FISCAL YEAR <strong>2011</strong><br />
ANNUAL LISTING OF OBLIGATED PROJECTS<br />
December 8, <strong>2011</strong><br />
The preparation <strong>of</strong> this document was financed cooperatively by the Federal Highway Administration and the Federal<br />
Transit Administration <strong>of</strong> the United States Department <strong>of</strong> Transportation, the Ohio Department <strong>of</strong> Transportation,<br />
the Kentucky Transportation Cabinet, the Indiana Department <strong>of</strong> Transportation and local units <strong>of</strong> government within<br />
the <strong>OKI</strong> region. The opinions, findings and conclusions expressed in this document are those <strong>of</strong> the author and are<br />
not necessarily those <strong>of</strong> the United States Department <strong>of</strong> Transportation. This report does not constitute a standard,<br />
specification or regulation.
The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users<br />
(SAFETEA-LU) requires that the Metropolitan Planning Organizations prepare an <strong>annual</strong><br />
<strong>listing</strong> <strong>of</strong> <strong>projects</strong>, including investments in pedestrian walkways and bicycle<br />
transportation facilities, for which Federal funds have been <strong>obligated</strong> in the preceding<br />
<strong>year</strong>. The <strong>listing</strong> shall be published or otherwise made available by the cooperative<br />
effort <strong>of</strong> the State, transit operator and metropolitan planning organization for public<br />
review. The <strong>listing</strong> shall be consistent with the funding categories identified in each<br />
metropolitan Transportation Improvement Program (TIP). This requirement has been<br />
revised by the SAFETEA-LU, 23 U.S.C. 134(j)(7)(B), 23 U.S.C. 135(g)(4)(B), 49 U.S.C.<br />
5303(j)(7)(B), and 49 U.S.C. 5304(g)(4)(B).<br />
The following tables and maps provide information on transportation <strong>projects</strong> in the <strong>OKI</strong><br />
region that were <strong>obligated</strong> for spending using federal funds during state <strong>fiscal</strong> <strong>year</strong><br />
<strong>2011</strong>--July 1, 2010 through June 30, <strong>2011</strong> for Ohio <strong>projects</strong> and federal <strong>fiscal</strong> <strong>year</strong><br />
<strong>2011</strong>-October 1, 2010 through September 30, <strong>2011</strong> for Kentucky and Indiana.<br />
The <strong>OKI</strong> region includes Butler, Clermont, Hamilton and Warren counties in Ohio;<br />
Boone, Campbell and Kenton counties in Kentucky; and, Dearborn County in Indiana.<br />
Maps are provided in this report for highway <strong>projects</strong> that received federal authorization<br />
for the construction phase. Highway <strong>projects</strong> that have received federal authorization<br />
for only the preliminary engineering or right-<strong>of</strong>-way phase will be listed, but will not be<br />
mapped. Projects with initial construction authorization in prior <strong>year</strong>s also will not be<br />
mapped.<br />
The information provided here is consistent with how <strong>projects</strong> are listed in the <strong>OKI</strong> TIP,<br />
i.e. <strong>projects</strong> are shown with a project identification number, route, section, location and<br />
description <strong>of</strong> project and funding amounts. This list provides information on the<br />
amount <strong>of</strong> funds programmed in the TIP, the amount <strong>of</strong> federal funds that were<br />
authorized during <strong>fiscal</strong> <strong>year</strong> <strong>2011</strong> and the amount <strong>of</strong> funds remaining and available for<br />
use in subsequent <strong>year</strong>s. Some <strong>projects</strong> have been authorized in earlier <strong>fiscal</strong> <strong>year</strong>s and<br />
received additional federal authorization during <strong>fiscal</strong> <strong>year</strong> <strong>2011</strong> to complete the project.<br />
Projects are listed by state and then alphabetically by county. Projects that were<br />
specifically identified as bicycle or pedestrian <strong>projects</strong> are identified as well as highway<br />
<strong>projects</strong> that contain a bicycle or pedestrian component.<br />
Project obligation information is also provided for five federally funded transit operators<br />
in the region: Butler County Regional Transit Authority (BCRTA), Clermont<br />
Transportation Connection (CTC), Middletown Transit System (MTS), the Southwest<br />
Ohio Regional Transit Authority (SORTA) and the Transit Authority <strong>of</strong> Northern<br />
Kentucky (TANK).<br />
An obligation is the federal government’s legal commitment to pay the federal share <strong>of</strong><br />
a project’s cost. An <strong>obligated</strong> project is one that has been authorized by a federal<br />
agency, such as the Federal Highway Administration (FHWA) or the Federal Transit<br />
Administration (FTA). Obligated <strong>projects</strong> are not necessarily initiated or completed in<br />
the programmed <strong>year</strong> and the amount <strong>of</strong> the obligation may not necessarily equal the<br />
total cost <strong>of</strong> the project. For FTA <strong>projects</strong>, obligation occurs when the FTA grant is<br />
awarded. For FHWA <strong>projects</strong>, the obligation occurs when a project agreement is<br />
executed and the state/grantee requests that the funds be <strong>obligated</strong>.
FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />
OHIO HIGHWAY, PLANNING AND RELATED TRANSPORTATION PROJECTS<br />
Butler County<br />
PID Facility Section Project Description Phase<br />
24659 IR 75-10.30/0.00<br />
24664 IR 75-3.76<br />
76380 SR 4-0.00<br />
77204 US 42-0.00<br />
77746 SR 732-8.69<br />
78073 CR 20-8.98<br />
80517<br />
SR 73/177-<br />
4.19/10.08<br />
81769 US 27-10.92<br />
81988 Butler-Warren Road<br />
83395 SR 4B-4.24<br />
83811 SR 732-0.00<br />
84747 SR 4-12.31<br />
Federal Funds<br />
Programmed<br />
Federal Funds<br />
Authorized<br />
Remaining<br />
Federal<br />
Funds<br />
Modify IR 75/SR 63 interchange--<br />
Project awarded 10/18/07,<br />
additional funding<br />
CON $903,280 $903,280 $0<br />
Minor rehabilitation <strong>of</strong> IR 75<br />
pavement from SLM 3.76 to 5.52--<br />
Project awarded 12/20/07,<br />
CON $1,216,409 $1,216,409 $0<br />
additional funding<br />
Add a lane northbound and<br />
southbound from Crescentville<br />
Road to Commercial Drive--Project<br />
CON $20,000 $20,000 $0<br />
awarded 5/14/08, additional funding<br />
Widen for a third lane where nonexistent<br />
and improve access control- CON $8,169,700 $747,424 $7,422,276<br />
-Project awarded 2/17/11<br />
Urban paving project in Oxford--<br />
Project awarded 3/16/11<br />
CON $311,520 $327,136 $0<br />
Major widening on Tylersville Road<br />
from Lakota Hills to Wetherington CON $2,294,000 $2,294,000 $0<br />
Drive--Project awarded 4/28/11<br />
Upgrade intersection <strong>of</strong> SR 73 and<br />
SR 177 with realignment and<br />
addition <strong>of</strong> turn lanes--Project<br />
CON $3,086,000 $2,659,075 $426,925<br />
awarded 4/28/11<br />
Widen mainline US 27 to preferred<br />
design standards from Stillwell-<br />
Beckett Road to Chestnut Street<br />
Widen existing two lane roadway to<br />
five lanes with curb and gutter from<br />
Tylersvile Road to Bethany Road--<br />
Project awarded 5/23/11<br />
Phase 5A <strong>of</strong> SR 4 Bypass widening<br />
project--Project awarded 7/28/11<br />
Resurface SR 732 throughout<br />
Butler County, omitting Oxford--<br />
Project awarded 7/28/11<br />
Add an additional left turn lane from<br />
SR 4 to NB Liberty Fairfield Road<br />
$396,828<br />
($90,000<br />
PE $1,162,048<br />
authorized in FY<br />
2009)<br />
$765,220<br />
CON $6,780,000 $6,580,874 $199,126<br />
CON $5,360,000 $3,528,800 $1,831,200<br />
CON $1,483,600 $1,610,400 $0<br />
ROW $1,333,000 $1,333,493 $0<br />
Facilities for Pedestrians and Bicycles in Butler County:<br />
85222<br />
Fairfield Streetscape Project along Dixie<br />
Landscaping Highway--Project awarded 9/22/10<br />
CON $127,768 $108,104 $19,664<br />
86673<br />
Promote walking and biking to<br />
Safe Routes to school through crosswalks, signs,<br />
School Project curb ramps and flashers--Project<br />
CON $105,000 $117,000 $0<br />
awarded 5/27/11<br />
90880 SRTS Travel Plan School Travel Plan Development Plng $12,000 $12,000 $0<br />
1
FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />
OHIO HIGHWAY, PLANNING AND RELATED TRANSPORTATION PROJECTS<br />
Clermont County<br />
PID Facility Section Project Description Phase<br />
Federal Funds<br />
Programmed<br />
Federal Funds<br />
Authorized<br />
Remaining<br />
Federal<br />
Funds<br />
9710 SR 132-18.54<br />
Relocate highway further west <strong>of</strong><br />
existing location to eliminate poor<br />
geometrics--Project awarded<br />
CON $101,302 $101,302 $0<br />
2/1/08, additional funding<br />
75682 SR 132-12.43<br />
Plane and pave a portion <strong>of</strong> SR 132-<br />
-Project awarded 6/9/11<br />
CON $1,140,000 $983,932 $156,068<br />
79070 CR 303-0.29<br />
Replacement <strong>of</strong> the old SR 52<br />
Bridge (C-303-0.29) over Nine Mile CON $675,000 $472,192 $202,808<br />
Creek--Project awarded 6/8/11<br />
79111 SR 28 Business<br />
Widen to 4 through lanes with turn<br />
lanes at signalized intersections<br />
and landscaped median--Project<br />
CON $3,000,000 $3,034,972 $0<br />
awarded 5/13/11<br />
82139<br />
CR 132-2.50<br />
(Wolfpen-Pleasant<br />
Improve 1.05 mi. <strong>of</strong> Wolfpen<br />
Pleasant Hill Road by providing a 3<br />
lane section with a 4 foot sidewalk CON $1,750,000 $1,444,622 $305,378<br />
Hill) on one side--Project awarded<br />
5/13/11<br />
82140 SR 28-2.05<br />
Construct a 5 lane (from existing<br />
three lane) curb and gutter section<br />
with a four foot sidewalk on one<br />
side--Project awarded 7/28/11,<br />
CON $1,760,000 $1,385,304 $374,696<br />
82141<br />
SR 125-15.04<br />
(Bethel Signals)<br />
83537 SR 28-2.12<br />
83605 SR 749-2.87<br />
83812 SR 125-1.25<br />
authorized in FY <strong>2011</strong><br />
New traffic signal controllers and<br />
signal heads installed at SR 125<br />
and SR 133, Union Street, Charity<br />
Street and East Street<br />
Construct loop ramp from SR28<br />
westbound to IR275 southbound<br />
Replace failed combination stone<br />
and concrete retaining wall--Project<br />
awarded 6/24/11<br />
Minor pavement rehabilitation from<br />
IR 275 to SR 132<br />
84547 SR 132-10.75<br />
Bridge rehabilitation (SFN 302884<br />
over a tributary <strong>of</strong> the East Fork<br />
Little Miami River--Project awarded<br />
5/12/11<br />
85233 SR 125-6.99<br />
Construct left turn lane on WB SR<br />
125 to SR 132<br />
Replace and install 14,000 feet <strong>of</strong><br />
89519 Guardrail Phase 3 new guardrail on various routes in<br />
Clermont County<br />
CON $110,000 $120,595 $0<br />
