Notification of Intent NATO Computer Incident Response ... - FSi
Notification of Intent NATO Computer Incident Response ... - FSi
Notification of Intent NATO Computer Incident Response ... - FSi
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
N A T O U N C L A S S I F I E D<br />
NC3A-BE/ACQ/ASG/11/754<br />
31 August 2011<br />
<strong>Notification</strong> <strong>of</strong> <strong>Intent</strong><br />
<strong>NATO</strong> <strong>Computer</strong> <strong>Incident</strong> <strong>Response</strong> Capability—FOC<br />
(NCIRC-FOC)<br />
IFB-CO-13212-NCIRC<br />
€32.4 Million<br />
(estimated cost basic scope)<br />
<strong>NATO</strong> Heads <strong>of</strong> State declared at the Lisbon Summit last November<br />
that <strong>NATO</strong> networks needed greater protection from attack by the end <strong>of</strong> 2012. The <strong>NATO</strong><br />
<strong>Computer</strong> <strong>Incident</strong> <strong>Response</strong> Capability is that part <strong>of</strong> <strong>NATO</strong>’s Information Assurance effort<br />
that provides the capability to respond to computer and network security threats and<br />
vulnerabilities rapidly and effectively.<br />
The purpose <strong>of</strong> this procurement is to provide a central management capability in Mons, Belgium, a<br />
remote connection at <strong>NATO</strong> Headquarters; the provision <strong>of</strong> mobile kits for rapid reaction teams; the<br />
deployment <strong>of</strong> cyber defence sensors at multiple sites; and the development, in spirals, <strong>of</strong> a Cyber<br />
Defence Decision Support System, providing situational awareness, dynamic risk assessment and<br />
management.<br />
The formal invitation for bid is planned to be issued in September 2011 with a bid closing in late<br />
November 2011. Contract award is scheduled for the first quarter <strong>of</strong> 2012.<br />
To: Distribution List<br />
Contracting Officer: Mr Graham Hindle<br />
E-mail: graham.hindle@nc3a.nato.int<br />
Subject: <strong>Notification</strong> <strong>of</strong> <strong>Intent</strong> (NOI) to Invite Bids for International<br />
Competitive Bidding (Amendment No. 1) to provide the <strong>NATO</strong><br />
<strong>Computer</strong> <strong>Incident</strong> <strong>Response</strong> Capability-Full Operational Capability<br />
(NCIRC-FOC)<br />
IFB CO-13212-NCIRC<br />
References:<br />
A. AC/4-D(2011)0009-FINAL-AS1 Non-Article 5 <strong>NATO</strong>-Led Alliance Operations and<br />
Missions Procurement Regulations<br />
B. AC/4-D/2261-ADD1(1996 Edition)(INV)<br />
C. AC/4-D(2008)0002-REV1 and AC/4-D(2009)0002, Best Value Procedures.<br />
D. AC/4-D/26194-REV1<br />
E. AC/4-D/26741-ADD2, AC/4-D/26741-ADD3; BC-D(2011)0053-ADD2<br />
F. AC/4-DS(2011)0012, AC/4-DS(2011)0020 and AC/4-DS(2011)0021<br />
G. Projects 2005/0IS03004, 2010/0IS03001, 2010/0IS03002, 2010/0IS03003 &<br />
2010/0IS03005<br />
H. NC3A-BE/ACQ/ASG/11/453 dated 23 June 2011 (Original NOI)<br />
Boulevard Leopold III, B-1110 Bruxelles, Belgique. Tel. +32 (0)2 7074111 or xxxx (4 digit ext.), Fax + 32(0)2 707 8770, IVSN 232 XXXX (4 digit ext.)<br />
N A T O U N C L A S S I F I E D<br />
Page 1
N A T O U N C L A S S I F I E D<br />
N A T O U N C L A S S I F I E D<br />
NC3A-BE/ASG/11/754<br />
1. In accordance with Reference (A) and further to Reference (H), amended notice is<br />
hereby given <strong>of</strong> the intent <strong>of</strong> the <strong>NATO</strong> C3 Agency, as the Host Nation, to issue an<br />
Invitation for Bid (AOM ICB) in relation to the provision <strong>of</strong> a <strong>NATO</strong> <strong>Computer</strong><br />
<strong>Incident</strong> <strong>Response</strong> Capability-Full Operational Capability (NCIRC-FOC).<br />
2. A summary <strong>of</strong> the requirements for this Invitation for Bid (IFB) is set forth in Annex A<br />
attached hereto.<br />
3. The reference for the Invitation for Bid is IFB CO-13212-NCIRC, and all<br />
correspondence concerning this IFB should reference this number.<br />
