of</strong>essional engineer.<br />
1.5 QUALITY ASSURANCE<br />
A. Comply with the Specifications for Aluminum Structures, Latest Edition, ASCE 7-95,<br />
Minimum Design Loads for Buildings and Other Structures, Latest Edition, American<br />
Architectural Manufacturers Association (AAMA) and the American Society for Testing<br />
and Materials (ASTM) recommendations for fabrication, construction details and<br />
installation procedures, except as otherwise indicated.<br />
B. Structural Performance: Provide prefabricated walkway cover systems capable <strong>of</strong><br />
withstanding the effects <strong>of</strong> gravity loads and the following loads and stresses within<br />
limits and under conditions indicated:<br />
1. Design Loads: As indicated on the Structural Engineering Drawings.<br />
2. Engineering Responsibility: Preparation <strong>of</strong> Shop Drawings and comprehensive<br />
engineering analysis by a qualified pr<strong>of</strong>essional engineer.<br />
C. Field Measurements: Verify size, location and placement <strong>of</strong> prefabricated walkway<br />
cover prior to fabrication.<br />
D. Installer Qualifications: An experienced erector who has specialized in erecting and<br />
installing work similar in material, design, and extent to that indicated for this Project<br />
and who is acceptable to manufacturer.<br />
E. Shop Assembly: Coordinate field measurements and shop drawings with fabrication<br />
and shop assembly to minimize field adjustments, mechanical attachment and field<br />
assembly <strong>of</strong> units. Pre-assemble units in ship to greatest extent possible and<br />
disassemble as necessary for shipping and handling limitations. Clearly mark units for<br />
re-assembly and coordinated installation.<br />
F. Warranties: Manufacturer’s standard one (1) year warranty.<br />
G. Source Limitations: Obtain each type <strong>of</strong> prefabricated walkway covers through one<br />
source from a single manufacturer.<br />
10530-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PREFABRICATED ALUMINUM WALKWAY COVERS<br />
H. Product Options: Drawings indicate size, pr<strong>of</strong>iles, and dimensional requirements <strong>of</strong><br />
prefabricated walkway covers are based on the specific system indicated. Refer to<br />
Division 1 Section "Product Requirements."<br />
1. Do not modify intended aesthetic effects, as judged solely by Architect, except<br />
with Architect's approval. If modifications are proposed, submit comprehensive<br />
explanatory data to Architect for review.<br />
1.6 DELIVERY, STORAGE, AND HANDLING<br />
A. Deliver components, sheets, prefabricated walkway cover components, and other<br />
manufactured items so as not to be damaged or deformed. Package prefabricated<br />
walkway cover components for protection during transportation and handling.<br />
B. Unload, store, and erect prefabricated walkway covers components in a manner to<br />
prevent bending, warping, twisting, and surface damage.<br />
C. Stack prefabricated walkway cover components horizontally on platforms or pallets,<br />
covered with suitable weathertight and ventilated covering. Store components to<br />
ensure dryness, with positive slope for drainage <strong>of</strong> <strong>water</strong>. Do not store components in<br />
contact with other materials that might cause staining, denting, or other surface<br />
damage.<br />
D. Protect strippable protective covering on metal prefabricated walkway covers<br />
components from exposure to sunlight and high humidity, except to extent necessary<br />
for period <strong>of</strong> prefabricated walkway covers installation.<br />
1.7 PROJECT CONDITIONS<br />
A. Field Measurements: Verify locations <strong>of</strong> structural members and wall opening<br />
dimensions by field measurements before prefabricated walkway covers fabrication<br />
and indicate measurements on Shop Drawings.<br />
1.8 COORDINATION<br />
A. Coordinate metal prefabricated walkway covers with structural supports and other<br />
adjoining work to provide a secure and noncorrosive installation.<br />
PART 2 - PRODUCTS<br />
2.1 MANUFACTURERS<br />
A. In other Part 2 articles where titles below introduce lists, the following requirements<br />
apply for product selection:<br />
1. Basis-<strong>of</strong>-Design Products: The design for each prefabricated walkway covers<br />
specified is based on the product specified. Subject to compliance with<br />
requirements, provide either the named product or a comparable product by<br />
another manufacturer.<br />
10530-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
2.2 PREFABRICATED ALUMINUM WALKWAY COVER DESIGN<br />
PREFABRICATED ALUMINUM WALKWAY COVERS<br />
A. Protective cover shall be all welded extruded aluminum system complete with internal<br />
drainage. Non-welded systems are not acceptable.<br />
2.3 PREFABRICATED WALKWAY COVER MATERIALS<br />
A. Aluminum Members: All sections shall be extruded aluminum 6063 alloy, heat treated<br />
to T-6 temper.<br />
B. Fasteners: Fasteners shall be aluminum, 18-8 stainless steel or 300 series stainless<br />
steel.<br />
C. Protective coating: Aluminum columns embedded in concrete shall be protected by<br />
clear acrylic.<br />
D. Grout: Grout shall be 2000 p.s.i. compressive strength, 1 part Portland cement and 3<br />
parts masonry sand. Add <strong>water</strong> to produce pouring consistency.<br />
E. Gaskets: Gaskets shall be dry seal santoprene pressure type.<br />
F. Aluminum Extrusions: Extruded Aluminum Alloy 6063-T6:<br />
1. Surface: Smooth, flat finish.<br />
2. Exposed Finishes: Apply the following coil coating, as specified or indicated on<br />
Drawings.<br />
a. Class I, Clear Anodic Finish: AA-M12C22A41 (Mechanical Finish:<br />
nonspecular as fabricated; Chemical Finish: etched, medium matte;<br />
Anodic Coating: Architectural Class I, clear coating 0.018 mm or thicker)<br />
complying with AAMA 611.<br />
2.4 PREFABRICATED WALKWAY COVER CONSTRUCTION<br />
A. General: Provide factory-formed internally draining prefabricated walkway covers <strong>of</strong><br />
design, materials, sizes, depth, arrangement, and metal thickness as indicated and as<br />
required for optimum performance with respect to strength; durability; and uniform<br />
appearance. <strong>Inc</strong>lude supports, anchorages, and accessories required for complete<br />
assembly.<br />
B. Basis-<strong>of</strong>-Design Product: as manufactured by Peachtree Protective Covers, <strong>Inc</strong>., 1477<br />
Rosedale Drive, Hiram, GA 30141, phone 770-439-2120 or a comparable product.<br />
a. Exterior Finish: Clear anondized.<br />
2.5 PREFABRICATED ALUMINUM WALKWAY COVER COMPONENTS<br />
A. Columns: Columns shall be radius-cornered tubular extrusion <strong>of</strong> size shown on<br />
drawings with cutout and internal diverter for drainage where indicated. Circular<br />
downspout opening in column not acceptable.<br />
10530-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PREFABRICATED ALUMINUM WALKWAY COVERS<br />
B. Beams: Beams shall be open-top tubular extrusion <strong>of</strong> size and shape shown on<br />
drawings, top edges thickened for strength and designed to receive deck members in<br />
self-flashing manner. Structural ties shall be installed in tops <strong>of</strong> all beams.<br />
C. Deck: Deck shall be extruded self-flashing sections interlocking into a composite unit.<br />
Closures at deck ends shall be welded plates.<br />
D. Fascia: Fascia shall be manufacturer’s standard shape. Size as indicated on<br />
drawings.<br />
2.6 FABRICATION<br />
A. General: Fabricate and finish prefabricated walkway covers accessories at the factory<br />
to greatest extent possible, by manufacturer's standard procedures and processes, as<br />
necessary to fulfill indicated performance requirements. Comply with indicated pr<strong>of</strong>iles<br />
and with dimensional and structural requirements.<br />
1. Form panel lines, breaks, and angles to be sharp and true, with surfaces free<br />
from warp and buckle.<br />
B. Bent Construction: Beams and columns shall be factory welded with neatly mitered<br />
corners into one-piece rigid bents. All welds shall be smooth and uniform using an<br />
inert gas shielded arc. Suitable edge preparation shall be performed to assure 100%<br />
penetration. Grind welds only where interfering with adjoining structure to allow for<br />
flush connection. Field welding is not permitted. Rigid mechanical joints shall be used<br />
when shipping limitations prohibit the shipment <strong>of</strong> fully welded bents.<br />
C. Deck Construction: Deck shall be manufactured <strong>of</strong> extruded modules that interlock in a<br />
self-flashing manner. Interlocking joints shall be positively fastened at 8” O.C. creating<br />
a monolithic structural unit capable <strong>of</strong> developing the full strength <strong>of</strong> the sections. The<br />
fastenings must have minimum shear strength <strong>of</strong> 350 pounds each. Deck shall be<br />
assembled with sufficient camber to <strong>of</strong>fset dead load deflection.<br />
2.7 FINISHES, GENERAL<br />
A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products"<br />
for recommendations for applying and designating finishes.<br />
B. Protect mechanical and painted finishes on exposed surfaces from damage by<br />
applying a strippable, temporary protective covering before shipping.<br />
PART 3 - EXECUTION<br />
3.1 EXAMINATION<br />
A. Examine substrates, areas, and conditions, with Installer present, for compliance with<br />
requirements for installation tolerances, supports, and other conditions affecting<br />
performance <strong>of</strong> work.<br />
10530-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PREFABRICATED ALUMINUM WALKWAY COVERS<br />
1. Examine column sleeves and anchor bolts and other prefabricated walkway<br />
cover support components to verify that they have been installed within<br />
alignment tolerances required by prefabricated walkway covers manufacturer.<br />
2. For the record, prepare written report, endorsed by Installer, listing conditions<br />
detrimental to performance <strong>of</strong> work.<br />
B. Proceed with installation only after unsatisfactory conditions have been corrected.<br />
3.2 PREPARATION<br />
A. Erection shall be performed after all concrete, masonry, and ro<strong>of</strong>ing work in the vicinity<br />
is completed and cleaned.<br />
B. Clean substrates <strong>of</strong> substances harmful to insulation, including removing projections<br />
capable <strong>of</strong> interfering with attachment.<br />
C. Install flashings and other sheet metal to comply with requirements specified in<br />
Division 7 Section "Sheet Metal Flashing and Trim."<br />
3.3 PREFABRICATED ALUMINUM WALKWAY COVER INSTALLATION, GENERAL<br />
A. General: Install prefabricated walkway covers in orientation, sizes, and locations<br />
indicated on Drawings and in full compliance with manufacturer’s instructions. Install<br />
extrusions perpendicular to vertical supports, unless otherwise indicated. Anchor<br />
prefabricated walkway covers and other components <strong>of</strong> the work securely in place, with<br />
provisions for thermal and structural movement.<br />
1. Field cutting <strong>of</strong> prefabricated walkway covers components by torch is not<br />
permitted.<br />
2. Anchor prefabricated walkway covers to building substructure as indicated.<br />
3. Cut and trim component parts during erection only with the approval <strong>of</strong> the<br />
manufacturer or fabricator, and in accordance with their recommendations.<br />
Restore finish completely. Remove and replace members where cutting and<br />
trimming has impaired the strength or appearance <strong>of</strong> the assemblies as directed.<br />
4. Do not erect warped, bowed, deformed or otherwise damages or defaced<br />
members. Remove and replace any members damaged in the erection process<br />
as directed.<br />
5. Locate and space fastenings in uniform vertical and horizontal alignment.<br />
6. Install flashing and trim as prefabricated walkway covers work proceeds.<br />
B. Column Sleeves: Column sleeves (Styr<strong>of</strong>oam blockouts) or anchor bolts (if required)<br />
shall be furnished by Canopy manufacturer and installed by the General Contractor.<br />
C. Erection: Protective cover shall be erected true to line, level and plumb. Aluminum<br />
columns embedded in concrete shall be protected by clear acrylic. Downspout<br />
columns shall be filled with grout to the discharge level to prevent standing <strong>water</strong>.<br />
Non-draining columns shall have weep holes installed at top <strong>of</strong> concrete to remove<br />
condensation.<br />
10530-6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PREFABRICATED ALUMINUM WALKWAY COVERS<br />
3.4 ERECTION TOLERANCES<br />
A. Erection Tolerances: Variation from level: +/- 1/4” maximum in any column to column<br />
space or 20’-0” runs, non-cumulative.<br />
3.5 FIELD QUALITY CONTROL<br />
A. Remove and replace applications <strong>of</strong> prefabricated walkway covers where inspections<br />
indicate that they do not comply with specified requirements.<br />
3.6 CLEANING AND PROTECTION<br />
A. Remove temporary protective coverings and strippable films, if any, as prefabricated<br />
walkway covers are installed, unless otherwise indicated in manufacturer's written<br />
installation instructions. On completion <strong>of</strong> prefabricated walkway covers installation,<br />
clean finished surfaces as recommended by prefabricated walkway covers<br />
manufacturer. Maintain in a clean condition during construction.<br />
B. Replace prefabricated walkway covers components that have been damaged or have<br />
deteriorated beyond successful repair.<br />
END OF SECTION 10530<br />
10530-7<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 10700<br />
EXTERIOR SUN CONTROL DEVICES<br />
PART 1 - GENERAL<br />
1.1 RELATED DOCUMENTS<br />
A. Drawings and general provisions <strong>of</strong> the Contract, including General and<br />
Supplementary Conditions and Division 1 Specification Sections, apply to this Section.<br />
1.2 SUMMARY<br />
A. This Section includes the following:<br />
1. Custom factory-formed and mechanically assembled, exterior sunshades.<br />
B. Related Sections include the following:<br />
1. Division 5 Section "Structural Steel" for secondary support framing supporting<br />
metal sunshades.<br />
2. Division 7 Section "Joint Sealants" for field-applied sealants not otherwise<br />
specified in this Section.<br />
1.3 PERFORMANCE REQUIREMENTS<br />
A. General: Provide sunshades that comply with performance requirements specified as<br />
determined by testing manufacturers' standard assemblies similar to those indicated for<br />
this Project, by a qualified testing and inspecting agency.<br />
B. Structural Performance: Provide sunshades capable <strong>of</strong> withstanding the effects <strong>of</strong><br />
gravity loads and the following loads and stresses within limits and under conditions<br />
indicated on the structural drawings.<br />
C. Thermal Movements: Provide sunshades that allow for thermal movements resulting<br />
from the following maximum change (range) in ambient and surface temperatures by<br />
preventing buckling, opening <strong>of</strong> joints, overstressing <strong>of</strong> components, failure <strong>of</strong> joint<br />
sealants, failure <strong>of</strong> connections, and other detrimental effects. Base engineering<br />
calculation on surface temperatures <strong>of</strong> materials due to both solar heat gain and<br />
nighttime-sky heat loss.<br />
1. Temperature Change (Range): 120 deg F (67 deg C), ambient; 180 deg F (100<br />
deg C), material surfaces.<br />
1.4 SUBMITTALS<br />
A. Product Data: <strong>Inc</strong>lude construction details, material descriptions, dimensions <strong>of</strong><br />
individual components and pr<strong>of</strong>iles, and finishes for each type <strong>of</strong> sunshade and<br />
associated accessories.<br />
10700-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
EXTERIOR SUN CONTROL DEVICES<br />
B. Shop Drawings: Submit shop drawings for fabrication and erection <strong>of</strong> sunshade and<br />
accessories. <strong>Inc</strong>lude plans, elevations and details <strong>of</strong> sections and connections to<br />
adjoining work. Indicate materials, finishes, fasteners, joinery and other information to<br />
determine compliance with specified requirements. Distinguish between factory- and<br />
field-assembled work.<br />
C. Shop Drawings: Submit shop drawings for fabrication and erection <strong>of</strong> prefabricated<br />
aluminum canopies and accessories. <strong>Inc</strong>lude plans, elevations and details <strong>of</strong> sections<br />
and connections to adjoining work. Indicate materials, finishes, fasteners, joinery and<br />
other information to determine compliance with specified requirements. For installed<br />
products indicated to comply with design loads, include structural analysis data signed<br />
and sealed by the qualified pr<strong>of</strong>essional engineer, registered in the State <strong>of</strong> Florida,<br />
responsible for their preparation. Submit design calculations confirming the<br />
prefabricated aluminum canopies meet or exceed all structural requirements <strong>of</strong> the<br />
authorities having jurisdiction.<br />
D. Warranties: Special warranties specified in this Section.<br />
1.5 QUALITY ASSURANCE<br />
A. Comply with SMACNA “Architectural Sheet Metal Manual” recommendations for<br />
fabrication, construction details and installation procedures, except as otherwise<br />
indicated.<br />
B. Field Measurements: Verify size, location and placement <strong>of</strong> sunshades prior to<br />
fabrication.<br />
C. Shop Assembly: Coordinate field measurements and shop drawings with fabrication<br />
and shop assembly to minimize field adjustments, mechanical attachment and field<br />
assembly <strong>of</strong> units. Pre-assemble units in ship to greatest extent possible and<br />
disassemble as necessary for shipping and handling limitations. Clearly mark units for<br />
re-assembly and coordinated installation.<br />
D. Structural Performance: Provide prefabricated aluminum canopy systems capable <strong>of</strong><br />
withstanding the effects <strong>of</strong> gravity loads and the following loads and stresses within<br />
limits and under conditions indicated:<br />
1. Design Loads: As indicated on Drawings.<br />
2. Engineering Responsibility: Preparation <strong>of</strong> Shop Drawings and comprehensive<br />
engineering analysis by a qualified pr<strong>of</strong>essional engineer registered in the State<br />
<strong>of</strong> Florida.<br />
3. Analysis <strong>of</strong> blade deflection shall be limited to L/120, 3/4 inch, or as required by<br />
code.<br />
E. Installer Qualifications: An experienced installer who has specialized in erecting and<br />
installing work similar in material, design, and extent to that indicated for this Project<br />
and who is acceptable to manufacturer.<br />
F. Shop Assembly: Coordinate field measurements and shop drawings with fabrication<br />
and shop assembly to minimize field adjustments, mechanical attachment and field<br />
assembly <strong>of</strong> units. Pre-assemble units in ship to greatest extent possible and<br />
disassemble as necessary for shipping and handling limitations. Clearly mark units for<br />
re-assembly and coordinated installation.<br />
10700-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
EXTERIOR SUN CONTROL DEVICES<br />
G. Warranties: Manufacturer’s standard one (1) year warranty.<br />
H. Source Limitations: Obtain each type <strong>of</strong> prefabricated exterior sun control device and<br />
components through one source from a single manufacturer.<br />
I. Product Options: Drawings indicate size, pr<strong>of</strong>iles, and dimensional requirements <strong>of</strong><br />
sunshade are based on the specific system indicated. Refer to Division 1 Section<br />
"Product Requirements."<br />
1. Do not modify intended aesthetic effects, as judged solely by Architect, except<br />
with Architect's approval. If modifications are proposed, submit comprehensive<br />
explanatory data to Architect for review.<br />
1.6 DELIVERY, STORAGE, AND HANDLING<br />
A. Deliver components, sheets, equipment enclosure panels, and other manufactured<br />
items so as not to be damaged or deformed. Package sunshades for protection during<br />
transportation and handling.<br />
B. Unload, store, and erect sunshade components in a manner to prevent bending,<br />
warping, twisting, and surface damage.<br />
C. Stack sunshade components horizontally on platforms or pallets, covered with suitable<br />
weathertight and ventilated covering. Store components to ensure dryness, with<br />
positive slope for drainage <strong>of</strong> <strong>water</strong>. Do not store components in contact with other<br />
materials that might cause staining, denting, or other surface damage.<br />
D. Protect strippable protective covering on metal sunshade components from exposure<br />
to sunlight and high humidity, except to extent necessary for period <strong>of</strong> sunshade<br />
installation.<br />
1.7 PROJECT CONDITIONS<br />
A. Field Measurements: Verify locations <strong>of</strong> structural members and wall opening<br />
dimensions by field measurements before sunshade fabrication and indicate<br />
measurements on Shop Drawings.<br />
1.8 COORDINATION<br />
A. Coordinate metal sunshades with structural supports and other adjoining work to<br />
provide a secure and noncorrosive installation.<br />
PART 2 - PRODUCTS<br />
2.1 MANUFACTURERS<br />
A. In other Part 2 articles where titles below introduce lists, the following requirements<br />
apply for product selection:<br />
10700-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
EXTERIOR SUN CONTROL DEVICES<br />
1. Basis-<strong>of</strong>-Design Products: The design for each metal sunshade specified is<br />
based on the product named. Subject to compliance with requirements, provide<br />
either the named product or a comparable product by one <strong>of</strong> the other<br />
manufacturers specified.<br />
2.2 SUNSHADE MATERIALS<br />
A. Clip Angles: Structural grade aluminum.<br />
B. Fastenings: Fasteners shall be aluminum or stainless steel. Provide types, gauges<br />
and lengths to suit unit installation conditions.<br />
C. Anchors and Inserts: Use non-ferrous metal or hot-dip galvanized anchors and inserts<br />
for installation and elsewhere as required for corrosion resistance. Use stainless steel<br />
or lead expansion bolt devices for drilled-in place anchors. Furnish inserts, as<br />
required, to be set into concrete or masonry work.<br />
D. Aluminum Extrusions: ASTM B211, Alloy 6063-T5:<br />
1. Surface: Smooth, flat finish.<br />
2. Exposed Finishes: Apply the following coil coating, as specified or indicated on<br />
Drawings.<br />
a. Class I, Clear Anodic Finish: AA-M12C22A41 (Mechanical Finish:<br />
nonspecular as fabricated; Chemical Finish: etched, medium matte;<br />
Anodic Coating: Architectural Class I, clear coating 0.018 mm or thicker)<br />
complying with AAMA 611.<br />
2.3 SUNSHADE CONSTRUCTION<br />
A. General: Provide factory-formed metal sunshades <strong>of</strong> design, materials, sizes, depth,<br />
arrangement, and metal thickness as indicated and as required for optimum<br />
performance with respect to strength; durability; and uniform appearance. <strong>Inc</strong>lude<br />
supports, anchorages, and accessories required for complete assembly.<br />
B. Basis-<strong>of</strong>-Design Product: C/S Sunshade Model 100-3 as manufactured by Construction<br />
Specialties, <strong>Inc</strong>., 49 Meeker Avenue, Cranford, NJ 07016; 1-800-631-7379, or a<br />
comparable product.<br />
C. All fascia, blades, and outrigger components shall be fabricated from extruded<br />
aluminum sections in (ASTM B211) 6063-T5 alloy.<br />
D. Outrigger support tab brackets shall be high strength aluminum. Outriggers shall be<br />
custom fabricated aluminum flat channel fabricated to the pr<strong>of</strong>iles detailed. Outriggers<br />
to be a minimum <strong>of</strong> ¼” thick, six inches tall. Double end plates are required at all<br />
outrigger conditions. Outriggers to be secured to steel “tabs” that are welded to the<br />
steel support tube.<br />
E. Blades shall be 6 inch tall, longspan, extruded aluminum and <strong>of</strong> a box shape as<br />
detailed. Blades shall be factory assembled to outriggers using stainless steel, type F,<br />
thread cutting screws through internal slots in blades. Welded construction is not<br />
acceptable. Blades must be mechanically secured to allow for replacement in case <strong>of</strong><br />
10700-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
EXTERIOR SUN CONTROL DEVICES<br />
damage. Fasteners to be hex head. Blades to be miter cut and fitted to outrigger<br />
channels.<br />
F. No fascia.<br />
G. Sunshades are to be shipped in corded sections to be fitted to support members by the<br />
installer.<br />
a. Exterior Finish: Clear anondized.<br />
2.4 FABRICATION<br />
A. General: Fabricate and finish sunshades and accessories at the factory to greatest<br />
extent possible, by manufacturer's standard procedures and processes, as necessary<br />
to fulfill indicated performance requirements. Comply with indicated pr<strong>of</strong>iles and with<br />
dimensional and structural requirements.<br />
1. Form panel lines, breaks, and angles to be sharp and true, with surfaces free<br />
from warp and buckle.<br />
2. Provide fixed Sunshades and accessories <strong>of</strong> design, material, sizes, depth,<br />
arrangement, and thickness as indicated or as required for optimal performance<br />
with respect to strength; durability; and uniform appearance.<br />
3. <strong>Inc</strong>lude supports, anchorage and accessories required for complete assembly.<br />
2.5 FINISHES, GENERAL<br />
A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products"<br />
for recommendations for applying and designating finishes.<br />
B. Protect mechanical and painted finishes on exposed surfaces from damage by<br />
applying a strippable, temporary protective covering before shipping.<br />
C. Appearance <strong>of</strong> Finished Work: Variations in appearance <strong>of</strong> abutting or adjacent pieces<br />
are acceptable if they are within one-half <strong>of</strong> the range <strong>of</strong> approved Samples.<br />
Noticeable variations in the same piece are not acceptable. Variations in appearance<br />
<strong>of</strong> other components are acceptable if they are within the range <strong>of</strong> approved Samples<br />
and are assembled or installed to minimize contrast.<br />
PART 3 - EXECUTION<br />
3.1 EXAMINATION<br />
A. Examine substrates, areas, and conditions, with Installer present, for compliance with<br />
requirements for installation tolerances, sunshade supports, and other conditions<br />
affecting performance <strong>of</strong> work.<br />
10700-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
EXTERIOR SUN CONTROL DEVICES<br />
1. Examine primary and secondary wall framing to verify that girts, angles,<br />
channels, studs, and other sunshade support members and anchorage have<br />
been installed within alignment tolerances required by sunshade manufacturer.<br />
2. For the record, prepare written report, endorsed by Installer, listing conditions<br />
detrimental to performance <strong>of</strong> work.<br />
B. Proceed with installation only after unsatisfactory conditions have been corrected.<br />
3.2 PREPARATION<br />
A. Clean substrates <strong>of</strong> substances harmful to insulation, including removing projections<br />
capable <strong>of</strong> interfering with attachment.<br />
B. Install flashings and other sheet metal to comply with requirements specified in<br />
Division 7 Section "Sheet Metal Flashing and Trim."<br />
3.3 SUNSHADE INSTALLATION, GENERAL<br />
A. General: Install sunshades in orientation, sizes, and locations indicated on Drawings<br />
and in full compliance with manufacturer’s instructions. Install extrusions perpendicular<br />
to vertical supports, unless otherwise indicated. Anchor sunshades and other<br />
