21.03.2015 Views

water storage tank - Balmoral Group

water storage tank - Balmoral Group

water storage tank - Balmoral Group

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Pipe connections and fittings<br />

All pipe connections are made at <strong>Balmoral</strong> Tanks’ factory before<br />

dispatch and customers are asked to provide full details when<br />

ordering. The type of pipe connection should be specified together<br />

with the relevant standard to which the coupling flanges are drilled<br />

or the pipes screwed. To assist delivery, the size and position of<br />

each connection should also be specified at the time of ordering.<br />

Ball and gate valves and all pipework, including bends and flanges,<br />

can be supplied if specified at the time of ordering.<br />

Connections can be supplied as flanged stools to BS4504, ASA or<br />

DIN standards, or, for small pipework, screwed sockets to BS1387.<br />

The connections are shop-welded to the plates in positions agreed<br />

at the time of order.<br />

Pipework configuration<br />

The inlet or delivery pipe can enter the <strong>tank</strong> through either the side<br />

wall at the top of the <strong>tank</strong> or through the <strong>tank</strong> base. Flow can be<br />

controlled through a ball valve, equilibrium float valve or automatic<br />

float switch.<br />

The outlet or service pipe should be taken through the base of the<br />

<strong>tank</strong> and fitted with an internal bellmouth pipe or rose strainer to<br />

prevent suspended matter entering the <strong>water</strong> supply.<br />

The overflow should always be fitted to give at least 75mm of<br />

freeboard below the top of the <strong>tank</strong> in accordance with the UK<br />

Water Byelaws, or other regulations, to give the required air gap.<br />

The washout pipe opening should be fitted flush with the bottom of<br />

the <strong>tank</strong> and a sluice valve fitted immediately below the <strong>tank</strong> base.<br />

Optional extras<br />

¢ Ball-valve housing used to raise <strong>water</strong> level to maximise <strong>storage</strong><br />

¢ Screened overflows and warning pipes to Water Regulation 16<br />

(UK Byelaw 30)<br />

¢ Internal and external mild steel ladders complete<br />

with safety hoops and rails<br />

¢ Walkways with railings<br />

¢ Indicator gear or contents gauges<br />

¢ Air gaps to latest WRAS guidelines<br />

14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!