Muller Engineering Company, Inc.<br />

Happy Canyon Creek Major <strong>Drainage</strong>way Plan - DRAFT<br />

Reach 3, located adjacent to I-25, is another severely degraded reach. Though the floodplain width<br />

through this reach has always been limited due to the steep topography, construction of I-25 further<br />

constricted the Happy Canyon Creek floodplain <strong>and</strong> reduced the stream length by eliminating<br />

me<strong>and</strong>ers in the channel. The constricted floodplain combined with increased flow rates from<br />

upstream development <strong>and</strong> from I-25 itself have led to channel instability in this reach, with the<br />

potential to threaten the integrity of I-25. There are numerous instances of slope paving failure, <strong>and</strong><br />

a sheet pile failure where the Oak Ridge tributary crosses below the interstate. Ongoing bank scour<br />

is evident through recent bank collapses. Happy Canyon makes a 90-degree turn to cross under the<br />

I-25 bridge; the channel invert has scoured several feet along the north (outer) side of the bridge<br />

crossing, potentially threatening the bridge abutment.<br />

A second exposed utility is located just upstream of<br />

Birch Avenue in Gr<strong>and</strong>view Estates in an area of<br />

localized channel degradation. The type <strong>and</strong> size of<br />

the utility are unknown. Channel degradation in<br />

this area is also apparent at the pier for the Birch<br />

Avenue bridge; the paint line is 2-3 feet above the<br />

channel invert. This degradation may pose a hazard<br />

to the bridge structure.<br />

<strong>Flood</strong> hazards <strong>and</strong> problem areas are identified in<br />

Figures C-2 through C-4.<br />

4.3 Previous Analyses<br />

Paint line indicates possible degradation below<br />

Birch Avenue bridge<br />

Previous hydraulic analyses along Happy Canyon Creek include the 1977 FHAD, the 1993 OSP, <strong>and</strong><br />

the 2001 analysis <strong>and</strong> preliminary design of channel improvements within Gr<strong>and</strong>view Estates,<br />

completed by HDR.<br />

Failed slope paving along Happy Canyon<br />

Creek below I-25 barrier wall.<br />

Channel scour below I-25 bridge; original<br />

invert to right<br />

Active cattle grazing along Reaches 4 <strong>and</strong> 6 in the City of Lone Tree poses a water quality hazard to<br />

the watershed as a result of cattle manure in the stream bed <strong>and</strong> overbanks. During field<br />

investigations, manure was noticed as far north as E-470, two miles beyond the grazing area. It is<br />

likely that, during large storm events, manure is<br />

washed down Happy Canyon Creek into Cherry<br />

Creek, eventually reaching Cherry Creek Reservoir.<br />

With a single cow producing 12 tons of manure per<br />

year, this is potentially a significant nutrient<br />

source for the Reservoir. In addition to the water<br />

quality impacts, the cattle threaten the health of<br />

the stream by trampling the banks, killing off the<br />

wetl<strong>and</strong> <strong>and</strong> riparian vegetation adjacent to the<br />

channel <strong>and</strong> leaving the banks vulnerable to<br />

Cattle near Happy Canyon Creek in Lone Tree<br />

erosion.<br />

The FHAD identified few flood hazards along Happy Canyon Creek, as most of the watershed was<br />

undeveloped at the time. Crossings at Dogwood Avenue, Birch Avenue, <strong>and</strong> old West Parker Road<br />

(now Lincoln Avenue) within Gr<strong>and</strong>view Estates were undersized at the time; bridges have since<br />

been installed at Birch <strong>and</strong> Lincoln. It appears the Dogwood crossing has also been replaced, though<br />

not with sufficient capacity; the FHAD identifies a triple culvert crossing consisiting of one 36” CMP<br />

<strong>and</strong> two 36”x60” CMP arches while the current crossing is a triple 48” CMP. Existing development at<br />

the time was outside the floodplain limits.<br />

The 1993 OSP identified inadequately sized road crossings at Clydesdale Road, Lincoln Avenue, <strong>and</strong><br />

Dogwood Avenue. As mentioned above, the Lincoln Avenue crossing has since been replaced with a<br />

bridge. West Parker Road was found to be adequately sized based on a 100-year peak of 3800 cfs;<br />

the increased peak of 6200 cfs in this study exceeds the structure capacity. <strong>Flood</strong>plain delineation<br />

was not performed for the 1993 OSP; structure flooding was based on the floodplain limits<br />

established in the 1977 FHAD, which was superimposed on the OSP mapping. According to the text,<br />

structure flooding was limited to barns <strong>and</strong> other outbuildings within Gr<strong>and</strong>view Estates, though<br />

review of the OSP plan drawings shows three homes within the boundary.<br />

The HDR study built upon the findings of the 1993 OSP with regards to flood hazards; additional<br />

problem areas within Gr<strong>and</strong>view Estates were noted including areas of bank instability <strong>and</strong> channel<br />

degradation. Multiple phases of construction were identified <strong>and</strong> prioritized; several of these<br />

August 2013 Page 4-5 Alternative Analysis