2025 [CLAY COUNTY]<br />

BF Policy 3.2<br />

BF Objective 4:<br />

BF Policy 4.1:<br />

BF Objective 5:<br />

BF Policy 5.1:<br />

BF Objective 6:<br />

BF Policy 6.1:<br />

BF Policy 6.2:<br />

BF Policy 6.3:<br />

BF Objective 7:<br />

BF Policy 7.1:<br />

Other than Branan Field Road, Blanding Boulevard, the Cleveland<br />

Connector, and parts of CR 209 Ext., no other roads shall exceed 4 lanes.<br />

The county shall minimize, to the extent possible, the right-of-way costs<br />

when constructing new roadway facilities and expanding existing<br />

roadway facilities by taking maximum advantage of rights-of-way<br />

established for other transportation modes and reserved right-of-way<br />

corridors, and by protecting its existing and future rights-of-way from<br />

building encroachment to the fullest extent of the law.<br />

The <strong>County</strong> has identified needed future transportation rights-of-way through<br />

the Adequate Public Facilities Map. These rights-of-way will be acquired by<br />

the <strong>County</strong> at the time of site plan review, or at the time the <strong>County</strong> is<br />

designing the road, or when the landowner voluntarily chooses to donate this<br />

land, whichever comes first.<br />

The <strong>County</strong> will evaluate transportation impacts of development within<br />

the Branan Field District as a unified plan of development.<br />

At the end of each phase, and at the time changes are made to the<br />

development program, and in conjunction with transportation modeling<br />

update to the MPO network, <strong>Clay</strong> <strong>County</strong> will evaluate potential impacts from<br />

development within the Branan Field District and make appropriate changes<br />

to capacity limits or to the Capital Improvements Program as appropriate.<br />

Provide for non-vehicular transportation modes when planning new or<br />

upgraded roadways.<br />

The <strong>County</strong> shall prepare a bicycle corridor long-range plan concurrent with<br />

the development of the Master Plan. All corridors identified shall be included<br />

in the MPO bicycle corridor long-range plan within the Comprehensive<br />

Bikeway Plan for the Jacksonville Urbanized Area.<br />

The <strong>County</strong> will reserve space for a potential trolley corridor in the Branan<br />

Field right-of-way.<br />

The Branan Field land development regulations will include design standards<br />

to implement Transit Oriented Design in Activity Centers, Community<br />

Centers and Neighborhood Centers.<br />

The establishment of an interconnected system of rights-of-way which<br />

provides for the safe, convenient and efficient movement of nonmotorized<br />

traffic, specifically pedestrian and bicycle accommodations,<br />

throughout the county shall be accomplished by requiring pedestrian<br />

facilities on all newly constructed or improved existing minor arterials,<br />

collector roadways and local streets.<br />

All roads within the District, with the exception of the Branan Field Road<br />

limited access road, will have minimum five foot wide sidewalks on both<br />

18 Branan Field Master Plan | Exhibit L

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!