<strong>Ecological</strong> <strong>Management</strong> <strong>Plan</strong> <strong>for</strong><br />

<strong>LNG</strong> <strong>Facility</strong> <strong>Preclearing</strong> Activities<br />

September 2010<br />

any dead animals located;<br />

photographs of rescued fauna; and<br />

details of habitat trees.<br />

Animals captured, relocated or euthanised during HBT felling will also be recorded by the ecologists.<br />

All hours logged by the ecologists are to be captured on weekly timesheets that need to be verified (signed)<br />

by the Bechtel Site Manager, who will <strong>for</strong>ward the data to <strong>QGC</strong> <strong>for</strong> processing and payment every <strong>for</strong>tnight.<br />

8.3 Induction and Training<br />

All employees and sub-contractors working on the site will undergo site inductions which address the<br />

following:<br />

HSSE and emergency response procedures;<br />

location of sensitive areas including vegetation protection areas and habitat areas;<br />

management procedures <strong>for</strong> habitat trees;<br />

location and identification of project footprint and boundaries;<br />

clearing and construction limits <strong>for</strong> people, plant and machinery;<br />

basic fauna rescue procedures;<br />

basic weed identification and control measures.<br />

The contact details of relevant personnel listed in Table 13 will also be discussed and made available<br />

during induction and environmental tool-box talks.<br />

The environmental content of the site induction will be endorsed and audited by <strong>QGC</strong>.<br />

8.4 Conflict <strong>Management</strong><br />

Any conflicts of procedure, personnel and/or direction of activities which cannot be resolved using normal<br />

supervisory procedures <strong>for</strong> site clearing works will need to be managed as follows:<br />

1. Personnel involved to report conflict to EPC Contractor and <strong>QGC</strong> Site HSSE Managers<br />

2. If unresolved, report conflict to EPC Contractor and <strong>QGC</strong> Project HSSE Managers or Construction<br />

Managers. Where possible, this should be done in a manner that prevents unnecessary work<br />

stoppage and maintains a smooth working interface.<br />

9.0 ENVIRONMENTAL MONITORING AND COMPLIANCE SYSTEMS<br />

The procedures included in this <strong>Ecological</strong> <strong>Management</strong> <strong>Plan</strong> have been designed with the ultimate goal of:<br />

1. minimising impacts on native fauna during grubbing and clearing activities; and<br />

2. where practicable, avoiding or minimising impacts on significant vegetation outside the <strong>LNG</strong> footprint<br />

and within the <strong>LNG</strong> <strong>Facility</strong> boundary (e.g. hollow-bearing trees and threatened/endangered<br />

ecological communities).<br />