4. The scope <strong>of</strong> work for this project has been authorised as recommended by reference E.<br />
The basic scope <strong>of</strong> the intended contract covers the Capital Investment (NSIP) services<br />
and deliverables and life-cycle support cost over the five-year period. The ICB will<br />
include a requirement for a designated S<strong>of</strong>tware <strong>Incident</strong> Event Management (SIEM)<br />
system due to the fact that the current SIEM underpins the NCIRC Operations and other<br />
projects (e.g. Afghan Mission Network (AMN)).<br />
5. NC3A was authorised to use the Alliance Operations and Missions (AOM) International<br />
Competitive Bidding (ICB) Procedure, Best Value Procedures. The successful bid<br />
pursuant to this IFB will be that bid which is the best value for money <strong>of</strong>fered in<br />
accordance with the top-level bid evaluation criteria being: Price (40%) and Technical<br />
(60%). and the second-level technical sub-criteria <strong>of</strong>: Engineering (40%),Security (5%),<br />
Delivery (20%), Supportability (20%) and Management (15%).<br />
6. The cahier des charges (ICB) will include a “not-to exceed” cost clause for the capital<br />
investment cost in the amount <strong>of</strong> EUR 32,421,357, equivalent to 125% <strong>of</strong> the<br />
unadjusted amount authorised as financial scope, on the understanding that bids will not<br />
be declared non-compliant if the total (investment cost and support cost over the fiveyear<br />
period) bid cost is below the average total bid cost and its raw Supportability Score<br />
is above the average raw Supportability Score.<br />
7. Eligibility and Exclusion Provisions<br />
To ensure that there is no real or apparent conflict <strong>of</strong> interest between services and<br />
expertise provided under this NCIRC Project and under the BI-SC AIS Programme<br />
Management and Integration Capability (BI-SC AIS PMIC) Contract (main Contractor<br />
IBM Nederland), prospective Bidders shall note that the Purchaser reserves the right to<br />
exclude the successful bidder and its prospective Sub-Contractors from the award <strong>of</strong><br />
this Contract if the successful bidder or its prospective Sub-Contractors may be in a<br />
position to unfairly influence this contract as a result <strong>of</strong> being selected for the work<br />
performed or to be performed under the PMIC Contract. This applies also to the<br />
Contractor's/Sub-Contractor's parent companies or subsidiaries unless the parent<br />
company or its subsidiaries provide pro<strong>of</strong> that they operate as a separate legal entity in a<br />
completely distinguishable and different business domain from that <strong>of</strong> the PMIC.<br />
Appropriate wording, clauses and certificates/declarations will be included in the<br />
NCIRC IFB.<br />
8. It is planned to place a single contract for the entire scope <strong>of</strong> work. No partial bidding<br />
will be allowed.<br />
Page 2
N A T O U N C L A S S I F I E D<br />
N A T O U N C L A S S I F I E D<br />
NC3A-BE/ASG/11/754<br />
9. Pursuant to paragraph 6 <strong>of</strong> Reference A, the following information is provided for the<br />
information <strong>of</strong> the Nations:<br />
10. The IFB is planned to be issued by the end <strong>of</strong> September 2011 with a Bid Closing Date<br />
late November 2011 and Contract Award in the first quarter <strong>of</strong> 2012.<br />
11. In addition to the firms nominated in Annex B <strong>of</strong> this letter, it is requested that NC3A<br />
be provided with a list, not later than 14 September 2011, <strong>of</strong> qualified and certified<br />
firms which may be interested in receiving an Invitation for Bid for this project. This<br />
list should include the NAME <strong>of</strong> the FIRM, the TELEPHONE and FAX NUMBER and<br />
E-MAIL-ADDRESS and POINT OF CONTACT within each <strong>of</strong> the nominated firms.<br />
This information is critical to enable prompt and accurate communication with<br />
prospective bidders and should be sent to the following address:<br />
