Routing TraceTek cable through conduit pipe end during cable installation<br />

When installing TraceTek cable into the Dabico pit, the PVC<br />

end cap hole can be punched out using finger pressure.<br />

Push the TraceTek cable through the hole. You may need to<br />

bend the end cap to open the hole enough for the cable end<br />

to pass through.<br />

After TraceTek cable connectorization completed, place wire cage over conduit ends<br />

Carefully complete any TraceTek cable connectorization (if<br />

required). Route the cable through the openings in the wire<br />

cage, so that the wire cage can rest on the ground, and be<br />

positioned above the conduit end caps- without putting any<br />

lateral pressure on the cable. Center the wire cage so that it<br />

is not against the sidewall of the Dabico pit in order to provide<br />

clearance for the plastic pail to rest against the ground. If<br />

necessary, the wire cage can be bent/shaped to fit the needs of<br />

the conduit orientation within the Dabico pit.<br />

Making cable connections and securing the fastening straps<br />

Take up any loose slack in the connector wires and TraceTek<br />

cables by forming loops approximately 4 to 5 inches in<br />

diameter. Avoid tightly bent cable and kinks/pinch points<br />

that produce pressure that can lead to false alarms. Loop<br />

orientation should be vertical.<br />

TraceTek cable should not be secured with tie wraps, since<br />

the pressure could lead to false alarms. Fastening straps<br />

have been provided to maintain loop shape above the wire<br />

cage. Maintain vertical loop positioning while putting on the<br />

fastening straps.<br />

Note: For clarity, pictures of cable connections do not<br />

include the heat shrink tubing that is used in the TraceTek<br />

cable connectorization and installation process.<br />

THERMAL MANAGEMENT SOLUTIONS EN-TraceTek<strong>TT</strong>RiserKit<strong>DAB</strong>9-IM-H58753 01/13 2 / 4