ROW $225,000 $225,000 $0<br />
CON $880,000 $1,004,960 $0<br />
CON $2,724,490 $2,724,490 $0<br />
CON $286,000 $324,984 $0<br />
PE $35,560 $65,365 $0<br />
CON $300,000 $300,000 $0<br />
Facilities for Pedestrians and Bicycles in Clermont County:<br />
81224<br />
Williamsburg<br />
Streetscape<br />
87510 SR 28-4.02<br />
Main Street Streetscape with<br />
sidewalk removal and replacement<br />
with pavers, new streetlights, new<br />
streetscape benches and trash<br />
receptacles--Project awarded<br />
5/14/08, additional funding<br />
Addition <strong>of</strong> sidewalks, signs and<br />
striping for pedestrian crosswalks<br />
along SR 28--Project awarded<br />
3/9/11<br />
CON $15,265 $15,265 $0<br />
CON $274,000 $165,722 $108,278<br />
2
FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />
OHIO HIGHWAY, PLANNING AND RELATED TRANSPORTATION PROJECTS<br />
Hamilton County<br />
PID Facility Section Project Description Phase<br />
20082 US 50-18.79<br />
Waldvogel Viaduct and widening <strong>of</strong><br />
US 50<br />
24954 IR 71-2.48<br />
Paint structural steel on Bridge No.<br />
HAM-71-0243 R, SFN 3106802<br />
Preliminary Engineering <strong>of</strong> the<br />
75119 IR 71/75-0.00/0.00 approaches to the Brent Spence<br />
Bridge<br />
District wide pavement preventive<br />
75680<br />
Preventive maintenance on priority system for<br />
Maintenance FY 11 FY <strong>2011</strong>--Hamilton and Greene<br />
counties<br />
75720 IR 75-0.30<br />
Rehabilitation and investigation <strong>of</strong><br />
bridges for repair areas<br />
75736 US 50-19.03<br />
Rehabilitate the 6th Street<br />
Expressway (sold with PID 20082)<br />
75882 US 22-15.84<br />
Widen US 22 to increase capacity<br />
and improve safety--Project<br />
awarded 2/17/06, additional funding<br />
Federal Funds<br />
Programmed<br />
Federal Funds<br />
Authorized<br />
Remaining<br />
Federal<br />
Funds<br />
CON $44,937,598 $49,506,707 $0<br />
CON $2,609,000 $2,444,247 $0<br />
PE $29,866,000 $1,491,658 $28,374,342<br />
CON $1,047,420 $1,075,833 $0<br />
CON $7,920,000 $2,310,291 $5,609,709<br />
CON $25,687,000 $25,687,000 $0<br />
CE $510,000 $510,000 $0<br />
75933 SR 747-3.829<br />
Construct a grade separation<br />
between SR 747 and CSX two track<br />
rail line--Project awarded 12/3/03,<br />
CE $1,769,363 $1,769,363 $0<br />
additional funding<br />
77889 IR 75-7.85<br />
IR 75 widening from south <strong>of</strong> SR<br />
562 to north <strong>of</strong> SR 4<br />
PE $5,616,000 $5,600,000 $16,000<br />
78089 US 42-16.52<br />
Install left turn lanes (NB and SB)<br />
on US 42 at Cottingham Drive<br />
ROW $202,500 $202,500 $0<br />
79088 Montana Avenue<br />
Widen pavement to AASHTO<br />
standard width lanes with turn lanes CON $2,000,000 $1,503,971 $496,029<br />
as warranted, new sidewalk<br />
79308 IR 74 ARTIMIS<br />
Expansion <strong>of</strong> the ARTIMIS system<br />
along IR 74 in Hamilton County--<br />
Project awarded 4/17/08, additional<br />
CE $86,000 $86,000 $0<br />
funding<br />
79394 US 22-14.51 Resurfacing CON $223,258 $223,258 $0<br />
80005 IR 275-18.82<br />
Noise wall construction project<br />
$2,534,000 $2,534,000<br />
CON<br />
along IR 275<br />
(state funds) (state funds)<br />
$0<br />
Replace superstruture HAM-74-<br />
80098 IR 74-7.76 0776L&R--Project awarded CON $6,407,444 $6,407,444 $0<br />
11/24/10, additional funding<br />
81798 Cheviot Signals<br />
Install mast arm signals at 4<br />
intersections and replace<br />
controllers, cabinets and wiring-- CE $1,220 $1,220 $0<br />
Project awarded 7/1/09, additional<br />
funding<br />
81899 SR 125-5.20<br />
Construct a partial continuous flow<br />
intersection at SR 125 and Five ROW $275,200 $275,200 $0<br />
Mile Road<br />
82278 IR 75-5.58<br />
Reconstruction <strong>of</strong> Mitchell Avenue<br />
interchange, Phase 1 <strong>of</strong> IR 75 CON $50,752,000 $37,335,567 $13,416,433<br />
widening<br />
82283 IR 75-7.72<br />
Replace RR bridge no. HAM-75-<br />
0722, SFN: 3109992, Phase 6 <strong>of</strong> IR<br />
75 widening<br />
ROW $900,000 $4,954,545 $0<br />
82284 IR 74-18.00<br />
Improve Colerain/Beekman<br />
interchange with associated work<br />
on IR 74, Phase 3 <strong>of</strong> IR 75 widening<br />
ROW $440,000 $1,740,201 $0<br />
3
FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />
OHIO HIGHWAY, PLANNING AND RELATED TRANSPORTATION PROJECTS<br />
Hamilton County (continued)<br />
PID Facility Section Project Description Phase<br />
Federal Funds<br />
Programmed<br />
Federal Funds<br />
Authorized<br />
Remaining<br />
Funds<br />
82286 IR 75-6.78<br />
Reconstruct IR 75 from north <strong>of</strong><br />
Mitchell interchange through SR<br />
562 interchange, Phase 7 <strong>of</strong> IR 75<br />
ROW $907,300 $814,400 $92,900<br />
widening<br />
82288 IR 75-12.60<br />
Reconstruct the interstate between<br />
Shepherd Lane and Glendale- ROW $7,407,000 $9,984,982 $0<br />
Milford Rd<br />
83077 IR 71-15.78<br />
Add an auxiliary lane NB on IR 71<br />
from Pfeiffer Road to IR 275<br />
PE $608,000 $265,862 $342,138<br />
83469 CR 239-9.49<br />
Widening and resurfacing South<br />
Gilmore Rd. from I-275 to north <strong>of</strong><br />
Kolb Drive--Project awarded 9/1/11,<br />
CON $12,650,000 $3,121,500 $9,528,500<br />
authorized in FY <strong>2011</strong><br />
83518 SR 264/SR 747<br />
Resurace portions <strong>of</strong> SR 264 and<br />
SR 747--Project awarded 7/7/11, CON $2,362,800 $2,515,920 $0<br />
authorized in FY <strong>2011</strong><br />