<strong>NATO</strong> C3 Agency<br />
Boulevard Leopold III<br />
1110 Brussels, Belgium<br />
Attention: Graham Hindle – Senior Contracting Officer<br />
Tel: +32 (2) 707-8857<br />
Fax: +32 (2) 707-8770<br />
e-mail: Graham.Hindle@nc3a.nato.int<br />
12. Bidders will be required to declare a bid validity <strong>of</strong> 12 months from closing date for<br />
receipt <strong>of</strong> bids, supported by a Bid Guarantee <strong>of</strong> €500,000 (Five hundred thousand<br />
Euro). Should the selection and award procedure exceed the 12 month after Bid<br />
Closing Date, firms will be requested to voluntarily extend the validity <strong>of</strong> their bids and<br />
Bid Guarantee accordingly. Bidders may decline to do so, withdraw their bid and<br />
excuse themselves from the bidding process without penalty;<br />
13. National authorities are advised that some sections <strong>of</strong> the ICB package, applicable to the<br />
bidding and the contractual documents will contain information classified as “<strong>NATO</strong><br />
RESTRICTED”. Bidders must therefore have an overall personnel security and facility<br />
clearance <strong>of</strong> "<strong>NATO</strong> RESTRICTED" at the time <strong>of</strong> the IFB release in order to be<br />
eligible to receive Bidding documents and to submit a Bid. The transmission <strong>of</strong> such<br />
classified material shall be processed through the Bidder’s respective National<br />
Delegation/Mission to <strong>NATO</strong>. Bidders will also be required to submit any bid response<br />
material through their respective National Delegation/Mission to <strong>NATO</strong>.<br />
14. The successful contractor will be required to handle and store classified information up<br />
to the level <strong>of</strong> “<strong>NATO</strong> RESTRICTED”. In addition, contractor personnel working on<br />
<strong>NATO</strong> sites will be required to hold individual security clearances <strong>of</strong> “<strong>NATO</strong><br />
SECRET”. Only companies maintaining such cleared facilities and the appropriate<br />
personnel clearances will be able to perform the resulting contract.<br />
15. It is requested that all additional firms interested in participating in this procurement be<br />
introduced by their National Authorities with the required “Declaration <strong>of</strong> Eligibility”<br />
and certification <strong>of</strong> their security clearances. It is emphasised that requests for<br />
Page 3
N A T O U N C L A S S I F I E D<br />
N A T O U N C L A S S I F I E D<br />
NC3A-BE/ASG/11/754<br />
participation in this competition received directly from individual firms cannot be<br />
considered.<br />
16. Your assistance in this procurement is greatly appreciated.<br />
Attachment(s):<br />
FOR THE GENERAL MANAGER:<br />
Graham Hindle<br />
Senior Contracting Officer<br />
Acquisition Division<br />
Annex A- Summary <strong>of</strong> the Requirements<br />
Annex B- Updated Potential Bidders List (additions highlighted)<br />
Page 4
.<br />
N A T O U N C L A S S I F I E D<br />
Distribution for Official <strong>Notification</strong><br />
<strong>of</strong> <strong>Intent</strong> to Call for Bids for IFB-13212-NCIRC<br />
<strong>NATO</strong> Delegations (Attn: Infrastructure Adviser):<br />
N A T O U N C L A S S I F I E D<br />
NC3A-BE/ASG/11/754<br />
Albania 1<br />
Belgium 1<br />
Bulgaria 1<br />
Canada 1<br />
Croatia 1<br />
Czech Republic 1<br />
Denmark 1<br />
Estonia 1<br />
France 1<br />
Germany 1<br />
Greece 1<br />
Hungary 1<br />
Italy 1<br />
Latvia 1<br />
Lithuania 1<br />
Luxembourg 1<br />
The Netherlands 1<br />
Norway 1<br />
Poland 1<br />
Portugal 1<br />
Romania 1<br />
Slovakia 1<br />
Slovenia 1<br />
Spain 1<br />
Turkey 1<br />
United Kingdom 1<br />
United States 1<br />
Belgian Ministry <strong>of</strong> Economic Affairs 1<br />
Embassies in Brussels (Attn: Commercial Attaché):<br />
Albania 1<br />
Bulgaria 1<br />
Canada 1<br />
Croatia 1<br />
Czech Republic 1<br />
Denmark 1<br />
Estonia 1<br />
France 1<br />
