FISCAL YEAR <strong>2011</strong><br />

ANNUAL LISTING OF OBLIGATED PROJECTS<br />

December 8, <strong>2011</strong><br />

The preparation <strong>of</strong> this document was financed cooperatively by the Federal Highway Administration and the Federal<br />

Transit Administration <strong>of</strong> the United States Department <strong>of</strong> Transportation, the Ohio Department <strong>of</strong> Transportation,<br />

the Kentucky Transportation Cabinet, the Indiana Department <strong>of</strong> Transportation and local units <strong>of</strong> government within<br />

the <strong>OKI</strong> region. The opinions, findings and conclusions expressed in this document are those <strong>of</strong> the author and are<br />

not necessarily those <strong>of</strong> the United States Department <strong>of</strong> Transportation. This report does not constitute a standard,<br />

specification or regulation.


The Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users<br />

(SAFETEA-LU) requires that the Metropolitan Planning Organizations prepare an <strong>annual</strong><br />

<strong>listing</strong> <strong>of</strong> <strong>projects</strong>, including investments in pedestrian walkways and bicycle<br />

transportation facilities, for which Federal funds have been <strong>obligated</strong> in the preceding<br />

<strong>year</strong>. The <strong>listing</strong> shall be published or otherwise made available by the cooperative<br />

effort <strong>of</strong> the State, transit operator and metropolitan planning organization for public<br />

review. The <strong>listing</strong> shall be consistent with the funding categories identified in each<br />

metropolitan Transportation Improvement Program (TIP). This requirement has been<br />

revised by the SAFETEA-LU, 23 U.S.C. 134(j)(7)(B), 23 U.S.C. 135(g)(4)(B), 49 U.S.C.<br />

5303(j)(7)(B), and 49 U.S.C. 5304(g)(4)(B).<br />

The following tables and maps provide information on transportation <strong>projects</strong> in the <strong>OKI</strong><br />

region that were <strong>obligated</strong> for spending using federal funds during state <strong>fiscal</strong> <strong>year</strong><br />

<strong>2011</strong>--July 1, 2010 through June 30, <strong>2011</strong> for Ohio <strong>projects</strong> and federal <strong>fiscal</strong> <strong>year</strong><br />

<strong>2011</strong>-October 1, 2010 through September 30, <strong>2011</strong> for Kentucky and Indiana.<br />

The <strong>OKI</strong> region includes Butler, Clermont, Hamilton and Warren counties in Ohio;<br />

Boone, Campbell and Kenton counties in Kentucky; and, Dearborn County in Indiana.<br />

Maps are provided in this report for highway <strong>projects</strong> that received federal authorization<br />

for the construction phase. Highway <strong>projects</strong> that have received federal authorization<br />

for only the preliminary engineering or right-<strong>of</strong>-way phase will be listed, but will not be<br />

mapped. Projects with initial construction authorization in prior <strong>year</strong>s also will not be<br />

mapped.<br />

The information provided here is consistent with how <strong>projects</strong> are listed in the <strong>OKI</strong> TIP,<br />

i.e. <strong>projects</strong> are shown with a project identification number, route, section, location and<br />

description <strong>of</strong> project and funding amounts. This list provides information on the<br />

amount <strong>of</strong> funds programmed in the TIP, the amount <strong>of</strong> federal funds that were<br />

authorized during <strong>fiscal</strong> <strong>year</strong> <strong>2011</strong> and the amount <strong>of</strong> funds remaining and available for<br />

use in subsequent <strong>year</strong>s. Some <strong>projects</strong> have been authorized in earlier <strong>fiscal</strong> <strong>year</strong>s and<br />

received additional federal authorization during <strong>fiscal</strong> <strong>year</strong> <strong>2011</strong> to complete the project.<br />

Projects are listed by state and then alphabetically by county. Projects that were<br />

specifically identified as bicycle or pedestrian <strong>projects</strong> are identified as well as highway<br />

<strong>projects</strong> that contain a bicycle or pedestrian component.<br />

Project obligation information is also provided for five federally funded transit operators<br />

in the region: Butler County Regional Transit Authority (BCRTA), Clermont<br />

Transportation Connection (CTC), Middletown Transit System (MTS), the Southwest<br />

Ohio Regional Transit Authority (SORTA) and the Transit Authority <strong>of</strong> Northern<br />

Kentucky (TANK).<br />

An obligation is the federal government’s legal commitment to pay the federal share <strong>of</strong><br />

a project’s cost. An <strong>obligated</strong> project is one that has been authorized by a federal<br />

agency, such as the Federal Highway Administration (FHWA) or the Federal Transit<br />

Administration (FTA). Obligated <strong>projects</strong> are not necessarily initiated or completed in<br />

the programmed <strong>year</strong> and the amount <strong>of</strong> the obligation may not necessarily equal the<br />

total cost <strong>of</strong> the project. For FTA <strong>projects</strong>, obligation occurs when the FTA grant is<br />

awarded. For FHWA <strong>projects</strong>, the obligation occurs when a project agreement is<br />

executed and the state/grantee requests that the funds be <strong>obligated</strong>.


FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />

OHIO HIGHWAY, PLANNING AND RELATED TRANSPORTATION PROJECTS<br />

Butler County<br />

PID Facility Section Project Description Phase<br />

24659 IR 75-10.30/0.00<br />

24664 IR 75-3.76<br />

76380 SR 4-0.00<br />

77204 US 42-0.00<br />

77746 SR 732-8.69<br />

78073 CR 20-8.98<br />

80517<br />

SR 73/177-<br />

4.19/10.08<br />

81769 US 27-10.92<br />

81988 Butler-Warren Road<br />

83395 SR 4B-4.24<br />

83811 SR 732-0.00<br />

84747 SR 4-12.31<br />

Federal Funds<br />

Programmed<br />

Federal Funds<br />

Authorized<br />

Remaining<br />

Federal<br />

Funds<br />

Modify IR 75/SR 63 interchange--<br />

Project awarded 10/18/07,<br />

additional funding<br />

CON $903,280 $903,280 $0<br />

Minor rehabilitation <strong>of</strong> IR 75<br />

pavement from SLM 3.76 to 5.52--<br />

Project awarded 12/20/07,<br />

CON $1,216,409 $1,216,409 $0<br />

additional funding<br />

Add a lane northbound and<br />

southbound from Crescentville<br />

Road to Commercial Drive--Project<br />

CON $20,000 $20,000 $0<br />

awarded 5/14/08, additional funding<br />

Widen for a third lane where nonexistent<br />

and improve access control- CON $8,169,700 $747,424 $7,422,276<br />

-Project awarded 2/17/11<br />

Urban paving project in Oxford--<br />

Project awarded 3/16/11<br />

CON $311,520 $327,136 $0<br />

Major widening on Tylersville Road<br />

from Lakota Hills to Wetherington CON $2,294,000 $2,294,000 $0<br />

Drive--Project awarded 4/28/11<br />

Upgrade intersection <strong>of</strong> SR 73 and<br />

SR 177 with realignment and<br />

addition <strong>of</strong> turn lanes--Project<br />

CON $3,086,000 $2,659,075 $426,925<br />

awarded 4/28/11<br />

Widen mainline US 27 to preferred<br />

design standards from Stillwell-<br />

Beckett Road to Chestnut Street<br />

Widen existing two lane roadway to<br />

five lanes with curb and gutter from<br />

Tylersvile Road to Bethany Road--<br />

Project awarded 5/23/11<br />

Phase 5A <strong>of</strong> SR 4 Bypass widening<br />

project--Project awarded 7/28/11<br />

Resurface SR 732 throughout<br />

Butler County, omitting Oxford--<br />

Project awarded 7/28/11<br />

Add an additional left turn lane from<br />

SR 4 to NB Liberty Fairfield Road<br />

$396,828<br />

($90,000<br />

PE $1,162,048<br />

authorized in FY<br />

2009)<br />

$765,220<br />

CON $6,780,000 $6,580,874 $199,126<br />

CON $5,360,000 $3,528,800 $1,831,200<br />

CON $1,483,600 $1,610,400 $0<br />

ROW $1,333,000 $1,333,493 $0<br />

Facilities for Pedestrians and Bicycles in Butler County:<br />

85222<br />

Fairfield Streetscape Project along Dixie<br />

Landscaping Highway--Project awarded 9/22/10<br />

CON $127,768 $108,104 $19,664<br />

86673<br />

Promote walking and biking to<br />

Safe Routes to school through crosswalks, signs,<br />

School Project curb ramps and flashers--Project<br />

CON $105,000 $117,000 $0<br />

awarded 5/27/11<br />

90880 SRTS Travel Plan School Travel Plan Development Plng $12,000 $12,000 $0<br />

1


FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />

OHIO HIGHWAY, PLANNING AND RELATED TRANSPORTATION PROJECTS<br />

Clermont County<br />

PID Facility Section Project Description Phase<br />

Federal Funds<br />

Programmed<br />

Federal Funds<br />

Authorized<br />

Remaining<br />

Federal<br />

Funds<br />

9710 SR 132-18.54<br />

Relocate highway further west <strong>of</strong><br />

existing location to eliminate poor<br />

geometrics--Project awarded<br />

CON $101,302 $101,302 $0<br />

2/1/08, additional funding<br />

75682 SR 132-12.43<br />

Plane and pave a portion <strong>of</strong> SR 132-<br />

-Project awarded 6/9/11<br />

CON $1,140,000 $983,932 $156,068<br />

79070 CR 303-0.29<br />

Replacement <strong>of</strong> the old SR 52<br />

Bridge (C-303-0.29) over Nine Mile CON $675,000 $472,192 $202,808<br />

Creek--Project awarded 6/8/11<br />

79111 SR 28 Business<br />

Widen to 4 through lanes with turn<br />

lanes at signalized intersections<br />

and landscaped median--Project<br />

CON $3,000,000 $3,034,972 $0<br />

awarded 5/13/11<br />

82139<br />

CR 132-2.50<br />

(Wolfpen-Pleasant<br />

Improve 1.05 mi. <strong>of</strong> Wolfpen<br />

Pleasant Hill Road by providing a 3<br />

lane section with a 4 foot sidewalk CON $1,750,000 $1,444,622 $305,378<br />

Hill) on one side--Project awarded<br />

5/13/11<br />

82140 SR 28-2.05<br />

Construct a 5 lane (from existing<br />

three lane) curb and gutter section<br />

with a four foot sidewalk on one<br />

side--Project awarded 7/28/11,<br />

CON $1,760,000 $1,385,304 $374,696<br />

82141<br />

SR 125-15.04<br />

(Bethel Signals)<br />

83537 SR 28-2.12<br />

83605 SR 749-2.87<br />

83812 SR 125-1.25<br />

authorized in FY <strong>2011</strong><br />