components <strong>of</strong> the work securely in place, with provisions for thermal and structural<br />
movement.<br />
1. Field cutting <strong>of</strong> sunscreen components by torch is not permitted.<br />
2. Anchor sunshade to building substructure as indicated.<br />
3. Miter sunshade fascia assembly at outside corners as indicated.<br />
4. Cut and trim component parts during erection only with the approval <strong>of</strong> the<br />
manufacturer or fabricator, and in accordance with their recommendations.<br />
Restore finish completely. Remove and replace members where cutting and<br />
trimming has impaired the strength or appearance <strong>of</strong> the assemblies as directed.<br />
5. Do not erect warped, bowed, deformed or otherwise damages or defaced<br />
members. Remove and replace any members damaged in the erection process<br />
as directed.<br />
6. Install screw fasteners in predrilled holes.<br />
7. Locate and space fastenings in uniform vertical and horizontal alignment.<br />
8. Install flashing and trim as sunshade work proceeds.<br />
B. Metal Protection: Where dissimilar metals will contact each other or corrosive<br />
substrates, protect against galvanic action by painting contact surfaces with bituminous<br />
coating, by applying rubberized-asphalt underlayment to each contact surface, or by<br />
other permanent separation as recommended by sunshade manufacturer.<br />
1. Coat back side <strong>of</strong> sunshade components with bituminous coating or isolation<br />
tape where wall panels will contact wood, ferrous metal, or cementitious<br />
construction.<br />
2. Prepare joints and apply sealants to comply with requirements in Division 7<br />
Section "Joint Sealants."<br />
10700-6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
EXTERIOR SUN CONTROL DEVICES<br />
3.4 ERECTION TOLERANCES<br />
A. Erection Tolerances: Variation from level: +/- 1/8” maximum in any column to column<br />
space or 20’-0” runs, non-cumulative.<br />
B. Offsets in end-to-end or edge-to-edge alignment <strong>of</strong> consecutive members 1/32”.<br />
3.5 FIELD QUALITY CONTROL<br />
A. Remove and replace applications <strong>of</strong> sunshades where inspections indicate that they do<br />
not comply with specified requirements.<br />
3.6 CLEANING AND PROTECTION<br />
A. Remove temporary protective coverings and strippable films, if any, as sunshades are<br />
installed, unless otherwise indicated in manufacturer's written installation instructions.<br />
On completion <strong>of</strong> sunshade installation, clean finished surfaces as recommended by<br />
sunshade manufacturer. Maintain in a clean condition during construction.<br />
B. Replace sunshade components that have been damaged or have deteriorated beyond<br />
successful repair.<br />
END OF SECTION 10700<br />
10700-7<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 10801<br />
TOILET AND BATH ACCESSORIES<br />
PART 1 - GENERAL<br />
1.1 RELATED DOCUMENTS<br />
A. Drawings and general provisions <strong>of</strong> the Contract, including General and<br />
Supplementary Conditions and Division 1 Specification Sections, apply to this Section.<br />
1.2 SUMMARY<br />
A. This Section includes the following:<br />
1. Toilet and bath accessories.<br />
2. Underlavatory guards.<br />
B. Related Sections include the following:<br />
1. Division 9 Section "Ceramic Tile" for ceramic toilet and bath accessories.<br />
1.3 QUALITY ASSURANCE<br />
A. Source Limitations: Provide products <strong>of</strong> same manufacturer for each type <strong>of</strong> accessory<br />
unit and for units exposed to view in same areas, unless otherwise approved by<br />
Architect.<br />
1. Products <strong>of</strong> other manufacturers with equal characteristics, as judged solely by<br />
Architect, may be provided.<br />
1.4 COORDINATION<br />
A. Coordinate accessory locations with other work to prevent interference with clearances<br />
required for access by disabled persons, proper installation, adjustment, operation,<br />
cleaning, and servicing <strong>of</strong> accessories.<br />
B. Deliver inserts and anchoring devices set into concrete or masonry as required to<br />
prevent delaying the Work.<br />
PART 2 - PRODUCTS<br />
2.1 MANUFACTURERS<br />
A. Manufacturers: Subject to compliance with requirements, provide accessories by one<br />
<strong>of</strong> the following:<br />
1. Toilet and Bath Accessories:<br />
10801-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
TOILET AND BATH ACCESSORIES<br />
a. A & J Washroom Accessories, <strong>Inc</strong>.<br />
b. American Specialties, <strong>Inc</strong>.<br />
c. Bobrick Washroom Equipment, <strong>Inc</strong>.<br />
d. Bradley Corporation.<br />
2. Underlavatory Guards:<br />
a. Brocar Products, <strong>Inc</strong>.<br />
b. Truebro, <strong>Inc</strong>.<br />
B. Products: Subject to compliance with requirements, provide one <strong>of</strong> the products<br />
indicated for each designation in the Toilet and Bath Accessory Schedule on the<br />
drawings.<br />
2.2 MATERIALS<br />
A. Stainless Steel: ASTM A 666, Type 304, with No. 4 finish (satin), in 0.0312-inch (0.8-<br />
mm) minimum nominal thickness, unless otherwise indicated.<br />
B. Brass: ASTM B 19, leaded and unleaded flat products; ASTM B 16 (ASTM B 16M),<br />
rods, shapes, forgings, and flat products with finished edges; ASTM B 30, castings.<br />
C. Sheet Steel: ASTM A 366/A 366M, cold rolled, commercial quality, 0.0359-inch (0.9-<br />
mm) minimum nominal thickness; surface preparation and metal pre<strong>treatment</strong> as<br />
required for applied finish.<br />
D. Galvanized Steel Sheet: ASTM A 653/A 653M, G60 (Z180).<br />
E. Chromium Plating: ASTM B 456, Service Condition Number SC 2 (moderate service),<br />
nickel plus chromium electrodeposited on base metal.<br />
F. Mirror Glass: ASTM C 1036, Type I, Class 1, Quality q2, nominal 6.0 mm thick, with<br />
silvering, electroplated copper coating, and protective organic coating complying with<br />
FS DD-M-411.<br />
G. Galvanized Steel Mounting Devices: ASTM A 153/A 153M, hot-dip galvanized after<br />
fabrication.<br />
H. Fasteners: Screws, bolts, and other devices <strong>of</strong> same material as accessory unit,<br />
tamper and theft resistant when exposed, and <strong>of</strong> galvanized steel when concealed.<br />
2.3 FABRICATION<br />
A. General: One, maximum 1-1/2-inch- (38-mm-) diameter, unobtrusive stamped<br />
manufacturer logo, as approved by Architect, is permitted on exposed face <strong>of</strong><br />
accessories. On interior surface not exposed to view or back surface <strong>of</strong> each<br />
accessory, provide printed, <strong>water</strong>pro<strong>of</strong> label or stamped nameplate indicating<br />
manufacturer's name and product model number.<br />
B. General: Names or labels are not permitted on exposed faces <strong>of</strong> accessories. On<br />
interior surface not exposed to view or on back surface <strong>of</strong> each accessory, provide<br />
10801-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
TOILET AND BATH ACCESSORIES<br />
printed, <strong>water</strong>pro<strong>of</strong> label or stamped nameplate indicating manufacturer's name and<br />
product model number.<br />
C. Surface-Mounted Toilet Accessories: Unless otherwise indicated, fabricate units with<br />
tight seams and joints, and exposed edges rolled. Hang doors and access panels with<br />
continuous stainless-steel hinge. Provide concealed anchorage where possible.<br />
D. Recessed Toilet Accessories: Unless otherwise indicated, fabricate units <strong>of</strong> all-welded<br />
construction, without mitered corners. Hang doors and access panels with full-length,<br />
stainless-steel hinge. Provide anchorage that is fully concealed when unit is closed.<br />
E. Keys: Provide universal keys for internal access to accessories for servicing and<br />
resupplying. Provide minimum <strong>of</strong> six keys to Owner's representative.<br />
PART 3 - EXECUTION<br />
3.1 INSTALLATION<br />
A. Install accessories according to manufacturers' written instructions, using fasteners<br />
appropriate to substrate indicated and recommended by unit manufacturer. Install<br />
units level, plumb, and firmly anchored in locations and at heights indicated.<br />
B. Secure mirrors to walls in concealed, tamper-resistant manner with special hangers,<br />
toggle bolts, or screws. Set units level, plumb, and square at locations indicated,<br />
according to manufacturer's written instructions for substrate indicated.<br />
C. Install grab bars to withstand a downward load <strong>of</strong> at least 250 lbf (1112 N), when tested<br />
according to method in ASTM F 446.<br />
3.2 ADJUSTING AND CLEANING<br />
A. Adjust accessories for unencumbered, smooth operation and verify that mechanisms<br />
function properly. Replace damaged or defective items.<br />
B. Remove temporary labels and protective coatings.<br />
C. Clean and polish exposed surfaces according to manufacturer's written<br />
recommendations.<br />
3.3 TOILET AND BATH ACCESSORY SCHEDULE – REFER TO DRAWINGS<br />
END OF SECTION 10801<br />
10801-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 11451<br />
RESIDENTIAL APPLIANCES<br />
PART 1 - GENERAL<br />
1.1 SUMMARY<br />
A. This Section includes the following:<br />
1. Cooking equipment.<br />
2. Refrigerator/freezers.<br />
3. Icemakers.<br />
4. Dishwashers.<br />
1.2 SUBMITTALS<br />
A. Product Data: For each type <strong>of</strong> product indicated.<br />
B. Maintenance data.<br />
1.3 QUALITY ASSURANCE<br />
A. Installer Qualifications: An employer <strong>of</strong> workers trained and approved by manufacturer<br />
for installation and maintenance <strong>of</strong> units required for this Project.<br />
B. Electrical Components, Devices, and Accessories: Listed and labeled as defined in<br />
NFPA 70, Article 100, by a testing agency acceptable to authorities having jurisdiction,<br />
and marked for intended use.<br />
C. Residential Appliances: Comply with NAECA standards.<br />
D. Energy Ratings: Provide appliances that qualify for the EPA/DOE ENERGY STAR<br />
product labeling program.<br />
1.4 WARRANTY<br />
A. Special Warranty: Manufacturer's standard form in which manufacturer <strong>of</strong> each<br />
appliance specified agrees to repair or replace residential appliances or components<br />
that fail in materials or workmanship within specified warranty period.<br />
1. Electric Range: Five-year limited warranty for in-home service on surface-burner<br />
elements.<br />
2. Refrigerator/Freezer: Five-year limited warranty for in-home service on the<br />
sealed refrigeration system.<br />
3. Dishwasher: 10-year warranty for in-home service against deterioration <strong>of</strong> tub<br />
and door liner.<br />
11451-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
RESIDENTIAL APPLIANCES<br />
PART 2 - PRODUCTS<br />
2.1 MANUFACTURERS<br />
A. In other Part 2 articles where titles below introduce lists, the following requirements<br />
apply to product selection:<br />
1. Basis-<strong>of</strong>-Design Product: The design for each residential appliance is based on<br />
the product named. Subject to compliance with requirements, provide either the<br />
named product or a comparable product by one <strong>of</strong> the other manufacturers<br />
specified.<br />
2.2 COOKING APPLIANCES<br />
A. Built-in Microwave Oven:<br />
1. Basis-<strong>of</strong>-Design Product: KitchenAid Model KBMS1454SSS or a comparable<br />
product.<br />
2. Type: Built-in.<br />
3. Finish – Stainless steel.<br />
2.3 REFRIGERATION APPLIANCES<br />
A. Refrigerator/Freezer:<br />
1. Basis-<strong>of</strong>-Design Product: KitchenAid Model KBFS20ETSS or a comparable<br />
product.<br />
2. Type: Freestanding, French door top, pull out bottom freezer.<br />
3. Storage capa<strong>city</strong>: 19.7 Cu.Ft.<br />
4. Front Panel: Manufacturer's standard stainless steel.<br />
B. Icemaker IC:<br />
1. Basis-<strong>of</strong>-Design Product: KitchenAid Model KUIC18NNTS or a comparable<br />
product.<br />
2. Type: Under the counter.<br />
3. Front Panel: Manufacturer's standard stainless steel.<br />
2.4 CLEANING APPLIANCES<br />
A. Dishwasher DW:<br />
1. Basis-<strong>of</strong>-Design Product: KitchenAid Model KUDS03STSS or a comparable<br />
product.<br />
11451-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
RESIDENTIAL APPLIANCES<br />
2. Type: Under the counter, 24 inches wide.<br />
3. Front Panel: Manufacturer’s standard stainless steel.<br />
PART 3 - EXECUTION<br />
3.1 INSTALLATION, GENERAL<br />
A. Built-in Equipment: Securely anchor units to supporting cabinets or countertops with<br />
concealed fasteners. Verify that clearances are adequate for proper functioning and<br />
rough openings are completely concealed.<br />
B. Freestanding Equipment: Place units in final locations after finishes have been<br />
completed in each area. Verify that clearances are adequate to properly operate<br />
equipment.<br />
C. Utilities: Refer to Divisions 15 and 16 for plumbing and electrical requirements.<br />
END OF SECTION 11451<br />
11451-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 12491<br />
HORIZONTAL LOUVER BLINDS<br />
PART 1 - GENERAL<br />
1.1 RELATED DOCUMENTS<br />
A. Drawings and general provisions <strong>of</strong> the Contract, including General and<br />
Supplementary Conditions and Division 1 Specification Sections, apply to this Section.<br />
1.2 SUMMARY<br />
A. This Section includes the following types <strong>of</strong> venetian blinds and accessories:<br />
1. Miniblinds with aluminum louver slats.<br />
B. Related Sections include the following:<br />
1. Division 6 Section "Miscellaneous Carpentry" for wood blocking and grounds for<br />
mounting horizontal louver blinds and accessories.<br />
1.3 DEFINITIONS<br />
A. Miniblind: Venetian blind with nominal 1-inch- (25-mm-) wide louver slat.<br />
1.4 SUBMITTALS<br />
A. Product Data: For each type <strong>of</strong> product indicated. <strong>Inc</strong>lude styles, material<br />
descriptions, construction details, dimensions <strong>of</strong> individual components and pr<strong>of</strong>iles,<br />
features, finishes, and operating instructions.<br />
B. Samples for Initial Selection: For each colored component <strong>of</strong> each type <strong>of</strong> horizontal<br />
louver blind indicated.<br />
C. Maintenance Data: For horizontal louver blinds to include in maintenance manuals.<br />
<strong>Inc</strong>lude the following:<br />
1. Methods for maintaining horizontal louver blinds and finishes.<br />
2. Precautions about cleaning materials and methods that could be detrimental to<br />
finishes and performance.<br />
3. Operating hardware.<br />
1.5 QUALITY ASSURANCE<br />
A. Source Limitations: Obtain horizontal louver blinds through one source from a single<br />
manufacturer.<br />
12491-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HORIZONTAL LOUVER BLINDS<br />
B. Fire-Test-Response Characteristics: Provide horizontal louver blinds with the fire-testresponse<br />
characteristics indicated, as determined by testing identical products per test<br />
method indicated below by UL or another testing and inspecting agency acceptable to<br />
authorities having jurisdiction:<br />
1. Flame-Resistance Ratings: Passes NFPA 701.<br />
2.<br />
C. Corded Window Covering Product Standard: Provide horizontal louver blinds<br />
complying with WCMA A 100.1.<br />
1.6 DELIVERY, STORAGE, AND HANDLING<br />
A. Deliver blinds in factory packages, marked with manufacturer and product name, and<br />
location <strong>of</strong> installation using same room designations indicated on Drawings and in a<br />
window <strong>treatment</strong> schedule.<br />
1.7 PROJECT CONDITIONS<br />
A. Environmental Limitations: Do not install horizontal louver blinds until construction and<br />
wet and dirty finish work in spaces, including painting, is complete and ambient<br />
temperature and humidity conditions are maintained at the levels indicated for Project<br />
when occupied for its intended use.<br />
B. Field Measurements: Where horizontal louver blinds are indicated to fit to other<br />
construction, verify dimensions <strong>of</strong> other construction by field measurements before<br />
fabrication and indicate measurements on Shop Drawings. Allow clearances for<br />
operable glazed units' operation hardware throughout the entire operating range.<br />
Notify Architect <strong>of</strong> discrepancies. Coordinate fabrication schedule with construction<br />
progress to avoid delaying the Work.<br />
PART 2 - PRODUCTS<br />
2.1 MANUFACTURERS<br />
A. Available Manufacturers: Subject to compliance with requirements, manufacturers<br />
<strong>of</strong>fering products that may be incorporated into the Work include, but are not limited to,<br />
the following:<br />
1. Horizontal Louver Blinds, Aluminum Louver Slats:<br />
a. Comfortex Window Fashions.<br />
b. Hunter Douglas Window Fashions.<br />
c. Levolor Contract; a Newell Company; Levolor.<br />
d. Springs Window Fashions Division, <strong>Inc</strong>.; Bali.<br />
e. Springs Window Fashions Division, <strong>Inc</strong>.; Graber.<br />
f. Verosol USA, <strong>Inc</strong>.<br />
B. Louver Slats: Aluminum, alloy and temper recommended by producer for type <strong>of</strong> use<br />
and finish indicated; with crowned pr<strong>of</strong>ile and radiused corners.<br />
12491-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HORIZONTAL LOUVER BLINDS<br />
1. Nominal Slat Width: 1 inch (25 mm) for miniblinds.<br />
2. Nominal Slat Thickness: Not less than 0.006 inch (0.15 mm).<br />
3. Slat Finish: One color as indicated.<br />
a. Ionized Coating: Antistatic, dust-repellent, baked polyester finish.<br />
C. Headrail: Formed steel or extruded aluminum; long edges returned or rolled; fully<br />
enclosing operating mechanisms on three sides and ends; capa<strong>city</strong> for one blind per<br />
headrail.<br />
1. Finish Color Characteristics: Color texture, pattern, and gloss differing from<br />
louver slats as selected by Architect from manufacturer's full range.<br />
D. Bottom Rail: Formed-steel or extruded-aluminum tube, sealed with plastic or metal<br />
capped ends top contoured to match crowned shape <strong>of</strong> louver slat bottom contoured<br />
for minimizing light gaps; with enclosed and protected ladders and tapes to prevent<br />
their contact with sill.<br />
E. Tilt Control: Consisting <strong>of</strong> enclosed worm gear mechanism, slip clutch or detachable<br />
wand preventing overrotation, and linkage rod, for the following operation:<br />
1. Tilt Operation: Manual with clear plastic wand.<br />
2. Length <strong>of</strong> Tilt Control: Full length <strong>of</strong> blind.<br />
3. Tilt: Full.<br />
F. Lift Operation: Manual, cord lock; locks pull cord to stop blind at any position in<br />
ascending or descending travel.<br />
G. Mounting: Ceiling mounting permitting easy removal and replacement without<br />
damaging blind or adjacent surfaces and finishes; with spacers and shims required for<br />
blind placement and alignment indicated.<br />
1. Provide intermediate support brackets if end support spacing exceeds spacing<br />
recommended by manufacturer for weight and size <strong>of</strong> blind.<br />
2.2 HORIZONTAL LOUVER BLINDS FABRICATION<br />
A. Product Standard and Description: Comply with AWCMA Document 1029, unless<br />
otherwise indicated, for each horizontal louver blind designed to be self-leveling and<br />
consisting <strong>of</strong> louver slats, rails, ladders, tapes, lifting and tilting mechanisms, cord, cord<br />
lock, tilt control, and installation hardware.<br />
B. Concealed Components: Noncorrodible or corrosion-resistant-coated materials.<br />
1. Lifting and Tilting Mechanisms: With permanently lubricated moving parts.<br />
C. Unit Sizes: Obtain units fabricated in sizes to fill window and other openings as<br />
follows, measured at 74 deg F (23 deg C):<br />
1. Blind Units Installed between (Inside) Jambs: Width equal to 1/4 inch (6 mm) per<br />
side or 1/2 inch (12 mm) total, plus or minus 1/8 inch (3 mm), less than jamb-tojamb<br />
dimension <strong>of</strong> opening in which each blind is installed. Length equal to<br />
12491-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HORIZONTAL LOUVER BLINDS<br />
1/4 inch (6 mm), plus or minus 1/8 inch (3 mm), less than head-to-sill dimension<br />
<strong>of</strong> opening in which each blind is installed.<br />
D. Installation Brackets: Designed for easy removal and reinstallation <strong>of</strong> blind, for<br />
supporting headrail and operating hardware, and for hardware position and blind<br />
mounting method indicated.<br />
E. Installation Fasteners: Not fewer than two fasteners per bracket, fabricated from metal<br />
noncorrosive to blind hardware and adjoining construction; type designed for securing<br />
to supporting substrate; and supporting blinds and accessories under conditions <strong>of</strong><br />
normal use.<br />
F. Color-Coated Finish:<br />
1. Metal: For components exposed to view, apply manufacturer's standard baked<br />
finish complying with manufacturer's written instructions for surface preparation<br />
including pre<strong>treatment</strong>, application, baking, and minimum dry film thickness.<br />
PART 3 - EXECUTION<br />
3.1 EXAMINATION<br />
A. Examine substrates, areas, and conditions, with Installer present, for compliance with<br />
requirements for installation tolerances, operational clearances, and other conditions<br />
affecting performance. Proceed with installation only after unsatisfactory conditions<br />
have been corrected.<br />
3.2 HORIZONTAL LOUVER BLIND INSTALLATION<br />
A. Install blinds level and plumb and aligned with adjacent units according to<br />
manufacturer's written instructions, and located so exterior louver edges in any position<br />
are not closer than 1 inch (25 mm) to interior face <strong>of</strong> glass. Install intermediate support<br />
as required to prevent deflection in headrail. Allow clearances between adjacent blinds<br />
and for operating glazed opening's operation hardware, if any.<br />
B. Head Mounted: Install headrail on face <strong>of</strong> opening head.<br />
3.3 ADJUSTING<br />
A. Adjust horizontal louver blinds to operate smoothly, easily, safely, and free from<br />
binding or malfunction throughout entire operational range.<br />
3.4 CLEANING AND PROTECTION<br />
A. Clean blind surfaces after installation, according to manufacturer's written instructions.<br />
B. Provide final protection and maintain conditions, in a manner acceptable to<br />
manufacturer and Installer, that ensure that horizontal louver blinds are without<br />
damage or deterioration at time <strong>of</strong> Substantial Completion.<br />
12491-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HORIZONTAL LOUVER BLINDS<br />
C. Replace damaged blinds that cannot be repaired, in a manner approved by Architect,<br />
before time <strong>of</strong> Substantial Completion.<br />
END OF SECTION 12491<br />
12491-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 15400<br />
PLUMBING<br />
PART 1 – GENERAL<br />
1.1 DESCRIPTION<br />
A. The General Provisions <strong>of</strong> the Contract, including the General Requirements,<br />
Supplementary Conditions and Special Conditions, are hereby made a part <strong>of</strong> this<br />
Section as if fully repeated herein.<br />
B. Scope <strong>of</strong> Work: Work included under this section <strong>of</strong> the specifications shall include<br />
complete plumbing systems as shown on the drawings and as specified herein.<br />
1. Trench excavation, pumping, backfilling and compaction for underground piping<br />
and plumbing.<br />
2. Soil, waste and vent piping.<br />
3. Domestic hot and cold <strong>water</strong> piping.<br />
4. Fixtures.<br />
5. Water coolers.<br />
6. Water heaters and <strong>water</strong> heater drain pans.<br />
7. Fittings, hangers, valves, sleeves, escutcheons, etc.<br />
8. Lead flashing.<br />
9. Insulation.<br />
10. Controls.<br />
11. Disinfection <strong>of</strong> potable <strong>water</strong> piping.<br />
C. Related Work: The following work is specified in other sections <strong>of</strong> these specifications.<br />
1. Power wiring: Electrical - 16000.<br />
D. Point <strong>of</strong> Connection: Underground <strong>water</strong> and sanitary piping shall commence where<br />
shown on the drawings.<br />
E. Prior to start <strong>of</strong> any work, the successful Contractor shall meet with the Architect to<br />
determine that no questions remain concerning the intent <strong>of</strong> the drawings or<br />
specifications. The Contractor shall bring up for discussion and decision any questions<br />
concerning the project. No work shall be performed prior to this meeting. The<br />
Architect shall set the date, time, and place <strong>of</strong> conference.<br />
1.2 CODES, ORDINANCES AND PERMITS<br />
A. Comply with all codes applying to the Work <strong>of</strong> this contract including Florida Building<br />
Code 2007, Florida Building Code 2007 – Mechanical and Florida Building Code 2007<br />
– Plumbing. Obtain information on all code restrictions and requirements. In case <strong>of</strong><br />
conflict between the contract documents and a governing code or ordinance, such<br />
conflict shall be immediately brought to the attention <strong>of</strong> the Architect for resolution.<br />
Extra payment will not be allowed for Work required by code restrictions except<br />
through written agreement with the Owner.<br />
15400-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF 04-07-11
PLUMBING<br />
B. Apply for, obtain, and pay for all required permits and inspection certificates. Final<br />
payment is contingent upon delivery <strong>of</strong> such certificates to the Architect.<br />
C. Where applicable, all materials and equipment shall bear the Underwriters'<br />
Laboratories seal or ASME code stamp. Certificates to this effect shall be furnished to<br />
the Architect upon request.<br />
1.3 SITE INSPECTION<br />
A. Visit the site and thoroughly inspect conditions affecting the Work before submitting<br />
bid. Assume responsibility for meeting all existing conditions including access and<br />
workspace limitations.<br />
1.4 DRAWINGS AND SPECIFICATIONS.<br />
A. Refer to the general construction drawings which are bound with the drawings <strong>of</strong> this<br />
Work for construction details, elevations, etc. Architectural and structural drawings<br />
shall take precedence over plumbing drawings. It is the intent <strong>of</strong> the plumbing<br />
drawings to show the general arrangement <strong>of</strong> the system and not to indicate all <strong>of</strong>fsets,<br />
fittings and accessories which may be required, nor to show exact locations <strong>of</strong> piping,<br />
fixtures or equipment except where actual dimensions are given. All vertical piping<br />
shall be located in walls in finished spaces unless otherwise noted.<br />
B. Specifications and drawings shall be considered as supplementary to each other,<br />
requiring materials and labor indicated, specified, or implied by either specifications or<br />
drawings. It is the intent <strong>of</strong> the drawings and specifications to call for finished Work,<br />
tested, and ready for operation, and in complete conformance with all applicable<br />
codes, rules and regulations. Minor details not usually shown nor specified, but<br />
manifestly necessary for the proper installation and operation <strong>of</strong> the various systems,<br />
shall be included in the Work and in the bid proposal, the same as if specified or shown<br />
on the drawings.<br />
C. If any departures from the drawings and specifications are deemed necessary, details<br />
<strong>of</strong> such departures and the reasons therefore shall be submitted to the Architect for<br />
approval. No departures shall be made without prior approval <strong>of</strong> the Architect.<br />
1.5 APPROVED MANUFACTURERS<br />
A. Specific reference in the specifications to any article, device, product, material, fixture<br />
or type <strong>of</strong> construction, etc., by proprietary name, make or catalog number shall be<br />
interpreted as establishing a standard <strong>of</strong> quality and shall not be construed as limiting<br />