Page 1
N A T O U N C L A S S I F I E D<br />
N A T O U N C L A S S I F I E D<br />
NC3A-BE/ASG/11/754<br />
Germany 1<br />
Greece 1<br />
Hungary 1<br />
Italy 1<br />
Latvia 1<br />
Lithuania 1<br />
Luxembourg 1<br />
The Netherlands 1<br />
Norway 1<br />
Poland 1<br />
Portugal 1<br />
Romania 1<br />
Slovakia 1<br />
Slovenia 1<br />
Spain 1<br />
Turkey 1<br />
United Kingdom 1<br />
United States 1<br />
<strong>NATO</strong> HQ<br />
<strong>NATO</strong> Office <strong>of</strong> Resources 1<br />
Director, <strong>NATO</strong> HQ C3 Staff 1<br />
SACTREPEUR<br />
Attention: Infrastructure Assistant 1<br />
Strategic Commands<br />
HQ SACT Attn: ACOS C4ISR 1<br />
ACO Attn: SPT CIS Director 1<br />
<strong>NATO</strong> Agencies<br />
NCSA 1<br />
NC3A – All NATEXs<br />
Czech Republic<br />
Denmark<br />
France<br />
Germany<br />
Greece<br />
Hungary<br />
Italy<br />
The Netherlands<br />
Norway<br />
Page 2
Poland<br />
Spain<br />
Turkey<br />
UK<br />
USA<br />
NC3A<br />
N A T O U N C L A S S I F I E D<br />
N A T O U N C L A S S I F I E D<br />
NC3A-BE/ASG/11/754<br />
Deputy General Manager Mr K Scheid 1<br />
CAB Administrator Ms M-L Le Bourlot 1<br />
CAT 2 Leader Mr B Christiansen 1<br />
CAT 2 Group Leader Mr Bottesini 1<br />
CAT 2 HPMO Mr M. Flis 1<br />
CAT 2 PM Mr F Rousset 1<br />
DSA-ACO/ACT BGEN G Feat 1<br />
DSA-NIP Mr B Bigelow 1<br />
DSA ACO LTC H. Haughton 1<br />
ACQ/ASG Principal Contracting Officer Mr J Wager 1<br />
ACQ/ASG Senior Contracting Officer Mr G Hindle 1<br />
ACS/ASG Principal Contracting Assistant Ms D Kokkali 1<br />
NLO Mr K Dixon 1<br />
Legal Adviser Mrs S Rocchi 1<br />
Registry 1<br />
Page 3
General Project Overview<br />
N A T O U N C L A S S I F I E D<br />
Summary <strong>of</strong> Requirements<br />
N A T O U N C L A S S I F I E D<br />
ANNEX A to<br />
NC3A-BE/ASG/11/754<br />
1. The <strong>NATO</strong> <strong>Computer</strong> <strong>Incident</strong> <strong>Response</strong> Capability is that part <strong>of</strong> <strong>NATO</strong>’s<br />
Information Assurance effort that provides the capability to respond to computer and<br />
network security threats and vulnerabilities rapidly and effectively due to its<br />
preparedness to respond to Information Assurance-related incidents as they occur. Its<br />
main organisational elements include the NCIRC Technical Centre (NCIRC TC)<br />
located within the <strong>NATO</strong> CIS Services Agency (NCSA) Headquarters at Mons,<br />
Belgium, and the NCIRC Coordination Centre (NCIRC CC) located within the<br />
Emerging Security Challenges Division (ESCD), <strong>NATO</strong> Headquarters.<br />
2. The purpose <strong>of</strong> the project is to implement and support, in an incremental approach,<br />
the NCIRC - Full Operational Capability (FOC). It will build upon NCIRC IOC and<br />
significantly extend both the breadth and depth <strong>of</strong> <strong>NATO</strong>’s cyber defences. It includes<br />
the provision <strong>of</strong> a central management capability at the Tier-2 level at Mons, a remote<br />
connection from the Tier-1 level at HQ; the provision <strong>of</strong> mobile kits for rapid reaction<br />
teams (increment 1); the deployment <strong>of</strong> cyber defence sensors on Tier-3 sites<br />
(increment 2); and the development, in spirals, <strong>of</strong> a Cyber Defence Decision Support<br />
System, providing situation awareness, dynamic risk assessment and management<br />
(increment 3).<br />
3. Other increments, such as the Cyber Defence Threat Assessment Cell Capability<br />
(increment 4) and the Alternate Capability (increment 5), are intended to form part <strong>of</strong><br />
the NCIRC FOC project scope but are not in scope <strong>of</strong> the current invitation for bid.<br />
Indeed, as their initiation has started, they are not yet authorised for implementation.<br />
4. The project is intended to meet the level <strong>of</strong> ambition <strong>of</strong> <strong>NATO</strong> Head <strong>of</strong> States as<br />
declared during the Lisbon Summit, in November 2011, which called for the<br />
