Medallion-Lok Installation Manual - McElroy Metal
Medallion-Lok Installation Manual - McElroy Metal
Medallion-Lok Installation Manual - McElroy Metal
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
MEDALLION-LOK<br />
HIGH SIDE EAVE WITHOUT WALL PANEL<br />
Butyl Tube Sealant<br />
Hi-Side Trim<br />
5 1/4”<br />
4 5/8” Max.<br />
On Pitch<br />
43D Pop Rivet<br />
at 0’ - 6” O.C.<br />
Zee Closure (Field Cut) w/1” Roll<br />
Tape Sealant Top and Bottom<br />
<strong>Medallion</strong>-<strong>Lok</strong> Clip<br />
<strong>Medallion</strong>-<strong>Lok</strong> Panel<br />
30# Felt Paper<br />
(Recommended)<br />
Perimeter Cleat<br />
Substructure<br />
Substructure<br />
Hex Head Fastener<br />
#9 - 15 x 1” Type A Woodgrip<br />
(2 Required per Panel)<br />
Pancake Head Fastener<br />
#10 - 12 x 1” Type A<br />
at 1’ - 0” O.C.<br />
<strong>Medallion</strong>-<strong>Lok</strong> Panel<br />
Zee Closure (Field Cut) w/1” Roll<br />
Tape Sealant Top and Bottom<br />
<strong>Medallion</strong>-<strong>Lok</strong> Clip<br />
Hi-Side Trim<br />
<strong>Medallion</strong>-<strong>Lok</strong> Panel<br />
Min. #30<br />
Felt Paper<br />
(Recommended)<br />
Perimeter Cleat<br />
Substructure<br />
NOTES:<br />
1. Place a continuous run of 1” tape sealant between the panel legs.<br />
2. Field cut and attach zee closure with two (2) #9 - 15 x 1” fasteners through<br />
closure, sealant, panel and into substructure.<br />
3. Apply tube sealant to zee closure and panel ribs.<br />
4. Attach sidewall perimeter zee.<br />
5. Slide hi-side trim over perimeter zee, before attaching to zee closure.<br />
Place a run of 1” tape over zee closure.<br />
6. Attach hi-side trim to zee closure with 43D pop rivets on 0'-6'' centers.<br />
13<br />
▲