competition. Equal products may be submitted for approval to be used subject to<br />
compliance with requirements set forth in the General Requirements, Division 1, and, if<br />
applicable, in the Instructions to Bidders.<br />
1.6 MANUFACTURER'S SPECIFICATIONS<br />
A. Where the name <strong>of</strong> a concern or manufacturer is mentioned on the drawings or in<br />
specifications in reference to his required service or product, and no qualifications or<br />
specification <strong>of</strong> such is included, then the material gauges, details <strong>of</strong> manufacturer,<br />
15400-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PLUMBING<br />
finish, etc., shall be in accordance with his standard practice, directions or<br />
specifications. The Contractor shall be responsible for any infringement <strong>of</strong> patents,<br />
royalties or copyrights which may be incurred thereby.<br />
B. Equipment scheduled on the drawings was used to arrive at space, maintenance, and<br />
utility service. If other equipment is submitted and approved, take responsibility for<br />
maintaining these space, maintenance, and utility service requirements and cost for<br />
any resulting changes including cost to change electrical service required by<br />
substituted equipment.<br />
C. All materials and equipment shall be new and first class in every respect. As far as is<br />
practical, similar products shall be by one manufacturer.<br />
1.7 SUBMITTALS<br />
A. Submit shop drawings in accordance with the General Requirements, Division 1.<br />
B. Samples <strong>of</strong> any plumbing equipment or materials shall be submitted if requested by<br />
the Architect. If a sample is requested, have the sample delivered to the Architect or<br />
arrange for the Architect to examine it elsewhere. Failure to comply may be cause for<br />
rejection.<br />
C. Submit shop drawings or catalog data for the Architect's approval before purchasing or<br />
installing the following:<br />
1. Piping (where revised from the drawings).<br />
2. Fixtures.<br />
3. Water coolers.<br />
4. Water heaters and <strong>water</strong> heater drain pans.<br />
5. Valves and appurtenances.<br />
6. Pipe hangers.<br />
7. Insulation.<br />
8. Floor drains and trap primers.<br />
9. Controls.<br />
10. Thermostatic mixing valves.<br />
1.8 PERFORMANCE DATA<br />
A. All performance data specified herein shall be considered actual performance <strong>of</strong><br />
equipment as installed. Make suitable allowances if installation details are such that<br />
actual operating conditions unfavorably affect performance as compared to conditions<br />
under which the equipment was rated.<br />
1.9 CATALOG, OPERATION AND MAINTENANCE DATA<br />
A. Provide four (4) complete sets <strong>of</strong> a compilation <strong>of</strong> catalog data <strong>of</strong> each manufactured<br />
item <strong>of</strong> fixtures and equipment used in the Plumbing Work. In addition to the catalog<br />
data, installation, operating and maintenance data and bill <strong>of</strong> materials for all operating<br />
equipment shall be submitted. Each <strong>of</strong> the four sets <strong>of</strong> data shall be bound in loose<br />
15400-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PLUMBING<br />
leaf binders and submitted to the Architect before final payment is made. A complete<br />
double index shall be provided as follows:<br />
1. Listing the products alphabetically by name.<br />
2. Listing the names <strong>of</strong> manufacturers alphabetically by name together with their<br />
addresses and the names and addresses <strong>of</strong> local sales representatives.<br />
B. It is the intent <strong>of</strong> this catalog, operation and maintenance data to provide the Owner<br />
with complete instructions on the proper operation and use, lubrication and periodic<br />
maintenance, together with the source <strong>of</strong> replacement parts and service, for the items<br />
<strong>of</strong> equipment covered.<br />
1.10 CONTRACTOR COORDINATION<br />
A. The Electrical Contractor shall furnish, set and wire all controls, disconnect devices,<br />
and starters as required for all equipment except for those items furnished with integral<br />
controls, disconnect devices, and/or starters.<br />
B. Furnish detailed information to the Electrical Contractor on power wiring requirements<br />
for all plumbing equipment actually purchased as soon as practical. This shall include<br />
all diagrams and instructions necessary for the Electrical Contractor to make<br />
connections properly. If equipment actually purchased requires larger electrical service<br />
than equipment scheduled, arrange and pay for required electrical service change.<br />
C. Coordinate location <strong>of</strong> equipment and piping with Electrical*, Fire Protection,* and<br />
HVAC Contractors to maintain clearance for equipment maintenance, avoid<br />
interference with duct and HVAC piping runs, and to prevent piping from being installed<br />
over electrical panels. If interference develops, the Architect will decide which<br />
equipment, conduit, duct, piping, etc., must be relocated regardless <strong>of</strong> installation<br />
order. Take responsibility for relocating Plumbing work, if so ordered, including all<br />
associated costs.<br />
D. Within 30 days following award <strong>of</strong> the contract, report to the Architect in writing, all real<br />
or potential errors, ambiguities and/or conflicts on the Plumbing Work or between the<br />
trades and obtain an agreement with the Architect on a solution. Those reported after<br />
30 days, except as a result <strong>of</strong> unforeseen circumstances, shall be resolved at the<br />
discretion <strong>of</strong> the Architect. Report conflicts resulting from the progress <strong>of</strong> Work to the<br />
Architect immediately or accept the expense for corrective work caused by failure to<br />
report such a conflict. Do not make any changes in design without the written approval<br />
<strong>of</strong> the Architect. Changes in design means any change which will affect the capa<strong>city</strong>,<br />
reliability, operation or safety <strong>of</strong> the systems or any parts there<strong>of</strong>, including changes<br />
which may be required to conform to local regulations or codes.<br />
1.11 CONTRACTOR'S WARRANTY<br />
A. Provide written warranties as specified in the General Requirements, Division 1, and<br />
repair any defects becoming apparent within the warranty period as directed by the<br />
Architect.<br />
15400-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PLUMBING<br />
1.12 PROTECTION<br />
A. Protect all materials and equipment against damage and vandalism during<br />
construction. Replace any damaged material or equipment and place the systems in<br />
perfect working condition.<br />
PART 2 - PRODUCTS<br />
2.1 FIXTURES<br />
A. Fixtures including faucets, valves, drains, and trim, shall be as scheduled on drawings.<br />
Approved manufacturers are Acorn, American Standard, Bradley, Elkay, Fiat, Just,<br />
Kohler, Symmons and T & S.<br />
B. Flush valves shall be Sloan or Zurn.<br />
2.2 WATER COOLERS<br />
A. Water coolers shall be as scheduled on drawings. Approved manufacturers are Elkay<br />
or Halsey Taylor.<br />
2.3 WATER HEATERS AND DRAIN PANS<br />
A. Water heaters shall be as scheduled on drawings. Approved manufacturers are A.O.<br />
Smith, State, Lochinvar, Rheem, Bradford White.<br />
B. Drain pans for electric <strong>water</strong> heaters shall be minimum 2" deep with molded and<br />
sealed corners and shall be fabricated from 24 gauge (0.0276") galvanized steel or<br />
high impact plastic with minimum thickness 0.0625".<br />
2.4 PIPE<br />
A. Soil, waste and vent piping above grade shall be one <strong>of</strong> the following with exposed<br />
sanitary piping under lavatories chrome plated copper/brass:<br />
1. Solid wall DWV polyvinyl chloride (PVC), schedule 40, solvent weld joints.<br />
Exposed sanitary piping under lavatories shall be chrome plated copper/brass.<br />
(Note: Piping located in supply or return air plenums shall be insulated if PVC is<br />
used. Coordinate with Mechanical Contractor for locations <strong>of</strong> air plenums. See<br />
insulation section <strong>of</strong> this Specification for thickness and type.<br />
2. Spun service weight cast-iron, hub and spigot pattern joints made with white<br />
oakum and pure lead or joints made with elastomeric compression gasket. All<br />
cast iron pipe and fittings shall be made in the United States, marked with the<br />
collective trademark <strong>of</strong> Cast Iron Soil Pipe Institute (CISPI) and be listed by NSF<br />
International.<br />
3. Spun service weight cast-iron, no hub, joints made with stainless steel clamps<br />
and neoprene gaskets. All cast iron pipe and fittings shall be made in the United<br />
15400-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PLUMBING<br />
States, marked with the collective trademark <strong>of</strong> Cast Iron Soil Pipe Institute<br />
(CISPI) and be listed by NSF International.<br />
4. Copper DWV, solder joints.<br />
B. Soil, waste and vent piping below grade shall be solid wall DWV polyvinyl chloride<br />
(PVC), schedule 40, solvent weld joints.<br />
C. Hot and cold <strong>water</strong> supply piping above and below grade shall be chlorinated polyvinyl<br />
chloride (CPVC), solvent weld joints, suitable for use at minimum working pressure <strong>of</strong><br />
160 PSI at 73 deg. F. and 100 PSI at 180 deg. F. Pipes 1/2" thru 2" shall be CPVC-CT<br />
(copper pipe size) meeting test requirements <strong>of</strong> SDR 11. Pipes larger than 2" shall be<br />
CPVC Schedule 80 with Schedule 80 fittings.<br />
2.5 DIELECTRIC UNIONS<br />
A. Use dielectric unions when joining dissimilar metals.<br />
2.6 FLOOR DRAINS AND TRAP PRIMERS<br />
A. Floor drains shall be as scheduled on drawings and shall have perforated or slotted<br />
strainers, outlets same size as waste pipe to which connected, cast-iron body with<br />
inside caulk connection, and deep seal trap. Strainers shall be minimum size required<br />
for sanitary pipe size indicated. Provide ductile iron grates for heavy traffic areas.<br />
Approved manufacturers are Ancon, Josam, Smith, Wade, Zurn.<br />
B. Trap primers shall be as scheduled on drawings. Pressure drop activated trap primers<br />
shall be Mifab model MR-500 with model MI-DU distribution unit (where required).<br />
2.7 INTERIOR HOSE BIBS AND FREEZELESS EXTERIOR WALL HYDRANTS<br />
A. Interior hose bibs shall be angle type, all brass 3/4" inlet, with flange for wall mounting<br />
and vacuum breaker, and box with locking cover for recessed installation in wall or<br />
floor.<br />
B. Freezeless wall hydrant shall have 3/4" hose nozzle, loose operating key, compression<br />
type valve seat, vacuum breaker, and box for recessed installation in wall or floor.<br />
2.8 SHOCK ABSORBERS<br />
A. Shock absorbers shall be bellows or piston type <strong>water</strong> hammer arrestors. Closed end,<br />
vertical standpipe air chambers will not be accepted. Water hammer arrestors shall be<br />
sized and installed in accordance with PDI standards and the manufacturers<br />
specifications. Access shall be provided to <strong>water</strong> hammer arrestors.<br />
2.9 CLEANOUTS<br />
A. Floor cleanouts shall be cast-iron with adjustable housing, ferrule with plug, with round<br />
secured nickel brass scoriated top for finished concrete floors (including those covered<br />
15400-6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PLUMBING<br />
by carpeting) and round secured nickel brass recessed top for vinyl tile floors and<br />
carpeted floors. Ductile iron tops for heavy traffic areas.<br />
B. Wall cleanouts shall be screw type with chromium plated bronze or stainless steel<br />
access cover plates designed to be installed outside wall finish material.<br />
2.10 VALVES<br />
A. Valves <strong>of</strong>fered under these specifications shall be limited to the products <strong>of</strong> a type<br />
regularly produced for the service and capacities specified. Ratings shall be in<br />
accordance with the manufacturer's latest literature available. Valves shall be line size<br />
unless specifically shown otherwise. All equipment service valves and all shut-<strong>of</strong>f<br />
valves 2" and smaller shall be bronze body full port ball valves with stainless steel ball<br />
and nylon seat.<br />
B. Gate valves 2-1/2" and larger shall be flanged ends, Class 125, iron body, bronze<br />
mounted, bolted bonnet, rising stem, OS & Y, solid wedge. 2" and smaller shall be<br />
either threaded end or solder end, Class 125, bronze body, solid wedge; union bonnet<br />
and rising stem for threaded end valve, and screwed bonnet, non-rising stem for solder<br />
end valves.<br />
C. Check valves shall be vertical lift check with bronze disc for vertically mounted valves<br />
and swing check, horizontal swing bronze disc with screw cap for horizontally mounted<br />
valves.<br />
D. Throttling valves shall generally be globe pattern, unless otherwise shown on<br />
drawings.<br />
E. Drain valves for all lines shall be 1/2" size, 200 pound, bronze globe valves with<br />
threaded ends and hose thread adapter nipple.<br />
F. Approved manufacturers are Apollo, Brass Craft, Capital, Chicago Faucet, Crane,<br />
Delany, Delta, Dunham Bush, Jamesbury, Milwaukee, Nibco, Sloan, Speakman,<br />
Stockham, T & S, Walworth, Watts, Zurn.<br />
2.11 PIPE HANGERS<br />
A. Hangers and supports specified by "Type" herein shall be designed and manufactured<br />
in accordance with the Manufacturers Standardization Society <strong>of</strong> Valve and Fittings<br />
Industry (MSS) Publication SP-58 and shall be selected and applied in accordance with<br />
the Manufacturers Standardization Society <strong>of</strong> Valve and Fittings Industry (MSS)<br />
Publication SP-69.<br />
B. Pipe hangers shall be galvanized steel hangers selected within the manufacturer's<br />
published load ratings and shall be Auto-Grip, Fee and Mason, or Grinnel. Pipe 2-1/2<br />
inches and smaller shall be MSS Type 7, 10. Pipe 3 inches and larger shall be MSS<br />
Type 1, 260.<br />
C. Hanger rods shall be galvanized steel threaded both ends or continuous thread, sized<br />
with safety factor <strong>of</strong> five (5). Approved: Grinnell Fig. 140 or 146. Rods for trapeze<br />
hangers supporting several pipes shall be sized for the total piping load.<br />
15400-7<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PLUMBING<br />
D. Hangers for copper pipe shall be either copper-plated type or pipe contact area shall<br />
be plastic coated to prevent direct contact between the pipe and hanger.<br />
E. Supports for insulated pipes shall have insulation shields MSS Type 40.<br />
F. Beam clamps shall be MSS Type 29.<br />
G. Inserts:<br />
1. Preset Type: Malleable iron with removable interchangeable nuts having lateral<br />
adjustment <strong>of</strong> not less than one and five-eights inch. Continuous inserts shall<br />
have a capa<strong>city</strong> <strong>of</strong> 2000 Ib. per foot and shall be hooked over reinforcing.<br />
Approved: C-B Universal Fig. 282; Unistrut Products Co., P-300; Brinkley B32-1.<br />
2. After Set Type: Self-drilling style expansion shells shall be used in concrete and<br />
brick. Toggle bolts shall be used on block walls and partitions. Approved: Phillips<br />
Drill Co. "Red Head"; Raul"Saber Tooth" and "Spring Wings".<br />
3. Power Actuated After Set Features: Pin and stud anchors shall have a<br />
withdrawal resistance four times the indicated load. Approved: Hilti Fastening<br />
Systems, Hilti, <strong>Inc</strong>.; Ramset Fastening Systems, Olin Corp.<br />
H. Use vibration isolators in hanger rods to isolate vibration in piping subject to vibration,<br />
or where shown on drawings.<br />
2.12 SECONDARY PIPE POSITIONING AND SUPPORTS:<br />
A. Makeshift, field devised methods <strong>of</strong> plumbing pipe support, such as with the use <strong>of</strong><br />
scrap framing materials, are not allowed. Support and positioning <strong>of</strong> piping shall be by<br />
means <strong>of</strong> engineered methods that comply with IAPMO PS 42-96. These shall be<br />
Hubbard Enterprises/HOLDRITE support systems or Owner-approved equivalent.<br />
B. For plenum applications use pipe supports that meet ASTM E-84 25/50 standards,<br />
such as the Hubbard Enterprises/HOLDRITE Flame Fighter TM or Owner-approved<br />
equivalent.<br />
C. For vertical mid-span supports <strong>of</strong> piping 4” and under, use Hubbard<br />
Enterprises/HOLDRITE Stout Brackets with Hubbard Enterprises/HOLDRITE Stout<br />
Clamps or two-hole pipe clamps (MSS Type 26).<br />
2.13 SLEEVES AND ESCUTCHEONS<br />
A. Sleeves shall be 18 gauge galvanized steel or pre-formed plastic. Sleeves shall be<br />
sized to allow approximately 1/8" gap around the pipe or its insulation.<br />
B. Sleeves through floor slabs or fire walls shall be galvanized steel pipe <strong>of</strong> proper size.<br />
Sleeves through floor slabs shall extend 1/2" above the finished floor.<br />
C. Sleeves penetrating fire-rated walls, floors or ceilings shall be filled with fire-rated<br />
material capable <strong>of</strong> maintaining the fire-resistance rating <strong>of</strong> the wall, floor or ceiling.<br />
D. Escutcheon plates for finished spaces shall be nickel-plated.<br />
15400-8<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PLUMBING<br />
2.14 EQUIPMENT, VALVE AND PIPE IDENTIFICATION<br />
A. All identification legends, arrows and color bands shall be stenciled on pressuresensitive<br />
labeling material approved by the Architect. Labeling material colors for use<br />
on piping shall be as specified in ANSI A 13.1 latest revision.<br />
B. Valve tags shall be plastic, aluminum or brass at least 1" in diameter and stamped with<br />
contrasting colored figures as large as possible.<br />
C. Pipe markers shall be Seton style RPM or approved equal.<br />
2.15 INSULATION<br />
A. Piping insulation shall be pre-formed, flame-retardant, elastomeric, polyethylene, pipe<br />
insulation similar to AP Armaflex, AP Armaflex SS, IMCOA Imolock or NOMACO<br />
Nomalock, and installed in accordance with manufacturer's instructions. Pre-formed<br />
Owens-Corning 3.5 pound density fiberglass pipe insulation with all service jacket and<br />
self-sealing lap will be approved for pipe installed in dry locations. Insulation<br />
thicknesses shall be as follows:<br />
1. Cold <strong>water</strong>: 1/2" thick.<br />
2. Hot <strong>water</strong>: 1" thick.<br />
3. All PVC piping located in supply or return air plenums: 1/2" thick. Insulation shall<br />
meet all state and local code requirements for plenum use.<br />
B. At all exposed piping under handicapped lavatories in rest rooms, provide pre molded<br />
vinyl Insulation. Insulation shall be "Handi Lav-guard" insulation kits as manufactured<br />
by Truebro <strong>Inc</strong>. or approved equal. Truebro <strong>Inc</strong>. phone no. is (203) 875-2868.<br />
C. All insulation materials and coatings shall meet flame spread and smoke developed<br />
ratings per NFPA Bulletin 90-A when tested in accordance with ASTM Standard E 84<br />
and shall meet local requirements for use in return air plenums. Smoke developed less<br />
than or equal to 50, and flame spread less than or equal to 25. All coatings and<br />
mastics shall be nonflammable in wet state.<br />
2.16 LEAD FLASHING<br />
A. Lead flashing shall be sheet lead weighing 4 pounds per square foot for all pipe<br />
flashing through ro<strong>of</strong>.<br />
2.17 EQUIPMENT SUPPORTS<br />
A. Equipment supports shall be sized and designed to support the equipment and shall<br />
be hot-dip galvanized steel.<br />
2.18 STRAINERS<br />
A. Strainers shall be self-cleaning and <strong>of</strong> same size as pipe lines in which they are<br />
installed and shall be Webster, Sarco, Dunham, H<strong>of</strong>fman, Illinois, or approved equal, Y<br />
15400-9<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PLUMBING<br />
type with 125 pound iron body, screwed connections to 2" in size and flanged ends for<br />
larger sizes.<br />
B. Screens for <strong>water</strong> strainers shall be perforated Monel cylinders with 3/64" perforations.<br />
C. Water strainer 2" and larger shall have a 3/4" valved blow-down connection extended<br />
full size to discharge over the nearest accessible floor drain.<br />
2.19 MOTORS<br />
A. Full Load Motor Efficiencies: All motors installed in equipment specified in these<br />
specifications shall be classified under the National Electric Manufacturers<br />
Association's Standard as "energy efficient" or shall otherwise meet the requirements<br />
<strong>of</strong> the Florida Energy Code.<br />
B. Except where otherwise specified, all motors shall be designed for continuous service<br />
and for regular starting on full-line voltage with normal starting current. The limits on<br />
service factor and temperature rise above 40 deg. C. ambient at rated load shall be as<br />
follows:<br />
1. Motor Enclosure Service Factor Temperature Rise<br />
2. Drip-Pro<strong>of</strong> 115% 40 deg. C.<br />
3. Totally Enclosed None 55 deg. C.<br />
C. The insulation portion <strong>of</strong> the motor leads between the lug and motor frame shall be at<br />
least 5" in length when four or less motor leads are used and at least 8" in length when<br />
more than four motor leads are used. When terminal type lugs are supplied, they shall<br />
be solderless, Burndy "Hy-Dent" type or approved equal.<br />
D. Motors shall be furnished for operation as specified or as noted on drawings. All<br />
motors shall conform to IEEE, NEMA and ANSI standards and shall be General<br />
Electric, Westinghouse, Louis Allis.<br />
E. Motors furnished for indoor installation shall be <strong>of</strong> the open, drip-pro<strong>of</strong> design. Motors<br />
furnished for installation in wet locations or outdoors shall be <strong>of</strong> the totally-enclosed<br />
design. Motors furnished for installation in hazardous locations shall be <strong>of</strong> the<br />
explosion-pro<strong>of</strong> design.<br />
2.20 ACCESS DOORS<br />
A. Access doors shall be as similar to those manufactured by Milcor Division <strong>of</strong> Inland-<br />
Ryerson <strong>of</strong> type as follows:<br />
B. Door Location Door Type<br />
C. Drywall Style "DW"<br />
D. Masonry or Tile Style "M-Stainless"<br />
E. Acoustical Tile Style "AT"<br />
15400-10<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PLUMBING<br />
F. Plaster Style "K"<br />
G. Fire Rated Walls/Ceilings Style "Fire Rated"<br />
H. Each door shall be equipped with two flush, screwdriver operated, cam latches and,<br />
other than Style "M", shall be finished to match adjacent surface. Door sizes shall be<br />
applicable to access required for normal service.<br />
PART 3 - EXECUTION<br />
3.1 INSTALLATION OF THE WORK<br />
A. Examine the site and all drawings before proceeding with the layout and installation <strong>of</strong><br />
the Work. Locate all vertical piping within walls in finished spaces unless specifically<br />
noted otherwise. Such piping cannot always be shown within walls on drawings due to<br />
their small scale.<br />
B. Arrange the Work essentially as shown, exact layout to be made on the job to suit<br />
actual conditions. Confer and cooperate with other trades on the job so all Work will be<br />
installed in proper relationship and coordinate precise location <strong>of</strong> parts with the Work <strong>of</strong><br />
others.<br />
C. Arrange for required chases, slots and openings with the General Contractor including<br />
locations <strong>of</strong> required pipe sleeves through walls and foundations. Assume liability for<br />
cutting or patching made necessary by failure to make proper arrangements in this<br />
respect.<br />
D. Indicated equipment connections are necessarily based on equipment <strong>of</strong> a given<br />
manufacture. Assume responsibility for proper arrangement <strong>of</strong> piping, ducts, etc. to<br />
connect approved equipment in a proper and approved manner. Follow equipment<br />
manufacturer's detailed instructions and recommendations in the installation and<br />
connection <strong>of</strong> all equipment. In case <strong>of</strong> conflict between manufacturer's instructions<br />
and the contract documents, notify the Architect before proceeding. No equipment<br />
installation or connections shall be made in a manner that voids the manufacturer's<br />
warranty.<br />
E. Install all Work in a neat and workmanlike manner, using only workmen thoroughly<br />
qualified in the trade or duties they are to perform. Rough Work will be rejected.<br />
3.2 EXCAVATION, BACKFILLING AND PUMPING<br />
A. Excavate, back-fill and compact all trenches required for underground plumbing work.<br />
Maintain trenches free <strong>of</strong> <strong>water</strong> until installation is complete and provide all necessary<br />
shoring.<br />
B. Contractor shall field verify all existing underground utilities and avoid damage to<br />
same. Where existing utilities are damaged, the contractor shall be responsible for all<br />
repairs or replacement.<br />
15400-11<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PLUMBING<br />
C. Excavate trenches suitable in width to provide a minimum <strong>of</strong> 6" clear space between<br />
the barrel <strong>of</strong> the pipe and the trench wall on both sides <strong>of</strong> the pipe. Accurately grade<br />
the trench bottom to provide uniform bearing and support for each section <strong>of</strong> the pipe<br />
on undisturbed soil at every point along its entire length. Take care not to excavate<br />
below the depth necessary and excavate bell holes to ensure proper bedding. Backfill<br />
over-depths with loose, granular, moist material and thoroughly compact to the depth<br />
required.<br />
D. Place and compact backfill material in 6" layers until the pipe has a minimum cover <strong>of</strong><br />
12". Place and compact the remaining material in 12" layers. Grade the surface to a<br />
reasonable uniformity and leave the mounding in neat condition as approved by the<br />
Architect.<br />
E. Backfill all trenches passing under foundations with concrete to the underside <strong>of</strong> the<br />
foundation and at a 2:1 slope away from each side <strong>of</strong> the foundation. Backfill all<br />
trenches that are parallel and deeper than foundations with concrete to a point that will<br />
place the top <strong>of</strong> the concrete on a 2:1 slope away from the foundation bottom. Do not<br />
backfill trenches until all required tests and inspections are completed.<br />
3.3 PIPE INSTALLATION – GENERAL<br />
A. Install all piping in a workmanlike manner, according to the best practice <strong>of</strong> the trade,<br />
properly pitched and vented to eliminate air pockets or traps, and to ensure rapid and<br />
noiseless circulation throughout the entire system. Run all piping parallel with or at<br />
right angles to building walls and partitions. Run all vertical piping within walls in<br />
finished spaces unless noted otherwise.<br />
B. Install all piping so as not to interfere with any electric lighting outlets, ductwork, other<br />
piping, or equipment. Do not install piping in front <strong>of</strong> any door or window and avoid<br />
interference with any such openings. Do not install any piping over any motors,<br />
transformers, electrical panels, or other electrical equipment.<br />
C. Cut pipes accurately to measurements established at the building and install without<br />
springing or forcing. Cut piping square and remove all burrs and fins before<br />
assembling. Use standard fittings for all reductions in size and changes in direction.<br />
Mitering <strong>of</strong> pipe to form elbows or reducers will not be permitted. Thoroughly clean all<br />
piping before installation and make sure the piping is free <strong>of</strong> all foreign material after<br />
installation.<br />
D. Because <strong>of</strong> the small scale <strong>of</strong> the drawings, it is not possible to indicate all <strong>of</strong>fsets,<br />
fittings and valves. Carefully investigate all conditions affecting the Work to avoid<br />