achievement <strong>of</strong> the NCIRC FOC by end <strong>of</strong> 2012.<br />
General Requirements<br />
5. The scope <strong>of</strong> the works, in addition to the contractor’s overall project management,<br />
includes:<br />
a. A very short pro<strong>of</strong> <strong>of</strong> concept phase that aims to validate the performance <strong>of</strong><br />
the contractor’s proposed solutions to meet critical operational requirements<br />
and to demonstrate the contractor’s ability to implement the project within<br />
time and quality constraints.<br />
b. A preliminary design phase, including minor adjustments to baselined<br />
requirements, to produce the high level design.<br />
c. A development phase including the detailed design, development, integration,<br />
test, installation, migration and initial acceptance <strong>of</strong> the core infrastructure <strong>of</strong><br />
the Tier-1 and Tier-2 elements, on which all NCIRC sub systems will operate:<br />
Page 1
N A T O U N C L A S S I F I E D<br />
N A T O U N C L A S S I F I E D<br />
ANNEX B to<br />
NC3A-BE/ASG/11/754<br />
a Security <strong>Incident</strong> Event Management System; a Cyber Defence operation<br />
management system; an initial Cyber Defence Decision Support System;<br />
standalone computer forensics; malware analysis tools; a dedicated testing<br />
environment; and the mobile kits for the rapid reaction teams. It will also<br />
include the integration <strong>of</strong> all central management for the NCIRC-managed<br />
sensors.<br />
d. The deployment <strong>of</strong> NCIRC-managed sensors, i.e. network-based intrusion<br />
detection/prevention systems, full packet capture, Online Vulnerability<br />
Assessment, Online <strong>Computer</strong> Forensics and on-site log aggregation. The<br />
sensors will be deployed (about 50 geographical locations) on the <strong>NATO</strong><br />
military command structure, some operational theatres, HQ and civilian<br />
agencies for all security classification domains.<br />
e. The s<strong>of</strong>tware development, in several spirals extending beyond 2012, to further<br />
enhance the Cyber Defence Decision Support System.<br />
f. The provision <strong>of</strong> operations and maintenance support to the NCIRC FOC<br />
capabilities during both initial use and for up to 5 years thereafter.<br />
Page 2
ALBANIA<br />
TCN shpk<br />
N A T O U N C L A S S I F I E D<br />
N A T O U N C L A S S I F I E D<br />
ANNEX B to<br />
NC3A-BE/ASG/11/754<br />
LIST OF POTENTIAL BIDDERS – IFB-CO-13212-NCIRC<br />
BELGIUM<br />
ACCSCO<br />
Accenture – Health and Public Service<br />
AKACIO<br />
Aprico Consultants<br />
Artemis Consulting SPRL - BE<br />
Astron N.V.<br />
Atermon NV/SA<br />
Atos Origin Belgium NV/SA<br />
Avalon Network<br />
Avaya Inc.<br />
Axxes<br />
BAE Systems<br />
Belgacom (Telindus) NV<br />
Business & Decision Benelux<br />
C-CURE<br />
CTG<br />
Computacenter NV<br />
<strong>Computer</strong> Sciences Corporation<br />
<strong>Computer</strong>land S.L.M.<br />
Concurrent Technologies Corporation (CTC)<br />
Cybertrust Belgium NV<br />
Damovo Belgium NV/SA<br />
Dell NV<br />
Deloitte<br />
Dimension Data Belgium<br />
Ericsson sa/nv<br />
Eurocity<br />
Extreme Networks Inc.<br />
Getronics Belgium SA/NV<br />
Gillam-FEI<br />
Global Crossing Belgium bvba<br />
Guidance N.V. / S.A.<br />
IBM Belgium NV/SA<br />
Ilias Solutions<br />
Insight Technology Solutions Belgium, In<br />
Luciad n.v.<br />
MMS-Secure N.V.- S.A.<br />
NCTS bvba/sprl<br />
NextiraOne<br />
Omega Management & Consulting Group N.V.<br />
Oracle Belgium<br />
Prodata Systems NV<br />
Page 1
N A T O U N C L A S S I F I E D<br />
RealDolmen<br />
SAIT Zenitel<br />
Safir consulting b.v.b.a.<br />
Securelink NV<br />
Serco Belgium<br />
Siemens Enterprise Communications NV/SA/Siemens SEN BGD<br />
Siemens IT Solutions and Services SA/NV<br />
Simac ICT Belgium<br />
Sogeti Belgium NV/SA<br />
Steria Benelux S.A<br />
Thales Alenia Space Etca s.a.<br />
Thales S.A.<br />