83637 Lockland Signals<br />
Upgrade and interconnect 7<br />
signalized intersections--Project CON $465,000 $273,004 $191,996<br />
awarded 11/10/10<br />
Steel beam bridge painting over<br />
$125,000<br />
83925 Sharon Road<br />
Sharon Road and the NS Railroad--<br />
($682,463<br />
CON $146,537<br />
Project awarded 6/3/10, additional<br />
authorized in FY<br />
$21,537<br />
funding<br />
2010)<br />
84437 US 27-14.15<br />
Extend the SB right turn lane on US<br />
27 to westbound on ramp to IR 275<br />
PE $23,000 $23,000 $0<br />
84444 SR 562-0004L<br />
Rehabilitate Bridge HAM-562-0.04L<br />
by replacing the concrete deck and<br />
including other related rehabilitation<br />
CON $1,034,550 $646,425 $388,125<br />
work--Project awarded 9/1/11,<br />
authorized in FY <strong>2011</strong><br />
84603 US 27-15.78<br />
Rehabilitate bridges HAM-27-<br />
15.86L&R over Bank Road and<br />
HAM-27-18.49L&R over Great<br />
PE $139,078 $139,078 $0<br />
Miami River<br />
86247 CTCS Various<br />
Replacement and expansion <strong>of</strong> the<br />
existing computerized traffic control<br />
system interconnect cabling--<br />
CE $21,570 $21,570 $0<br />
Project awarded 4/14/10, additional<br />
86370<br />
Construct Phase II <strong>of</strong> the Intermodal<br />
Banks Bid Package<br />
and Transit Center project--Project<br />
#11<br />
awarded 5/19/10, additional funds<br />
CON $6,320,601 $612,956 $5,707,645<br />
Eliminate slip ramps for right turn<br />
86798 IR 75-15.34<br />
lanes at both exit ramps from IR 75<br />
to Sharon Road--Project awarded<br />
CON $481,500 $512,820 $0<br />
9/1/11, authorized FY <strong>2011</strong><br />
86799 IR 71-0.00 Install pavement markings CON $248,000 $72,840 $175,160<br />
86801 IR 71-19.74<br />
Improve signal timing & operations<br />
by upgrading signals at IR 71 and<br />
Fields Ertel/Mason Montgomery --<br />
CON $1,216,000 $1,254,247 $0<br />
Project awarded 6/24/11<br />
ITS and signal system upgrade in<br />
87071 Springdale Signals the City <strong>of</strong> Springdale--Project<br />
awarded 4/28/11<br />
87149 IR 75-2.52<br />
Rehabilitate the state maintained<br />
portion <strong>of</strong> the Western Hills Viaduct<br />
over IR 75<br />
CON $796,660 $588,568 $208,092<br />
CON $148,500<br />
$24,359<br />
($239,000<br />
authorized in FY<br />
2010)<br />
$124,141<br />
4
FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />
OHIO HIGHWAY, PLANNING AND RELATED TRANSPORTATION PROJECTS<br />
Hamilton County (continued)<br />
PID Facility Section Project Description Phase<br />
Federal Funds<br />
Programmed<br />
Federal Funds<br />
Authorized<br />
Remaining<br />
Funds<br />
87763 SR 125-5.41<br />
88129 IR 75-11.09<br />
88234<br />
IR 74/75 Building<br />
Demolition<br />
Access management and minor traffic<br />
control improvements from 5 Mile<br />
Road in Anderson Township to 9 Mile<br />
Road in Clermont County<br />
Replace railroad bridge prior to<br />
widening on SB IR 75 in the split<br />
Building demolition for interstate 74<br />
& 75 reconstruction--Project<br />
awarded 9/22/10, authorized FY<br />
PE $103,500 $222,843 $0<br />
PE $408,000 $408,000 $0<br />
CON $1,276,000 $870,320 $405,680<br />
<strong>2011</strong><br />
Retr<strong>of</strong>it all existing traffic signal<br />
88794 Mt. Healthy Signals heads at 14 signalized locations in CON $78,492 $61,392 $17,100<br />
Mt Healthy--Awarded 5/26/11<br />
Install traffic signal and restripe for<br />
89060 US 27-6.54 left turn lane on US 27 at Blue Rock CON $183,546 $125,577 $57,969<br />
Road<br />
Repower two Central Railroad<br />
89191<br />
CIND RR Company <strong>of</strong> Indiana Railroad<br />
Locomotive locomotives with GenSet diesel<br />
CON $2,624,526 $2,624,526 $0<br />
engines--Project awarded 4/22/11<br />
Install automatic flashing light<br />
89373 Norwood Avenue signals and roadway gates at I&O CON $193,000 $193,000 $0<br />
crossing on Norwood Avenue<br />
Install automatic flashing light<br />
89375 Linden Street<br />
signals and roadway gates at<br />
Norfolk Southern crossing on<br />
CON $279,348 $279,348 $0<br />
Linden Street in Elmwood Place<br />
Widen Westbourne Dr for dual LT<br />
89905 SR 264-8.49 lanes to NB SR 264 and widen SB PE $114,063 $171,900 $0<br />
SR 264 for RT lane at Westbourne<br />
91129 US 52-37.88 Emergency Culvert Reconstruction CON $762,100 $762,100 $0<br />
Facilities for Pedestrians and Bicycles in Hamilton County:<br />
83769<br />
Construct a sidewalk on one side<br />
Asbury Road<br />
<strong>of</strong> Asbury Road--Project awarded<br />
Sidewalks<br />
8/18/11, authorized in FY <strong>2011</strong><br />
84853 IR 71-5.71<br />
Rehabilitation <strong>of</strong> pedestrian bridge<br />
over IR 71<br />
Wooster Pike Streetscape including<br />
86076 US 50-34.49<br />
gateway signage, landscaped<br />
median, lighting and crosswalks--<br />
Awarded 4/14/11<br />
89452<br />
Cincinnati Public SRTS Educational and<br />
Schools Encouragement Programs<br />
90907 Mariemont SRTS<br />
SRTS Educational and<br />
Encouragement Programs<br />
91528<br />
Cincinnati Public SRTS Educational and<br />
Schools Encouragement Programs<br />
CON $536,000 $589,000 $0<br />
CON $1,253,000 $1,259,280 $0<br />
CON $712,818 $651,132 $61,686<br />
PLNG $24,000 $24,000 $0<br />
PLNG $9,000 $9,000 $0<br />
PLNG $44,800 $44,800 $0<br />
5
Warren County<br />
FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />
PID Facility Section Project Description Phase<br />
81986 Bethany Road<br />
82957 Culverts FY 12<br />