interferences between pipes, ducts, valves, conduits, electrical fixtures and equipment<br />
and install as conditions may dictate as part <strong>of</strong> this contract.<br />
E. Install all piping in cabinets and vanities as tight to the rear <strong>of</strong> the cabinet or vanity as<br />
possible to provide full utilization <strong>of</strong> the cabinet or vanity for storage.<br />
3.4 PIPE INSTALLATION<br />
A. Sanitary Piping: Locate and size sanitary piping within the building where not shown<br />
on the drawings in accordance with applicable plumbing code. Flash all vents passing<br />
15400-12<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PLUMBING<br />
through ro<strong>of</strong> with sheet lead flashing extending a minimum <strong>of</strong> 6" out around base and a<br />
minimum <strong>of</strong> 6" up the stack into a cast-iron flashing collar. Support all soil and vent<br />
stacks at the base by means <strong>of</strong> piers or heavy hangers close to the bottom <strong>of</strong> the riser<br />
and at each floor by means <strong>of</strong> heavy iron clamps. Pitch all 2 1/2" and smaller drain<br />
piping at least 1/4" per foot and 3" and larger drain piping at least 1/8" per foot unless<br />
otherwise noted.<br />
B. Fixtures, Floor Drains and Cleanouts: Provide all fixtures and floor drains with traps to<br />
comply with local regulations and as hereinafter specified. Provide exposed traps with<br />
brass cleanout plugs. Provide floor drains with trap primers connected as shown on<br />
drawings. Provide cleanouts in soil and waste lines as shown on the plans and as<br />
required by the governing codes. Extend cleanouts for piping concealed in floor or<br />
ceiling construction through the floor above and provide with adjustable floor level<br />
cleanout set flush with the finished floor. Use wall cleanouts for piping concealed in<br />
wall construction.<br />
C. Water Supply Piping:<br />
1. Provide a complete system <strong>of</strong> hot and cold <strong>water</strong> piping extending from <strong>water</strong><br />
supply to each fixture and item <strong>of</strong> equipment requiring <strong>water</strong> as indicated on<br />
drawings.<br />
2. Install all <strong>water</strong> piping systems in such a manner that systems can be drained or<br />
vented completely by providing vents and drain valves at all high and low points.<br />
3. Install valves at take-<strong>of</strong>f from the main and upstream <strong>of</strong> all equipment<br />
connections and elsewhere as indicated on drawings or as required. Provide<br />
shock absorbers in accordance with PDI selection standards. Make final<br />
connection to the plumbing fixtures as specified with the plumbing fixture.<br />
Provide a union in the connection to each threaded valve, fixture or piece <strong>of</strong><br />
apparatus so that it may be readily removed. Install unions downstream <strong>of</strong> shut<strong>of</strong>f<br />
valves.<br />
3.5 PIPE ASSEMBLY<br />
A. Sweat Joints in Copper Pipe: Cut pipe squarely to accurate length for full penetration<br />
into fittings. Remove burrs from ends, clean soldering surface thoroughly, flux,<br />
assemble and solder before surfaces oxidize. Use approved non-corrosive flux and<br />
95-5 lead free solder. Use sufficient heat for complete penetration <strong>of</strong> solder and wipe<br />
away excess flux and solder.<br />
B. Sewer Pipe: Start laying pipe so that spigot end is pointed in direction <strong>of</strong> flow. Lay all<br />
pipe with ends abutting and true to line and slope. Fit and match all pipe sections to<br />
form a sewer with a smooth and uniform invert. Clean sockets before joining pipes and<br />
form all joints in accordance with the pipe manufacturer's recommendations.<br />
C. Lead and Oakum Joints: Caulk with tarred spun oakum and fill with molten lead to a<br />
minimum depth <strong>of</strong> 1" at one pouring, then caulk solidly. Prefabricated joints such as<br />
"Dual Tite" or approved equal may be used for underground lines only.<br />
D. Elastomeric Compression Gasket Joints: Install elastomeric compression gasket joints<br />
in accordance with manufacturer's instructions.<br />
15400-13<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PLUMBING<br />
E. Solvent Weld Joints in PVC and CPVC Pipe: Cut pipe squarely to accurate length for<br />
full penetration into fittings. Remove burrs from ends, solvent clean joining surfaces<br />
thoroughly and form all joints in accordance with the pipe manufacturer's<br />
recommendations.<br />
F. No-Hub Joints: Cut pipe squarely to accurate length for full penetration into fittings.<br />
Remove burrs from ends, clean joining surfaces thoroughly and form all joints in<br />
accordance with the pipe manufacturer's recommendations.<br />
G. Threaded Joints in Steel Pipe: Cut pipe to accurate length, ream the ends, and remove<br />
burrs. Use clean, sharp dies. Imperfectly formed or torn threads will be rejected. Use<br />
approved dope on male threads only and clean away excess dope.<br />
H. Joints in Acid Resistant Pipe: Make all joints per pipe manufacturer's instructions.<br />
3.6 VALVE INSTALLATION<br />
A. Install all valves with the stems or spindle above the horizontal where possible and<br />
exercise utmost care not to install valves over electrical equipment. Provide extended<br />
valve stems on insulated pipe.<br />
B. Locate valves at all automatic valves, check valves, at all equipment so they can be<br />
isolated for repairs, at all branch lines connecting mains, and elsewhere as shown on<br />
drawings.<br />
C. Locate check valves on the discharge side <strong>of</strong> all pumps and elsewhere as shown on<br />
drawings.<br />
3.7 PIPE HANGER INSTALLATION<br />
A. Space hangers for horizontal pipe as follows:<br />
Cast iron soil pipe 5' lengths 5' on center maximum<br />
10' lengths 10' " " “<br />
Threaded pipe 1/2" to 1-1/4" 6' on center maximum<br />
1-1/2" to 3" 8' " " “<br />
4" and larger 10' " " “<br />
Plastic pipe 1/2" to 1" 3' on center maximum<br />
1-1/4" and larger 4' " " “<br />
Glass pipe 1/2" to 4" 8' on center maximum<br />
6" and larger 10' " " “<br />
Copper pipe 1-1/4" and smaller 6' on center maximum<br />
1-1/2" and larger 10' " " “<br />
B. Attach hanger rods to sufficiently rigid structural building members. If hangers must be<br />
attached to either the top chord or bottom chord <strong>of</strong> steel bar joist, attach the rods by<br />
clamp at the panel points. Do not under any circumstances burn or drill holes in either<br />
chord. Do not weld either chord. Provide additional hangers or anchoring devices<br />
necessary for proper support <strong>of</strong> piping at corners, tops <strong>of</strong> risers, etc. Provide<br />
galvanized steel shields over pipe insulation at pipe supports.<br />
15400-14<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PLUMBING<br />
C. Support <strong>of</strong> pipe tubing and equipment shall be accomplished though means <strong>of</strong><br />
engineered products specific to each application. Makeshift field devised methods shall<br />
not be allowed.<br />
3.8 SLEEVE AND ESCUTCHEON INSTALLATION<br />
A. Accurately locate and set required sleeves in walls, foundations, floors, etc. Where<br />
more than one pipe is necessarily passed through a single sleeve as to a unit piping<br />
enclosure or other conditions resulting in larger than 1/8" gap within the sleeve, tightly<br />
pack space with proper material to form a barrier against sound, vermin, fire, etc.<br />
B. Provide escutcheons on all finished surfaces where exposed piping, bare or insulated,<br />
pass through floors, walls or ceilings, except in boiler, utility or equipment rooms.<br />
Fasten escutcheons securely to pipe or pipe covering.<br />
3.9 FIRE RATED PENETRATIONS<br />
A. Fill all spaces around piping and spaces between piping and sleeves passing through<br />
fire-rated walls, floors, or ceilings with material capable <strong>of</strong> maintaining the fireresistance<br />
rating <strong>of</strong> the wall, floor or ceiling. Use Metacaulk 950GW-1 or approved<br />
equal caulking material for PVC and CPVC piping.<br />
B. Recessed fixture penetrations (ie. washer supply boxes, refrigerator supply boxes,<br />
etc.) <strong>of</strong> 1-hour rated firewalls shall be installed such that the required fire resistance will<br />
not be reduced. See architectural dwg's for penetration details.<br />
3.10 ACCESS DOORS<br />
A. Provide access doors at circulation pumps, valves, trap primers, air vents, shock<br />
absorbers, and like items requiring adjustment or maintenance accessibility if they<br />
cannot be located over lay-in type ceilings or cannot be accessible from attics or<br />
mechanical rooms. Obtain approval from Architect for location <strong>of</strong> access doors.<br />
Provide visible markers for access doors in concealed locations.<br />
B. Provide visible markers on finished side <strong>of</strong> lay-in type ceilings to indicate locations <strong>of</strong><br />
valves, air vents, and like items. See Architect for marker type.<br />
3.11 INSULATION<br />
A. Use application details in accordance with the insulating material supplier's<br />
recommendations except where a higher standard is specified herein.<br />
B. Run covering for piping unbroken through hanger clevises, sleeves, etc. Use details<br />
for covering cold surfaces such that continuous covering with unbroken vapor barrier is<br />
provided. Use these same covering and hanging details for pipes connecting to<br />
vibrating equipment or carrying pulsating pressure to avoid metal-to-metal contact<br />
between pipes and hangers.<br />
15400-15<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PLUMBING<br />
C. Provide an insert, not less than 6" long, <strong>of</strong> the same thickness and contour as<br />
adjoining insulation, between support shield and piping, but under the finish jacket, on<br />
piping 2" or larger, to prevent insulation from sagging at support points. Use heavy<br />
density insulating materials suitable for the specified temperature range and strong<br />
enough to prevent crushing.<br />
D. Cover surfaces <strong>of</strong> valves, fittings, strainers, and specialties with built-up insulation<br />
around irregular shapes to form smooth cylindrical surfaces. Cover such specialties in<br />
"cold" systems with special care to maintain continuous vapor barrier. Cover flanges<br />
and ground joint unions in "cold" systems.<br />
E. Insulate all above grade domestic cold and hot <strong>water</strong> piping including piping run above<br />
ceilings, in attics, in crawl space and concealed inside walls.<br />
3.12 EQUIPMENT SUPPORTS INSTALLATION<br />
A. Furnish, fabricate, and erect all structural supports and platforms as required for all<br />
equipment installed in this Work, unless otherwise specified. Make these supports and<br />
platforms independent <strong>of</strong> all other equipment supports and suspend them from the<br />
building structural steel, ro<strong>of</strong> purlins, inserts imbedded in concrete slabs, or support<br />
them on columns as required by the drawings. Attachments to steel bar joists must be<br />
approved by the Architect and must only be at panel points. Do not, under any<br />
circumstances, burn, drill or weld either chord <strong>of</strong> steel bar joist.<br />
B. Prepare and furnish drawing and templates indicating all concrete Work required for<br />
equipment furnished under this Work. All concrete required will be provided by the<br />
General Contractor. Provide, at the time concrete foundations, bases, or curbs are<br />
formed, all necessary anchor bolts as required for the various equipment in this Work.<br />
Grout all spaces between the equipment base and concrete supports.<br />
3.13 STRAINERS<br />
A. Locate strainers ahead <strong>of</strong> each automatic control valve, suction side <strong>of</strong> each pump and<br />
elsewhere as shown on drawings.<br />
3.14 CONTROLS<br />
A. Provide all pressure controls, tempering valves, aquastats, temperature and pressure<br />
relief valves and control valves necessary for the operation or adjustment <strong>of</strong> equipment<br />
and not supplied as part <strong>of</strong> the equipment.<br />
B. Install all high voltage (120 V or above) control wiring in EMT conduit. Install low<br />
voltage control wiring in conduit unless concealed in walls or above finished ceilings.<br />
Do not run low voltage control wiring in the same conduit as high voltage control or<br />
power wiring.<br />
3.15 WATER HEATER DRAIN PAN SYSTEM<br />
15400-16<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PLUMBING<br />
A. Install fiber glass drain pan under <strong>water</strong> heaters where scheduled and/or detailed on<br />
drawings. Install 3/4" drain line from drain pan to building exterior or where shown on<br />
drawing.<br />
3.16 EQUIPMENT, VALVE AND PIPE IDENTIFICATION<br />
A. Securely attach manufacturer's nameplate to all equipment giving data as to design<br />
and operating characteristics.<br />
B. Securely attach nameplates to all switches, control devices and similar items, giving<br />
the name and number <strong>of</strong> the item <strong>of</strong> equipment to which it is connected.<br />
C. Provide direction arrows and color bands every 25 feet where piping is located above<br />
lay-in type ceilings and in accessible attic and crawl spaces and within 5 feet <strong>of</strong> both<br />
sides <strong>of</strong> accessible wall penetrations for the following piping:<br />
1. Domestic hot <strong>water</strong> piping.<br />
2. Domestic cold <strong>water</strong> piping.<br />
3. Sanitary drain piping.<br />
4. Plumbing vent piping.<br />
D. Provide small scale drawing showing valve locations and valve number. Provide valve<br />
number on each valve tag. Intent <strong>of</strong> small scale drawing is to show what equipment<br />
each valve serves.<br />
3.17 TESTS<br />
A. Testing requirements are minimum and are not intended to be limiting where additional<br />
testing methods are required by the authority having jurisdiction.<br />
B. All drainage, vent and inside conductor piping shall be tested before fixtures are<br />
installed by capping or plugging the openings and filling the entire system with <strong>water</strong>,<br />
allowing it to stand thus filled for 24 hours with at least 15 feet <strong>of</strong> pressure. If required<br />
to test system in sections, provide necessary test tees, plugs and stand pipe to test the<br />
system with at least 15 feet <strong>of</strong> pressure. Remake all leaking joints and retest.<br />
C. Test all <strong>water</strong> supply piping before fixtures, equipment and/or hydrants are connected.<br />
Cap or plug the openings, fill the system with <strong>water</strong> and apply a hydrostatic pressure <strong>of</strong><br />
1.5 times the operating pressure or 125 PSIG, which ever is higher. Hold test<br />
pressures for at least 24 hours. Remake all leaking joints and retest.<br />
D. Test each fixture for soundness, stability <strong>of</strong> support and satisfactory operation <strong>of</strong> all its<br />
parts.<br />
3.18 DISINFECTION OF POTABLE WATER PIPING<br />
A. Disinfect any part <strong>of</strong> potable <strong>water</strong> system installed or repaired in accordance with one<br />
<strong>of</strong> the following methods before it is placed in service:<br />
15400-17<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
PLUMBING<br />
1. After tests are completed, fill all <strong>water</strong> supply systems with a solution containing<br />
50 PPM <strong>of</strong> available chlorine and allow to stand for a period <strong>of</strong> at least 6 hours<br />
before being flushed with clean <strong>water</strong>. Deliver a dated letter certifying<br />
sterilization to the Architect.<br />
2. After tests are completed, fill all <strong>water</strong> supply systems with a solution containing<br />
100 PPM <strong>of</strong> available chlorine and allow to stand for a period <strong>of</strong> at least 2 hours<br />
before being flushed with clean <strong>water</strong>. Deliver a dated letter certifying<br />
sterilization to the Architect.<br />
3.19 INSTRUCTION OF OWNER'S REPRESENTATIVE<br />
A. After final acceptance <strong>of</strong> all Work and occupancy <strong>of</strong> building, provide service to make<br />
system adjustments to suit conditions created by the occupancy; instruct Owner's<br />
operating personnel in operation adjustment and maintenance procedures <strong>of</strong> system<br />
components and acquaint Owner's operating personnel with locations and functions <strong>of</strong><br />
valves, control devices, etc., in the system.<br />
3.20 CLEANING AND RUBBISH<br />
A. During the Work, keep the premises clear <strong>of</strong> rubbish created as a result <strong>of</strong> the Work.<br />
Protect and prevent unnecessary induction <strong>of</strong> dirt into piping, fixtures and equipment.<br />
On completion <strong>of</strong> the Work, remove all rubbish and debris resulting from the Work and<br />
dispose <strong>of</strong> same. Thoroughly clean and leave in a satisfactory condition for use all<br />
equipment, pipe, fixtures, etc.<br />
3.21 RECORD DRAWINGS<br />
A. The Architect will furnish one set <strong>of</strong> blue line prints <strong>of</strong> the drawings as issued for this<br />
contract. Use these prints to indicate accurately and neatly any deviation in the actual<br />
installation from the drawings as issued. At the completion <strong>of</strong> the job, deliver the<br />
marked-up drawings to the Architect for a permanent record <strong>of</strong> the exact location <strong>of</strong> all<br />
equipment, pipe runs, etc. as incorporated in the job.<br />
3.22 COMPLETE SYSTEMS<br />
A. Leave all systems completely operative in all details and in satisfactory working<br />
condition, as determined by the Architect. Furnish and install as part <strong>of</strong> this contract all<br />
apparatus and material obviously a part <strong>of</strong> the systems and necessary for their<br />
operation.<br />
END OF SECTION 15400<br />
15400-18<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 15500<br />
HEATING, VENTILATING & AIR CONDITIONING<br />
PART 1 – GENERAL<br />
1.1 DESCRIPTION OF WORK<br />
A. The General Provisions <strong>of</strong> the Contract, Division 1, including the General<br />
Requirements, Supplementary Conditions and Special Conditions, along with<br />
the General Requirements, are hereby made a part <strong>of</strong> this Section as if fully<br />
repeated herein.<br />
B. Scope <strong>of</strong> Work: The scope <strong>of</strong> the work included under this section <strong>of</strong> these<br />
specifications shall include complete heating, ventilating and air conditioning<br />
systems as shown on the drawings and specified herein. This work shall<br />
include:<br />
1. Split-system heat pump and compressor/condenser units.<br />
2. Split system air handling units.<br />
3. Duct mounted air purification unit.<br />
4. Ventilating system.<br />
5. Refrigeration piping.<br />
6. Condensate drain piping.<br />
7. Condensate drain pan moisture monitor.<br />
8. Equipment supports, inertia bases, vibration isolators, and identification.<br />
9. Secondary condensate drain pans.<br />
10. Duct work.<br />
11. Insulation.<br />
12. Access doors.<br />
13. Controls and control wiring.<br />
14. Testing, adjusting and balancing.<br />
15. Corrosion protection <strong>of</strong> outdoor condenser/heat pump units.<br />
16. Plan for pipe sleeve and duct opening locations.<br />
C. Related Work Specified Elsewhere:<br />
1. Power wiring: Electrical – 16000.<br />
D. Prior to start <strong>of</strong> any work, the successful Contractor shall meet with the<br />
Architect to determine that no questions remain concerning the intent <strong>of</strong> the<br />
drawings or specifications. The Contractor shall bring up for discussion and<br />
decision any questions concerning the project. No work shall be performed<br />
prior to this meeting. The Architect shall set the date, time, and place <strong>of</strong><br />
conference.<br />
1.2 CODES, ORDINANCES AND PERMITS<br />
A. Comply with all codes applying to the Work <strong>of</strong> this contract including but not<br />
limited to the Florida Energy Efficiency Code, Florida Building Code 2007 and<br />
Florida Building Code 2007 - Mechanical. Obtain information on all code<br />
15500-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
restrictions and requirements. In case <strong>of</strong> conflict between the contract<br />
documents and a governing code or ordinance, such conflict shall be<br />
immediately brought to the attention <strong>of</strong> the Architect for resolution. Extra<br />
payment will not be allowed for Work required by code restrictions except<br />
through written agreement with the Owner.<br />
B. Apply for, obtain, and pay for all required permits and inspection certificates.<br />
Final payment is contingent upon delivery <strong>of</strong> such certificates to the Architect.<br />
C. Where applicable, all materials and equipment shall bear the Underwriters'<br />
Laboratories seal or ASME code stamp. Certificates to this effect shall be<br />
furnished to the Architect upon request.<br />
1.3 INDUSTRY STANDARDS<br />
A. Industry Standards: Unless modified by these specifications, the design,<br />
manufacture, testing and method <strong>of</strong> installing all materials, apparatus and<br />
equipment shall conform to the following:<br />
1. ASHRAE Standard 90, Energy Conservation in New Building Design.<br />
2. ANSI B9.1 Safety Code for Mechanical Refrigeration.<br />
3. Standards <strong>of</strong> National Fire Protection Association.<br />
4. ASHRAE Handbook <strong>of</strong> Fundamentals.<br />
5. SMACNA Standards for Duct work.<br />
6. Associated Air Balance Council Standards for Field Measurement and<br />
Instrumentation.<br />
7. Underwriters' Laboratories.<br />
8. National Electrical Code.<br />
9. Air Moving & Conditioning Association.<br />
10. Air Conditioning & Refrigeration Institute.<br />
11. Industrial Ventilation Manual (American Conference <strong>of</strong> Governmental<br />
Industrial Hygienists).<br />
1.4 SITE INSPECTION<br />
A. Visit the site and thoroughly inspect conditions affecting the Work before<br />
submitting bid. Assume responsibility for meeting all existing conditions<br />
including access and work space limitations.<br />
1.5 DRAWINGS AND SPECIFICATIONS.<br />
A. Refer to the general construction drawings which are bound with the drawings<br />
<strong>of</strong> this Work for construction details, elevations, etc. Architectural and structural<br />
drawings shall take precedence over Division 15 drawings (Mechanical<br />
Drawings). It is the intent <strong>of</strong> the Mechanical Drawings to show the general<br />
arrangement <strong>of</strong> the system and not to indicate all <strong>of</strong>fsets, fittings and<br />
accessories which may be required, nor to show exact locations <strong>of</strong> piping, duct<br />
work or equipment except where actual dimensions are given. All vertical<br />
piping shall be located in walls in finished spaces unless otherwise noted.<br />
15500-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
B. Specifications and drawings shall be considered as supplementary to each<br />
other, requiring materials and labor indicated, specified, or implied by either<br />
specifications or drawings. It is the intent <strong>of</strong> the drawings and specifications to<br />
call for finished Work, tested, and ready for operation, and in complete<br />
conformance with all applicable codes, rules and regulations. Minor details not<br />
usually shown or specified, but manifestly necessary for the proper installation<br />
and operation <strong>of</strong> the various systems, shall be included in the Work and in the<br />
proposal, the same as if specified or shown on the drawings.<br />
C. If any departures from the drawings and specifications are deemed necessary,<br />
details <strong>of</strong> such departures and the reasons therefore shall be submitted to the<br />
Architect for approval. No departures shall be made without prior approval <strong>of</strong><br />
the Architect.<br />
D. Specific reference in the specifications to any article, device, product, material,<br />
fixture or type <strong>of</strong> construction, etc., by proprietary name, make or catalog<br />
number shall be interpreted as establishing a standard <strong>of</strong> quality and shall not<br />
be construed as limiting competition. Substitutes may be used subject to<br />
compliance with requirements set forth in the General Requirements, Division<br />
1, and as approved by the Architect.<br />
E. Submit cost implications to contract in bid when providing substitutes for<br />
specified equipment and for all alternatives requested in the construction<br />
documents.<br />
1.6 MANUFACTURER'S SPECIFICATIONS<br />
A. Where the name <strong>of</strong> a concern or manufacturer is mentioned on the Drawings or<br />
in Specifications in reference to his required service or product, and no<br />
qualifications or specification <strong>of</strong> such is included, then the material gauges,<br />
details <strong>of</strong> manufacturer, finish, etc., shall be in accordance with his standard<br />
practice, directions or specifications. The Contractor shall be responsible for<br />
any infringement <strong>of</strong> patents, royalties, or copyrights which may be incurred<br />
thereby.<br />
B. Equipment scheduled on drawings was used to arrive at space, maintenance<br />
access, utility service and equipment supports. If other equipment is submitted<br />
and approved, take responsibility for maintaining these space, maintenance<br />
access, utility service requirements and any revisions required for installation<br />
such as equipment supports, ro<strong>of</strong> curbs and access ladders. Take<br />
responsibility for the coordination and cost for any resulting changes including<br />
cost to change electrical service required by substituted equipment.<br />
C. All materials and equipment shall be new and first class in every respect. As<br />
far as is practical, similar products shall be by one manufacturer. Equipment<br />
designed to operate as a system such as outdoor condenser or heat pump<br />
units with indoor air handling units shall be from one manufacturer unless<br />
scheduled otherwise.<br />
1.7 SUBMITTALS<br />
15500-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
A. Submit shop drawings in accordance with the General Requirements, Division<br />
1.<br />
B. Samples <strong>of</strong> insulation, diffusers, dampers or any other mechanical equipment<br />
or materials shall be submitted if requested by the Architect. If a sample is<br />
requested, have the sample delivered to the Architect or arrange for the<br />
Architect to examine it elsewhere. Failure to comply may be cause for<br />
rejection.<br />
C. Submit shop drawings or catalog data for the Architect's approval before<br />
purchasing or installing the following:<br />
1. Split-system compressor/condenser.<br />
2. Air handling units.<br />
3. Grilles, diffusers and registers.<br />
4. Duct shop drawing (where different from design drawing).<br />
5. Duct mounted air purification unit.<br />
6. Exhaust and supply fans.<br />
7. Insulation.<br />
8. Secondary condensate drain pans.<br />
9. Vibration isolators and inertia bases.<br />
10. Controls and wiring diagrams.<br />
D. Submit detailed and dimension plan showing all pipe sleeves and duct<br />
openings required in building structure including floors and ro<strong>of</strong> deck.<br />
1.8 PERFORMANCE DATA<br />
A. All performance data specified herein shall be considered actual performance<br />
<strong>of</strong> equipment as installed. Make suitable allowances if installation details are<br />
such that actual operating conditions unfavorably affect performance as<br />
compared to conditions under which the equipment was rated.<br />
1.9 CATALOG, OPERATION AND MAINTENANCE DATA<br />
A. Provide four (4) complete sets <strong>of</strong> a compilation <strong>of</strong> catalog data <strong>of</strong> each<br />
