12.04.2015 Views

2007-08 WSF Implementation Manual - reach

2007-08 WSF Implementation Manual - reach

2007-08 WSF Implementation Manual - reach

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Weighted Student Formula/School Financial Plan <strong>Implementation</strong> <strong>Manual</strong><br />

for all funds, and the Total Changes. The Total Changes does not have to<br />

equal $0.<br />

3. Notes: This worksheet is for the principal’s optional use, to enter footnotes<br />

related to specific lines on the input sheets.<br />

4. Standards Based Education: This is the input sheet for planned costs for<br />

Standards Based Education (Goal 1 of the AFP).<br />

5. Quality Student Support: This is the input sheet for planned costs for<br />

Quality Student Support (Goal 2 of the AFP).<br />

6. Continuous Improvement: This is the input sheet for planned costs for<br />

Continuous Improvement (Goal 3 of the AFP).<br />

7. School Operations: This is the input sheet for planned costs for School<br />

Operations. The AFP does not have a corresponding Goal for School<br />

Operations.<br />

8. <strong>WSF</strong> Position Summary: This worksheet is a summary of the <strong>WSF</strong>-funded<br />

positions on the input sheets, with a comparison of FY <strong>2007</strong>-<strong>08</strong> to FY 2006-<br />

07, and the difference. This sheet will be used to review personnel changes<br />

required by the FY <strong>2007</strong>-<strong>08</strong> plan. Note: When submitting the Template to<br />

the CAS, the FY <strong>2007</strong>-<strong>08</strong> data should have no positions funded by Program<br />

ID 15954, LSB-1.<br />

9. <strong>WSF</strong> Expenditure Plan Load: This worksheet contains the details of <strong>WSF</strong><br />

funds which will be loaded into the Budget System Expenditure Plan file for<br />

FY <strong>2007</strong>-<strong>08</strong>. Note: The FTE funds will be loaded into the Central Salary<br />

Org ID, instead of the school’s Org ID.<br />

Pre-populated data.<br />

The Financial Plan Template has been pre-loaded with historical data. The<br />

Program ID crosswalk was used to determine which data was loaded into each<br />

worksheet.<br />

• FTEs and funds included in the school’s approved FY 2006-07 Financial<br />

Plan Template<br />

• General fund FTEs established at your school as of October 2, 2006,<br />

multiplied times average salary, plus fringe<br />

• Non-salary funds in your school’s expenditure plan as of June 30, 2006 for<br />

all General and Federal programs<br />

• Amounts spent from cash accounts as of June 30, 2006 for all Special and<br />

Trust programs<br />

The principal needs to change the items that will be different from the prior years’<br />

data to create the FY <strong>2007</strong>-<strong>08</strong> Financial Plan. The principal can change FTEs,<br />

add or zero out programs, change hours or days for casual hires, and add or<br />

zero out non-payroll expenditures. Carryover data is not included on the<br />

Financial Plan Template. The Categorical, Federal, Special, and Trust amounts<br />

are included as an estimate of the FY <strong>2007</strong>-<strong>08</strong> available resources. The actual<br />

allocation or revenue may be different for these programs. The data entry is for<br />

FY <strong>2007</strong>-<strong>08</strong> allocations.<br />

Layout of the Input Worksheets.<br />

Draft Version 5.0 Page 47 of 64

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!