New traffic signal controllers and<br />

signal heads installed at SR 125<br />

and SR 133, Union Street, Charity<br />

Street and East Street<br />

Construct loop ramp from SR28<br />

westbound to IR275 southbound<br />

Replace failed combination stone<br />

and concrete retaining wall--Project<br />

awarded 6/24/11<br />

Minor pavement rehabilitation from<br />

IR 275 to SR 132<br />

84547 SR 132-10.75<br />

Bridge rehabilitation (SFN 302884<br />

over a tributary <strong>of</strong> the East Fork<br />

Little Miami River--Project awarded<br />

5/12/11<br />

85233 SR 125-6.99<br />

Construct left turn lane on WB SR<br />

125 to SR 132<br />

Replace and install 14,000 feet <strong>of</strong><br />

89519 Guardrail Phase 3 new guardrail on various routes in<br />

Clermont County<br />

CON $110,000 $120,595 $0<br />

ROW $225,000 $225,000 $0<br />

CON $880,000 $1,004,960 $0<br />

CON $2,724,490 $2,724,490 $0<br />

CON $286,000 $324,984 $0<br />

PE $35,560 $65,365 $0<br />

CON $300,000 $300,000 $0<br />

Facilities for Pedestrians and Bicycles in Clermont County:<br />

81224<br />

Williamsburg<br />

Streetscape<br />

87510 SR 28-4.02<br />

Main Street Streetscape with<br />

sidewalk removal and replacement<br />

with pavers, new streetlights, new<br />

streetscape benches and trash<br />

receptacles--Project awarded<br />

5/14/08, additional funding<br />

Addition <strong>of</strong> sidewalks, signs and<br />

striping for pedestrian crosswalks<br />

along SR 28--Project awarded<br />

3/9/11<br />

CON $15,265 $15,265 $0<br />

CON $274,000 $165,722 $108,278<br />

2


FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />

OHIO HIGHWAY, PLANNING AND RELATED TRANSPORTATION PROJECTS<br />

Hamilton County<br />

PID Facility Section Project Description Phase<br />

20082 US 50-18.79<br />

Waldvogel Viaduct and widening <strong>of</strong><br />

US 50<br />

24954 IR 71-2.48<br />

Paint structural steel on Bridge No.<br />

HAM-71-0243 R, SFN 3106802<br />

Preliminary Engineering <strong>of</strong> the<br />

75119 IR 71/75-0.00/0.00 approaches to the Brent Spence<br />

Bridge<br />

District wide pavement preventive<br />

75680<br />

Preventive maintenance on priority system for<br />

Maintenance FY 11 FY <strong>2011</strong>--Hamilton and Greene<br />

counties<br />

75720 IR 75-0.30<br />

Rehabilitation and investigation <strong>of</strong><br />

bridges for repair areas<br />

75736 US 50-19.03<br />

Rehabilitate the 6th Street<br />

Expressway (sold with PID 20082)<br />

75882 US 22-15.84<br />

Widen US 22 to increase capacity<br />

and improve safety--Project<br />

awarded 2/17/06, additional funding<br />

Federal Funds<br />

Programmed<br />

Federal Funds<br />

Authorized<br />

Remaining<br />

Federal<br />

Funds<br />

CON $44,937,598 $49,506,707 $0<br />

CON $2,609,000 $2,444,247 $0<br />

PE $29,866,000 $1,491,658 $28,374,342<br />

CON $1,047,420 $1,075,833 $0<br />

CON $7,920,000 $2,310,291 $5,609,709<br />

CON $25,687,000 $25,687,000 $0<br />

CE $510,000 $510,000 $0<br />

75933 SR 747-3.829<br />

Construct a grade separation<br />

between SR 747 and CSX two track<br />

rail line--Project awarded 12/3/03,<br />

CE $1,769,363 $1,769,363 $0<br />

additional funding<br />

77889 IR 75-7.85<br />

IR 75 widening from south <strong>of</strong> SR<br />

562 to north <strong>of</strong> SR 4<br />

PE $5,616,000 $5,600,000 $16,000<br />

78089 US 42-16.52<br />

Install left turn lanes (NB and SB)<br />

on US 42 at Cottingham Drive<br />

ROW $202,500 $202,500 $0<br />

79088 Montana Avenue<br />

Widen pavement to AASHTO<br />

standard width lanes with turn lanes CON $2,000,000 $1,503,971 $496,029<br />

as warranted, new sidewalk<br />

79308 IR 74 ARTIMIS<br />

Expansion <strong>of</strong> the ARTIMIS system<br />

along IR 74 in Hamilton County--<br />

Project awarded 4/17/08, additional<br />

CE $86,000 $86,000 $0<br />

funding<br />

79394 US 22-14.51 Resurfacing CON $223,258 $223,258 $0<br />

80005 IR 275-18.82<br />

Noise wall construction project<br />

$2,534,000 $2,534,000<br />

CON<br />

along IR 275<br />

(state funds) (state funds)<br />

$0<br />

Replace superstruture HAM-74-<br />

80098 IR 74-7.76 0776L&R--Project awarded CON $6,407,444 $6,407,444 $0<br />

11/24/10, additional funding<br />

81798 Cheviot Signals<br />

Install mast arm signals at 4<br />

intersections and replace<br />

controllers, cabinets and wiring-- CE $1,220 $1,220 $0<br />

Project awarded 7/1/09, additional<br />

funding<br />

81899 SR 125-5.20<br />

Construct a partial continuous flow<br />

intersection at SR 125 and Five ROW $275,200 $275,200 $0<br />

Mile Road<br />

82278 IR 75-5.58<br />

Reconstruction <strong>of</strong> Mitchell Avenue<br />

interchange, Phase 1 <strong>of</strong> IR 75 CON $50,752,000 $37,335,567 $13,416,433<br />

