05.03.2015 Views

A Guide to Managing an Ageing Workforce - Public Sector ...

A Guide to Managing an Ageing Workforce - Public Sector ...

A Guide to Managing an Ageing Workforce - Public Sector ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4. Pl<strong>an</strong> <strong>an</strong>d Implement the Strategy<br />

The strategies selected should be those most suitable for the individual agency <strong>an</strong>d this will depend on the<br />

agency’s culture <strong>an</strong>d values. The Agency Age-diverse assessment in Appendix B will identify areas for<br />

action.<br />

Consider the points below in pl<strong>an</strong>ning age-inclusive strategies:<br />

• which areas require action<br />

• the risks <strong>to</strong> the org<strong>an</strong>isation if action is not taken<br />

• the rationale for choosing the proposed strategies<br />

• how these strategies will link <strong>to</strong> the agency’s strategic pl<strong>an</strong><br />

• the benefits for the agency in implementing these strategies<br />

• a cost/benefit <strong>an</strong>alysis <strong>an</strong>d the resources required <strong>to</strong> implement the strategies<br />

• what the strategies aim <strong>to</strong> achieve <strong>an</strong>d how these will be measured <strong>an</strong>d evaluated<br />

• a timeframe <strong>an</strong>d <strong>an</strong> implementation pl<strong>an</strong><br />

A project pl<strong>an</strong> <strong>an</strong>d program strategy should be developed. A project pl<strong>an</strong> summarises the results of the project<br />

pl<strong>an</strong>ning process in<strong>to</strong> a brief document <strong>to</strong> be approved by the senior executive. It should include miles<strong>to</strong>nes<br />

<strong>an</strong>d timelines for the deliverables <strong>an</strong>d will provide a basis <strong>to</strong> moni<strong>to</strong>r <strong>an</strong>d control the project. Any ch<strong>an</strong>ges <strong>to</strong><br />

the project should be recorded against the project pl<strong>an</strong>. See Appendix D for a Project Pl<strong>an</strong>.<br />

Pl<strong>an</strong> for success<br />

• What do the strategies ultimately<br />

intend <strong>to</strong> achieve?<br />

• What measures will determine if<br />

the strategies are successful?<br />

• What measures will be used in<br />

the short <strong>an</strong>d in the long term?<br />

• How often will these measures<br />

be assessed?<br />

• What systems or processes need<br />

<strong>to</strong> be ch<strong>an</strong>ged or developed?<br />

• Is advice needed <strong>to</strong> implement<br />

ch<strong>an</strong>ges?<br />

A program strategy is a coherent set of rules, guidelines <strong>an</strong>d activities that will be undertaken <strong>to</strong> achieve the<br />

specified objectives. These should be realistic <strong>an</strong>d attainable <strong>to</strong> enable <strong>an</strong> operational pl<strong>an</strong> <strong>to</strong> be devised.<br />

See Appendix E for a Program Strategy template.<br />

www.publicsec<strong>to</strong>r.wa.gov.au A <strong>Guide</strong> <strong>to</strong> <strong>M<strong>an</strong>aging</strong> <strong>an</strong> <strong>Ageing</strong> <strong>Workforce</strong> 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!