29.03.2015 Views

Medallion-Lok Installation Manual - McElroy Metal

Medallion-Lok Installation Manual - McElroy Metal

Medallion-Lok Installation Manual - McElroy Metal

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MEDALLION-LOK<br />

VALLEY<br />

<strong>Medallion</strong>-<strong>Lok</strong> Clip<br />

<strong>Medallion</strong>-<strong>Lok</strong> Panel<br />

1” Roll Tape<br />

Sealant<br />

Fill Cavity w/Urethane<br />

Sealant at End<br />

Valley Trim<br />

Substructure<br />

Offset Cleat<br />

4” Typical<br />

Min. #30 Felt Paper<br />

(Recommended)<br />

Pancake Head Fastener<br />

#10 - 12 x 1” Type A<br />

at 1’ - 0” O.C.<br />

(Must Penetrate Tape Sealant)<br />

Pancake Head Fastener<br />

#10 - 12 x 1” Type A<br />

Pancake Head Fastener<br />

#10 - 12 x 1” Type A<br />

at 1’ - 0” O.C.<br />

(Must Penetrate Tape Sealant)<br />

<strong>Medallion</strong>-<strong>Lok</strong> Panel<br />

Valley Trim<br />

<strong>Medallion</strong>-<strong>Lok</strong> Clip<br />

Min. #30 Felt Paper<br />

(Recommended)<br />

1” Roll Tape Sealant<br />

Min. #30 Felt Paper<br />

(Recommended)<br />

Offset Cleat<br />

Substructure<br />

NOTES:<br />

1. Locate valley trim over substructure.<br />

2. Apply a continuous run of 1” roll tape sealant over valley trim and under offset cleat.<br />

3. Locate offset cleat approximately 4” from center of valley trim and fasten through cleat,<br />

sealant, valley trim and into substructure.<br />

4. Locate a clip 6” from end of panel.<br />

5. Field cut 1 1/2” off leg of panel and hem panel. Allow clearance for thermal movement.<br />

15<br />

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!