widening<br />

82283 IR 75-7.72<br />

Replace RR bridge no. HAM-75-<br />

0722, SFN: 3109992, Phase 6 <strong>of</strong> IR<br />

75 widening<br />

ROW $900,000 $4,954,545 $0<br />

82284 IR 74-18.00<br />

Improve Colerain/Beekman<br />

interchange with associated work<br />

on IR 74, Phase 3 <strong>of</strong> IR 75 widening<br />

ROW $440,000 $1,740,201 $0<br />

3


FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />

OHIO HIGHWAY, PLANNING AND RELATED TRANSPORTATION PROJECTS<br />

Hamilton County (continued)<br />

PID Facility Section Project Description Phase<br />

Federal Funds<br />

Programmed<br />

Federal Funds<br />

Authorized<br />

Remaining<br />

Funds<br />

82286 IR 75-6.78<br />

Reconstruct IR 75 from north <strong>of</strong><br />

Mitchell interchange through SR<br />

562 interchange, Phase 7 <strong>of</strong> IR 75<br />

ROW $907,300 $814,400 $92,900<br />

widening<br />

82288 IR 75-12.60<br />

Reconstruct the interstate between<br />

Shepherd Lane and Glendale- ROW $7,407,000 $9,984,982 $0<br />

Milford Rd<br />

83077 IR 71-15.78<br />

Add an auxiliary lane NB on IR 71<br />

from Pfeiffer Road to IR 275<br />

PE $608,000 $265,862 $342,138<br />

83469 CR 239-9.49<br />

Widening and resurfacing South<br />

Gilmore Rd. from I-275 to north <strong>of</strong><br />

Kolb Drive--Project awarded 9/1/11,<br />

CON $12,650,000 $3,121,500 $9,528,500<br />

authorized in FY <strong>2011</strong><br />

83518 SR 264/SR 747<br />

Resurace portions <strong>of</strong> SR 264 and<br />

SR 747--Project awarded 7/7/11, CON $2,362,800 $2,515,920 $0<br />

authorized in FY <strong>2011</strong><br />

83637 Lockland Signals<br />

Upgrade and interconnect 7<br />

signalized intersections--Project CON $465,000 $273,004 $191,996<br />

awarded 11/10/10<br />

Steel beam bridge painting over<br />

$125,000<br />

83925 Sharon Road<br />

Sharon Road and the NS Railroad--<br />

($682,463<br />

CON $146,537<br />

Project awarded 6/3/10, additional<br />

authorized in FY<br />

$21,537<br />

funding<br />

2010)<br />

84437 US 27-14.15<br />

Extend the SB right turn lane on US<br />

27 to westbound on ramp to IR 275<br />

PE $23,000 $23,000 $0<br />

84444 SR 562-0004L<br />

Rehabilitate Bridge HAM-562-0.04L<br />

by replacing the concrete deck and<br />

including other related rehabilitation<br />

CON $1,034,550 $646,425 $388,125<br />

work--Project awarded 9/1/11,<br />

authorized in FY <strong>2011</strong><br />

84603 US 27-15.78<br />

Rehabilitate bridges HAM-27-<br />

15.86L&R over Bank Road and<br />

HAM-27-18.49L&R over Great<br />

PE $139,078 $139,078 $0<br />

Miami River<br />

86247 CTCS Various<br />

Replacement and expansion <strong>of</strong> the<br />

existing computerized traffic control<br />

system interconnect cabling--<br />

CE $21,570 $21,570 $0<br />

Project awarded 4/14/10, additional<br />

86370<br />

Construct Phase II <strong>of</strong> the Intermodal<br />

Banks Bid Package<br />

and Transit Center project--Project<br />

#11<br />

awarded 5/19/10, additional funds<br />

CON $6,320,601 $612,956 $5,707,645<br />

Eliminate slip ramps for right turn<br />

86798 IR 75-15.34<br />

lanes at both exit ramps from IR 75<br />

to Sharon Road--Project awarded<br />

CON $481,500 $512,820 $0<br />

9/1/11, authorized FY <strong>2011</strong><br />

86799 IR 71-0.00 Install pavement markings CON $248,000 $72,840 $175,160<br />

86801 IR 71-19.74<br />

Improve signal timing & operations<br />

by upgrading signals at IR 71 and<br />

Fields Ertel/Mason Montgomery --<br />

CON $1,216,000 $1,254,247 $0<br />

Project awarded 6/24/11<br />

ITS and signal system upgrade in<br />

87071 Springdale Signals the City <strong>of</strong> Springdale--Project<br />

awarded 4/28/11<br />

87149 IR 75-2.52<br />

Rehabilitate the state maintained<br />

portion <strong>of</strong> the Western Hills Viaduct<br />

over IR 75<br />

CON $796,660 $588,568 $208,092<br />

CON $148,500<br />

$24,359<br />

($239,000<br />

authorized in FY<br />

2010)<br />

$124,141<br />

4


FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />

OHIO HIGHWAY, PLANNING AND RELATED TRANSPORTATION PROJECTS<br />

Hamilton County (continued)<br />

PID Facility Section Project Description Phase<br />

Federal Funds<br />

Programmed<br />

Federal Funds<br />

Authorized<br />

Remaining<br />

Funds<br />

87763 SR 125-5.41<br />

88129 IR 75-11.09<br />

88234<br />

IR 74/75 Building<br />

Demolition<br />

Access management and minor traffic<br />

control improvements from 5 Mile<br />

Road in Anderson Township to 9 Mile<br />

Road in Clermont County<br />

Replace railroad bridge prior to<br />

widening on SB IR 75 in the split<br />

Building demolition for interstate 74<br />

& 75 reconstruction--Project<br />

awarded 9/22/10, authorized FY<br />

PE $103,500 $222,843 $0<br />

PE $408,000 $408,000 $0<br />

CON $1,276,000 $870,320 $405,680<br />

<strong>2011</strong><br />

Retr<strong>of</strong>it all existing traffic signal<br />

88794 Mt. Healthy Signals heads at 14 signalized locations in CON $78,492 $61,392 $17,100<br />

Mt Healthy--Awarded 5/26/11<br />

Install traffic signal and restripe for<br />

89060 US 27-6.54 left turn lane on US 27 at Blue Rock CON $183,546 $125,577 $57,969<br />

Road<br />

Repower two Central Railroad<br />

89191<br />

CIND RR Company <strong>of</strong> Indiana Railroad<br />

