3/1/2012<br />
Threat<br />
1. Electricity theft & vandalism of<br />
infrastructure<br />
2. Sufficiency of Generation Capacity<br />
(delays due to protracted negotiations<br />
and lack of guarantees).<br />
3. Vagaries of weather including drought<br />
and floods.<br />
4. Affordability of power (new<br />
connections, tariffs, fuel costs)<br />
5. Right of Way for power infrastructure<br />
(levies, encroach<strong>me</strong>nt, etc.)<br />
MAJOR SUB-SECTORAL SECTORAL CHALLENGES<br />
Mitigation<br />
• Dry type transfor<strong>me</strong>rs, intruder alarms,<br />
relocation of transfor<strong>me</strong>rs, etc .<br />
• Community policing, public education<br />
• Lobbying for stiff penalties for infrastructure<br />
vandals<br />
• E<strong>me</strong>rgency generation<br />
• Raising reserve margin<br />
• Fast tracking so<strong>me</strong> projects<br />
• Projects under Feed In Tariffs policy<br />
• Diversify generation sources<br />
• Regional Interconnection<br />
• Least Cost Generation Planning<br />
• Promoting green energy sources<br />
• Credit facilities to custo<strong>me</strong>rs for connection<br />
costs<br />
• Public Education<br />
• Engaging local authorities<br />
6. Uncoordinated urban planning. • Engaging local authorities, Govern<strong>me</strong>nt urban<br />
17<br />
planners and other infrastructural developers<br />
FUTURE OUTLOOK<br />
Strategies for <strong>me</strong>eting demand going forward are in place.<br />
Support from develop<strong>me</strong>nt partners for network<br />
infrastructural invest<strong>me</strong>nt program in place – <strong>Kenya</strong> <strong>Power</strong>’s<br />
contribution also in place.<br />
Favorable operating environ<strong>me</strong>nt is expected from a vibrant<br />
economy.<br />
Accelerated economic activity is expected from large scale<br />
expansion of infrastructure.<br />
Revised legislation to imple<strong>me</strong>nt the new constitution will lead<br />
to :<br />
Better streamlining of stakeholder interests in power<br />
supply<br />
Clearer invest<strong>me</strong>nt boundaries for players in the electricity<br />
subsector<br />
18<br />
THANK YOU<br />
19<br />
5