manufactured item <strong>of</strong> equipment used in the Mechanical Work. In addition to<br />
the catalog data, installation, operating and maintenance data and bill <strong>of</strong><br />
materials for all operating equipment shall be submitted. Each <strong>of</strong> the four sets<br />
<strong>of</strong> data shall be bound in loose leaf binders and submitted to the Architect<br />
before final payment is made. A complete double index shall be provided as<br />
follows:<br />
1. Listing the products alphabetically by name.<br />
2. Listing the names <strong>of</strong> manufacturers alphabetically by name together with<br />
their addresses and the names and addresses <strong>of</strong> local sales<br />
representatives.<br />
B. It is the intent <strong>of</strong> this catalog, operation and maintenance data to provide the<br />
Owner with complete instructions on the proper operation and use, lubrication<br />
and periodic maintenance, together with the source <strong>of</strong> replacement parts and<br />
service, for the items <strong>of</strong> equipment covered.<br />
15500-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
1.10 CONTRACTOR COORDINATION<br />
A. The Electrical Contractor will furnish, set and wire all disconnect devices and<br />
starters as required for all equipment except for those items furnished with<br />
integral disconnect devices and/or starters.<br />
B. Furnish detailed information to the Electrical Contractor on power wiring<br />
requirements for all mechanical equipment actually purchased as soon as<br />
practical. This shall include all diagrams and instructions necessary for the<br />
Electrical Contractor to make connections properly. If equipment actually<br />
purchased requires larger electrical service than equipment scheduled, arrange<br />
and pay for required electrical service change.<br />
C. Provide all air conditioning control devices, including thermostats, and<br />
complete all control wiring, including final connections.<br />
D. Coordinate location <strong>of</strong> equipment, piping, and duct work with Electrical<br />
Contractor and Plumbing Contractor to maintain clearance for equipment<br />
maintenance, prevent interference with duct and piping runs, and to prevent<br />
ducts and piping from being installed over electrical panels. If interference<br />
develops, the Architect will decide which equipment, conduit, duct, piping, etc.,<br />
must be relocated regardless <strong>of</strong> installation order. Take responsibility for<br />
relocating Mechanical work, if so ordered, including all associated costs.<br />
E. Within 30 days following award <strong>of</strong> the contract, report to the Architect in writing,<br />
all real or potential errors, ambiguities and/or conflicts on the Mechanical Work<br />
or between the trades and obtain an agreement with the Architect on a solution.<br />
Those reported after 30 days, except as a result <strong>of</strong> unforeseen circumstances,<br />
shall be resolved at the discretion <strong>of</strong> the Architect. Report conflicts resulting<br />
from the progress <strong>of</strong> Work to the Architect immediately or accept the expense<br />
for corrective work caused by failure to report such a conflict.<br />
1.11 CHANGES<br />
A. Do not make any changes in design without the written approval <strong>of</strong> the<br />
Architect. Changes in design means any change which will affect the capa<strong>city</strong>,<br />
reliability, operation or safety <strong>of</strong> the systems or any parts there<strong>of</strong>, including<br />
changes which may be required to conform to local regulations or codes.<br />
1.12 MECHANICAL CONTRACTOR'S WARRANTY<br />
A. Provide written warranties as specified in the General Requirements, Division<br />
1, and provide a five year warranty for all refrigeration compressors against<br />
defects in materials and workmanship. Repair any defects becoming apparent<br />
within the warranty period as directed by the Architect.<br />
1.13 PROTECTION OF MATERIALS AND EQUIPMENT<br />
A. Provide complete protection against weather, rain, windstorms, frost, ice, heat,<br />
and acts <strong>of</strong> vandalism, so as to maintain all materials and equipment free from<br />
injury or damage, including physical damage <strong>of</strong> any nature. At end <strong>of</strong> each<br />
15500-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
workday, cover work as required to provide such protection. This shall include<br />
but not be limited to erection <strong>of</strong> all temporary shelters to protect adequately any<br />
materials and equipment stored on site, cribbing <strong>of</strong> any materials and<br />
equipment above the floor <strong>of</strong> the construction, and the covering <strong>of</strong> materials<br />
and equipment in the building under construction with protective covering.<br />
B. Provide dry storage facilities for materials and equipment; including but not<br />
limited to duct work, insulation, air handling units, *VAV boxes, fan terminal<br />
units, controls, motor operated equipment, etc.; sensitive to damage by<br />
moisture. Outside, unprotected storage will not be accepted. Storage inside<br />
building being constructed will not be accepted until ro<strong>of</strong> and walls are weather<br />
tight unless temporary protection is provided.<br />
C. Failure to comply shall be sufficient cause for rejection <strong>of</strong> damaged materials<br />
and equipment. Replace any damaged material or equipment and place the<br />
systems in perfect working condition.<br />
PART 2 – PRODUCTS<br />
2.1 SPLIT SYSTEM COMPRESSOR/CONDENSER UNITS<br />
A. Capa<strong>city</strong> shall be as scheduled on the drawings and adjusted for line losses <strong>of</strong><br />
refrigerant piping. Capa<strong>city</strong> shall be combined rating at actual conditions<br />
entering the evaporator and 95 degrees F outdoor ambient temperature.<br />
B. Unit shall have all operating components assembled on one common base.<br />
These shall include: compressor, condenser coil, condenser fan and motor,<br />
charging valves, all controls, and a holding charge <strong>of</strong> refrigerant. Units shall be<br />
designed for outdoor installation with all exterior surfaces factory painted with<br />
primer and enamel for weather protection. Drain holes shall be provided for<br />
elimination <strong>of</strong> rain. Provide removable panels for access to components.<br />
C. Condenser coil shall be <strong>of</strong> the continuous *aluminum *copper [option on units ><br />
5 tons] plate fin and copper tube type and shall be circuited for integral subcooler.<br />
The coil shall be tested with refrigerant and sealed with a holding<br />
charge <strong>of</strong> refrigerant.<br />
D. Compressor shall be mounted on vibration isolators.<br />
E. Refrigeration circuit components shall include liquid line service valve, suction<br />
line service valve, and full charge <strong>of</strong> compressor oil and holding charge <strong>of</strong><br />
refrigerant.<br />
F. Controls shall be mounted in separate panel on the side <strong>of</strong> the unit for<br />
installation and service access. Units shall be provided with controls specified<br />
on the drawings and all standard controls including the following even if not<br />
considered standard:<br />
1. Single point power connection.<br />
2. Compressor and fan contactors.<br />
3. Motor overload protection for ungrounded legs.<br />
4. Crankcase oil heater.<br />
15500-6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
5. High pressure cut-out.<br />
6. Auto reset low-pressure switch to stop compressor if refrigerant pressure<br />
drops below 7 psig.<br />
7. Compressor anti-cycling relays set between 3 and 5 minutes.<br />
8. Low-ambient controller down to 30º F. for winter operation.<br />
9. Evaporator freeze thermostat to stop unit operation if evaporator reaches<br />
freeze-up conditions.<br />
10. Indoor time delay relay to continue indoor blower motor after compressor<br />
cycles <strong>of</strong>f.<br />
11. Refrigerant filter dryer (two-way for heat pumps).<br />
12. Adjustable outdoor thermostat to prevent supplemental electric heat from<br />
operating except during defrost mode or when outside air temperature is<br />
below set-point (40 F).<br />
13. Thermostatic expansion valve kit.<br />
14. Liquid solenoid valve to stop and start liquid refrigerant flow in response<br />
to compressor operation.<br />
G. Approved Manufacturers: Carrier, Lennox, McQuay, Trane, York.<br />
2.2 AIR HANDLING UNITS<br />
A. Air handling units shall be draw through type with 1" thick, standard size filters<br />
and shall have DX cooling coils and electric heating coils as scheduled on<br />
drawings with minimum unit capacities as indicated.<br />
B. Fan capacities shall be as scheduled on drawings. Fans shall be direct drive<br />
with two or three speed motors or belt drive as scheduled. Fans and motors<br />
shall be mounted on vibration isolators.<br />
C. Casing shall be constructed <strong>of</strong> heavy duty, factory painted, galvanized sheet<br />
steel adequately reinforced with structural members. Units shall include plastic<br />
drain pan, with at least 1" thick insulation, extending under coil and fan sections<br />
with brass drain connection. Removable panels in front <strong>of</strong> unit shall provide<br />
access to all internal parts. Units shall have filter access panel and filter rack.<br />
All unit panels shall be internally insulated to meet requirements <strong>of</strong> the Florida<br />
Energy Code. All insulating materials shall meet the requirements <strong>of</strong> NFPA 90-<br />
A. Units shall be equipped with duct collars on intake and discharge <strong>of</strong> unit and<br />
single point power connection.<br />
D. Direct expansion cooling coils shall be <strong>of</strong> the continuous aluminum plate fin and<br />
copper tube type and shall have an equalizing type distributor. The coil shall be<br />
tested with refrigerant and sealed with a holding charge <strong>of</strong> nitrogen at 10 PSIG.<br />
E. Electric heating coil shall be factory installed and protected with air flow switch.<br />
Heaters over 10 KW shall have heating elements sequenced on and <strong>of</strong>f in at<br />
least two stages and shall be wired for multiple stage operation. All heaters<br />
shall be equipped with manual reset thermal overload device, current overload<br />
for heaters above 10 KW and required heating and cooling system controls<br />
including 60 VA control circuit (24 v) transformer. Low-voltage connections<br />
shall be point-to-point on terminal board.<br />
F. Unit controls shall include but not be limited to solid-state interlock control<br />
board, control transformer, and evaporator freeze thermostat.<br />
15500-7<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
G. Approved Manufacturers: Carrier, Lennox, McQuay, Trane, York.<br />
2.3 DUCT MOUNTED AIR PURIFICATION UNITS<br />
A. Air purification unit shall be "DUCTWORX" as manufactured by Ecoquest<br />
international or pre-approved equal. Units can be obtained from Ecoquest Pure<br />
Water and Air [Office (912) 882-4006 or cell (904) 610-8482 or e-mail<br />
jmcosman@ecoquestintl.com].<br />
2.4 WALL PROPELLER SUPPLY AND EXHAUST FANS<br />
A. Fans shall be <strong>of</strong> size, drive type, capa<strong>city</strong>, and electrical characteristics<br />
scheduled on drawings. Accessories shall be as scheduled. Complete unit<br />
shall be approved by the Underwriters' Laboratories and be in full accordance<br />
with all provisions <strong>of</strong> the National Electric Code.<br />
B. Fan frame shall be heavy gauge painted steel with fan assembly bolted to<br />
frame for ease <strong>of</strong> removal and service. Fan bearings shall be <strong>of</strong> ball bearing<br />
type with minimum average life <strong>of</strong> 100,000 hours. Fan blades shall be heavy<br />
duty steel. Fan drives shall be designed for at least 165% <strong>of</strong> rated horsepower<br />
capabilities.<br />
C. Pre-wired, factory mounted speed controller for direct drive units.<br />
D. Approved Manufacturers: Acme, Aerovent, American Coolair, Greenheck,<br />
Hartzell, Loren Cook, Penn Ventilator, Swartwout, Twin City.<br />
2.5 SUPPLY AND EXHAUST FANS<br />
A. Fans shall be <strong>of</strong> size, type and capa<strong>city</strong> indicated on the drawings. Power<br />
supply shall be as scheduled. The complete units shall be approved by the<br />
Underwriters' Laboratories and be in full accordance with all provisions <strong>of</strong> the<br />
National Electric Code.<br />
B. Provide fan with internal integral thermal protector and unit mounted<br />
disconnect.<br />
C. Pre-wired, factory mounted speed controller for direct drive units.<br />
D. Approved Manufacturers: Acme, Aerovent, American Coolair, Greenheck,<br />
Hartzell, Loren Cook, Penn Ventilator, Swartwout, Twin City.<br />
2.6 REFRIGERANT PIPING AND ACCESSORIES<br />
A. Piping shall be type "L" hard drawn copper with wrought copper, refrigerant<br />
grade fittings. All elbows shall be long radius.<br />
B. Moisture indicator shall be installed in the liquid line just before the refrigerant<br />
solenoid valve. Thermostatic expansion valves shall be provided for each<br />
evaporator circuit. Valves shall be equipped with external equalizer.<br />
15500-8<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
2.7 CONDENSATE DRAIN PIPING AND SECONDARY DRAIN PAN<br />
A. Condensate piping located inside building below ceilings shall be non-insulated<br />
schedule 40 polyvinyl chloride (PVC).<br />
B. Secondary drain pans shall be fabricated from a single sheet <strong>of</strong> minimum 18<br />
gage stainless steel or minimum 1/8" thick fiberglass to form a 4" deep<br />
minimum seamless pan with formed and sealed corners. Pan shall be provided<br />
with 24 volt <strong>water</strong> detector to shut down the air handling unit when any <strong>water</strong><br />
enters the drain pan. Water detector shall be UL listed and approved for use by<br />
local authority. Mechanical float switches are not acceptable.<br />
C. Alternative to the secondary condensate drain pan, subject to local approval <strong>of</strong><br />
local municipal Authority having jurisdiction, is a condensate drain trap float<br />
switch shall be "EZ-TRAP" model EZT-225 or approved equal. (EZ TRAP 3<br />
Kellogg Court, Unit 10, Edison, NJ 08817 phone 732-248-8066).<br />
2.8 PIPE HANGERS<br />
A. Pipe hangers for refrigerant and condensate piping located inside building shall<br />
be non-metallic strap hangers designed to rigidly support piping without<br />
damage to pipe insulation.<br />
B. Pipe hangers shall be Auto-Grip, Fee and Mason, Grinnel, galvanized steel<br />
clevis hangers, roller or fixed as shown on drawings, selected within the<br />
manufacturer's published load ratings.<br />
C. Hangers for copper pipe shall be either copper-plated type or there shall be a<br />
shield <strong>of</strong> 4 pounds sheet lead to completely surround the pipe to prevent direct<br />
contact with the hanger.<br />
D. Supports for pipes with vapor barrier type covering shall not contact the pipe<br />
but shall surround the unbroken covering. Provide galvanized steel shields with<br />
mitered corners properly formed to the jacket outside diameter between hanger<br />
clevises and the lower 1/3 <strong>of</strong> the circumference. Size shields as follows:<br />
1. Pipe up to 1" 18 gauge x 8" long<br />
2. 1-1/4" to 2" 16 gauge x 12" long<br />
3. 2-1/2" to 4" 14 gauge x 16" long<br />
4. 5" and larger 12 gauge x 20" long<br />
E. Use vibration isolators in hanger rods to isolate vibration in piping subject to<br />
vibration, or where shown on drawings.<br />
2.9 SLEEVES AND ESCUTCHEONS<br />
A. Sleeves shall be 18 gauge galvanized steel or pre-formed plastic. Sleeves<br />
shall be sized to allow approximately 1/8" gap around the pipe or its insulation.<br />
B. Sleeves through floors or fire walls shall be galvanized steel pipe <strong>of</strong> proper<br />
size. Sleeves through floors shall extend 1/2" above the finished floor. Sleeves<br />
penetrating fire-rated walls, floors or ceilings shall be filled with fire-rated<br />
15500-9<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
material capable <strong>of</strong> maintaining the fire-resistance rating <strong>of</strong> the wall, floor or<br />
ceiling.<br />
C. Escutcheon plates for finished spaces shall be nickel-plated.<br />
2.10 EQUIPMENT SUPPORTS, VIBRATION ISOLATORS, AND IDENTIFICATION<br />
A. Equipment supports shall be sized and designed to support the equipment and<br />
shall be fabricated from galvanized steel.<br />
B. Hangers for horizontal air handling units including in-line supply and exhaust<br />
fans and fan terminal units shall be sized for equipment load but shall not be<br />
less than 3/8" diameter steel rod and shall have spring isolators designed for 1"<br />
maximum deflection. Hanger straps and/or wire will not be accepted.<br />
C. Supports for vertical air handling units up thru 2,000 cfm shall be fabricated<br />
from galvanized steel angles designed to support the unit. Angles shall be at<br />
least 1-1/2" x 1-1/2" x 1/4" thick. Supports shall be designed to allow clearance<br />
for return air ducts or plenum.<br />
D. Vibration isolators for air handling units over 2,000 cfm, except for AHUs<br />
scheduled to have secondary drain pans or equipment scheduled to have<br />
concrete inertia base, shall be housed spring type vibration isolators, similar to<br />
Kinetics Model SL and SM, sized for equipment load, and designed for 1"<br />
maximum deflection. Air handling units with internal spring isolation shall have<br />
neoprene inertia pads, similar to Kinetics Model NP or NG, sized and designed<br />
for unit load.<br />
E. Vibration isolators for floor-mounted air handling units with secondary drain<br />
pans shall be neoprene inertia pads, similar to Kinetics Model NP or NG, sized<br />
and designed for unit load.<br />
F. Vibration rails shall be provide for ro<strong>of</strong>top A/C unit ro<strong>of</strong> curbs mounted between<br />
ro<strong>of</strong>top unit and top <strong>of</strong> ro<strong>of</strong> curb. Vibration rails shall be designed for each<br />
specific ro<strong>of</strong>top unit.<br />
G. Concrete inertia base and spring isolators for equipment scheduled to have<br />
concrete inertia base shall be designed for equipment load to prevent<br />
equipment vibration transmission to floor. Inertia base frames shall be preengineered<br />
welded steel pouring frames with welded-in concrete reinforcement,<br />
equipment mounting bolts and vibration isolator bracket. Frames shall be<br />
similar to Kinetics Model CIB-H or L depending on equipment type.<br />
H. All identification legends shall be stenciled on pressure-sensitive labeling<br />
material approved by the Architect. Labeling material colors for use on piping<br />
shall be as specified in ANSI A 13.1 latest revision. Equipment labels shall be<br />
laminated, phenolic strips 1/16" thick and engraved to show black letters on<br />
white background not less than 1/4" high.<br />
I. Valve tags shall be plastic, aluminum or brass at least 1" in diameter and<br />
stamped with contrasting colored figures as large as possible.<br />
15500-10<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
J. Pipe markers shall be Seton style RPM or approved equal.<br />
2.11 MOTORS<br />
A. Full Load Motor Efficiencies: All motors installed in equipment specified in<br />
these specifications shall be classified under the National Electric<br />
Manufacturers Association's Standard as "Energy Efficient" or shall otherwise<br />
meet the requirements <strong>of</strong> the Florida Energy Code.<br />
B. Except where otherwise specified, all motors shall be designed for continuous<br />
service and for regular starting on full-line voltage with normal starting current.<br />
The limits on service factor and temperature rise above 40º C. ambient at rated<br />
load shall be as follows:<br />
1. Motor Enclosure Service Factor Temperature Rise<br />
2. Drip-Pro<strong>of</strong> 115% 40º C.<br />
3. Totally Enclosed None 55º C.<br />
C. The insulation portion <strong>of</strong> the motor leads between the lug and motor frame shall<br />
be at least 5" in length when four or less motor leads are used and at least 8" in<br />
length when more than four motor leads are used. When terminal type lugs are<br />
supplied, they shall be solderless, Burndy "Hy-Dent" type or approved equal.<br />
D. Motors shall be furnished for operation as specified or as noted on the<br />
drawings. All motors shall conform to IEEE, NEMA and ANSI standards.<br />
E. Motors furnished for indoor installation shall be <strong>of</strong> the open, drip-pro<strong>of</strong> design.<br />
Motors furnished for installation in wet locations or outdoors shall be <strong>of</strong> the<br />
totally-enclosed design. Motors furnished for installation in hazardous locations<br />
shall be <strong>of</strong> the explosion-pro<strong>of</strong> design.<br />
2.12 DUCT WORK<br />
A. Supply air, return air, outside air, transfer air and exhaust air (except kitchen<br />
hood and laboratory hood exhaust) duct work, and return air plenums under<br />
vertical air handling units shall be galvanized sheet metal.<br />
B. Fabricate sheet metal duct work in accordance with latest edition <strong>of</strong> "HVAC<br />
Duct Construction Standards - Metal and Flexible" as published by SMACNA<br />
and to meet construction requirements for 1" W.G. minimum static pressure and<br />
seal class "C".<br />
C. Fabricate and seal duct joints and connections such that air leakage does not<br />
exceed five (5) percent <strong>of</strong> design air volume.<br />
D. Duct dimensions shown on drawings are finished inside dimensions. <strong>Inc</strong>rease<br />
duct sizes to allow for double wall construction, acoustic duct liner or fiberglass<br />
duct system wall thickness where applicable.<br />
E. Changes in direction, including Tees, in square and rectangular duct work for<br />
both supply air, outside air, and return air shall be made with mitered elbows<br />
fitted with closely spaced full radius air foil type turning vanes constructed for<br />
15500-11<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
maintaining constant velo<strong>city</strong> through elbow. Changes in direction in supply<br />
and return ducts may be made with radius elbows instead <strong>of</strong> mitered elbows<br />
and turning vanes if space limitations permit or if shown on drawings. Radius<br />
elbows in round duct work do not require turning vanes for either supply or<br />
return air.<br />
2.13 A/C DUCT WORK ACCESSORIES<br />
A. Manual balance/volume dampers shall be opposed blade type and shall be 16<br />
gauge minimum galvanized steel with zinc-plated hardware and bronze or nylon<br />
bearings. Blades shall not be over 8" wide nor less than 16 gage galvanized<br />
steel. Maximum leakage shall be less than 1% at static pressure <strong>of</strong> 4" W.G.<br />
Provide locking quadrant damper operators on manual dampers.<br />
B. Provide 24 V electric operators on automatic dampers. Electric operators shall<br />
be oil immersed gear train type with spring return and shall function<br />
proportionally or pulsed directly for position control.<br />
C. Turning vanes shall be factory fabricated full radius double thickness air foil<br />
type with 24 gauge rails and hollow vanes.<br />
D. Extractors at branch take-<strong>of</strong>fs shall be adjustable push rod type with locking<br />
hardware. Extractors at sidewall supply grilles shall be adjustable by removing<br />
the grille face.<br />
E. Splitters shall be constructed <strong>of</strong> at least the same gauge galvanized steel as<br />
the duct wherein they are used and shall not be less than 24 gauge. Blades<br />
shall be formed in two thickness <strong>of</strong> metal to provide rounded nose to air flow.<br />
F. Access doors shall be factory fabricated, double wall insulated type <strong>of</strong> 24<br />
gauge minimum galvanized steel. Doors shall be non-hinged, completely<br />
removable with hand operated adjustable tension catches and shall be<br />
completely gasketed around their perimeter. Doors shall be as large as the<br />
duct size will permit (within 1" <strong>of</strong> each duct edge) and large enough to permit<br />
access to fire dampers and other items requiring access. Doors larger than 12"<br />
shall have latches on all four sides.<br />
G. Flexible connectors shall meet requirements <strong>of</strong> UL 191 for Class 1 connectors.<br />
2.14 FLEXIBLE DUCT<br />
A. Flexible duct shall be pre-insulated type, listed by Underwriters' Laboratories,<br />
<strong>Inc</strong>., Class 1 ducts, polymer film supported by helically wound, spring-steel<br />
wire; fibrous-glass insulation; aluminized vapor-barrier film and shall conform to<br />
NFPA Bulletin 90-A.<br />
B. Duct shall be designed for pressure rating <strong>of</strong> 4-inch wg (1000 Pa) positive and<br />
0.5-inch wg (125 Pa) negative. Maximum air velo<strong>city</strong> shall be 4000 fpm.<br />
C. Insulation shall be the required thickness and material to provide a minimum<br />
thermal resistance "R" <strong>of</strong> 6.0 when located outside <strong>of</strong> the building thermal<br />
15500-12<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
envelop and “R” <strong>of</strong> 4.2 when located inside the building thermal envelope.<br />
Comply with ASHRAE/IESNA 90.1-2004.<br />
D. Flexible duct connectors shall be stainless-steel band with cadmium-plated hex<br />
screw to tighten band with a worm-gear action.<br />
2.15 INSULATION – GENERAL<br />
A. All insulation materials and coatings shall meet flame spread and smoke<br />
developed ratings per NFPA Bulletin 90-A when tested in accordance with<br />
ASTM Standard E-84. Smoke developed less than or equal to 50, and flame<br />
spread less than or equal to 25. All coatings and mastics shall be<br />
nonflammable in wet state.<br />
B. Approved Manufacturers: Armstrong World Industries, CertainTeed Corp.,<br />
Manville, IMCOA, NOMACO, Owens-Corning Fiberglas Corp., Pittsburg<br />
Corning Corp.<br />
2.16 DUCT WORK INSULATION<br />
A. General: Duct insulation shall be the required thickness and material to provide<br />
a minimum thermal resistance "R" <strong>of</strong> 8 when duct is located outside building,<br />
"R" <strong>of</strong> 6.0 when duct is located in areas within the building but on the non-air<br />
conditioned side <strong>of</strong> the building insulation and 4.2 when located on the air<br />
conditioned side <strong>of</strong> the building insulation unless otherwise noted on the<br />
drawings. These R values are "as-installed" minimums. Insulation nominal<br />
thickness shall not exceed 2".<br />
B. Flexible external insulation shall be fiberglass and shall have an "as-packaged"<br />
R value not less than 25% greater than the required "as-installed" value and<br />
shall have a duplex laminated, reinforced aluminum foil vapor barrier.<br />
C. Semi-rigid external insulation shall be fiberglass and shall have an "aspackaged"<br />
R value not less than the required "as-installed" value and shall<br />
have all service jacket (ASJ) facing.<br />
D. Acoustical duct liner shall be fiberglass insulation with air stream side faced<br />
with nonabrasive, fire-resistant coating to minimize air flow resistance and<br />
prevent microbial growth per ASTM G21 and G22. Maximum K factor shall be<br />
0.23 (BTU x inch) / (sq. ft. x º F. x hr). Thickness shall be determined by<br />
required "R" value depending on duct location. Minimum <strong>of</strong> 1" thick duct liner<br />
with additional external insulation sufficient to provide required "R" value may<br />
be use. ToughGard Duct Liner as manufactured by CertainTeed or approved<br />
equal.<br />
E. Extruded polystyrene insulation shall have following properties:<br />
1. Density: 1.35 P.C.F minimum.<br />
2. Resistance at 75º F: 5.0 (HR x SF x º F.)/(BTU x inch) minimum.\Water<br />
Vapor: 1.1 perm-in maximum.<br />
3. Water absorption: 0.3 % by volume maximum.<br />
15500-13<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
F. Aluminum Jacketing: 0.016" thick minimum with bands and seals <strong>of</strong> same<br />