Locomotive locomotives with GenSet diesel<br />

CON $2,624,526 $2,624,526 $0<br />

engines--Project awarded 4/22/11<br />

Install automatic flashing light<br />

89373 Norwood Avenue signals and roadway gates at I&O CON $193,000 $193,000 $0<br />

crossing on Norwood Avenue<br />

Install automatic flashing light<br />

89375 Linden Street<br />

signals and roadway gates at<br />

Norfolk Southern crossing on<br />

CON $279,348 $279,348 $0<br />

Linden Street in Elmwood Place<br />

Widen Westbourne Dr for dual LT<br />

89905 SR 264-8.49 lanes to NB SR 264 and widen SB PE $114,063 $171,900 $0<br />

SR 264 for RT lane at Westbourne<br />

91129 US 52-37.88 Emergency Culvert Reconstruction CON $762,100 $762,100 $0<br />

Facilities for Pedestrians and Bicycles in Hamilton County:<br />

83769<br />

Construct a sidewalk on one side<br />

Asbury Road<br />

<strong>of</strong> Asbury Road--Project awarded<br />

Sidewalks<br />

8/18/11, authorized in FY <strong>2011</strong><br />

84853 IR 71-5.71<br />

Rehabilitation <strong>of</strong> pedestrian bridge<br />

over IR 71<br />

Wooster Pike Streetscape including<br />

86076 US 50-34.49<br />

gateway signage, landscaped<br />

median, lighting and crosswalks--<br />

Awarded 4/14/11<br />

89452<br />

Cincinnati Public SRTS Educational and<br />

Schools Encouragement Programs<br />

90907 Mariemont SRTS<br />

SRTS Educational and<br />

Encouragement Programs<br />

91528<br />

Cincinnati Public SRTS Educational and<br />

Schools Encouragement Programs<br />

CON $536,000 $589,000 $0<br />

CON $1,253,000 $1,259,280 $0<br />

CON $712,818 $651,132 $61,686<br />

PLNG $24,000 $24,000 $0<br />

PLNG $9,000 $9,000 $0<br />

PLNG $44,800 $44,800 $0<br />

5


Warren County<br />

FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />

PID Facility Section Project Description Phase<br />

81986 Bethany Road<br />

82957 Culverts FY 12<br />

84465 SR 123-0.06<br />

89376 TR 173 Eltzroth Rd<br />

Widen roadway to 3 lanes with right<strong>of</strong>-way<br />

for 5 lanes between Butler-<br />

Warren Road and the Mason<br />

Corporate line<br />

Line, rehabilitate and/or replace<br />

various culverts on US 22 and SR<br />

123<br />

Resurface and perform pavement<br />

repairs from SR 28 to US 22--<br />

Project awarded 1/20/11<br />

Install automatic flashing light<br />

signals and roadway gates at<br />

Indiana & Ohio crossing<br />

Federal Funds<br />

Programmed<br />

Federal Funds<br />

Authorized<br />

Remaining<br />

Funds<br />

CON $3,934,000 $3,934,000 $0<br />

CON $461,120 $440,000 $21,120<br />

CON $1,589,600<br />

$34,304<br />

($1,807,000<br />

authorized in<br />

FY 2010)<br />

CON $193,000 $193,000 $0<br />

$0<br />

Facilities for Pedestrians and Bicycles in Warren County:<br />

Addition <strong>of</strong> turn lanes, bike lane and<br />

79850 US 42-0.00 sidewalks from Butler-Warren Road<br />

to Tylersville Road<br />

Construct a streetscape by adding<br />

83146<br />

sidewalks and landscaping on<br />

Lebanon<br />

Broadway (US 48) from Main to<br />

Streetscape<br />

Silver Street--Project awarded<br />

12/23/08, additional funding<br />

CON $4,987,200 $4,669,549 $317,651<br />

CON $60,000 $60,000 $0<br />

District-wide (ODOT - District 8)<br />

PID Facility Section Project Description Phase<br />

87949<br />

88862<br />

D08 Signal<br />

Backplate<br />

D08 Bridge<br />

Inspections<br />

FY <strong>2011</strong>-2012<br />

Ohio Planning Projects<br />

Federal Funds<br />

Programmed<br />

Federal Funds<br />

Authorized<br />

Remaining<br />

Funds<br />

District 8 rigid overlays CON $500,000 $443,081 $56,919<br />

District 8 consultant bridge<br />

inspection contract <strong>of</strong> various truss<br />

bridges in the District for calendar<br />

<strong>year</strong> <strong>2011</strong> and 2012<br />

PE $240,000 $240,000 $0<br />

88173<br />

Transit On-Board<br />

Survey<br />

Conduct surveys <strong>of</strong> transit users on<br />

SORTA, TANK and CTC PLNG $202,515 $202,515 $0<br />

Pilot program to assist carpools with<br />

88453 Banks Pilot Program 2 or more persons parking at the PLNG $500,000 $500,000 $0<br />

Banks Intermodal Facility<br />

90498 Regional Planning FY 2012 Land Use Planning PLNG $286,440 $286,440 $0<br />

90501 Air Quality Planning FY 2012 Air Quality Program PLNG $330,000 $330,000 $0<br />

90503 Rideshare FY 2012 Rideshare Program PLNG $191,790 $191,790 $0<br />

90532 Regional Planning FY 2012 Fiscal Impact Anal. Model PLNG $83,629 $83,629 $0<br />

6


Fiscal Year <strong>2011</strong> Obligated Highway Projects<br />

Boone, Campbell & Kenton Counties, KY<br />

6-220.00<br />

2010 RTP-2<br />

6-2019.00<br />

!<br />

6-2022.00<br />

6-2021.00<br />

6-193.00<br />

6-219.06<br />

6-219.06<br />

6-2027.00<br />

!<br />

6-2020.00<br />

6-193.01<br />

6-364.00<br />

!<br />

!<br />

!<br />

6-195.09<br />

6-363.00<br />

6-71.01<br />

§¨¦ 275 ¾¡ 27<br />

6-405.00<br />

6-2800.20<br />

6-344.21<br />

6-2026.00<br />

6-224.00<br />

! 6-352.01<br />

6-2032.00<br />

6-2033.00<br />

!<br />

¾¡ 25<br />

6-219.05<br />

¾¡ 42<br />

§¨¦ 71<br />

6-46.20<br />

q 0<br />

T.M.M. 12-8-<strong>2011</strong><br />

6-2034.00<br />

Miles<br />

0.425 0.85 1.7 2.55 3.4 4.25<br />

T:\GIS\Staff\Paine\TIP\Obligated Projects\<strong>2011</strong>\<strong>2011</strong> Deleted Projects_ NKY.mxd


FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />

KENTUCKY HIGHWAY, PLANNING AND RELATED TRANSPORTATION PROJECTS<br />

Boone County<br />

Project<br />

Facility<br />

Mileposts<br />

(Length) Project Description Phase<br />

Federal Funds<br />

Programmed<br />

Federal Funds<br />

Authorized<br />

Remaining<br />

Federal<br />

Funds<br />

6-14.50 IR 75<br />

175.314 -<br />

180.106<br />

(.10 miles)<br />

6-158.00 KY 536 (3 miles)<br />

6-193.00 South Airfield Road<br />

6-193.01 South Airfield Road<br />

6-405.00 KY 237<br />

6-405.00 KY 237<br />

6-909.00<br />

6-1046.00<br />

6-2032.00 IR 75<br />

6-2032.00 IR 75<br />

7.49 -<br />

9.897<br />

(2.407<br />

miles)<br />

7.49 -<br />

9.897<br />

(2.407<br />

miles)<br />

High Street<br />

(CS 3011)<br />

PE and environmental assessment<br />

for interchange reconstruction<br />

PE, environmental assessment and<br />

DE for development <strong>of</strong> contract<br />

plans for reconstruction <strong>of</strong> roadway<br />

Construct South Airfield Road from<br />

KY 18 NE to KY 1017<br />

Construct South Airfield Road from<br />

KY 18 NE to KY 1017<br />

PE and environmental assessment<br />

for pavement replacement from<br />

Conner Drive to Medical Arts Drive<br />

Grade, drain and surfacing for<br />

pavement and guardrail<br />

rehabilitation<br />

Purchase flourescent yellow<br />

horizontal alignment signs for<br />

installation on various rural roads in<br />

Boone and Kenton counties<br />

High Street (CS 3011) in Walton,<br />

bridge and approaches at NS (CNO<br />

& TP) Railroad, 100' east <strong>of</strong> US 25.<br />

PE, environmental assessment and<br />

169.439 -<br />

design engineering for milling 1.5"<br />

182.813<br />

and resurfacing. Does not include IR<br />

(13.4 miles)<br />

71/75 ramps<br />

169.439 -<br />

Grade, drain and surface to mill and<br />

182.813<br />

resurface<br />

(13.4 miles)<br />

DES $1,500,000 $1,500,000 $0<br />

DES $2,876,396<br />

CON $49,469,520<br />

$200,000<br />

($2,676,396<br />

previously<br />

authorized)<br />

$17,184,760<br />

($32,284,760<br />

previously<br />

authorized)<br />

CON $245,000 $245,000 $0<br />

DES $100,000 $100,000 $0<br />

CON $12,000,000<br />

$6,000,000<br />

($6,000,000<br />

previously<br />

authorized)<br />

CON $60,000 $60,000 $0<br />

UTIL $1,080,000<br />

$340,000<br />

($740,000<br />

previously<br />

authorized)<br />

DES $5,000 $5,000 $0<br />

CON $12,559,938<br />

$4,686,040<br />

($7,873,898<br />

previously<br />

authorized)<br />

$0<br />

$0<br />

$0<br />

$0<br />

$0<br />

6-2033.00 IR 75<br />

6-2033.00 IR 75<br />

169.439 -<br />

176.000<br />

(6.6 miles)<br />

169.439 -<br />

176.000<br />

(6.6 miles)<br />

PE, environmental assessment and<br />

design engineering for milling 1.5"<br />

and resurfacing. Does not include IR<br />

71/75 interchange ramps<br />

Grade, drain and surface to mill and<br />

resurface<br />

DES $5,000 $5,000 $0<br />

CON $5,266,120<br />

$1,766,120<br />

($3,500,000<br />

previously<br />

authorized)<br />

$0<br />

Facilities for Pedestrians and Bicycles in Boone County:<br />

Florence Park Trail<br />

Identification<br />

6-195.09 Florence Sidewalks<br />

Purchase & install 30 trail markers<br />

for the Florence Park Trail System in<br />

Orleans, South Fork and Lincoln<br />

Woods Parks<br />

Construct a sidewalk along<br />

Burlington Pike (KY 18) from<br />

Tanners Lane west over IR 71/75 to<br />

Hopeful Church Road<br />

CON $10,185 $10,185 $0<br />

CON $222,000<br />

$221,900<br />

(restore $100<br />

previously<br />

<strong>obligated</strong> &<br />

released)<br />

$0<br />

6-3019.00<br />

Burlington Sidewalk<br />

Project Phase III<br />

PE for new sidewalks along Idlewild<br />

Road connecting to Boone County<br />

fairgrounds & existing sidewalks on<br />

Conrad Lane and Bullittsville Road<br />

7<br />

DES $34,008 $27,406 $6,602


FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />

KENTUCKY HIGHWAY, PLANNING AND RELATED TRANSPORTATION PROJECTS<br />

Campbell County<br />

Project<br />

Facility<br />

Mileposts<br />

(Length) Project Description Phase<br />

Federal Funds<br />

Programmed<br />

Federal Funds<br />

Authorized<br />

Remaining<br />

Federal<br />

Funds<br />

6-46.20 US 27<br />

6-224.00 KY 8<br />

6-403.00 US 27<br />

6-406.00 KY 1892<br />

6-1076.00 CS 1193<br />

6-1072.00 KY 1996<br />

6-2020.00 IR 275<br />

6-2020.00 IR 275<br />

6-2021.00 IR 471<br />

6-2021.00 IR 471<br />

6-2026.00 IR 275<br />

1.9 - 5.2<br />

(3.3 miles)<br />

Grade, drain and surface to provide<br />

a 4-lane facility from 0.8 miles S <strong>of</strong><br />

KY 154 to 0.3 miles S <strong>of</strong> KY 824<br />

Construct turn lane on KY 8 at KY<br />

1998, east <strong>of</strong> Ft. Thomas<br />

PE and environmental assessment<br />

for constructing underground garage<br />

and multimodal facility<br />

2.152 - PE and environmental assessment<br />

2.50 for sight distance and drainage<br />

(.348 miles) improvements<br />

0.733 -<br />

0.833<br />

(0.10 miles)<br />

.209 -<br />

.309<br />

(0.10 miles)<br />

73.55 -<br />

75.38<br />

(1.8 miles)<br />

73.55 -<br />

75.38<br />

(1.8 miles)<br />

PE, environmental assessment and<br />

design engineering for bridge<br />

replacement<br />

PE, environmental assessment and<br />

design engineering for bridge<br />

replacement<br />

PE, environmental assessment and<br />

design engineering for structural<br />

overlay<br />

Grade, drain and surface for<br />

structural overlay<br />

0 - 4.75 PE, environmental assessment and<br />

(4.75 miles) design engineering for structural<br />

overlay<br />

0 - 5.72<br />

(5.72 miles)<br />

75.386 -<br />

77.023<br />

(1.6 miles)<br />

Pavement reconstruction on IR 471<br />

from MP 0.0 (US 27) to MP 5.72<br />

(Ohio State Line)<br />

Grade, drain and surface for<br />

structural overlay<br />

CON $28,232,143<br />

CON<br />

$1,170,000<br />

(State Bond<br />

funds only)<br />

$612,143<br />

($27,620,000<br />

previously<br />

authorized)<br />

$0<br />

$0 $0<br />

DES $396,000 $396,000 $0<br />

DES $152,000 $152,000 $0<br />

DES $140,000 $140,000 $0<br />

DES $150,000 $150,000 $0<br />

DES $400,000<br />

CON $68,114,564<br />

DES $1,380,000<br />

$0 ($400,000<br />

previously<br />

authorized)<br />

$24,057,282<br />

($44,057,282<br />