Threon NV<br />
Tinc Associates<br />
Trasys<br />
Uniskill NV<br />
Unisys Belgium S.A.<br />
Van Roey Automation NV<br />
BULGARIA<br />
Bianor Services EOOD<br />
Electron Progress AD<br />
Lirex BG Ltd<br />
Telelink EAD<br />
CANADA<br />
ADGA Group<br />
Dialogic Corporation<br />
Fiber Connections Inc.<br />
General Dynamics Canada Ltd.<br />
MacDonald, Dettwiler and Associates Ltd.MDA<br />
McBride Consulting Group Inc<br />
Network Innovations Inc.<br />
Prolity Corporation<br />
Sybertooth Inc<br />
Valcom Consulting Group Inc<br />
CROATIA<br />
CROZ d.o.o. za informaticku djelatnost<br />
CS <strong>Computer</strong> Systems Ltd<br />
INsig2 d.o.o.<br />
Senso IS d.o.o.<br />
CZECH REPUBLIC<br />
LTI DataComm - Czech Republic Office<br />
N A T O U N C L A S S I F I E D<br />
ANNEX B to<br />
NC3A-BE/ASG/11/754<br />
Page 2
Risk Analysis Consultants, Ltd.<br />
SITEL, spol. s r.o.<br />
Skill s.r.o.<br />
TietoEnator Czech s.r.o.<br />
DENMARK<br />
Dan:<strong>of</strong>fice ApS<br />
Gatehouse A/S<br />
SAAB Danmark A/S<br />
Systematic S<strong>of</strong>tware Engineering A/S<br />
Terma A/S<br />
N A T O U N C L A S S I F I E D<br />
FRANCE<br />
ASTRIUM SAS<br />
Alliance Qualité Logiciel SA (AQL)<br />
Altran Systemes d'Information<br />
CS Systèmes d'Informations<br />
Cassidian SAS<br />
DCNS sa<br />
France Developement Conseil (FDC)<br />
Global Technologies<br />
INEO Defense<br />
Integral Systems Europe<br />
LGM<br />
Orange Business Services Orange -France Telecom<br />
SODENA<br />
Sagem Defense Securite<br />
Studec<br />
Thales Communications SA<br />
GERMANY<br />
Atos Origin GmbH<br />
Bechtle GmbH System House Aachen<br />
CONET Solutions GmbH<br />
CSC Deutschland Solutions GmbH<br />
Carl-Otto Schartenberg GmbH<br />
Cordsen Engineering Gmbh<br />
Corporate quality consulting GmbH<br />
DELL GmbH<br />
DV Kombinat GmbH<br />
EADS Deutschland GmbH(ex Dornier GmbH)<br />
ESG Elektroniksystem - und Logistik GmbH<br />
Eagle Eye Security<br />
FREQUENTIS Nachrichtentechnik GmbH<br />
GBS TEMPEST & Service GmbH<br />
GTSI Corp.<br />
N A T O U N C L A S S I F I E D<br />
ANNEX B to<br />
NC3A-BE/ASG/11/754<br />
Page 3
Hewlett Packard GmbH<br />
IABG GmbH<br />
IBM Deutschland<br />
KB Impuls Service GmbH<br />
Logica Deutschland GmbH & Co. KG.<br />
ML Consulting GmbH<br />
ND SatCom Defence GmbH<br />
O&O S<strong>of</strong>tware GmbH<br />
OHB-System AG<br />
OrgaTech GmbH<br />
Quin GmbH<br />
Rohde & Schwarz GmbH & Co. KG<br />
SALT Solutions GmbH<br />
SQS S<strong>of</strong>tware Quality Systems AG<br />
Serco GmbH<br />
Sowatech S<strong>of</strong>twaretechnik GmbH&Co KG<br />
T-Systems International GmbH<br />
Thales Communications GmbH<br />
TriaGnoSys GmbH<br />
VEGA Deutschland GmbH & Co. KG.<br />
]init[ AG für Digitale Kommunikation<br />
blueCarat AG<br />
btconsult GmbH<br />
weisser + böhle GmbH<br />
GREECE<br />
European Dynamics SA<br />
Info-Quest SA<br />
Intracom Defense Electronics S.A.<br />
PC SYSTEMS S.A.<br />
SSMART S.A. & SIGNAAL HELLAS S.A.<br />
HUNGARY<br />
Albacomp Co<br />
HM ARZENÁL Elektromechanikai ZRt.<br />
MoD ED Co.<br />
Radiant PLC<br />
Synergon Information Systems plc<br />
e-Selectrade-<strong>Computer</strong> Ltd.<br />
ICELAND<br />
Kogun Ltd.<br />
ITALY<br />
Akron Business Technologies srl<br />
Almaviva S.p.A.<br />
N A T O U N C L A S S I F I E D<br />
N A T O U N C L A S S I F I E D<br />
ANNEX B to<br />
NC3A-BE/ASG/11/754<br />
Page 4
CapGemini Italia S.p.A.<br />
Ce.S.I.S S.r.l.<br />
ELE.SI.A. S.p.A<br />
Elsag Datamat SpA<br />
Engineering Ingegneria Informatica S.p.a<br />
Fondazione FORMIT<br />
Selex Elsag S.p.A.<br />
Selex Sistemi Integrati SpA<br />
Sirti S.P.A<br />
TESEO S.p.A<br />
Vitrociset S.p.A.<br />
LATVIA<br />
Baltic Information & Security Systems<br />
LITHUANIA<br />
Blue Bridge<br />
JSC FIMA<br />
Synergy Consulting<br />
N A T O U N C L A S S I F I E D<br />
NETHERLANDS<br />
42 Solutions B.V.<br />
ADD Engineering B.V.<br />
Alcatel-Lucent Telecom Nederland B.V.<br />
Alten Nederland B.V.<br />
Altran Technologies<br />
Atlis<br />
