<strong>Ecological</strong> <strong>Management</strong> <strong>Plan</strong> <strong>for</strong><br />

<strong>LNG</strong> <strong>Facility</strong> <strong>Preclearing</strong> Activities<br />

September 2010<br />

Action Specifications Timing<br />

this in<strong>for</strong>mation provided to clearing crews. A 50m<br />

buffer should be marked around active threatened<br />

species nest trees.<br />

Each HBT is to be numbered; size and number of<br />

hollows to be recorded, as well as species and<br />

diameter at breast height (DBH).<br />

Provide GPS coordinates to <strong>QGC</strong> <strong>for</strong> mapping<br />

Fauna relocation<br />

Generate<br />

preclearing/clearing report<br />

Conduct trapping <strong>for</strong> arboreal species to allow <strong>for</strong><br />

relocation prior to felling. This will be decided depending<br />

on the area to be cleared e.g. Open woodland species<br />

will be relocated to similar habitat.<br />

Provide a report on the above actions, including any<br />

specific recommendations <strong>for</strong> clearing works (potential<br />

issues to be relayed to the Site Manager immediately)<br />

See ‗reporting‘ in s8.2 <strong>for</strong> further details<br />

No more than four days<br />

prior to commencing<br />

felling activities<br />

Minimum two days prior<br />

to commencing clearing<br />

activities<br />

7.3 Resources<br />

Ecologists are likely to require the following equipment during preclearing and clearing activities:<br />

personal protective equipment (to be provided/funded by <strong>QGC</strong> where necessary);<br />

crow bar or similar <strong>for</strong> rolling/breaking logs;<br />

tree marking spray paint and bright flagging tape; and<br />

hessian sacks, butcher hooks, leather gloves, blankets, transport boxes <strong>for</strong> rescue, cotton bags.<br />

The appointed ecologists are to procure all necessary equipment required <strong>for</strong> the undertaking of their tasks.<br />

A designated area <strong>for</strong> a temporary fauna housing facility will be required to house injured fauna or those<br />

requiring collection/release. This will be established by the EPC Contractor, in consultation with an<br />

ecologist.<br />

8.0 COMMUNICATION & CONSULTATION<br />

8.1 Contact Details<br />

The following contact details will be kept at the site office and with the ecologists, Site Environmental<br />

Inspectors/Manager and the Construction Superintendent-Clearing.<br />

Table 16: List of Contact Details<br />

Contact Person Contact Name Number<br />

Construction Manager (Bechtel)<br />

TBA<br />

Senior Project Manager (Bechtel) Craig Albert +1 713 235 2000<br />