material by Premetco International or approved equal.<br />
G. Glass Cloth and Mastic Jacket:<br />
1. Glass cloth shall have breaking strength not less than 76 pounds per<br />
inch, warp, and 90 pounds per inch, weft. Thickness shall be 6 mils<br />
minimum. Finish shall be pressure sensitive adhesive designed to be<br />
applied over aluminized film type vapor barrier jacket. Material shall be<br />
as manufactured by PermaGlas-Mesh, <strong>Inc</strong>. or approved equal.<br />
2. Mastic shall be white, vinyl acrylic weather barrier material designed for<br />
outdoor applications over glass cloth. Mastic shall be WC-7 as<br />
manufactured by Vimasco Corporation or approved equal.<br />
H. Vapor Barrier Jacket:<br />
1. ASTM C921, White kraft paper reinforced with glass fiber yarn and<br />
bonded to aluminized film.<br />
2. Moisture Vapor Transmission: ASTM E96; 0.02 perm inches.<br />
3. Secure with self sealing longitudinal laps and butt strips.<br />
4. Secure with outward clinch expanding staples and vapor barrier mastic.<br />
2.17 REFRIGERANT SUCTION PIPING INSULATION<br />
A. Above grade piping inside building and when installed in PVC conduit: 3/4"<br />
thick, pre-formed, flame-retardant, elastomeric, polyethylene, pipe insulation<br />
similar to IMCOA Imolock or NOMACO Nomalock, and installed in accordance<br />
with manufacturer's instructions.<br />
B. Exposed piping outside building: 3/4" thick, pre-formed, flame-retardant,<br />
elastomeric, polyethylene, pipe insulation similar to IMCOA Imolock or<br />
NOMACO Nomalock, and installed in accordance with manufacturer's<br />
instructions and, in addition, provide banded aluminum jackets to floor or wall<br />
penetration. Install and secure aluminum jackets in accordance with<br />
manufacturer's instructions.<br />
C. Below grade and when not installed in PVC conduit: 1" thick, pre-formed rigid<br />
cellular glass type similar to Pittsburgh Corning Foamglas, installed in<br />
accordance with manufacturer's instructions. Finish with 2 coats <strong>of</strong> asphalt<br />
base mastic equal to Foster 60-25 reinforced with layer <strong>of</strong> glass fabric.<br />
2.18 CONDENSATE DRAIN PIPING INSULATION<br />
A. Primary condensate copper piping, if used instead <strong>of</strong> schedule 40 PVC, shall<br />
be insulated with 1/2", pre-formed, flame-retardant, elastomeric, polyethylene,<br />
pipe insulation similar to IMCOA Imolock and Armstrong Armaflex, or, in dry<br />
locations, 1/2" thick 3.5 pound density molded fiberglass with all-purpose, high<br />
density, white kraft bonded to aluminum foil, reinforced with fiberglass yarn<br />
jacket. Insulation located in supply or return air plenums shall meet all state<br />
and local code requirements for plenum use. Install pipe insulation in<br />
accordance with manufacturer's instructions.<br />
15500-14<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
B. Copper or PVC used for primary or secondary condensate piping located inside<br />
building above ceilings shall be insulated with 1/2", pre-formed, flame-retardant,<br />
elastomeric, polyethylene, pipe insulation similar to IMCOA Imolock and<br />
Armstrong Armaflex, or, in dry locations, 1/2" thick 3.5 pound density molded<br />
fiberglass with all-purpose, high density, white kraft bonded to aluminum foil,<br />
reinforced with fiberglass yarn jacket. Install pipe insulation in accordance with<br />
manufacturer's instructions.<br />
2.19 PIPE INSULATION JACKETING, BANDING, AND TAPING<br />
A. All service jacketing: Kraft Paper aluminum foil/vinyl coating fire retardant<br />
construction by Lamtec Corp., Alpha Associates, or approved equal.<br />
B. Aluminum jacketing: 0.016" thick minimum with 1/2" wide bands and seals <strong>of</strong><br />
same material by Premetco International or approved equal.<br />
C. PVC jacketing: 0.03" thick minimum with self sealing laps and heavy duty fitting<br />
covers <strong>of</strong> matching thickness by Proto Corp or approved equal. All PVC shall<br />
have flame and smoke rating <strong>of</strong> 25/50 or less and be UV resistant.<br />
D. PITTCOTE® 404 coating and PC® fabric 79 reinforcing by Pittsburgh Corning.<br />
No alternatives accepted.<br />
E. Fiber reinforced tape 3/4" wide Scotch Brand #8934 by 3M or approved equal.<br />
2.20 AIR DISTRIBUTION EQUIPMENT<br />
A. Air distribution devices shall be as scheduled on the drawings. All supply<br />
diffusers shall be selected to deliver the indicated volume <strong>of</strong> supply air without<br />
exceeding the available throw and with an NC rating not to exceed 25, including<br />
half open damper. Submittal data shall clearly indicate performance <strong>of</strong> selected<br />
devices including air quantity, pattern, throw, pressure drop, sound level, finish,<br />
dimensions and construction <strong>of</strong> all air distribution devices.<br />
B. Refer to Architectural reflected ceiling plans for exact location <strong>of</strong> air distribution<br />
devices. All non-linear supply, return and exhaust diffusers, grilles and<br />
registers shall be steel construction unless scheduled otherwise and shall have<br />
baked enamel finish with color selected by the Architect. In lieu <strong>of</strong> aluminized<br />
steel, steel grills and diffusers with thermoset Alkyd-Melamine painting system<br />
applied by an electro-deposition system that totally submerges the entire<br />
product in the paint followed by a baking process at 315º F., similar to process<br />
used by Titus, will be accepted. This optional material and paint system shall<br />
pass ASTM D-1654, 300 hour Corrosive Environments Salt Spray Test, ASTM<br />
D 870, 500 hour Water Immersion Test, and ASTM D-2794 Reverse Impact<br />
Cracking Test without creepage, blistering, or deterioration <strong>of</strong> paint surface.<br />
C. Ceiling surface and sidewall supply registers shall, unless otherwise scheduled,<br />
have opposed blade type key operated dampers with a detachable key. One<br />
(1) key shall be furnished for each register.<br />
D. Linear supply and return diffusers shall be as scheduled on drawings. Material<br />
shall be steel. Finish shall be selected by the Architect.<br />
15500-15<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
E. Thermally powered VAV diffusers shall be Therma-fuser as manufactured by<br />
Acutherm, Hayward, CA. Diffusers shall be thermally powered using two room<br />
temperature sensing elements (one for cooling control and one for heating<br />
control) and one changeover element for switching the diffuser from cooling<br />
mode to heating mode by sensing supply air temperature. All sensing elements<br />
shall be built into diffuser. Room temperature sensing elements shall be field<br />
adjustable. Changeover element shall be factory set to engage heating mode<br />
at 81º F and engage cooling mode at 70º F. *Optional wall mounted, remote,<br />
adjustable, temperature controls shall be provided as scheduled. Diffusers<br />
shall have five (5) year warranty.<br />
F. Approved Manufacturers: Acutherm, Anemostat, Krueger, Metalaire, Metal<br />
Industries, Nailor, Price, Seiho, Titus, Tuttle & Bailey.<br />
2.21 OUTSIDE AIR INTAKE AND EXHAUST AIR LOUVERS<br />
A. Wall louvers shall be drainable type with drain gutter in each blade and downspouts<br />
in frame jambs and mullions. Frame and blade material to be anodized<br />
extruded aluminum construction, anodize color to be selected by the Architect.<br />
Frame shall contain integral caulking slots. Insect screen shall be installed on<br />
building side <strong>of</strong> louver. Insect screens on air intake louvers shall be made<br />
accessible from the building side <strong>of</strong> louver through access doors in duct work or<br />
from the outside through removable louver frame.<br />
B. Frame and blade material for louvers in s<strong>of</strong>fit to be anodized extruded<br />
aluminum construction, anodize color to be selected by the Architect. Insect<br />
screen shall be installed on building side <strong>of</strong> louver. Insect screens on air intake<br />
louvers shall be accessible from the outside through a removable louver frame.<br />
C. Design shall incorporate structural supports required to withstand minimum<br />
wind load <strong>of</strong> 110 mph. Louver size shall be as scheduled on drawing.<br />
D. Published performance data must be submitted for approval prior to fabrication<br />
and must demonstrate pressure drop and <strong>water</strong> penetration equal to or less<br />
than unit scheduled on drawings.<br />
E. Approved Manufacturers: Arrow, Empco, Ruskin, United Air.<br />
2.22 FIRE DAMPERS<br />
A. Fire dampers shall be <strong>of</strong> the guillotine type, spring loaded, fusible link, U.L.<br />
approved, and in accordance with NFPA Bulletin 90-A requirements.<br />
Construction shall be galvanized steel. Dampers shall be similar to Ruskin<br />
model DIBD2 STYLE B, or type detailed on drawings. Dampers shall be sizes<br />
as shown on drawings and shall stack out <strong>of</strong> air stream on all ducts.<br />
B. Fire dampers at ceiling diffusers shall be spring loaded, fusible link, U.L.<br />
approved, and in accordance with NFPA requirements. Dampers shall be<br />
similar to Ruskin model CFD2 as scheduled and <strong>of</strong> sizes shown for<br />
diffusers/grilles on the drawings.<br />
15500-16<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
C. Approved Manufacturers: Airstream Balance, <strong>Inc</strong>., Metal Industries, Ruskin,<br />
United Air.<br />
2.23 CORROSION PROTECTION FOR ALL CONDENSER UNITS<br />
A. Provide corrosion protection for all condenser/heat pump units. Corrosion<br />
protection system shall be Bronze Glow, Heresite, Adsil, or pre-approved equal,<br />
applied only by applicators certified and/or licensed by system manufacturer.<br />
2.24 CONTROLS<br />
A. Room temperature thermostats shall be programmable type designed for<br />
cooling and electric heating or heat pump with electric emergency heating<br />
applications as applicable. Unit shall have automatic heating/cooling<br />
changeover with system light; digital display indicating time <strong>of</strong> day, day <strong>of</strong> week,<br />
room temperature, current program operating mode, and current active stage; 3<br />
hour timed override; two occupied and two unoccupied programs per day;<br />
keyboard disable to prevent tampering; 7-day program basis; status indicating<br />
lights displayed in digital display; constant fan operation during occupied mode;<br />
auto fan operation during setback (set applicable dip switch or program mode);<br />
integral temperature sensor. "Auto" fan mode shall allow supply fan to run only<br />
when cooling or heating is required by the room thermostat.<br />
B. Motor operated dampers shall have aluminum frames and aluminum air foil<br />
blades with synthetic elastomeric mechanically attached, field replaceable<br />
blade seals. Electric actuators shall be manufactured by Belimo and shall be<br />
selected for the required operating characteristics compatible with the control<br />
system.<br />
C. Provide clear plastic lockable covers to fit over all thermostats. Cover shall<br />
have vent holes top and bottom to provide fast thermal response for thermostat.<br />
2.25 ACCESS DOORS<br />
A. Access doors shall be as similar to those manufactured by Milcor Division <strong>of</strong><br />
Inland-Ryerson <strong>of</strong> type as follows:<br />
1. Door Location Door Type<br />
2. Drywall Style "DW"<br />
3. Masonry or Tile Style "M-Stainless"<br />
4. Acoustical Tile Style "AT"<br />
5. Plaster Style "K"<br />
6. Fire Rated Walls/Ceilings Style "Fire Rated"<br />
B. Each door shall be equipped with two flush, screwdriver operated, cam latches<br />
and, other than Style "M", shall be finished to match adjacent surface. Door<br />
sizes shall be applicable to access required for normal service.<br />
PART 3 – EXECUTION<br />
15500-17<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
3.1 INSTALLATION OF THE WORK<br />
A. Examine the site and all drawings before proceeding with the layout and<br />
installation <strong>of</strong> the Work.<br />
B. Arrange the Work essentially as shown, exact layout to be made on the job to<br />
suit actual conditions. Confer and cooperate with other trades on the job so all<br />
Work will be installed in proper relationship and coordinate precise location <strong>of</strong><br />
parts with the Work <strong>of</strong> others.<br />
C. Arrange for required chases, slots and openings with the General Contractor<br />
including locations <strong>of</strong> required pipe sleeves through walls and foundations.<br />
Assume liability for cutting or patching made necessary by failure to make<br />
proper arrangements in this respect. Provide detailed and dimension plan<br />
showing all pipe sleeves and duct openings required in building structure<br />
including floors and ro<strong>of</strong> deck.<br />
D. Indicated equipment connections are necessarily based on equipment <strong>of</strong> a<br />
given manufacture. Assume responsibility for proper arrangement <strong>of</strong> pipes,<br />
ducts, etc. to connect approved equipment in a proper and approved manner.<br />
Follow equipment manufacturer's detailed instructions and recommendations in<br />
the installation and connection <strong>of</strong> all equipment. In case <strong>of</strong> conflict between<br />
manufacturer's instructions and the contract documents, notify the Architect<br />
before proceeding. No equipment installation or connections shall be made in a<br />
manner that voids the manufacturer's warranty.<br />
E. Duct work shown on drawings is designed to produce required air quantity at<br />
estimated pressure drop which is used for air handling unit air quantity,<br />
pressure, and motor horsepower. Actual field installation may result in lower or<br />
higher pressure drop at the design air quantity which may require adjustment <strong>of</strong><br />
fan speed. Take responsibility for this adjustment including replacement <strong>of</strong> fan<br />
sheave, if required, to obtain required air quantity and maintain required duct<br />
static pressure.<br />
F. Install all Work in a neat and workmanlike manner, using only workmen<br />
thoroughly qualified in the trade or duties they are to perform. Rough Work will<br />
be rejected.<br />
3.2 DUCT MOUNTED AIR PURIFICATION UNITS<br />
A. Install air purification unit in supply air duct where shown on drawings.<br />
Connect power cord to 110 VAC outlet located near air handling unit.<br />
3.3 CONDENSATE DRAIN PIPE INSTALLATION<br />
A. Install condensate piping in a workmanlike manner, according to the best<br />
practice <strong>of</strong> the trade, properly pitched and vented to eliminate air pockets or<br />
traps, and to ensure rapid drainage from each unit. Cut pipe squarely to<br />
accurate length for full penetration into fittings. Remove burrs from ends <strong>of</strong><br />
PVC pipe, clean joining surfaces thoroughly and form all joints in accordance<br />
with the pipe manufacturer's recommendations.<br />
15500-18<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
B. Provide a valve, female hose connection with hose thread cap and rubber<br />
washer, and 4" deep trap to prevent back suction into the air unit as detailed on<br />
drawings.<br />
C. Run condensate drain line from each A/C unit as noted on the drawings.<br />
D. Install condensate drain trap float switch, when approved by local municipal<br />
Authority having jurisdiction, to turn <strong>of</strong>f unit if condensate backs up in trap.<br />
E. Install all condensate lines located underground or under the building floor in<br />
PVC conduit with wide sweep elbows. Seal space between piping and PVC<br />
conduit at each end <strong>of</strong> conduit to eliminate entry <strong>of</strong> <strong>water</strong>.<br />
3.4 CONDENSATE DRAIN PAN MOISTURE MONITORS<br />
A. Install Liebert “Liqui-tect 410" or approved equal moisture monitor in each<br />
condensate drain pan in and all air handling units unless the units are provided<br />
with secondary drains or condensate drain trap float switches. Bond the<br />
monitor mounting legs, do not use mechanical fasteners such as screws or<br />
bolts, to the condensate drain pan bottom with adhesive suitable for the<br />
application. Adjust the height <strong>of</strong> the monitor contacts at least ¼” below top<br />
edge <strong>of</strong> drain pan. Connect moisture monitor output contacts to *ro<strong>of</strong>top units<br />
*and air handling units to shut down the unit fan(s) if <strong>water</strong> is detected within<br />
1/4" <strong>of</strong> the condensate drain pan top and adjust moisture monitor probes<br />
accordingly. Provide 24 VAC or VDC source and connect to moisture monitor.<br />
3.5 REFRIGERANT PIPE INSTALLATION<br />
A. Size and install all refrigerant piping to complete the system connecting heat<br />
pumps/condensers to air handlers in accordance with the equipment<br />
manufacturer's instructions based on equipment size, route <strong>of</strong> piping, and good<br />
refrigeration system practice. Layout piping in most direct route to minimize<br />
amount <strong>of</strong> system refrigerant. Install refrigerant tube size to minimize pressure<br />
drop and provide for oil return to compressor. Braze all joints with 15%<br />
minimum silver alloy solder.<br />
B. Run horizontal piping above ceilings and vertical piping inside walls in finished<br />
spaces (not including mechanical rooms).<br />
C. After completion <strong>of</strong> entire system and before any pipe is covered, test the entire<br />
refrigerant circuit to assure that it is absolutely tight. Conduct low-side test at<br />
150 psi; high-side at 300 psi.<br />
D. After completion <strong>of</strong> leak testing, evacuate and charge the system utilizing a<br />
procedure approved by air conditioning unit's manufacturer.<br />
E. Install all refrigerant lines located underground or under the building floor in<br />
PVC conduit sized to contain both the liquid and hot gas lines including required<br />
insulation. Seal space between piping and PVC conduit at each end <strong>of</strong> conduit<br />
to eliminate entry <strong>of</strong> <strong>water</strong>.<br />
15500-19<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
3.6 PIPE ASSEMBLY<br />
A. Sweat Joints in Copper Pipe (other than refrigerant piping): Cut pipe squarely<br />
to accurate length for full penetration into fittings. Remove burrs from ends,<br />
clean soldering surface thoroughly, flux, assemble and solder before surfaces<br />
oxidize. Use approved non-corrosive flux. Use sufficient heat for complete<br />
penetration <strong>of</strong> solder and wipe away excess flux and solder.<br />
B. Solvent Weld Joints in PVC Pipe: Cut pipe squarely to accurate length for full<br />
penetration into fittings. Remove burrs from ends, clean joining surfaces<br />
thoroughly and form all joints in accordance with the pipe manufacturer's<br />
recommendations.<br />
3.7 VALVE INSTALLATION<br />
A. Install all valves with the stems or spindle above the horizontal where possible<br />
and exercise utmost care not to install valves over electrical equipment.<br />
B. Locate ball valves at all automatic valves, check valves, at all equipment so<br />
they can be isolated for repairs, at all branch lines connecting mains, and<br />
elsewhere as shown on drawings.<br />
C. Locate check valves on the discharge side <strong>of</strong> all pumps and elsewhere as<br />
shown on drawings.<br />
3.8 PIPE HANGER INSTALLATION<br />
A. Space hangers for horizontal refrigerant piping 6 feet on center.<br />
B. Space hangers for horizontal copper condensate piping 8 feet on center.<br />
C. Space hangers for horizontal PVC condensate piping 4 feet on center.<br />
D. Space hangers for horizontal pipe as follows:<br />
Plastic pipe<br />
4' on center maximum<br />
Copper pipe<br />
1/2" and smaller 6' on center maximum<br />
3/4" to 1-1/2" 8' " " "<br />
Steel pipe<br />
12' on center maximum<br />
E. Attach hanger rods to sufficiently rigid structural building members. If hangers<br />
shall be attached to either the top chord or bottom chord <strong>of</strong> steel bar joist,<br />
attach the rods by clamp at the panel points. Do not under any circumstances<br />
burn or drill holes in either chord. Do not weld either chord.<br />
F. Provide additional hangers or anchoring devices necessary for proper support<br />
<strong>of</strong> piping at corners, tops <strong>of</strong> risers, etc.<br />
G. Provide galvanized steel shields over pipe insulation at pipe supports.<br />
15500-20<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
3.9 SECONDARY DRAIN PANS<br />
A. Install secondary drain pans under all air handling units mounted above<br />
ceilings, where shown on drawings, and/or as designated on equipment<br />
schedule. Drain pans shall be sized and installed such that the entire unit base<br />
supports, including return duct on vertical units, shall be within the pan limits.<br />
B. Run secondary drain line as shown on drawings or provide drain pan with<br />
<strong>water</strong> detector to shut down air handling unit when any <strong>water</strong> enters drain pan.<br />
Water detector shall be UL listed and approved for use by local authority.<br />
C. Where local building & mechanical codes permit, provide a float switch in the<br />
condensate drain trap instead <strong>of</strong> the secondary drain pan and <strong>water</strong> detector.<br />
Connect float switch to air handling unit to shut <strong>of</strong>f unit when <strong>water</strong> backs up in<br />
drain trap.<br />
3.10 SLEEVE AND ESCUTCHEON INSTALLATION<br />
A. Accurately locate and set required sleeves. Where more than one pipe is<br />
necessarily passed through a single sleeve as to a unit piping enclosure or<br />
other conditions resulting in larger than 1/8" gap within the sleeve, tightly pack<br />
space with proper material to form a barrier against sound, vermin, fire, etc.<br />
B. Fill all spaces between piping and sleeves passing through fire-rated walls,<br />
floors, or ceilings with material capable <strong>of</strong> maintaining the fire-resistance rating<br />
<strong>of</strong> the wall, floor or ceiling.<br />
C. Provide properly fitted sheet metal flanges around sheet metal ducts entering<br />
exposed into finished spaces and/or to cover excessive gaps around ducts<br />
entering into non-finished spaces. In addition provide metal flashing around<br />
duct work penetrating exterior walls and seal to provide weather tight system.<br />
D. Provide escutcheons on all finished surfaces where exposed piping, bare or<br />
insulated, pass through floors, walls or ceilings, except in boiler, utility or<br />
equipment rooms. Fasten escutcheons securely to pipe or pipe covering.<br />
3.11 HVAC DUCT WORK<br />
A. Install all duct work in accordance with SMACNA standards. Install extractors<br />
and air balance dampers in all branch take <strong>of</strong>fs including take <strong>of</strong>fs to supply<br />
diffusers. Paint inside <strong>of</strong> diffusers and duct visible through diffusers flat black.<br />
B. Support duct from building structure with straps, rods, or angles as detailed in<br />
"HVAC Duct Construction Standards - Metal and Flexible" as published by<br />
SMACNA. Horizontal and diagonal joist bridging shall not be considered part <strong>of</strong><br />
building structure for duct supporting purposes. Where joist are located too far<br />
apart for duct support or duct runs are parallel to joist, provide angles between<br />
joist designed to support duct without sagging.<br />
C. Seal all transverse joints and longitudinal seams in ductwork in accordance<br />
with SMACNA standards regardless <strong>of</strong> pressure and seal class. Pressure test<br />
all ductwork in accordance with SMACNA "HVAC Air Duct Leakage Test<br />
15500-21<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
Manual" and provide test results in a report form for approval by the Engineer<br />
prior to installing duct insulation.<br />
D. Fabricate and install fiberglass return air and transfer air duct system in<br />
accordance with the latest edition <strong>of</strong> "Fibrous Glass Duct Construction<br />
Standards", SMACNA, for 2" W.G. static pressure and 2,000 fpm velo<strong>city</strong>.<br />
Furthermore, closure systems for longitudinal seams and transverse joints shall<br />
be in accordance with procedure necessary to comply with Section III,<br />
CLOSURES. Joint sealing shall be made with glass fabric and mastic in<br />
accordance with local codes.<br />
E. Install flexible ducts with a minimum run and with a minimum <strong>of</strong> bends. No run<br />
shall exceed 12 *8 for [DCSB]* feet for diffusers and *3 feet for VAV boxes and<br />
FTUs and bends shall have a minimum radius <strong>of</strong> 1-1/2 times the diameter <strong>of</strong> the<br />
duct measured from the center line. Seal all joints and connections. Connect<br />
flex duct to spin-in and air distribution fittings using metal clamps; nylon draw<br />
bands and wire straps will not be accepted. Support flexible duct from building<br />
structure. Do not lay on light fixtures or ceiling. Flexible duct sizes shall be as<br />
noted on drawings. *Transitions for flexible duct size shown and inlet<br />
connections for VAV boxes and FTUs shall be made at inlet connection.<br />
F. Install double wall duct work in accordance with duct manufacturer's<br />
instructions and details.<br />
G. Make all supply, return and outside air duct connections to air handling units<br />
with flexible connectors specifically designed for equipment used.<br />
3.12 FIRE DAMPERS<br />
A. Install fire dampers at all duct penetrations <strong>of</strong> floors and fire rated walls. Install<br />
fire dampers as shown on drawings and in accordance with manufacturer's<br />
instructions and details. Install fire damper to allow opening and resetting <strong>of</strong> fire<br />
damper shutter from the duct access door or opening.<br />
3.13 BALANCE DAMPERS<br />
A. Install balance dampers at all branch connections and other locations shown<br />
on drawings. Install balance dampers at all flex duct connections for diffusers<br />
except where only one diffuser is connected to branch duct.<br />
B. Install automatic/motor operated volume dampers where shown on drawings<br />
and in accordance with manufacturer's instruction.<br />
3.14 ACCESS DOORS<br />
A. Provide wall/ceiling access doors at dampers, valves, air vents, fire damper<br />
access doors, and like items requiring adjustment or maintenance accessibility<br />
if they cannot be located over lay-in type ceilings or in attic and mechanical<br />
rooms. Obtain approval from Architect for location <strong>of</strong> access doors.<br />
15500-22<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
B. Provide access doors in ducts within arm-reach <strong>of</strong> fire dampers and located to<br />
permit opening and resetting fire damper shutter. Locate access doors over<br />
lay-in type ceilings. Provide ceiling access doors if duct access doors cannot<br />
be located over lay-in type ceilings. Provide access doors in walls behind<br />
which duct access doors are located. Obtain approval from Architect for<br />
location <strong>of</strong> access doors.<br />
C. Provide visible markers on finished side <strong>of</strong> lay-in type ceilings to indicate<br />
locations <strong>of</strong> duct access doors, valves, adjustable dampers, air vents, fire<br />
damper access doors and like items. See Architect for marker type.<br />
3.15 CONTROLS – GENERAL<br />
A. Furnish all controls and control wiring to provide for proper performance <strong>of</strong><br />
equipment as noted on drawings.<br />
B. Install all high voltage (120 V or above) control wiring in EMT conduit. Install<br />
low voltage control wiring in conduit unless concealed in walls or above finished<br />
ceilings. Use plenum rated wire above ceilings when used as supply and return<br />
air plenums. Do not run low voltage control wiring in the same conduit as high<br />
voltage control or power wiring.<br />
C. Install room thermostats where shown on drawings and 48" above the floor<br />
unless otherwise noted on drawings. Program thermostats to run supply fan<br />