previously<br />

authorized)<br />

$380,000<br />

($1,000,000<br />

previously<br />

authorized)<br />

CON $49,000,000 $49,000,000 $0<br />

CON $36,281,423<br />

$14,281,423<br />

($22,000,000<br />

previously<br />

th i d)<br />

$0<br />

$0<br />

$0<br />

$0<br />

Facilities for Pedestrians and Bicycles in Campbell County:<br />

6-3701.00<br />

Newport Riverfront<br />

Commons<br />

Bicycle/Pedestrian<br />

Corridor<br />

PE for multi-use trail, sidewalks and<br />

other improvements along the<br />

corridor at Newport's Riverboat Row<br />

Scenic Byway<br />

DES $41,000 $41,000 $0<br />

8


FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />

KENTUCKY HIGHWAY, PLANNING AND RELATED TRANSPORTATION PROJECTS<br />

Kenton County<br />

Project<br />

Facility<br />

6-71.01 KY 1303 1.48 KM<br />

6-107.00 KY 371<br />

6-219.06<br />

6-220.00 KY 17<br />

6-344.21 KY 16<br />

6-352.01<br />

Mileposts<br />

(Length) Project Description Phase<br />

Grade, drain and surface for<br />

roadway relocation<br />

2.293 - Utility adjustments to extend a right<br />

3.244 (0.17 turn lane on KY 371 to SB IR 75 on<br />

miles) ramp<br />

US 25/<br />

McAlpin/Garvey<br />

24.009 -<br />

24.401<br />

N/S Railroad<br />

Crossing<br />

6-361.00 Turkeyfoot Road<br />

Construct realignment <strong>of</strong> US<br />

25/McAlpin/Garvey intersection (see<br />

pedestrian funding section)<br />

Bridge painting on the Roebling<br />

Suspension Bridge over the Ohio<br />

River at Covington<br />

Reconstruct KY 16 from Hand Pike<br />

to south <strong>of</strong> Old Taylor Mill Road<br />

Install automatic gates at NS RR<br />

crossing on Wright Road just east <strong>of</strong><br />

KY 2043, south <strong>of</strong> Independence<br />

PE, environmental assessment and<br />

DE for extending right turn lane on<br />

NB Turkeyfoot Rd to EB IR 275<br />

ramp<br />

PE, environmental assessment and<br />

6-362.00 IR 275<br />

DE for development <strong>of</strong> contract<br />

82.0 - 82.1<br />

plans for ramp widening to allow<br />

dual left turn lanes<br />

6-363.00 US 25<br />

Construst right turn lane on Dixie<br />

7.10 - 7.15<br />

Highway at Dudley Road<br />

0.571 - PE, environmental assessmane and<br />

6-1075.00 KY 1120 0.671 design engineering for bridge<br />

(0.10 miles) replacement over CSX Railroad<br />

6-2019.00 IR 75<br />

6-2022.00 IR 75<br />

6-2027.00 IR 275<br />

6-2027.00 IR 275<br />

6-2034.00 IR 75<br />

6-2034.00 IR 75<br />

6-2800.20 IR 275<br />

190.75 -<br />

191.22<br />

(0.47 miles)<br />

188.334 -<br />

190.754<br />

(2.4 miles)<br />

80.12 -<br />

82.47<br />

(2.4 miles)<br />

80.12 -<br />

82.47<br />

(2.4 miles)<br />

166.263 -<br />

169.439<br />

(3.2 miles)<br />

166.263 -<br />

169.439<br />

(3.2 miles)<br />

Mill 1/2" thin overlay on IR 75 from<br />

.30 miles north <strong>of</strong> KY 1120 overpass<br />

to .09 miles north <strong>of</strong> EB KY 8<br />

overpass<br />

Repair and grind pavement on IR 75<br />

from .251 miles S <strong>of</strong> KY 1072 to<br />

.301 miles N <strong>of</strong> KY 1120<br />

PE, environmental assessment and<br />

design engineering to repair and<br />

grind pavement<br />

Repair and grind pavement on IR<br />

275 from .55 miles south <strong>of</strong><br />

Horsebranch Road to US 25<br />

PE, environmental assessment and<br />

design engineering for milling 1.5"<br />

and resurfacing<br />

Grade, drain and surface to mill and<br />

resurface<br />

77.20 - Install high tension cable median<br />

81.55 (1.52 barrier from KY 9 interchange to<br />

miles) east <strong>of</strong> KY 1303 interchange<br />

9<br />

Federal Funds<br />

Programmed<br />

CON $7,459,430<br />

UTIL $295,000<br />

CON $1,124,237<br />

CON $13,269,360<br />

CON<br />

$7,800,000<br />

(State Funds Only)<br />

CON $148,547<br />

DES $320,000<br />

DES $240,000<br />

Federal Funds<br />

Authorized<br />

$167,440<br />

($7,291,990<br />

previously<br />

authorized)<br />

$80,000<br />

($215,000<br />

previously<br />

authorized)<br />

$39,237<br />

($1,085,000<br />

previously<br />

authorized)<br />

$50,000<br />

($13,219,360<br />

previously<br />

authorized)<br />

-$46,753<br />

($195,300<br />

previously<br />

authorized)<br />

$70,000<br />

($250,000<br />

previously<br />

authorized)<br />

$90,000<br />

($150,000<br />

previously<br />

authorized)<br />

Remaining<br />

Federal<br />

Funds<br />

$0<br />

$0<br />

$0<br />

$0<br />

$0 $0<br />

CON $150,600 $150,600 $0<br />

DES $170,000 $170,000 $0<br />

$785,797<br />

($1,365,000<br />

CON $2,150,797<br />

previously<br />

authorized)<br />

$3,106,849<br />

($8,380,000<br />

CON $11,486,849<br />

previously<br />

authorized)<br />

modify agreement<br />

to remove<br />

DES $250,000 $250,000 advance<br />

construction and<br />

obligate $250,000<br />

$1,798,766<br />

($5,290,000<br />

CON $7,088,766<br />

previously<br />

authorized)<br />

DES $5,000 $5,000 $0<br />

$726,426<br />

($800,000<br />

CON $1,526,426<br />

previously<br />

authorized)<br />

$0 ($671,652<br />

previously<br />

authorized)--<br />

CON $671,652<br />

agreement<br />

modified to correct<br />

entries<br />

$0<br />

$0<br />

$0<br />

$0<br />

$0<br />

$0<br />

$0<br />

$0<br />

$0


FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />

KENTUCKY HIGHWAY, PLANNING AND RELATED TRANSPORTATION PROJECTS<br />

Kenton County (continued)<br />

Project<br />

Facility<br />

Mileposts<br />

(Length) Project Description Phase<br />

Federal Funds<br />

Programmed<br />

Federal Funds<br />

Authorized<br />

Remaining<br />

Funds<br />

6-3703.00 KY 8<br />

PE and environmental to construct an<br />

additional lane on KY 8 (4th Street)<br />

west from Philadelphia to Crescent<br />

Street in Covington<br />

DES $150,000 $150,000 $0<br />

Facilities for Pedestrians and Bicycles in Kenton County:<br />

2010RTP-2<br />

Licking River<br />

Greenway, Phase 1<br />

Construct 3,756' <strong>of</strong> trail, trailhead<br />

and trailside facilities for the Licking<br />

River Greenway in Covington<br />

CON $80,000 $80,000 $0<br />

6-219.05<br />

Miles Elementary<br />

School Sidewalks<br />

Construct sidewalks along Dixie<br />

Highway and Sunset Avenue around<br />

Miles Elementary School<br />

CON $9,800<br />

Restore $9,600<br />

previously<br />