Atos Consulting<br />
Capgemini Nederland B.V.<br />
Cisco Systems International B.V.<br />
Clear2Pay Nederland<br />
Getronics PinkRoccade Nederland B.V.<br />
Global Systems and S<strong>of</strong>tware<br />
Intergraph Benelux B.V.<br />
LogicaCMG Public Sector B.V.<br />
Misco Nederland BV<br />
NCIM-Groep<br />
Open Text International B.V.<br />
PC-WARE Information Technologies BV<br />
PQR bv<br />
PTS S<strong>of</strong>tware BV<br />
PointGroup BV<br />
QThink B.V.<br />
SMT Simple Management Technologies B.V.<br />
SYSQA B.V.<br />
TNO Defence, Security and Safety<br />
N A T O U N C L A S S I F I E D<br />
ANNEX B to<br />
NC3A-BE/ASG/11/754<br />
Page 5
Uni Business Centre<br />
VX Company IT Services B.V.<br />
Ventus Information Management BV<br />
West Consulting B.V.<br />
Yoep B.V.<br />
iDelft B.V.<br />
NORWAY<br />
3D perception AS<br />
Ementor Norge AS<br />
ErgoGroup AS<br />
Nera Networks AS<br />
Teleplan AS<br />
Umoe IKT<br />
Vizada Networks AS<br />
POLAND<br />
ATM S.A.<br />
Asseco Poland S.A.<br />
ComArch S.A.<br />
DGT Spólka z o.o.<br />
Decs<strong>of</strong>t S.A.<br />
Designers S.J.<br />
Elmontex<br />
Lufthansa Systems Poland Sp. z o.o.<br />
Military Communication Institute<br />
OBR Centrum Techniki Morskiej<br />
Optimus SA<br />
PROKOM S<strong>of</strong>tware S.A.<br />
Produs S.A.<br />
Przemyslowy Instytut Telekomunikacji S.A.<br />
Qumak-Sekom S.A.<br />
S&T Services Polska Sp. z o.o.<br />
S<strong>of</strong>tblue Michal Kierul<br />
Solidex S.A.<br />
Sygnity S.A.<br />
Teldat - Sp.J. Kruszynski & Cichocki<br />
Unizeto Technologies SA<br />
WASKO Sp. z o.o. for WASKO S.A.<br />
Critical S<strong>of</strong>tware s.a.<br />
Deimos Engenharia S.A.<br />
Edis<strong>of</strong>t S.A.<br />
N A T O U N C L A S S I F I E D<br />
PORTUGAL<br />
PMO Projects (LOSTICAL - ConsultadoriaUnipessoal Lda.)<br />
Skys<strong>of</strong>t Portugal, S<strong>of</strong>tware e Tecnologias<br />
N A T O U N C L A S S I F I E D<br />
ANNEX B to<br />
NC3A-BE/ASG/11/754<br />
Page 6
ROMANIA<br />
MarcTel S.I.T. S.R.L.<br />
S.C. Teamnet International SA<br />
S.C. UTI Systems<br />
SC Kranszwald SRL<br />
SLOVAKIA<br />
Aliter Consulting, s.r.o.<br />
Igea d.o.o.<br />
N A T O U N C L A S S I F I E D<br />
SPAIN<br />
Alma Technologies s.a.<br />
Amper Programas de Electronicay Communicaciones, S.A.<br />
<strong>Computer</strong> Forensics Laboratories<br />
Especialidades Electricas S.A.<br />
FCC Servicios Industriales Y EnergeticosS.A.<br />
GMV<br />
INDRA Espacio S.A.<br />
Indra Sistemas (former Bde)<br />
Informática El Corte Ingles (IECISA)<br />
MDU, S.A.U.<br />
Siemens<br />
Tecnobit S.L<br />
TURKEY<br />
Altay Kollektif Sirketi M. Murad DuralVe Ort.<br />
Aydin Yazilim Ve Elektronik San A.S.(Ayesas)<br />
BiLGi GIS<br />
C TECH Bilisim Tek. San ve Tic A.S.<br />
Esdas Elektronik Systemler Destek SanayiVe Ticaret A.S.<br />
Havelsan Have Elektronic San. Ve Tic A.S.<br />
KOC Information and Defence TechnologiesInc.<br />
Kuanta Insaat Taahhut Elektronik Turizm<br />
METEKSAN Savunma Sanayi A.S.<br />
Mils<strong>of</strong>t Bilisim Iletisim Teknolojileri Anonim Sirketi<br />
Oyak Teknoloji Bilisim Ve Kart Hizmetleri Anonim Sikreti (OYTEK)<br />
Savronik Elektronik Sanayi ve Ticaret<br />
Tubitak Uekae<br />
STM Savunma Teknolojileri Mühendislik ve<br />
UNITED KINGDOM<br />
1st IT People<br />
Absolute Applications LTD<br />
Alcatel-Lucent Telecom Ltd<br />
Amulet Hotkey Ltd<br />
N A T O U N C L A S S I F I E D<br />
ANNEX B to<br />
NC3A-BE/ASG/11/754<br />
Page 7
N A T O U N C L A S S I F I E D<br />
Artemis Communications<br />
Audax<br />
Auriga (Europe)<br />
BAE Systems Integrated SystemTechnologies Limited<br />
BT Global Services<br />
Blazepoint Limited<br />
Boldon James Limited<br />
Boxing Orange<br />
Bruhn Newtech A/S<br />
C7 Solutions Ltd.<br />
CGP Associates Ltd<br />
Capital International IT Staffing Ltd.<br />
Cassidian Limited<br />
Clearswift Ltd.<br />
DP Connect Ltd<br />
Detica Limited<br />
Drumgrange Ltd.<br />
Dstl Farnborough<br />
EDS Defence Ltd<br />
Endace Europe Ltd.<br />
