Ecological Management Plan for LNG Facility Preclearing ... - QGC

Ecological Management Plan for LNG Facility Preclearing ... - QGC

Ecological Management Plan for LNG Facility Preclearing ... - QGC

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Ecological</strong> <strong>Management</strong> <strong>Plan</strong> <strong>for</strong><br />

<strong>LNG</strong> <strong>Facility</strong> <strong>Preclearing</strong> Activities<br />

September 2010<br />

Role<br />

Responsibility<br />

Supervise clearing works and ensure impacts on flora and fauna are<br />

minimised to the greatest extent practical, in accordance with<br />

commitments, guidelines and mitigation measures outlined in this<br />

<strong>Ecological</strong> <strong>Management</strong> <strong>Plan</strong>, as amended.<br />

Liaise with Queensland Parks and Wildlife about suitable relocation<br />

sites <strong>for</strong> fauna on Curtis Island<br />

Obtain necessary approvals <strong>for</strong> fauna handling<br />

Provide advice to the EPC Contractor/Proponent during<br />

environmental incidents<br />

Other Contractors/ Sub-contractors<br />

Ensure all specifications are met in accordance with the lead<br />

contractor‘s or Proponent‘s guidelines/work requirements/legal<br />

obligations as outlined in this <strong>Ecological</strong> <strong>Management</strong> <strong>Plan</strong>.<br />

7.2 Key Actions and Timing<br />

Key actions, timing and division of responsibility during preclearing activities (i.e. activities prior to tree<br />

felling/vegetation clearing and grubbing) are highlighted in the tables below.<br />

Table 13: Actions and Timing Associated with <strong>Preclearing</strong> Activities – <strong>QGC</strong><br />

Action Specifications Timing<br />

Arrange ecologists/fauna<br />

specialists<br />

Nominate local fauna<br />

handlers/carers<br />

Conduct spot HSSE and<br />

technical audits (where<br />

necessary)<br />

Generate weekly report<br />

Arrange ecologists/fauna specialists <strong>for</strong> all preclearing<br />

activities. Note: once on site, ecologists/fauna specialists<br />

will be under the management/supervision of the EPC<br />

contractor and expected to abide by the same site<br />

procedures and company requirements outlined in the<br />

project execution plan and various HSSE plans<br />

Provide EPC Contractor with details local veterinarians,<br />

registered wildlife carers/rescue organisations, and snake<br />

handlers<br />

Audits will be conducted to ensure on site activities are<br />

conducted in accordance with the current legislation,<br />

standards, licensing conditions and procedures detailed<br />

in applicable <strong>Management</strong> <strong>Plan</strong>s<br />

<strong>QGC</strong> Site HSSE Manager to interface with Bechtel Site<br />

Manager on a daily basis and provide a weekly report to<br />

the <strong>QGC</strong> Environmental Manager (important issues to be<br />

relayed immediately).<br />

At least three (3) weeks<br />

prior to commencement<br />

of preclearing (clearing)<br />

stage<br />

Two (2) weeks prior to<br />

preclearing (clearing)<br />

stage<br />

Conducted in<br />

accordance with <strong>LNG</strong><br />

(Midstream) HSSE<br />

<strong>Management</strong> <strong>Plan</strong><br />

Weekly from<br />

commencement of<br />

preclearing<br />

(preparation) stage<br />

Table 14: Actions and Timing Associated with <strong>Preclearing</strong> Activities – EPC Contractor<br />

Action Specifications Timing<br />

Provide details of<br />

clearing/work methods +<br />

Provide latest clearing schedule to ecologists/fauna<br />

specialists to enable planning of preclearing activity.<br />

At least three (3) weeks<br />

prior to preclearing<br />

36 of 43