<strong>Ecological</strong> <strong>Management</strong> <strong>Plan</strong> <strong>for</strong><br />
<strong>LNG</strong> <strong>Facility</strong> <strong>Preclearing</strong> Activities<br />
September 2010<br />
Action Specifications Timing<br />
this in<strong>for</strong>mation provided to clearing crews. A 50m<br />
buffer should be marked around active threatened<br />
species nest trees.<br />
Each HBT is to be numbered; size and number of<br />
hollows to be recorded, as well as species and<br />
diameter at breast height (DBH).<br />
Provide GPS coordinates to <strong>QGC</strong> <strong>for</strong> mapping<br />
Fauna relocation<br />
Generate<br />
preclearing/clearing report<br />
Conduct trapping <strong>for</strong> arboreal species to allow <strong>for</strong><br />
relocation prior to felling. This will be decided depending<br />
on the area to be cleared e.g. Open woodland species<br />
will be relocated to similar habitat.<br />
Provide a report on the above actions, including any<br />
specific recommendations <strong>for</strong> clearing works (potential<br />
issues to be relayed to the Site Manager immediately)<br />
See ‗reporting‘ in s8.2 <strong>for</strong> further details<br />
No more than four days<br />
prior to commencing<br />
felling activities<br />
Minimum two days prior<br />
to commencing clearing<br />
activities<br />
7.3 Resources<br />
Ecologists are likely to require the following equipment during preclearing and clearing activities:<br />
personal protective equipment (to be provided/funded by <strong>QGC</strong> where necessary);<br />
crow bar or similar <strong>for</strong> rolling/breaking logs;<br />
tree marking spray paint and bright flagging tape; and<br />
hessian sacks, butcher hooks, leather gloves, blankets, transport boxes <strong>for</strong> rescue, cotton bags.<br />
The appointed ecologists are to procure all necessary equipment required <strong>for</strong> the undertaking of their tasks.<br />
A designated area <strong>for</strong> a temporary fauna housing facility will be required to house injured fauna or those<br />
requiring collection/release. This will be established by the EPC Contractor, in consultation with an<br />
ecologist.<br />
8.0 COMMUNICATION & CONSULTATION<br />
8.1 Contact Details<br />
The following contact details will be kept at the site office and with the ecologists, Site Environmental<br />
Inspectors/Manager and the Construction Superintendent-Clearing.<br />
Table 16: List of Contact Details<br />
Contact Person Contact Name Number<br />
Construction Manager (Bechtel)<br />
TBA<br />
Senior Project Manager (Bechtel) Craig Albert +1 713 235 2000<br />
38 of 43