3/1/2012<br />

Threat<br />

1. Electricity theft & vandalism of<br />

infrastructure<br />

2. Sufficiency of Generation Capacity<br />

(delays due to protracted negotiations<br />

and lack of guarantees).<br />

3. Vagaries of weather including drought<br />

and floods.<br />

4. Affordability of power (new<br />

connections, tariffs, fuel costs)<br />

5. Right of Way for power infrastructure<br />

(levies, encroach<strong>me</strong>nt, etc.)<br />

MAJOR SUB-SECTORAL SECTORAL CHALLENGES<br />

Mitigation<br />

• Dry type transfor<strong>me</strong>rs, intruder alarms,<br />

relocation of transfor<strong>me</strong>rs, etc .<br />

• Community policing, public education<br />

• Lobbying for stiff penalties for infrastructure<br />

vandals<br />

• E<strong>me</strong>rgency generation<br />

• Raising reserve margin<br />

• Fast tracking so<strong>me</strong> projects<br />

• Projects under Feed In Tariffs policy<br />

• Diversify generation sources<br />

• Regional Interconnection<br />

• Least Cost Generation Planning<br />

• Promoting green energy sources<br />

• Credit facilities to custo<strong>me</strong>rs for connection<br />

costs<br />

• Public Education<br />

• Engaging local authorities<br />

6. Uncoordinated urban planning. • Engaging local authorities, Govern<strong>me</strong>nt urban<br />

17<br />

planners and other infrastructural developers<br />

FUTURE OUTLOOK<br />

Strategies for <strong>me</strong>eting demand going forward are in place.<br />

Support from develop<strong>me</strong>nt partners for network<br />

infrastructural invest<strong>me</strong>nt program in place – <strong>Kenya</strong> <strong>Power</strong>’s<br />

contribution also in place.<br />

Favorable operating environ<strong>me</strong>nt is expected from a vibrant<br />

economy.<br />

Accelerated economic activity is expected from large scale<br />

expansion of infrastructure.<br />

Revised legislation to imple<strong>me</strong>nt the new constitution will lead<br />

to :<br />

Better streamlining of stakeholder interests in power<br />

supply<br />

Clearer invest<strong>me</strong>nt boundaries for players in the electricity<br />

subsector<br />

18<br />