Enterprise Architects Ltd<br />
Esys Plc<br />
GGR Communications Ltd UK<br />
General Dynamics United Kingdom Limited<br />
GigaBeam Corporation<br />
HVR Consulting Services Limited<br />
Hi-Q Systems Ltd<br />
ITT Visual Information Solutions<br />
Inatech Solutions Ltd<br />
LA International <strong>Computer</strong> Consultants Ltd.<br />
Lockheed Martin UK Integrated Systems& Solutions Ltd.<br />
Mass Consultants Ltd<br />
Modis International Ltd.<br />
Moltek Consultants LTD<br />
Nettelics Ltd.<br />
Newman & Spurr Consultancy Ltd<br />
Northrop Grumman Mission Systems EuropeLtd.<br />
Open Networks - Government & Defence<br />
OSPL UK Ltd<br />
Osprey Index Ltd T\A 4ExForces<br />
Plextek Ltd<br />
Portcullis <strong>Computer</strong> Security<br />
QinetiQ Ltd<br />
Regency IT Consulting<br />
Resolution IT Services Ltd.<br />
Rheatech Limited<br />
N A T O U N C L A S S I F I E D<br />
ANNEX B to<br />
NC3A-BE/ASG/11/754<br />
Page 8
Rockwell Collins (UK) Ltd.<br />
SCN Ltd<br />
SVGC Limited<br />
Savi Technology UK<br />
Scom Group Limited<br />
Secure 4 S<strong>of</strong>tware Ltd.<br />
Selex Systems Integration Ltd<br />
Silicon Valley Group Plc<br />
Smiths Detection - Watford Limited<br />
S<strong>of</strong>tware Box Ltd.<br />
Square One Resources Limited<br />
Symbelec Ltd<br />
SyntheSys Systems Engineers Ltd.<br />
Systematic S<strong>of</strong>tware Engineering Ltd<br />
Systems Consultants Services Ltd (SCS)<br />
Systems Engineering & Assessment Ltd<br />
Telstra International<br />
The Bald Eagle Consultancy Ltd.<br />
Tw<strong>of</strong>our Group Ltd<br />
Ultra Electronics Ltd<br />
VT Communications<br />
Verizon Business<br />
WS Atkins Consultants Limited<br />
N A T O U N C L A S S I F I E D<br />
UNITED STATES<br />
ALTIMA GROUP INTERNATIONAL, INC. (AGI)<br />
AT&T Government Solutions, Inc.<br />
Advanced Systems Technology, inc.<br />
Affigent, LLC<br />
Applied Coherent Technology Corp.<br />
BIT Systems, Inc.<br />
Balaconis Consulting, Inc.<br />
Blue River Information Technology, LLC<br />
Booz Allen & Hamilton Inc<br />
CACI Inc. - Federal<br />
Communications Systems, a Division <strong>of</strong> ITT Corporation USA<br />
<strong>Computer</strong> Sciences Corporation (CSC)North American Public Sector<br />
Concurrent Technologies Corporation (CTC)<br />
Comtech Mobile Datacom Corporation<br />
DRS Technical Services, Inc.<br />
EDO Corporation<br />
EMW, Inc.<br />
ESRI Inc.<br />
East View Cartographic Inc.<br />
Engineering Solutions and Products Inc<br />
G2, Inc.<br />
N A T O U N C L A S S I F I E D<br />
ANNEX B to<br />
NC3A-BE/ASG/11/754<br />
Page 9
N A T O U N C L A S S I F I E D<br />
General Dynamics Information Technology<br />
GeoDecisions, a division <strong>of</strong> Gannett Flem<br />
Guidance S<strong>of</strong>tware, Inc.<br />
Guident Technologies Inc<br />
Houston Associates<br />
Hyperion, Inc.<br />
Intelsat General Corporation<br />
International Solutions Group (ISG)<br />
Io Solutions, Inc<br />
Jumpstart Solutions LLC<br />
L-3 Services, Inc., Global Security & Engineering Solutions<br />
LMI<br />
Level 3 Communications, LLC<br />
Lockheed Martin Corporation<br />
MA Federal Inc. (dba iGov.com)<br />
MCR Federal, Inc.<br />
ManTech Global Services Corporation<br />
Merlin International, Inc<br />
Micros<strong>of</strong>t Corporation<br />
Monteria LLC<br />
Mutual Telecom Services Inc<br />
NEE & PMC<br />
NetEffects, Inc.<br />
Norsat International Inc.<br />
Northrop Grumman Mission Systems<br />
OptiMetrics, Inc.<br />
Optimum Solutions, Inc.<br />
Raytheon CompanyNetwork Centric Systems<br />
SAIC<br />
Sprint Communications Company, L.P.<br />
Stealth International Intelligence Security Service Inc.<br />
Systems Research and ApplicationsCorporation<br />
Teledyne Brown Engineering, Inc.<br />
The Boeing Company<br />
UltiSat, Inc.<br />
Verizon Business Network Services, Inc.<br />
ViaSat, Inc.<br />
Winbourne & Costas, Inc<br />
Windmill International, Inc.<br />
N A T O U N C L A S S I F I E D<br />
ANNEX B to<br />
NC3A-BE/ASG/11/754<br />
Page 10