Muller Engineering Company, Inc.<br />
Happy Canyon Creek Major <strong>Drainage</strong>way Plan - DRAFT<br />
Alternative A is $22 million, however $14 million of this is due to the increased detention in<br />
RidgeGate <strong>and</strong> is exceedingly conservative for the additional improvements needed.<br />
Costs for each detention alternative including operations <strong>and</strong> maintenance are summarized in Table<br />
5-4.<br />
In each of the three detention alternatives, new or modified facilities are located within 10,000 feet<br />
of runways at Centennial Airport. These include the Airport 320 Pond, the E-470 pond, <strong>and</strong><br />
RidgeGate Pond HC525. Generally, FAA guidelines restrict uses that could attract wildlife within this<br />
zone, including detention ponds that will store water for an extended period of time. UDFCD has<br />
prepared a memor<strong>and</strong>um addressing this matter, which has been included in Appendix A.<br />
Table 5-4<br />
Detention Alternatives Cost Summary<br />
Capital Cost<br />
Contingency<br />
Engineering /<br />
Administration<br />
/ Legal Total Cost<br />
Annual<br />
O&M<br />
Total Cost<br />
Including<br />
Present Worth<br />
of 50 Years<br />
O&M<br />
Alternative A $ 18,348,044 $ 4,587,011 $ 5,504,413 $ 28,439,468 $ 145,000 $ 32,170,275<br />
Alternative B $ 18,681,315 $ 4,670,329 $ 5,604,395 $ 28,956,038 $ 155,000 $ 32,944,142<br />
Alternative C $ 32,512,917 $ 8,128,229 $ 9,753,875 $ 50,395,022 $ 175,000 $ 54,897,720<br />
August 2013 Page 5-9 Alternative Analysis