29.03.2015 Views

Medallion-Lok Installation Manual - McElroy Metal

Medallion-Lok Installation Manual - McElroy Metal

Medallion-Lok Installation Manual - McElroy Metal

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MEDALLION-LOK<br />

HIGH SIDE EAVE WITHOUT WALL PANEL<br />

Butyl Tube Sealant<br />

Hi-Side Trim<br />

5 1/4”<br />

4 5/8” Max.<br />

On Pitch<br />

43D Pop Rivet<br />

at 0’ - 6” O.C.<br />

Zee Closure (Field Cut) w/1” Roll<br />

Tape Sealant Top and Bottom<br />

<strong>Medallion</strong>-<strong>Lok</strong> Clip<br />

<strong>Medallion</strong>-<strong>Lok</strong> Panel<br />

30# Felt Paper<br />

(Recommended)<br />

Perimeter Cleat<br />

Substructure<br />

Substructure<br />

Hex Head Fastener<br />

#9 - 15 x 1” Type A Woodgrip<br />

(2 Required per Panel)<br />

Pancake Head Fastener<br />

#10 - 12 x 1” Type A<br />

at 1’ - 0” O.C.<br />

<strong>Medallion</strong>-<strong>Lok</strong> Panel<br />

Zee Closure (Field Cut) w/1” Roll<br />

Tape Sealant Top and Bottom<br />

<strong>Medallion</strong>-<strong>Lok</strong> Clip<br />

Hi-Side Trim<br />

<strong>Medallion</strong>-<strong>Lok</strong> Panel<br />

Min. #30<br />

Felt Paper<br />

(Recommended)<br />

Perimeter Cleat<br />

Substructure<br />

NOTES:<br />

1. Place a continuous run of 1” tape sealant between the panel legs.<br />

2. Field cut and attach zee closure with two (2) #9 - 15 x 1” fasteners through<br />

closure, sealant, panel and into substructure.<br />

3. Apply tube sealant to zee closure and panel ribs.<br />

4. Attach sidewall perimeter zee.<br />

5. Slide hi-side trim over perimeter zee, before attaching to zee closure.<br />

Place a run of 1” tape over zee closure.<br />

6. Attach hi-side trim to zee closure with 43D pop rivets on 0'-6'' centers.<br />

13<br />

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!