84465 SR 123-0.06<br />
89376 TR 173 Eltzroth Rd<br />
Widen roadway to 3 lanes with right<strong>of</strong>-way<br />
for 5 lanes between Butler-<br />
Warren Road and the Mason<br />
Corporate line<br />
Line, rehabilitate and/or replace<br />
various culverts on US 22 and SR<br />
123<br />
Resurface and perform pavement<br />
repairs from SR 28 to US 22--<br />
Project awarded 1/20/11<br />
Install automatic flashing light<br />
signals and roadway gates at<br />
Indiana & Ohio crossing<br />
Federal Funds<br />
Programmed<br />
Federal Funds<br />
Authorized<br />
Remaining<br />
Funds<br />
CON $3,934,000 $3,934,000 $0<br />
CON $461,120 $440,000 $21,120<br />
CON $1,589,600<br />
$34,304<br />
($1,807,000<br />
authorized in<br />
FY 2010)<br />
CON $193,000 $193,000 $0<br />
$0<br />
Facilities for Pedestrians and Bicycles in Warren County:<br />
Addition <strong>of</strong> turn lanes, bike lane and<br />
79850 US 42-0.00 sidewalks from Butler-Warren Road<br />
to Tylersville Road<br />
Construct a streetscape by adding<br />
83146<br />
sidewalks and landscaping on<br />
Lebanon<br />
Broadway (US 48) from Main to<br />
Streetscape<br />
Silver Street--Project awarded<br />
12/23/08, additional funding<br />
CON $4,987,200 $4,669,549 $317,651<br />
CON $60,000 $60,000 $0<br />
District-wide (ODOT - District 8)<br />
PID Facility Section Project Description Phase<br />
87949<br />
88862<br />
D08 Signal<br />
Backplate<br />
D08 Bridge<br />
Inspections<br />
FY <strong>2011</strong>-2012<br />
Ohio Planning Projects<br />
Federal Funds<br />
Programmed<br />
Federal Funds<br />
Authorized<br />
Remaining<br />
Funds<br />
District 8 rigid overlays CON $500,000 $443,081 $56,919<br />
District 8 consultant bridge<br />
inspection contract <strong>of</strong> various truss<br />
bridges in the District for calendar<br />
<strong>year</strong> <strong>2011</strong> and 2012<br />
PE $240,000 $240,000 $0<br />
88173<br />
Transit On-Board<br />
Survey<br />
Conduct surveys <strong>of</strong> transit users on<br />
SORTA, TANK and CTC PLNG $202,515 $202,515 $0<br />
Pilot program to assist carpools with<br />
88453 Banks Pilot Program 2 or more persons parking at the PLNG $500,000 $500,000 $0<br />
Banks Intermodal Facility<br />
90498 Regional Planning FY 2012 Land Use Planning PLNG $286,440 $286,440 $0<br />
90501 Air Quality Planning FY 2012 Air Quality Program PLNG $330,000 $330,000 $0<br />
90503 Rideshare FY 2012 Rideshare Program PLNG $191,790 $191,790 $0<br />
90532 Regional Planning FY 2012 Fiscal Impact Anal. Model PLNG $83,629 $83,629 $0<br />
6
Fiscal Year <strong>2011</strong> Obligated Highway Projects<br />
Boone, Campbell & Kenton Counties, KY<br />
6-220.00<br />
2010 RTP-2<br />
6-2019.00<br />
!<br />
6-2022.00<br />
6-2021.00<br />
6-193.00<br />
6-219.06<br />
6-219.06<br />
6-2027.00<br />
!<br />
6-2020.00<br />
6-193.01<br />
6-364.00<br />
!<br />
!<br />
!<br />
6-195.09<br />
6-363.00<br />
6-71.01<br />
§¨¦ 275 ¾¡ 27<br />
6-405.00<br />
6-2800.20<br />
6-344.21<br />
6-2026.00<br />
6-224.00<br />
! 6-352.01<br />
6-2032.00<br />
6-2033.00<br />
!<br />
¾¡ 25<br />
6-219.05<br />
¾¡ 42<br />
§¨¦ 71<br />
6-46.20<br />
q 0<br />
T.M.M. 12-8-<strong>2011</strong><br />
6-2034.00<br />
Miles<br />
0.425 0.85 1.7 2.55 3.4 4.25<br />
T:\GIS\Staff\Paine\TIP\Obligated Projects\<strong>2011</strong>\<strong>2011</strong> Deleted Projects_ NKY.mxd
FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />
KENTUCKY HIGHWAY, PLANNING AND RELATED TRANSPORTATION PROJECTS<br />
Boone County<br />
Project<br />
Facility<br />
Mileposts<br />
(Length) Project Description Phase<br />
Federal Funds<br />
Programmed<br />
Federal Funds<br />
Authorized<br />
Remaining<br />
Federal<br />
Funds<br />
6-14.50 IR 75<br />
175.314 -<br />
180.106<br />
(.10 miles)<br />
6-158.00 KY 536 (3 miles)<br />
6-193.00 South Airfield Road<br />
6-193.01 South Airfield Road<br />
6-405.00 KY 237<br />
6-405.00 KY 237<br />
6-909.00<br />
6-1046.00<br />
6-2032.00 IR 75<br />
6-2032.00 IR 75<br />
7.49 -<br />
9.897<br />
(2.407<br />
miles)<br />
7.49 -<br />
9.897<br />
(2.407<br />
miles)<br />
High Street<br />
(CS 3011)<br />
PE and environmental assessment<br />
for interchange reconstruction<br />
PE, environmental assessment and<br />
DE for development <strong>of</strong> contract<br />
plans for reconstruction <strong>of</strong> roadway<br />
Construct South Airfield Road from<br />
KY 18 NE to KY 1017<br />
Construct South Airfield Road from<br />
KY 18 NE to KY 1017<br />
PE and environmental assessment<br />
for pavement replacement from<br />
Conner Drive to Medical Arts Drive<br />
Grade, drain and surfacing for<br />
pavement and guardrail<br />
rehabilitation<br />
Purchase flourescent yellow<br />
horizontal alignment signs for<br />
installation on various rural roads in<br />
Boone and Kenton counties<br />
High Street (CS 3011) in Walton,<br />
bridge and approaches at NS (CNO<br />
& TP) Railroad, 100' east <strong>of</strong> US 25.<br />
PE, environmental assessment and<br />
169.439 -<br />
design engineering for milling 1.5"<br />
182.813<br />
and resurfacing. Does not include IR<br />
(13.4 miles)<br />
71/75 ramps<br />
169.439 -<br />
Grade, drain and surface to mill and<br />
182.813<br />
resurface<br />
(13.4 miles)<br />
DES $1,500,000 $1,500,000 $0<br />
DES $2,876,396<br />
CON $49,469,520<br />
$200,000<br />
($2,676,396<br />
previously<br />
authorized)<br />
$17,184,760<br />
($32,284,760<br />
previously<br />
authorized)<br />
CON $245,000 $245,000 $0<br />