<strong>obligated</strong> and<br />

released<br />

$0<br />

6-219.06<br />

Dixie Highway<br />

Sidewalks<br />

Construct sidewalks along Dixie<br />

Highway from Dudley Road to Town<br />

Center Blvd in Crestview Hills (see<br />

highway portion <strong>of</strong> project)<br />

CON $342,000<br />

$341,900 ($100<br />

previously<br />

authorized)<br />

$0<br />

District-wide (KYTC - District 6)<br />

Project Facility Section Project Description Phase<br />

Federal Funds<br />

Programmed<br />

Federal Funds<br />

Authorized<br />

Remaining<br />

Funds<br />

6-388.01 Various bridges<br />

Fracture critical inspection <strong>of</strong> Ohio<br />

River bridges in Ballard, McCracken,<br />

Union, Henderson, Daviess,<br />

Jefferson, Trimble, Boone,<br />

Campbell, Kenton, Mason, Greenup<br />

and Boyd counties<br />

BR $1,655,000 $1,655,000 $0<br />

Kentucky Planning Projects<br />

Northern Kentucky<br />

(Cincinnati)<br />

MPO Unified Planning Work<br />

Program, FY 2012 Plng $380,960 $380,960 $0<br />

6-400.07<br />

6-401.07<br />

6-966.00<br />

6-966.00<br />

Northern Kentucky<br />

Rideshare Program<br />

Northern KY<br />

Regional Planning--<br />

Land Use<br />

Northern KY<br />

Regional Planning--<br />

Fiscal Impact Model<br />

Northern KY<br />

Regional Planning--<br />

Air Quality<br />

Program to promote alternative<br />

transportation: carpooling,<br />

vanpooling and public transportation Plng $35,500 $35,500 $0<br />

Land Use Planning Plng $53,020 $53,020 $0<br />

Fiscal Impact Model Plng $15,480 $15,480 $0<br />

Air Quality Planning Plng $41,000 $41,000 $0<br />

10


Fiscal Year <strong>2011</strong> Obligated Highway Projects<br />

Dearborn County, IN<br />

ST 48<br />

ST 350 ST 46<br />

§¨¦ 74 ST 1<br />

§¨¦ 275<br />

!<br />

ST 262 ST 56<br />

ST 62 ST 148<br />

¾¡ 52 ¾¡ 52<br />

!<br />

¾¡ 50<br />

0401194<br />

0710986<br />

1005490<br />

0600727<br />

q 0<br />

T.M.M. 12-09-<strong>2011</strong><br />

Miles<br />

0.175 0.35 0.7 1.05 1.4 1.75<br />

T:\GIS\Staff\Paine\TIP\Obligated Projects\<strong>2011</strong>\<strong>2011</strong> Deleted Projects_ Dearborn.mxd


FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />

INDIANA HIGHWAY, PLANNING AND RELATED TRANSPORTATION PROJECTS<br />

Dearborn County<br />

Des # Facility Project Description Phase<br />

Federal Funds<br />

Programmed<br />

Federal Funds<br />

Authorized<br />

Remaining<br />

Federal<br />

Funds<br />

0400285 US 50<br />

0401194 IN 1006<br />

0500985 US 50<br />

0501247 IR 74<br />

0501248 IR 74<br />

0600727 US 50<br />

0600727 US 50<br />

0800426 IR 275<br />

0900144 SR 148<br />

0902173 US 50<br />

Bridge rehabilitation or repair on<br />

bridge over Tanners Creek and<br />

service road, 0.08 miles E <strong>of</strong> SR 48.<br />

Bridge rehabilitation or repair on<br />

George Street Bridge in the City <strong>of</strong><br />

Aurora.<br />

Resurfacing from SR 56/SR 350 to<br />

SR 1 in the City <strong>of</strong> Aurora.<br />

HMA overlay on IR 74 from SR 101<br />

to SR 1.<br />

HMA overlay on IR 74 from SR 1 to<br />

the Ohio State Line.<br />

Intersection improvement and<br />

horizontal sight correction at US 50<br />

and Doughty Road<br />

Intersection improvement and<br />

horizontal sight correction at US 50<br />

and Doughty Road.<br />

Interchange modification on the<br />

ramp from US 50 to IR 275.<br />

HMA overlay and preventive<br />

maintenance from SR 48 to Maple<br />

Street.<br />

District intersection improvement at<br />

Doughty Road<br />

Traffic signal project on the Doughty<br />

Road Connector<br />

PE $46,754 $46,754 $0<br />

CON $904,135 $706,552 $197,583<br />

CON<br />

CON<br />

CON<br />

$2,500,000<br />

(authorized in prior<br />

<strong>fiscal</strong> <strong>year</strong>)<br />

$4,200,000<br />

(authorized in prior<br />

<strong>fiscal</strong> <strong>year</strong>)<br />

$3,600,000<br />

(authorized in prior<br />

<strong>fiscal</strong> <strong>year</strong>)<br />

-$303,974 $0<br />

$591,840 $0<br />

$23,850 $0<br />

ROW $160,000 -$289,096 $0<br />

CON $389,000 $539,623 $0<br />

CON<br />

CON<br />

$459,512<br />

(authorized in prior<br />

<strong>fiscal</strong> <strong>year</strong>)<br />

$736,000<br />

(authorized in prior<br />

<strong>fiscal</strong> <strong>year</strong>)<br />

-$67,949 $0<br />

-$30,492 $0<br />

ROW $106,400 $106,400 $0<br />

1005490 Doughty Road<br />

CON $16,417 $22,341 $0<br />

1006021 US 50 ARTIMIS expansion PE $50,000 $39,860 $10,140<br />

1006586 State Line Road<br />

Advanced warning flashers at Bright<br />

Elementary School<br />

PE $1,620 $1,805 $0<br />

1006587 North Dearborn Rd<br />

Advanced warning flashers at North<br />

Dearborn Elementary School<br />

PE $1,620 $1,805 $0<br />

Advanced warning flashers at<br />

1006590 Old State Route 1 Sunman Dearborn Intermediate PE $810 $903 $0<br />

School<br />

Facilities for Pedestrians and Bicycles in Dearborn County:<br />

0710986 Lesko Park Trail<br />

Bicycle/pedestrian trail project, part<br />

<strong>of</strong> the linear greenway system from<br />

the Ohio State Line to Rising Sun<br />

PE<br />

$120,000 (PE<br />

phase authorized<br />

in prior <strong>fiscal</strong> <strong>year</strong>)<br />

-$120,000 $0<br />

0710986 Lesko Park Trail<br />

Bicycle/pedestrian trail project, part<br />

<strong>of</strong> the linear greenway system from<br />

the Ohio State Line to Rising Sun<br />

CON $790,000 $955,058 $0<br />

11


FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />

TRANSIT PROJECTS<br />

ALI CODE<br />

ALI Description<br />

Total Eligible<br />

Project<br />

Total FTA ALI<br />

Amount<br />

Non-Federal<br />

Share<br />

Butler County Regional Transit Authority<br />

11.42.20 Acquire miscellaneous support equipment $250,000 $200,000 $50,000<br />

30.09.01 Operating assistance up to 50% federal share $466,000 $233,000 $233,000<br />

11.12.04 Buy replacement vehicles


TRANSIT PROJECTS<br />

FISCAL YEAR <strong>2011</strong> LISTING OF OBLIGATED PROJECTS IN THE <strong>OKI</strong> REGION<br />

ALI CODE<br />

ALI Description<br />

Total Eligible<br />

Project<br />

Total FTA ALI<br />

Amount<br />

Non-Federal<br />

Share<br />

TANK<br />

44.23.01 Planning Projects $156,250 $125,000 $31,250<br />

11.7A.00 Preventive Maintenance $713,398 $570,718 $142,680<br />

11.12.01 40' diesel buses $4,345,050 $3,476,040 $869,010<br />

11.12.04