continuously during building occupied periods and in the "auto" mode during<br />
building unoccupied periods.<br />
D. Install room temperature sensors where shown on drawings and 48" above the<br />
floor unless otherwise noted on drawings.<br />
3.16 EQUIPMENT SUPPORTS INSTALLATION<br />
A. Furnish, fabricate, shop paint, and erect all structural supports and platforms as<br />
required for all equipment installed in this Work, unless otherwise specified.<br />
Make these supports and platforms independent <strong>of</strong> all other equipment<br />
supports and suspend them from the building structural steel, inserts imbedded<br />
in concrete slabs, or support them on columns as required by the drawings.<br />
Attachments to steel bar joists shall be approved by the Architect and must only<br />
be at panel points. Do not, under any circumstances, burn, drill or weld either<br />
chord <strong>of</strong> steel bar joist.<br />
B. Install galvanized steel supports under vertical air handling units up to 2,000<br />
cfm to allow installation <strong>of</strong> return air ducts and access to filters and unit access<br />
panels.<br />
C. Prepare and furnish drawing and templates indicating all concrete Work<br />
required for equipment furnished under this Work. All concrete required will be<br />
provided by the General Contractor. Provide, at the time concrete foundations,<br />
bases, or curbs are formed, all necessary anchor bolts as required for the<br />
various equipment in this Work. Grout all spaces between the equipment base<br />
and concrete supports.<br />
15500-23<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
3.17 EQUIPMENT INSTALLATION<br />
A. Install all equipment in accordance to equipment manufacturer's instructions.<br />
Install all equipment to permit removal <strong>of</strong> coils, fan shafts and wheels, filters,<br />
belt guards, sheaves and drives, and all other parts requiring periodic<br />
replacement or maintenance.<br />
B. Arrange equipment to permit ready access to valves, cocks, traps, starters,<br />
motors and control components, and to clear the openings <strong>of</strong> swinging and<br />
overhead doors and <strong>of</strong> access panels.<br />
C. Install spring type vibration isolators under air handling units larger than 2,000<br />
cfm, where shown on drawings, and in hanger rods supporting air handling<br />
units *including fan terminal units.<br />
D. Install neoprene inertia pads under floor-mounted air handling units with<br />
secondary drain pans.<br />
E. Install neoprene inertia pads under floor-mounted air handling units with<br />
internal spring isolation.<br />
F. Install vibration isolation rails between ro<strong>of</strong>top units and ro<strong>of</strong> curbs where<br />
scheduled on drawings.<br />
3.18 WALL LOUVERS<br />
A. Install outside air intake and exhaust louvers where shown in Arch. drawings.<br />
Insect screens on air intake louvers shall be made accessible from the building<br />
side <strong>of</strong> louver through access doors in duct work or from the outside through<br />
removable louver frame. Seal all joints weather tight between wall and louver<br />
frame to prevent leakage.<br />
3.19 IDENTIFICATION OF EQUIPMENT<br />
A. Securely attach manufacturer's nameplate to all equipment giving data as to<br />
design and operating characteristics.<br />
B. Securely attach nameplates to all switches, starters, gauges, control devices,<br />
including thermostats, and similar items, giving the name and number <strong>of</strong> the<br />
item <strong>of</strong> equipment to which it is connected.<br />
C. Identify all air handling units, heat pump units, compressor/condenser units,<br />
fans, FTUs, VAV boxes, pumps, control devices and other items <strong>of</strong> machinery<br />
or apparatus by stenciled letters.<br />
D. Identify all piping throughout the building with a legend giving the nature <strong>of</strong> the<br />
service and direction <strong>of</strong> flow. Use characters <strong>of</strong> sufficient size to be read from<br />
the floor level below the piping. Place legends and arrows adjacent to each<br />
change <strong>of</strong> direction and intermediately as necessary for proper identification<br />
from reasonable access points.<br />
15500-24<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
E. Attach identification tags on each valve with "S" hooks or chains. Valve tags<br />
are to contain the valve number, letter, or other required identification.<br />
3.20 OILING AND SERVICING<br />
A. Protect all bearings and packing glands during installation. Before the<br />
equipment is placed in operation, fill all bearings and packing glands with the<br />
type lubricant recommended by the equipment manufacturer. Prior to final<br />
acceptance adjust all equipment to operate properly.<br />
3.21 INSULATION – GENERAL<br />
A. Use application details in accordance with the insulating material supplier's<br />
recommendations except where a higher standard is specified herein. Clean<br />
exterior <strong>of</strong> all piping and duct work <strong>of</strong> foreign substances, including moisture,<br />
prior to application <strong>of</strong> insulation. Apply insulation to piping and duct work with<br />
all joints tightly fitted to eliminate voids. Replace broken or damaged insulation<br />
with new insulation and joint material.<br />
B. Replace or repair all existing insulation disturbed by new work and refinish to<br />
match adjacent insulation.<br />
3.22 PIPING INSULATION – GENERAL<br />
A. Run covering for piping unbroken through hanger clevises, sleeves, etc. Avoid<br />
metal-to-metal contact between pipes and hangers. Cover all insulated piping<br />
exterior to building with banded aluminum jackets. Install and secure all<br />
aluminum jackets in accordance with manufacturer's instructions.<br />
B. Provide an insert, not less than 6" long, <strong>of</strong> the same thickness and contour as<br />
adjoining insulation, between support shield and piping, but under the finish<br />
jacket, on piping 2" or larger, to prevent insulation from sagging at support<br />
points. Use heavy density insulating materials suitable for the specified<br />
temperature range and strong enough to prevent crushing. Cover fittings,<br />
valves, irregular surfaces, etc., with same insulation specified for piping<br />
including jacket. Cut jacket to fit without wrinkles or folds.<br />
3.23 DUCT WORK INSULATION<br />
A. Insulate all sheet metal supply air, transfer air, and return air duct work, except<br />
those specified for acoustic duct liner or as pre-insulated double wall ducts,<br />
located in concealed spaces with flexible external insulation.<br />
B. Insulate backs and necks <strong>of</strong> all diffusers and return grilles with flexible external<br />
insulation.<br />
C. Insulate all sheet metal supply air and return air duct work located in areas<br />
exposed to view whether areas are air conditioned or not, and return air plenum<br />
for vertical air handling units with semi-rigid external insulation.<br />
15500-25<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
D. Lap all joints a minimum <strong>of</strong> 2" with glass cloth and embed glass fabric in coat <strong>of</strong><br />
white mastic and cover glass fabric with white mastic (Duct tape shall not be<br />
used). Adhere insulation to duct with adhesive applied with a 2" wide brush at<br />
8" on centers. On ducts over 24 " on any side, additionally attach insulation to<br />
duct work on bottom and sides with Graham pin studs and speed washer or<br />
stick clips placed 18" on center each way.<br />
E. Insulate return air plenum on vertical air handling units with semi-rigid<br />
insulation. Extend end <strong>of</strong> external insulation at least 12" past the end <strong>of</strong> the<br />
internal duct liner.<br />
3.24 AIR SYSTEM TEST AND BALANCE<br />
A. The Test and Balance (TAB) Agency, completely independent from Contractors<br />
installing work under this specification section, shall perform all test and<br />
balance work in accordance with the recommendations <strong>of</strong> the Associated Air<br />
Balance Council, and after the entire mechanical system has been completed<br />
and is in full working order.<br />
B. TAB Agency shall contact the Architect and provide the schedule for TAB work<br />
at least one week prior to start <strong>of</strong> TAB work to afford the Architect the<br />
opportunity to visit the job site during the TAB work.<br />
C. TAB Agency shall make provisions in the contract to meet the Architect at the<br />
job site after the TAB report has been submitted to spot check at least 10% <strong>of</strong><br />
the TAB tested points. TAB Agency shall furnish equipment and TAB<br />
technician to complete these spot checks in the presence <strong>of</strong> the Engineer.<br />
D. The following organizations are approved for Test and Balance work for this<br />
project: Environmental Balance Corp., First Coast Test & Balance, Holistic Test<br />
& Balance, Perfect Balance, <strong>Inc</strong>., TABCO, Thermal Systems Balancing, <strong>Inc</strong>.<br />
and Tisdale Air Balance.<br />
E. Take responsibility for the following:<br />
1. Place all heating, ventilating, and air conditioning systems and equipment<br />
into full operation and maintain operation during each working day <strong>of</strong> the<br />
TAB Agency.<br />
2. Make any changes required for correct balance, as recommended by the<br />
TAB Agency, at no additional cost to the Owner. Such changes may<br />
encompass but are not limited to pulleys, belts, duct work, dampers, or<br />
the addition <strong>of</strong> dampers and access doors.<br />
3. Furnish TAB Agency with full set <strong>of</strong> applicable shop drawings, submittal<br />
data, and manufacturer's performance data.<br />
F. TAB Agency shall complete all following specified work:<br />
1. Mark all duct traverse points and other information on set <strong>of</strong> reproducible<br />
HVAC drawings. Assign ID numbers to all diffusers and grilles, note ID<br />
numbers on reproducible HVAC drawing, and use ID numbers in TAB<br />
report.<br />
2. Before commencing work, verify that systems are complete and operable.<br />
Ensure the following:<br />
15500-26<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
a. Equipment is operable and in a safe and normal condition.<br />
b. Temperature control systems are installed complete and operable.<br />
c. Proper thermal overload protection is in place for electrical<br />
equipment.<br />
d. Final filters are clean and in place.<br />
e. Correct fan rotation.<br />
f. Duct systems are clean <strong>of</strong> debris.<br />
g. Fire and volume dampers are in place and open.<br />
h. Coil fins have been cleaned and combed.<br />
i. Access doors are closed and duct end caps are in place.<br />
j. Air outlets are installed and connected.<br />
k. Duct system leakage has been minimized.<br />
3. Report any defects or deficiencies noted during performance <strong>of</strong> services<br />
to the Engineer. Promptly report abnormal conditions in mechanical<br />
systems or conditions which prevent system balance. Beginning <strong>of</strong><br />
balance work means acceptance <strong>of</strong> existing conditions.<br />
4. Adjust all air systems to the design values.<br />
5. Test and record all actual motor currents and note corresponding<br />
nameplate full load amperes.<br />
6. Test and adjust rpm <strong>of</strong> all blowers, fans, and similar air handling devices<br />
to plus or minus 5% <strong>of</strong> design quantities. Make pitot tube traverses <strong>of</strong> all<br />
main exhaust, supply, and return ducts and obtain air flow <strong>of</strong> each fan.<br />
Test and record each system’s starting pressure, suction and discharge.<br />
Test and adjust system for design recirculated and outside air flows.<br />
7. Test and adjust each diffuser, grille and register to within 5% <strong>of</strong> design<br />
requirements and identify and list each grille, diffuser and register. Use<br />
manufacturer's ratings on all equipment for required calculations.<br />
8. Recorded data shall represent actually measured, or observed conditions.<br />
9. Permanently mark settings <strong>of</strong> dampers and other adjustment devices<br />
allowing settings to be restored. Set and lock memory stops.<br />
10. After adjustment, take measurements to verify balance has not been<br />
disrupted or that such disruption has been rectified.<br />
11. Leave systems in proper working order, replacing belt guards, closing<br />
access doors, closing doors to electrical switch boxes, and restoring<br />
thermostats to specified settings.<br />
12. Upon completion <strong>of</strong> test and balance work, insert all data, including copy<br />
<strong>of</strong> marked-up HVAC drawing, into a complete typewritten report and<br />
submit six (6) copies <strong>of</strong> this report to the Architect.<br />
3.25 INSTRUCTION OF OWNER'S REPRESENTATIVE<br />
A. After final acceptance <strong>of</strong> all Work and occupancy <strong>of</strong> building, provide service to<br />
make system adjustments to suit conditions created by the occupancy; instruct<br />
Owner's operating personnel in operation adjustment and maintenance<br />
procedures <strong>of</strong> system components, acquaint them with locations and functions<br />
<strong>of</strong> valves, control devices, etc., in the system, and instruct them in the operation<br />
<strong>of</strong> the HVAC control system.<br />
B. The actual time <strong>of</strong> instruction shall be as required to fully prepare Owner's<br />
operating personnel to properly operate and maintain the systems as designed<br />
and installed but shall not be less than one (1) day for all equipment location<br />
and adjustments and *four (4) days <strong>of</strong> three (3) hour periods each day for BAS.<br />
15500-27<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
3.26 CLEANING AND RUBBISH<br />
A. During the Work, keep the premises clear <strong>of</strong> rubbish created as a result <strong>of</strong> the<br />
Work. Protect and prevent unnecessary induction <strong>of</strong> dirt and thoroughly clean<br />
all equipment used for temporary heat and/or ventilation.<br />
B. Use and maintain adequate filters in all fan coil equipment used for temporary<br />
heat and/or ventilation. Replace with new filters after construction and before<br />
units are placed in service. Close all air duct openings to effectively prevent the<br />
entrance <strong>of</strong> dust and construction debris during construction.<br />
C. On completion <strong>of</strong> the Work, remove all rubbish and debris resulting from the<br />
Work and dispose <strong>of</strong> same. Thoroughly clean and leave in a satisfactory<br />
condition for use all equipment, pipe, fixtures, duct work, etc.<br />
3.27 RECORD DRAWINGS<br />
A. The Architect will furnish prints <strong>of</strong> the mechanical drawings as issued for this<br />
contract. Use these prints to indicate accurately and neatly any deviation in the<br />
actual installation from the drawings as issued. At the completion <strong>of</strong> the job,<br />
deliver the marked-up drawings to the Architect for a permanent record <strong>of</strong> the<br />
exact location <strong>of</strong> all equipment, pipe runs, etc. as incorporated in the job.<br />
3.28 COMPLETE SYSTEMS<br />
A. Leave all systems completely operative in all details and in satisfactory working<br />
condition, as determined by the Architect. Furnish and install as part <strong>of</strong> this<br />
contract all apparatus and material obviously a part <strong>of</strong> the systems and<br />
necessary for their operation.<br />
B. Coordinate work specified herein and shown on mechanical drawings and<br />
insure completion in a timely and proper manner. Prior to requesting<br />
"Substantial Completion Inspection", provide the Architect with letter stating all<br />
requirements <strong>of</strong> this section have been met. Letter shall contain itemized list<br />
indicating each item has been personally checked by the Superintendent and<br />
that it is ready for inspection. With letter, provide reports, schedules, etc., as<br />
required. This section is intended as a checklist to insure items specified are<br />
properly installed and to insure against premature "Substantial Completion<br />
Inspection" requests.<br />
C. Check air distribution systems and insure systems are properly tested and<br />
balanced. Check filters and, if dirty, install new filters in units with disposable<br />
type filters and remove, wash and reinstall filters in units with permanent type<br />
filters. Dirty filters shall be defined as pressure drop exceeding 0.5" W.G.<br />
Provide one additional set <strong>of</strong> disposable and/or metal, washable, permanent,<br />
type filters as applicable for each unit. Lubricate fans, motors, and all other<br />
moving equipment requiring lubrication. Provide a maintenance schedule<br />
listing each piece <strong>of</strong> equipment requiring lubrication, points to be lubricated,<br />
product and device to be used, and frequency <strong>of</strong> lubrication required.<br />
D. Check and insure all equipment is properly installed, mounted as specified or<br />
shown and in accordance with manufacturer's recommendations. At equipment<br />
15500-28<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
HEATING, VENTILATING & AIR CONDITIONING<br />
start-up, insure controls, power wiring, and interlocks are complete. Check<br />
alignment <strong>of</strong> motors and drives. Verify overload heaters are properly sized and<br />
installed. Check for proper motor rotation. Provide specified system<br />
identification.<br />
E. Provide for thorough cleaning <strong>of</strong> installation. Cleaning shall include removing<br />
temporary covers; removing adhesive applied stickers except those giving<br />
specific maintenance instructions which were intended to remain on equipment;<br />
removing cord and wire affixed tags; removing paint, coating and adhesive<br />
spatters; and vacuuming inside air handling unit plenums.<br />
F. Provide for touch-up painting <strong>of</strong> factory finished equipment. Touch-up painting<br />
is intended to cover minor dents, scratches, and scuff marks. Prepare surface<br />
by light sanding or remove rust with chemical compounds designed for<br />
application and coat surface with primer followed by matching top coat. Where<br />
equipment has major surface damage and/or rusting, refinish entire equipment<br />
surfaces as directed by the Architect.<br />
G. Provide all specified operation and maintenance manuals. Obtain letter from<br />
Owner stating specified operating instructions have been completed.<br />
END OF SECTION 15500<br />
15500-29<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
SECTION 16000<br />
ELECTRICAL<br />
PART 1 – GENERAL<br />
1.1 DESCRIPTION OF WORK<br />
A. The General Provisions <strong>of</strong> the Contract, Division 1, including the General Requirements,<br />
Supplementary Conditions and Special Conditions, along with the General<br />
Requirements, are hereby made a part <strong>of</strong> this Section as if fully repeated herein.<br />
B. Scope <strong>of</strong> Work: <strong>Inc</strong>luded under this section <strong>of</strong> these specifications shall include complete<br />
electrical systems as shown on the drawings and specified herein. This work shall<br />
include:<br />
1. Temporary electric service and distribution for construction purpose.<br />
2. Permanent building service entrance equipment and feeder distribution.<br />
3. Trench excavation, pumping, backfilling and compaction for all underground<br />
electrical work.<br />
4. Building panelboards and branch circuits to electrical devices, lighting fixtures, and<br />
other electrically operated equipment.<br />
5. Empty conduits and outlets for telephone and computer systems.<br />
6. Coordination<br />
1.2 EXISTING CONDITIONS:<br />
A. Prior to start <strong>of</strong> any work, the successful Contractor shall meet with the Architect to<br />
determine that no questions remain concerning the intent <strong>of</strong> the drawings or<br />
specifications. Contractor shall outline his methods and procedures which will allow the<br />
Owner to continue to maintain <strong>facility</strong> functions during execution <strong>of</strong> this Work and bring<br />
up for discussion and decision any questions concerning the project. No work shall be<br />
performed prior to this meeting. The Architect shall set the date, time, and place <strong>of</strong><br />
conference.<br />
1.3 CODES, ORDINANCES AND PERMITS<br />
A. Comply with all codes applying to the Work <strong>of</strong> this contract including but not limited to<br />
the2007 Florida Building, the National Electrical Code (NEC), National Electrical Safety<br />
Code, ADA and OSHA, and Florida Life Safety Code 2008 Edition. Obtain information<br />
on all code restrictions and requirements. In case <strong>of</strong> conflict between the contract<br />
documents and a governing code or ordinance, such conflict shall be immediately<br />
brought to the attention <strong>of</strong> the Architect for resolution. Extra payment will not be allowed<br />
for work required by code restrictions except through written agreement with the Owner.<br />
B. Apply for, obtain, and pay for all required permits and inspection certificates. Final<br />
payment is contingent upon delivery <strong>of</strong> such certificates to the Architect.<br />
C. Although not a State requirement, a minimum <strong>of</strong> one licensed Journeyman Electrician<br />
shall be present for every 5 electrical workers on the jobsite throughout the course <strong>of</strong><br />
construction.<br />
16000-1<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
Electrical<br />
D. Where applicable, all materials and equipment shall bear the Underwriters' Laboratories<br />
seal. Certificates to this effect shall be furnished to the Architect upon request.<br />
1.4 SITE INSPECTION<br />
A. Visit the site and thoroughly inspect conditions affecting the work before submitting bid.<br />
Assume responsibility for meeting all existing conditions including access and work<br />
space limitations.<br />
1.5 DRAWINGS AND SPECIFICATIONS.<br />
A. Refer to the general construction drawings which are bound with the drawings <strong>of</strong> this<br />
Work for construction details, elevations, etc. Architectural and structural drawings shall<br />
take precedence over Division 16 drawings (Electrical Drawings).<br />
B. It is the intent <strong>of</strong> the drawings and specifications to call for finished Work, tested, and<br />
ready for operation, and in complete conformance with all applicable codes, rules and<br />
regulations. Minor details not usually shown or specified, but manifestly necessary for<br />
the proper installation and operation <strong>of</strong> the various systems, shall be included in the<br />
Work and in the proposal, the same as if specified or shown on the drawings.<br />
C. Specifications and drawings shall be considered as supplementary to each other,<br />
requiring materials and labor indicated, specified, or implied by either specifications or<br />
drawings. If any departures from the drawings and specifications are deemed<br />
necessary, details <strong>of</strong> such departures and the reasons therefore shall be submitted to<br />
the Architect for approval. No departures shall be made without prior approval <strong>of</strong> the<br />
Architect.<br />
D. Specific reference in the specifications to any article, device, product, material, fixture or<br />
type <strong>of</strong> construction, etc., by proprietary name, make or catalog number shall be<br />
interpreted as establishing a standard <strong>of</strong> quality and shall not be construed as limiting<br />
competition. Substitutes may be used subject to compliance with requirements set forth<br />
herein, and in the General Requirements, Division 1, and as approved by the Architect.<br />
1.6 SUBMITTALS<br />
A. Submit shop drawings, catalog sheets, or other descriptive data with sufficient<br />
information to establish design, quality and performance.<br />
B. Manufacturer catalog sheets submitted without specific model numbers indicated will be<br />
rejected. Data shall describe apparatus, equipment, panels, fixtures, and other items<br />
requiring descriptive literature. Submittals shall include the following:<br />
1. Light fixtures<br />
2. Panelboards<br />
3. Safety switches<br />
4. Transformers<br />
5. Wiring devices<br />
6. Occupancy sensors<br />
7. Time switches<br />
8. Transient Voltage Surge Suppression (TVSS)<br />
16000-2<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
Electrical<br />
C. Review <strong>of</strong> the submittals does not grant the contractor leave to proceed in error. The<br />
requirements <strong>of</strong> the drawings and specifications must be followed and are not waived or<br />
superceded in any way by the submittal review.<br />
D. Submittal data may be submitted for review and 'revised and resubmitted' only two times<br />
without cost to the contractor. Each subsequent submittal shall be reviewed for a flat fee<br />
<strong>of</strong> $100.00 payable to the reviewing engineer.<br />
1.7 MAINTENANCE DATA<br />
A. Collect and neatly retain maintenance and service data supplied with equipment<br />
furnished and installed under this contract until job completion, at which time deliver to<br />
the Architect for inclusion in the Maintenance Manual. All such data must be properly<br />
identified as for equipment served.<br />
B. Keep one set <strong>of</strong> prints current <strong>of</strong> any changes or variations by marking prints in a legible<br />
manner; and upon completion <strong>of</strong> project, deliver prints to the Architect. Do not make<br />
changes without prior approval <strong>of</strong> the Architect.<br />
1.8 TEMPORARY ELECTRIC SERVICE<br />
A. Provide complete temporary system <strong>of</strong> power and lighting wiring for use during<br />
construction and for testing <strong>of</strong> equipment. Comply with OSHA and NEC including<br />
personnel ground-fault protection requirements.<br />
1.9 COORDINATION - GENERAL<br />
A. Drawings are generally diagrammatic. Review all project drawings and coordinate all<br />
work with general contractor and different trades prior to installing any work so that<br />
interferences between electrical work and ducts, piping, equipment, architectural and<br />
structural work will be avoided. Do not install conduits, boxes and fittings in spaces<br />
required for ductwork or piping.<br />
B. Furnish all necessary <strong>of</strong>fsets in raceways, fittings, etc., required to properly install work<br />
so as to take up minimum space. Install all equipment to provide code required 'working<br />
space'. Furnish and install all materials required to accomplish this without additional<br />
cost.<br />
C. In case interference develops, the Architect will decide which trade work must be<br />
relocated regardless <strong>of</strong> which was installed first. Damage from interference or rework<br />
caused by inadequate coordination with other trades shall be rectified without additional<br />
cost.<br />
D. Within 30 days following award <strong>of</strong> contract, report to the Architect in writing all real or<br />
potential errors, ambiguities and/or conflicts on electrical work or between trades. Those<br />
reported after 30 days, except as a result <strong>of</strong> unforeseen circumstances, shall be<br />
resolved at the discretion <strong>of</strong> the Architect. Report conflicts resulting from progress <strong>of</strong><br />
work to the Architect immediately.<br />
1.10 COORDINATION - ELECTRICAL / MECHANICAL<br />
A. Unless specifically required otherwise, all motors, integral starters, control and<br />
monitoring devices, timers, relays, pilot devices and other required control components<br />
will be furnished under Division 15.<br />
16000-3<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
Electrical<br />
B. Unless specifically required otherwise, furnish and install disconnect switches, fuses and<br />