DES $100,000 $100,000 $0<br />
CON $12,000,000<br />
$6,000,000<br />
($6,000,000<br />
previously<br />
authorized)<br />
CON $60,000 $60,000 $0<br />
UTIL $1,080,000<br />
$340,000<br />
($740,000<br />
previously<br />
authorized)<br />
DES $5,000 $5,000 $0<br />
CON $12,559,938<br />
$4,686,040<br />
($7,873,898<br />
previously<br />
authorized)<br />
$0<br />
$0<br />
$0<br />
$0<br />
$0<br />
6-2033.00 IR 75<br />
6-2033.00 IR 75<br />
169.439 -<br />
176.000<br />
(6.6 miles)<br />
169.439 -<br />
176.000<br />
(6.6 miles)<br />
PE, environmental assessment and<br />
design engineering for milling 1.5"<br />
and resurfacing. Does not include IR<br />
71/75 interchange ramps<br />
Grade, drain and surface to mill and<br />
resurface<br />
DES $5,000 $5,000 $0<br />
CON $5,266,120<br />
$1,766,120<br />
($3,500,000<br />
previously<br />
authorized)<br />
$0<br />
Facilities for Pedestrians and Bicycles in Boone County:<br />
Florence Park Trail<br />
Identification<br />
6-195.09 Florence Sidewalks<br />
Purchase & install 30 trail markers<br />
for the Florence Park Trail System in<br />
Orleans, South Fork and Lincoln<br />
Woods Parks<br />
Construct a sidewalk along<br />
Burlington Pike (KY 18) from<br />
Tanners Lane west over IR 71/75 to<br />
Hopeful Church Road<br />
CON $10,185 $10,185 $0<br />
CON $222,000<br />
$221,900<br />
(restore $100<br />
previously<br />
<strong>obligated</strong> &<br />
released)<br />
$0<br />
6-3019.00<br />
Burlington Sidewalk<br />
Project Phase III<br />
PE for new sidewalks along Idlewild<br />
Road connecting to Boone County<br />
fairgrounds & existing sidewalks on<br />
Conrad Lane and Bullittsville Road<br />
7<br />
DES $34,008 $27,406 $6,602
FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />
KENTUCKY HIGHWAY, PLANNING AND RELATED TRANSPORTATION PROJECTS<br />
Campbell County<br />
Project<br />
Facility<br />
Mileposts<br />
(Length) Project Description Phase<br />
Federal Funds<br />
Programmed<br />
Federal Funds<br />
Authorized<br />
Remaining<br />
Federal<br />
Funds<br />
6-46.20 US 27<br />
6-224.00 KY 8<br />
6-403.00 US 27<br />
6-406.00 KY 1892<br />
6-1076.00 CS 1193<br />
6-1072.00 KY 1996<br />
6-2020.00 IR 275<br />
6-2020.00 IR 275<br />
6-2021.00 IR 471<br />
6-2021.00 IR 471<br />
6-2026.00 IR 275<br />
1.9 - 5.2<br />
(3.3 miles)<br />
Grade, drain and surface to provide<br />
a 4-lane facility from 0.8 miles S <strong>of</strong><br />
KY 154 to 0.3 miles S <strong>of</strong> KY 824<br />
Construct turn lane on KY 8 at KY<br />
1998, east <strong>of</strong> Ft. Thomas<br />
PE and environmental assessment<br />
for constructing underground garage<br />
and multimodal facility<br />
2.152 - PE and environmental assessment<br />
2.50 for sight distance and drainage<br />
(.348 miles) improvements<br />
0.733 -<br />
0.833<br />
(0.10 miles)<br />
.209 -<br />
.309<br />
(0.10 miles)<br />
73.55 -<br />
75.38<br />
(1.8 miles)<br />
73.55 -<br />
75.38<br />
(1.8 miles)<br />
PE, environmental assessment and<br />
design engineering for bridge<br />
replacement<br />
PE, environmental assessment and<br />
design engineering for bridge<br />
replacement<br />
PE, environmental assessment and<br />
design engineering for structural<br />
overlay<br />
Grade, drain and surface for<br />
structural overlay<br />
0 - 4.75 PE, environmental assessment and<br />
(4.75 miles) design engineering for structural<br />
overlay<br />
0 - 5.72<br />
(5.72 miles)<br />
75.386 -<br />
77.023<br />
(1.6 miles)<br />
Pavement reconstruction on IR 471<br />
from MP 0.0 (US 27) to MP 5.72<br />
(Ohio State Line)<br />
Grade, drain and surface for<br />
structural overlay<br />
CON $28,232,143<br />
CON<br />
$1,170,000<br />
(State Bond<br />
funds only)<br />
$612,143<br />
($27,620,000<br />
previously<br />
authorized)<br />
$0<br />
$0 $0<br />
DES $396,000 $396,000 $0<br />
DES $152,000 $152,000 $0<br />
DES $140,000 $140,000 $0<br />
DES $150,000 $150,000 $0<br />
DES $400,000<br />
CON $68,114,564<br />
DES $1,380,000<br />
$0 ($400,000<br />
previously<br />
authorized)<br />
$24,057,282<br />
($44,057,282<br />
previously<br />
authorized)<br />
$380,000<br />
($1,000,000<br />
previously<br />
authorized)<br />
CON $49,000,000 $49,000,000 $0<br />
CON $36,281,423<br />
$14,281,423<br />
($22,000,000<br />
previously<br />
th i d)<br />
$0<br />
$0<br />
$0<br />
$0<br />
Facilities for Pedestrians and Bicycles in Campbell County:<br />
6-3701.00<br />
Newport Riverfront<br />
Commons<br />
Bicycle/Pedestrian<br />
Corridor<br />
PE for multi-use trail, sidewalks and<br />
other improvements along the<br />
corridor at Newport's Riverboat Row<br />
Scenic Byway<br />
DES $41,000 $41,000 $0<br />
8
FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />
KENTUCKY HIGHWAY, PLANNING AND RELATED TRANSPORTATION PROJECTS<br />
Kenton County<br />
Project<br />
Facility<br />
6-71.01 KY 1303 1.48 KM<br />
6-107.00 KY 371<br />
6-219.06<br />
6-220.00 KY 17<br />
6-344.21 KY 16<br />
6-352.01<br />
Mileposts<br />
(Length) Project Description Phase<br />
Grade, drain and surface for<br />
roadway relocation<br />
2.293 - Utility adjustments to extend a right<br />
3.244 (0.17 turn lane on KY 371 to SB IR 75 on<br />
miles) ramp<br />
US 25/<br />
McAlpin/Garvey<br />
24.009 -<br />
24.401<br />
N/S Railroad<br />
Crossing<br />
6-361.00 Turkeyfoot Road<br />
Construct realignment <strong>of</strong> US<br />
25/McAlpin/Garvey intersection (see<br />
pedestrian funding section)<br />
Bridge painting on the Roebling<br />
Suspension Bridge over the Ohio<br />
River at Covington<br />
Reconstruct KY 16 from Hand Pike<br />
to south <strong>of</strong> Old Taylor Mill Road<br />
Install automatic gates at NS RR<br />
crossing on Wright Road just east <strong>of</strong><br />
KY 2043, south <strong>of</strong> Independence<br />
PE, environmental assessment and<br />
DE for extending right turn lane on<br />
NB Turkeyfoot Rd to EB IR 275<br />
ramp<br />
PE, environmental assessment and<br />
6-362.00 IR 275<br />
DE for development <strong>of</strong> contract<br />
82.0 - 82.1<br />
plans for ramp widening to allow<br />
dual left turn lanes<br />
6-363.00 US 25<br />
Construst right turn lane on Dixie<br />
7.10 - 7.15<br />
Highway at Dudley Road<br />
0.571 - PE, environmental assessmane and<br />
6-1075.00 KY 1120 0.671 design engineering for bridge<br />
(0.10 miles) replacement over CSX Railroad<br />
6-2019.00 IR 75<br />
6-2022.00 IR 75<br />
6-2027.00 IR 275<br />
6-2027.00 IR 275<br />
6-2034.00 IR 75<br />
6-2034.00 IR 75<br />
6-2800.20 IR 275<br />
190.75 -<br />
191.22<br />
(0.47 miles)<br />
188.334 -<br />
190.754<br />
(2.4 miles)<br />
80.12 -<br />
82.47<br />
(2.4 miles)<br />
80.12 -<br />
82.47<br />
(2.4 miles)<br />
166.263 -<br />
169.439<br />
(3.2 miles)<br />
166.263 -<br />
169.439<br />
(3.2 miles)<br />
Mill 1/2" thin overlay on IR 75 from<br />
.30 miles north <strong>of</strong> KY 1120 overpass<br />
to .09 miles north <strong>of</strong> EB KY 8<br />
overpass<br />
Repair and grind pavement on IR 75<br />
from .251 miles S <strong>of</strong> KY 1072 to<br />
.301 miles N <strong>of</strong> KY 1120<br />
PE, environmental assessment and<br />
design engineering to repair and<br />
grind pavement<br />
Repair and grind pavement on IR<br />
275 from .55 miles south <strong>of</strong><br />
Horsebranch Road to US 25<br />
PE, environmental assessment and<br />
design engineering for milling 1.5"<br />
and resurfacing<br />
Grade, drain and surface to mill and<br />
resurface<br />
77.20 - Install high tension cable median<br />
81.55 (1.52 barrier from KY 9 interchange to<br />
miles) east <strong>of</strong> KY 1303 interchange<br />
9<br />
Federal Funds<br />
Programmed<br />
CON $7,459,430<br />
UTIL $295,000<br />
CON $1,124,237<br />
CON $13,269,360<br />
CON<br />
$7,800,000<br />
(State Funds Only)<br />
CON $148,547<br />
DES $320,000<br />
DES $240,000<br />
Federal Funds<br />
Authorized<br />
$167,440<br />
($7,291,990<br />
previously<br />
authorized)<br />
$80,000<br />
($215,000<br />
previously<br />
authorized)<br />
$39,237<br />
($1,085,000<br />
previously<br />
authorized)<br />
$50,000<br />
($13,219,360<br />
previously<br />
authorized)<br />
-$46,753<br />
($195,300<br />
previously<br />
authorized)<br />
$70,000<br />
($250,000<br />
previously<br />
authorized)<br />
$90,000<br />
($150,000<br />
previously<br />
authorized)<br />
Remaining<br />
Federal<br />
Funds<br />
$0<br />
$0<br />
$0<br />
$0<br />
$0 $0<br />
CON $150,600 $150,600 $0<br />
DES $170,000 $170,000 $0<br />
$785,797<br />
($1,365,000<br />
CON $2,150,797<br />
previously<br />
authorized)<br />
$3,106,849<br />
($8,380,000<br />
CON $11,486,849<br />
previously<br />
authorized)<br />
modify agreement<br />
to remove<br />
DES $250,000 $250,000 advance<br />
construction and<br />
obligate $250,000<br />
$1,798,766<br />
($5,290,000<br />
CON $7,088,766<br />
previously<br />
authorized)<br />
DES $5,000 $5,000 $0<br />
$726,426<br />
($800,000<br />
CON $1,526,426<br />
previously<br />
authorized)<br />
$0 ($671,652<br />
previously<br />
authorized)--<br />
CON $671,652<br />
agreement<br />
modified to correct<br />
entries<br />
$0<br />
$0<br />
$0<br />
$0<br />
$0<br />
$0<br />
$0<br />
$0<br />
$0
FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />
KENTUCKY HIGHWAY, PLANNING AND RELATED TRANSPORTATION PROJECTS<br />
Kenton County (continued)<br />
Project<br />
Facility<br />
Mileposts<br />
(Length) Project Description Phase<br />
Federal Funds<br />
Programmed<br />
Federal Funds<br />
Authorized<br />
Remaining<br />
Funds<br />
6-3703.00 KY 8<br />
PE and environmental to construct an<br />
additional lane on KY 8 (4th Street)<br />
west from Philadelphia to Crescent<br />
Street in Covington<br />
DES $150,000 $150,000 $0<br />
Facilities for Pedestrians and Bicycles in Kenton County:<br />
2010RTP-2<br />
Licking River<br />
Greenway, Phase 1<br />
Construct 3,756' <strong>of</strong> trail, trailhead<br />
and trailside facilities for the Licking<br />
River Greenway in Covington<br />
CON $80,000 $80,000 $0<br />
6-219.05<br />
Miles Elementary<br />
School Sidewalks<br />
Construct sidewalks along Dixie<br />
Highway and Sunset Avenue around<br />
Miles Elementary School<br />
CON $9,800<br />
Restore $9,600<br />
previously<br />
<strong>obligated</strong> and<br />
released<br />
$0<br />
6-219.06<br />
Dixie Highway<br />
Sidewalks<br />
Construct sidewalks along Dixie<br />
Highway from Dudley Road to Town<br />
Center Blvd in Crestview Hills (see<br />
highway portion <strong>of</strong> project)<br />
CON $342,000<br />
$341,900 ($100<br />
previously<br />
authorized)<br />
$0<br />
District-wide (KYTC - District 6)<br />
Project Facility Section Project Description Phase<br />
Federal Funds<br />
Programmed<br />
Federal Funds<br />
Authorized<br />
Remaining<br />
Funds<br />
6-388.01 Various bridges<br />
Fracture critical inspection <strong>of</strong> Ohio<br />
River bridges in Ballard, McCracken,<br />
Union, Henderson, Daviess,<br />