power wiring connections to all equipment as indicated on drawings or as specifically<br />
required by the equipment manufacturer.<br />
C. The mechanical contractor shall furnish and install all heating, ventilation and air<br />
conditioning equipment, including all control devices and control wiring.<br />
D. Unless specifically required otherwise, make all power wiring connections to all <strong>water</strong><br />
heaters, pumps, machinery, appliances and other electrically operated equipment as<br />
indicated on drawings or as required. Furnish and install disconnect switches and<br />
starters as indicated on drawings, except for items furnished with integral disconnect<br />
switches and/or starters.<br />
E. Install and connect all separate disconnect switches and line voltage control devices<br />
furnished with the equipment but not factory mounted and connected on the equipment.<br />
F. Review shop drawings and verify final electrical characteristics and wiring before roughin<br />
<strong>of</strong> power feeds to any equipment to be provided. When electrical data on shop<br />
drawings differs from contemplated design, make necessary adjustments to wiring,<br />
disconnect, and branch-circuit protection for equipment actually installed.<br />
1.11 WORKING CLEARANCES<br />
A. Working clearances around electrical equipment requiring service shall comply with NEC<br />
requirements. Coordinate and verify clearances from equipment and work furnished by<br />
other trades. Should there be any apparent violations <strong>of</strong> clearance requirements, notify<br />
the Architect before proceeding with connection or placement <strong>of</strong> equipment. Rework<br />
caused by inadequate coordination shall be rectified at no extra cost.<br />
PART 2 – PRODUCTS<br />
2.1 MATERIALS<br />
A. All materials used in this project shall be new, unless otherwise noted, and listed by the<br />
Underwriters' Laboratories, <strong>Inc</strong>. as conforming to its standards where such standards<br />
have been established. These materials shall bear the U.L. label.<br />
B. Where materials, equipment, apparatus or other products are specified by manufacturer,<br />
brand name, type or catalog number, such designation is to establish standards <strong>of</strong><br />
desired design or quality and shall be basis <strong>of</strong> bid. Alternatives may be submitted to<br />
Architect for consideration.<br />
2.2 DISTRIBUTION EQUIPMENT<br />
A. Panelboards shall be molded case circuit breaker type with completely dead fronts<br />
enclosed in code gauge, galvanized sheet steel cabinets with adequate wiring gutters<br />
top, bottom and sides. Neutral bus bars shall be 100% rated, insulated for panelboards<br />
shown with neutral. Front trim shall contain hinged door with keyed lock and catch.<br />
Door shall be provided with plastic enclosed circuit directory. Upon completion <strong>of</strong><br />
installation, circuit directory shall be typewritten indicating usage and location <strong>of</strong> circuits<br />
as indicated on drawings.<br />
16000-4<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
Electrical<br />
B. Circuit breakers shall be single or multi-pole molded case, <strong>of</strong> common handle, common<br />
trip without handle ties, thermal magnetic, quick-make, quick-break, for manual and<br />
automatic operation. Refer to schedules on drawings for details regarding panel types,<br />
capa<strong>city</strong>, interrupting rating, mounting and other information. Circuit breakers which are<br />
indicated to serve permanently connected appliances such as <strong>water</strong> heaters,<br />
dishwashers, etc., shall be capable <strong>of</strong> being locked in open position.<br />
2.3 SAFETY SWITCHES<br />
A. Safety switches shall be quick-make, quick-break, general duty type in sheet steel<br />
enclosure, NEMA-1 for interior locations and NEMA-3R for exterior locations as required<br />
for rain tight installations, with door cover interlock. Fuse type and size shall be as<br />
indicated or as specifically required by the equipment manufacturer.<br />
2.4 DRY TYPE TRANSFORMERS<br />
A. Dry type transformers shall be general purpose, totally enclosed, indoor type <strong>of</strong> KVA size<br />
shown on drawings and shall be provided with standard universal primary voltage taps.<br />
Sound levels shall not exceed NEMA standards for the KVA sizes specified.<br />
B. Electrical characteristics shall generally be 480V, 3 delta primary, 208/120V, 3 wye<br />
secondary, *or 480V, 1 primary, 240/120V, 1 secondary, with grounded neutral, as<br />
indicated on drawings.<br />
C. Temperature classification for 112.5KVA and larger shall be 80 degrees C temperature<br />
rise.<br />
D. Load rating shall be continuous at full nameplate rating in 40 degree C ambient.<br />
2.5 CONDUIT<br />
A. Electrical metallic tubing (EMT) with set screw fittings shall generally be used for building<br />
interior except where exposed to physical damage, unless otherwise indicated or<br />
specified herein.<br />
B. Rigid or intermediate metal conduit with galvanized fittings and hardware shall be used<br />
on building exterior where exposed to weather.<br />
C. Rigid nonmetallic conduit (schedule 40 PVC) shall be used underground and in concrete<br />
slabs. Minimum PVC size shall be 1”. Floor penetrations shall be rigid galvanized ell's.<br />
D. Flexible conduit shall be used for final connections to motors, appliances and vibrating<br />
equipment.<br />
E. Electrical nonmetallic tubing (ENT) shall not be used.<br />
F. In locations where exterior devices are connected to an interior device via a common<br />
raceway, provide silicone sealant in conduit at junction box in interior and exterior<br />
locations after branch circuit wiring has been installed. Sealant shall be applied to inhibit<br />
air flow in raceway between interior and exterior device locations.<br />
2.6 TRANSIENT VOLTAGE SURGE SUPPRESSORS<br />
16000-5<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
Electrical<br />
A. Voltage surge suppressor shall be UL 1449 Listed, and shall meet or exceed maximum<br />
fault current indicated for panelboards on which installed. Advanced Protection<br />
Technologies in NEMA-3R enclosure with integral disconnect model #TE/4HPS/DS/*3R<br />
for 480V/3 /4W services or #TE/2HPS/DS/3R for 208V/3 /4W services, or approval equal<br />
by, Liebert, or Intermatic only.<br />
B. Provide all wiring/conduit connections in accordance with manufacturer's<br />
recommendations.<br />
2.7 CONDUCTORS<br />
A. All conductors shall be copper and shall not be smaller than #12 except where otherwise<br />
noted. Conductors smaller than #8 shall be solid. Conductors #8 and larger shall be<br />
stranded.<br />
B. Conductor insulation shall generally be XHHW or THHN as required for dry, damp or wet<br />
locations per NEC. Conductors subjected to higher ambient temperatures shall be<br />
derated in accordance with NEC.<br />
2.8 OUTLET BOXES<br />
A. All outlet boxes, extensions, and cover frames shall be galvanized sheet steel for<br />
concealed locations or cast metal for exposed locations unless otherwise noted. Boxes<br />
shall be 1 1/2" deep, minimum, and shall be sized to accommodate the installed conduit,<br />
conductors and device. Boxes to which fixtures are installed shall have studs and straps<br />
to support fixture weight. Where more than two switches are located side by side, outlet<br />
box shall be multi-ganged type as required for switches to be mounted under single<br />
cover plate. Provide divider plate between each device within multi-gang outlet.<br />
B. Boxes for installation in concrete block wall construction shall be gang type, 3 1/2" deep<br />
for switch devices and 4" square by 1 1/2" deep, with 1 1/4" single and two gang square<br />
corner extension covers for receptacle and junction purposes. Boxes for installation in<br />
brick wall construction shall be gang type, 3 1/2" deep. Boxes installed in plastered<br />
walls shall be 4" square by 1 1/2" deep, with 3/4" single and two gang plaster covers. All<br />
boxes shall have internal mounting ears or threaded tappings.<br />
C. Boxes for installation in fire rated walls or ceilings shall be 2”x4” or 4” round metal type.<br />
Spacing shall be a minimum <strong>of</strong> 24” apart. 4” square boxes shall be permitted provided<br />
they are equipped with a 2”x4” extension ring and spacing is a minimum <strong>of</strong> 24” on<br />
center. Aggregate area <strong>of</strong> the openings provided for the boxes shall not exceed 100<br />
square inches per 100 square feet <strong>of</strong> wall space.<br />
2.9 PULL AND JUNCTION BOXES<br />
A. Pull and junction boxes shall be constructed <strong>of</strong> code gauge galvanized sheet steel and<br />
fitted with screw covers held in place with corrosion resistant machine screws.<br />
B. Provide boxes where noted on drawings or where necessary to facilitate conductor<br />
pulling and splicing. Splicing <strong>of</strong> conductors is to be avoided as much as possible with<br />
continuous lengths being preferred. Box sizes shall conform to sizes required by NEC or<br />
as indicated on drawings.<br />
2.10 WIRING DEVICES<br />
16000-6<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
Electrical<br />
A. All wiring devices shall be commercial grade and product <strong>of</strong> one manufacturer<br />
throughout project except as otherwise noted. Device color shall *match existing. *be<br />
determined in shop drawing stage and shall be as directed by architect<br />
B. Wall switches shall be 20 ampere, 120-277V, A.C., toggle handle, quiet type, with side<br />
or back wiring terminals. Switches shall be single or multi-pole as indicated on<br />
drawings. Pilot light type switches shall be provided with red lighted handle which<br />
illuminates when switch is 'on'.<br />
C. Wall occupancy sensors shall be wall mounted combination ultrasonic and passive<br />
infrared type, with integral on/<strong>of</strong>f manual switch. Occupancy sensor shall be line voltage<br />
and intrinsically grounding type. Manufacturer shall be Sensor switch model # WSD-<br />
PDT *color I/W/G/A or approved equal. Open area and Corridor occupancy sensors<br />
shall be ceiling mounted combination ultrasonic and passive infrared type. Sensor shall<br />
be equipped with automatic gain control thereby allowing self calibration. Connect for<br />
use via wall switch generally as indicated on drawings. Manufacturer shall be Sensor<br />
Switch model # CM-PDT-10/CM-BoxPlate with PP-20 power pack, or approved equal by<br />
Hubbel or Wattstopper. Contractor shall coordinate location in field to maintain 5’ clear<br />
between ceiling mounted sensor and HVAC supply grilles.<br />
D. Duplex receptacles shall be straight blade, 20 ampere 125V, A.C., <strong>of</strong> grounding type,<br />
with side or back wiring terminals.<br />
E. GFI type receptacles shall be equipped with integral safety mechanism to remove power<br />
from device upon GFI component failure (UL943 compliant) with 'test' and 'reset' buttons<br />
shall be provided where indicated. GFI type receptacles shall be provided where<br />
indicated on drawings, series wiring to enable GFI protection for non-GFI type<br />
receptacles shall not be allowed.<br />
F. Device plates shall be rigid thermoplastic type, white in color for all flush installed outlet<br />
boxes in finished spaces. Weatherpro<strong>of</strong> devices shall be equipped with rain tight in use<br />
cover. Surface mounted device outlets shall be fitted with appropriate sheet steel or cast<br />
metal cover plates to match device and box. Nylon coverplates are not allowed.<br />
G. Special purpose outlets shall be as indicated on drawings and have matching cover<br />
plate.<br />
2.11 LIGHTING FIXTURES<br />
A. Furnish and install all lighting fixtures as shown on drawings and specified in fixture<br />
schedule. The fixture schedule is intended as a guide for selection. Unless otherwise<br />
noted, fixtures <strong>of</strong> other manufacturers will be acceptable if <strong>of</strong> similar design and<br />
characteristics, subject to approval.<br />
B. Although not specifically shown or specified, all light fixtures shall be provided with all<br />
necessary optional accessories and mounting hardware for installation as indicated or<br />
required.<br />
C. Electronic ballasts for fluorescent fixtures shall be UL Listed Class P, Type 1, flicker-free,<br />
full light output type and meeting the applicable requirements <strong>of</strong> the FCC, IEEE and<br />
ANSI with power factor not less than 90%, crest factor 1.5 maximum, frequency not less<br />
than 25,000 hertz, THD less than 10% and sound rating Class A. Ballasts shall be<br />
specifically designed for use with the type lamps indicated. *Ballasts for use with<br />
compact fluorescent lamps shall be provided with ‘end <strong>of</strong> life' protection to prevent<br />
16000-7<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
Electrical<br />
ballast operation upon lamp failure. Ballast warranty shall be 5 years minimum. All<br />
fluorescent fixtures shall be provided with integral disconnect which removes power to<br />
ballast.<br />
D. Ballast for HID fixtures shall be high power factor type selected for type and wattage <strong>of</strong><br />
lamp supplied.<br />
E. All recessed lighting fixtures installed in insulated ceilings or ceilings which abut an attic<br />
space shall be 'IC' rated, gasketed and sealed to prevent air leakage into the conditioned<br />
space, or provided with a sealed box (min 1/2" thick gypsum wall board, preformed<br />
polymeric vapor barrier, or other air tight assembly manufactured for this purpose) and<br />
maintaining required clearances <strong>of</strong> not less than 1/2" for combustible material and not<br />
less than 3" from insulation material.<br />
2.12 LAMPS<br />
A. Furnish and install one complete set <strong>of</strong> lamps for all installed fixtures as designated in<br />
fixture schedule, on drawings or specified herein. All lamps shall be <strong>of</strong> proper design to<br />
fit specific fixture indicated. To ensure uniform lighting and color, all lamps <strong>of</strong> the same<br />
type shall be provided by the same manufacturer.<br />
B. <strong>Inc</strong>andescent lamps shall be rated 120 volt with type and wattage as scheduled.<br />
C. Fluorescent lamps shall be color and size as scheduled, and designed for operation with<br />
the fixture ballast. Energy efficient type lamps shall be specifically approved for<br />
operation with the specified ballast.<br />
2.13 TIME SWITCHES<br />
A. Time switch controls shall be multi-pole, single throw, rated 20 amperes per pole<br />
(minimum), with astronomic dial properly selected for latitude <strong>of</strong> installation and 16 hour<br />
(minimum) spring reserve carry-over in the event <strong>of</strong> power failure. Time switch shall be<br />
installed in NEMA-1 surface enclosure unless otherwise noted.<br />
PART 3 – EXECUTION<br />
3.1 CUTTING AND PATCHING<br />
A. Place all sleeves, inserts, conduit hangers, etc. as construction progresses to avoid any<br />
unnecessary cutting <strong>of</strong> structural members. Cooperate with other contractors in location<br />
<strong>of</strong> electrical outlets that may conflict with location <strong>of</strong> other equipment.<br />
B. Obtain authorization from the Architect for any necessary cutting <strong>of</strong> building structure to<br />
facilitate installation <strong>of</strong> this work and do not proceed until authorization has been<br />
received. Limit necessary cutting and patching to the minimum size required for<br />
installation <strong>of</strong> conduit or apparatus.<br />
3.2 TRENCH EXCAVATION, PUMPING, BACKFILLING AND COMPACTION<br />
A. Excavate, back-fill and compact all trenches required for underground electrical work.<br />
Maintain trenches free <strong>of</strong> <strong>water</strong> until installation is complete and provide all necessary<br />
shoring.<br />
16000-8<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
Electrical<br />
B. Contractor shall field verify all existing underground utilities and avoid damage to same.<br />
Where existing utilities are damaged, the contractor shall be responsible for all repairs or<br />
replacement.<br />
C. Back-fill with loose, dry granular material in 6-inch lifts and thoroughly compact each lift.<br />
Dispose <strong>of</strong> all surplus material and rock as directed by the Architect. Grade the surface<br />
to a reasonable uniformity and leave the mounding in neat condition as approved by the<br />
Architect.<br />
D. Back-fill all trenches passing under foundations with concrete to the underside <strong>of</strong> the<br />
foundation and at a 2:1 slope away from each side <strong>of</strong> the foundation. Back-fill all<br />
trenches that are parallel and deeper than foundations with concrete to a point that will<br />
place the top <strong>of</strong> the concrete on a 2:1 slope away from the foundation bottom. Do not<br />
back-fill trenches until required inspections are completed.<br />
E. Repair or replace all topsoil, shrubbery, sod, sidewalks, streets, walls, etc. disturbed by<br />
the excavation, backfilling or pumping to the satisfaction <strong>of</strong> the Architect. Repair<br />
sidewalks in complete blocks; partial patching will not be accepted.<br />
3.3 GROUNDING AND BONDING<br />
A. Provide grounding electrode conductor for electric service equipment sized and<br />
connected in accordance with NEC.<br />
B. Bond equipment such as metallic housing and feeder metallic conduits to grounding<br />
conductor. Use grounding bushings, on service conduit and at other points where<br />
grounding continuity is broken.<br />
C. Although not specifically indicated or required by code, provide insulated green<br />
equipment grounding conductor for all feeders and branch circuits.<br />
D. Provide a bonding jumper for any equipment, motor, fixture or device to which current<br />
carrying conductors are connected that is not bonded directly to the grounded system.<br />
Connect bonding jumper to approved lugs and grounding conduit bushings or clamps.<br />
All non-metallic conduit shall contain an equipment grounding conductor.<br />
E. All grounding or bonding conductors shall be sized as required by NEC, or as herein<br />
specified, and shall be bare copper or TW insulated, with green coding.<br />
3.4 RACEWAYS<br />
A. Follow routing for conduit installation described on drawings as nearly as possible.<br />
Routing layout, however, is diagrammatical and where changes are necessary as a<br />
result <strong>of</strong> structural conditions, apparatus, or other causes, routing will have to be<br />
changed to meet these conditions. Conduit risers and <strong>of</strong>fsets are not indicated on<br />
drawings but are intended to be installed as required.<br />
B. Run conduit required to be exposed parallel or perpendicular to the walls, ceilings, or<br />
structural members and provide supports as required by NEC. In addition, install<br />
supports as required to form a secure and firm installation. Supports shall be galvanized<br />
pipe straps, hangers or wall brackets. Firmly support concealed conduit at the structure<br />
and install so as to prevent any vibration against structure, pipe or duct work.<br />
16000-9<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
Electrical<br />
C. Fit conduit installed in concrete or secured to structural members that pass through<br />
expansion joints constructed in the building with expansion fittings, complete with copper<br />
bonding jumper.<br />
D. All metallic conduit terminating in outlet, junction or pull boxes and cabinets must<br />
terminate with bushing and double locknuts except exposed cast boxes, where they may<br />
be omitted. Conduit sizes 1 1/4" and above shall have insulating fiber bushings with<br />
double locknuts. Grounding type bushings must be used at points where grounding<br />
continuity is broken and at service equipment.<br />
E. Fit all empty conduit systems with suitable nylon pull-string and blank <strong>of</strong>f to prevent<br />
entrance <strong>of</strong> foreign matter until conductors are installed.<br />
F. At motor connections, flexible connections, or connections subject to vibration, use<br />
flexible galvanized conduit with PVC outer jacket with grounding conductor.<br />
G. Conduit shall not be smaller than ½" trade size and must be sized to accept conductors<br />
indicated.<br />
3.5 WIRING<br />
A. No wiring shall be installed until the required raceway system including junction, outlet<br />
and device boxes is completed. Install wiring before painting begins and protect against<br />
being painted.<br />
B. Branch circuit sizes are noted on drawings and must be continuous without reduction in<br />
size throughout their length except where connecting to fixtures or devices.<br />
C. Branch circuit wire sizes shall be increased as required where long runs will cause<br />
excessive voltage drop per NEC.<br />
D. Wire circuits as described or indicated on drawings to achieve a connected load as<br />
scheduled. Should any change be necessary, it must be brought to the Architect's<br />
attention.<br />
3.6 BOXES<br />
A. The location <strong>of</strong> outlets on drawings is to be considered as approximate only inasmuch as<br />
outlets are to be centered in blocks, panels, or other modular units. Be familiar with<br />
requirements <strong>of</strong> other trades as well as the building in general to become aware <strong>of</strong><br />
various materials and finished surfaces in which outlets are to be installed.<br />
B. Install boxes square and plumb with receptacle and junction boxes in a vertical position.<br />
Cover all boxes for future use or junction purposes with blank plates.<br />
C. Boxes in exterior locations shall be cast metal boxes with threaded conduit hubs.<br />
Securely fasten boxes to building surfaces.<br />
3.7 PANELBOARDS<br />
A. Panelboards shall not be installed under any ducts, piping or other foreign equipment up<br />
to the structural ceiling as per code requirements. Where it appears that this condition<br />
will exist, the contractor shall notify the Architect immediately for resolution before<br />
16000-10<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
Electrical<br />
proceeding with the installation. Any rework caused by the lack <strong>of</strong> timely notification and<br />
coordination shall be provided without additional cost.<br />
3.8 ACCESS PANELS<br />
A. Provide ceiling access panels for equipment, devices, boxes and other like items<br />
requiring adjustment or maintenance accessibility if they are not located over lay-in type<br />
ceilings or are not otherwise accessible. Obtain approval from Architect for type and<br />
location <strong>of</strong> access panels.<br />
3.9 WIRING DEVICES<br />
A. Where indicated, gang devices together in common boxes with device straps bonded to<br />
metallic system or separate grounding conductor.<br />
B. Wiring device mounting heights shall be as follows, unless otherwise noted or required:<br />
1. Light switches and controls- 48" above floor to top<br />
2. Receptacles- 16" above floor to bottom<br />
3. Telephone and computer outlets- 16" above floor to bottom<br />
3.10 IDENTIFICATION LABELS<br />
A. Provide identification labels for each motor controller, safety switch, panelboard,<br />
contactor, time switch, control device, and circuit breaker. Labels shall be laminated,<br />
phenolic strips 1/16" thick and engraved to show black letters on white background not<br />
less than 1/4" high. *Emergency equipment and control device labels shall be provided<br />
per code on all emergency equipment. Labels shall be consist <strong>of</strong> white letters on red<br />
background. Where brackets are not provided, labels shall be mounted with screws, or<br />
approved adhesive.<br />
B. Where control apparatus is installed on or immediately adjacent to equipment, labels are<br />
not required.<br />
C. Provide UL approved arc-flash hazard marking on front cover (or other clearly visible<br />
location) <strong>of</strong> all electrical equipment as required by the NEC 110.<br />
3.11 LIGHTING FIXTURES<br />
A. All light fixtures shall be installed in accordance with the manufacturer's installation<br />
instructions or recommendations.<br />
B. Connect single-connected fixtures, surface or stem hung, with heat resistant fixture wire.<br />
Connect multiple-connected fluorescent fixtures, surface or stem hung, with type THHN<br />
heat resistant thermoplastic wire <strong>of</strong> a size indicated for branch circuit.<br />
C. Support fixtures to be recessed in readily removable tile ceilings (lay-in type) from the T-<br />
bar tile support and connect to remote mounted 4" square junction boxes with approved<br />
six foot long, 3/8" flexible conduit 'fixture whip' with grounding conductor bonded<br />
between conduit system and fixture.<br />
D. Lay-in type light fixtures installed in fire rated ceilings shall be independently supported<br />
per UL requirements.<br />
16000-11<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011
Electrical<br />
E. Upon project completion and just prior to delivering project to the Owner, clean all<br />
fixtures and remove all instruction tags.<br />
3.12 LAMPS<br />
A. Do not install full set <strong>of</strong> lamps until specific permission <strong>of</strong> the Architect has been<br />
obtained. Temporary lamps may be installed in permanent fixtures for construction<br />
purposes, but they must be replaced with new lamps when directed.<br />
3.13 TELEPHONE AND COMPUTER CONDUIT SYSTEM<br />
A. Install conduits, outlet boxes and backboards as shown on drawings. Conduit shall be<br />
as previously specified, with 3/4" as the minimum size. Provide all conduits with pullwire.<br />
Backboards shall be 3/4" plywood painted light gray with fire resistant paint.<br />
B. Wall outlets shall be 4" square by 1 1/2" deep with single gang extension covers and<br />
covered with blank specified plates. *Floor outlets shall be floor outlet boxes as<br />
previously specified.<br />
C. Coordinate with local telephone company and verify routing and termination point <strong>of</strong><br />
building telephone service entry conduits.<br />
D. Provide telephone service entry conduits and backboard with receptacles and ground<br />
conductor in accordance with telephone company requirements.<br />
E. Provide #6 stranded, green insulated, ground conductor from backboard to the electrical<br />
service ground and/or other ground sources approved and verified by the telephone<br />
company.<br />
F. Provide grounding electrode conductor at telephone service entry sized and connected<br />
in accordance with NEC. Ground rod shall be minimum 10' in length and 3/4" in<br />
diameter.<br />
3.14 EQUIPMENT CONNECTIONS<br />
A. Make all final power feed connections to starters and/or motorized equipment installed<br />
by heating and air conditioning and plumbing contractors as indicated or required. Refer<br />
to Electrical sections <strong>of</strong> the other contractors' specifications for further information.<br />
B. For air handling equipment with separate 'field installed' heater unit, provide fuse block<br />
with fuses, wiring and power connections for fan motor tapped to unit disconnect switch.<br />
C. Contractor shall assume that all circuit breakers indicated for 'hermetic refrigerate motorcompressor'<br />
A/C equipment are the wrong size. The contractor shall field verify and<br />
provide ‘HACR' type circuit breaker sized for 'maximum-overcurrent-protection' in<br />
accordance with the nameplate data for the equipment actually supplied.<br />
D. Verify all equipment for service and characteristics provided prior to rough-in and<br />
connection. Provide a grounding conductor for all equipment connected with flexible<br />
conduit and bond to conduit system and metallic frame <strong>of</strong> equipment.<br />
E. Be responsible for securing and installing proper insulated conductors required for<br />
equipment <strong>of</strong> higher temperature range beyond that <strong>of</strong> specified branch circuit type.<br />
END OF SECTION 16000<br />
16000-12<br />
99-326 Bid Final<br />
CITY OF LABELLE MEMBRANE WTF April 7, 2011