Jefferson, Trimble, Boone,<br />
Campbell, Kenton, Mason, Greenup<br />
and Boyd counties<br />
BR $1,655,000 $1,655,000 $0<br />
Kentucky Planning Projects<br />
Northern Kentucky<br />
(Cincinnati)<br />
MPO Unified Planning Work<br />
Program, FY 2012 Plng $380,960 $380,960 $0<br />
6-400.07<br />
6-401.07<br />
6-966.00<br />
6-966.00<br />
Northern Kentucky<br />
Rideshare Program<br />
Northern KY<br />
Regional Planning--<br />
Land Use<br />
Northern KY<br />
Regional Planning--<br />
Fiscal Impact Model<br />
Northern KY<br />
Regional Planning--<br />
Air Quality<br />
Program to promote alternative<br />
transportation: carpooling,<br />
vanpooling and public transportation Plng $35,500 $35,500 $0<br />
Land Use Planning Plng $53,020 $53,020 $0<br />
Fiscal Impact Model Plng $15,480 $15,480 $0<br />
Air Quality Planning Plng $41,000 $41,000 $0<br />
10
Fiscal Year <strong>2011</strong> Obligated Highway Projects<br />
Dearborn County, IN<br />
ST 48<br />
ST 350 ST 46<br />
§¨¦ 74 ST 1<br />
§¨¦ 275<br />
!<br />
ST 262 ST 56<br />
ST 62 ST 148<br />
¾¡ 52 ¾¡ 52<br />
!<br />
¾¡ 50<br />
0401194<br />
0710986<br />
1005490<br />
0600727<br />
q 0<br />
T.M.M. 12-09-<strong>2011</strong><br />
Miles<br />
0.175 0.35 0.7 1.05 1.4 1.75<br />
T:\GIS\Staff\Paine\TIP\Obligated Projects\<strong>2011</strong>\<strong>2011</strong> Deleted Projects_ Dearborn.mxd
FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />
INDIANA HIGHWAY, PLANNING AND RELATED TRANSPORTATION PROJECTS<br />
Dearborn County<br />
Des # Facility Project Description Phase<br />
Federal Funds<br />
Programmed<br />
Federal Funds<br />
Authorized<br />
Remaining<br />
Federal<br />
Funds<br />
0400285 US 50<br />
0401194 IN 1006<br />
0500985 US 50<br />
0501247 IR 74<br />
0501248 IR 74<br />
0600727 US 50<br />
0600727 US 50<br />
0800426 IR 275<br />
0900144 SR 148<br />
0902173 US 50<br />
Bridge rehabilitation or repair on<br />
bridge over Tanners Creek and<br />
service road, 0.08 miles E <strong>of</strong> SR 48.<br />
Bridge rehabilitation or repair on<br />
George Street Bridge in the City <strong>of</strong><br />
Aurora.<br />
Resurfacing from SR 56/SR 350 to<br />
SR 1 in the City <strong>of</strong> Aurora.<br />
HMA overlay on IR 74 from SR 101<br />
to SR 1.<br />
HMA overlay on IR 74 from SR 1 to<br />
the Ohio State Line.<br />
Intersection improvement and<br />
horizontal sight correction at US 50<br />
and Doughty Road<br />
Intersection improvement and<br />
horizontal sight correction at US 50<br />
and Doughty Road.<br />
Interchange modification on the<br />
ramp from US 50 to IR 275.<br />
HMA overlay and preventive<br />
maintenance from SR 48 to Maple<br />
Street.<br />
District intersection improvement at<br />
Doughty Road<br />
Traffic signal project on the Doughty<br />
Road Connector<br />
PE $46,754 $46,754 $0<br />
CON $904,135 $706,552 $197,583<br />
CON<br />
CON<br />
CON<br />
$2,500,000<br />
(authorized in prior<br />
<strong>fiscal</strong> <strong>year</strong>)<br />
$4,200,000<br />
(authorized in prior<br />
<strong>fiscal</strong> <strong>year</strong>)<br />
$3,600,000<br />
(authorized in prior<br />
<strong>fiscal</strong> <strong>year</strong>)<br />
-$303,974 $0<br />
$591,840 $0<br />
$23,850 $0<br />
ROW $160,000 -$289,096 $0<br />
CON $389,000 $539,623 $0<br />
CON<br />
CON<br />
$459,512<br />
(authorized in prior<br />
<strong>fiscal</strong> <strong>year</strong>)<br />
$736,000<br />
(authorized in prior<br />
<strong>fiscal</strong> <strong>year</strong>)<br />
-$67,949 $0<br />
-$30,492 $0<br />
ROW $106,400 $106,400 $0<br />
1005490 Doughty Road<br />
CON $16,417 $22,341 $0<br />
1006021 US 50 ARTIMIS expansion PE $50,000 $39,860 $10,140<br />
1006586 State Line Road<br />
Advanced warning flashers at Bright<br />
Elementary School<br />
PE $1,620 $1,805 $0<br />
1006587 North Dearborn Rd<br />
Advanced warning flashers at North<br />
Dearborn Elementary School<br />
PE $1,620 $1,805 $0<br />
Advanced warning flashers at<br />
1006590 Old State Route 1 Sunman Dearborn Intermediate PE $810 $903 $0<br />
School<br />
Facilities for Pedestrians and Bicycles in Dearborn County:<br />
0710986 Lesko Park Trail<br />
Bicycle/pedestrian trail project, part<br />
<strong>of</strong> the linear greenway system from<br />
the Ohio State Line to Rising Sun<br />
PE<br />
$120,000 (PE<br />
phase authorized<br />
in prior <strong>fiscal</strong> <strong>year</strong>)<br />
-$120,000 $0<br />
0710986 Lesko Park Trail<br />
Bicycle/pedestrian trail project, part<br />
<strong>of</strong> the linear greenway system from<br />
the Ohio State Line to Rising Sun<br />
CON $790,000 $955,058 $0<br />
11
FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />
TRANSIT PROJECTS<br />
ALI CODE<br />
ALI Description<br />
Total Eligible<br />
Project<br />
Total FTA ALI<br />
Amount<br />
Non-Federal<br />
Share<br />
Butler County Regional Transit Authority<br />
11.42.20 Acquire miscellaneous support equipment $250,000 $200,000 $50,000<br />
30.09.01 Operating assistance up to 50% federal share $466,000 $233,000 $233,000<br />
11.12.04 Buy replacement vehicles
TRANSIT PROJECTS<br />
FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />
ALI CODE<br />
ALI Description<br />
Total Eligible<br />
Project<br />
Total FTA ALI<br />
Amount<br />
Non-Federal<br />
Share<br />
TANK<br />
44.23.01 Planning Projects $156,250 $125,000 $31,250<br />
11.7A.00 Preventive Maintenance $713,398 $570,718 $142,680<br />
11.12.01 40' diesel buses $4,345,050 $3,476,040 $869,010<br />
11.12.04