2007-08 WSF Implementation Manual - reach
2007-08 WSF Implementation Manual - reach
2007-08 WSF Implementation Manual - reach
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Weighted Student Formula/School Financial Plan <strong>Implementation</strong> <strong>Manual</strong><br />
for all funds, and the Total Changes. The Total Changes does not have to<br />
equal $0.<br />
3. Notes: This worksheet is for the principal’s optional use, to enter footnotes<br />
related to specific lines on the input sheets.<br />
4. Standards Based Education: This is the input sheet for planned costs for<br />
Standards Based Education (Goal 1 of the AFP).<br />
5. Quality Student Support: This is the input sheet for planned costs for<br />
Quality Student Support (Goal 2 of the AFP).<br />
6. Continuous Improvement: This is the input sheet for planned costs for<br />
Continuous Improvement (Goal 3 of the AFP).<br />
7. School Operations: This is the input sheet for planned costs for School<br />
Operations. The AFP does not have a corresponding Goal for School<br />
Operations.<br />
8. <strong>WSF</strong> Position Summary: This worksheet is a summary of the <strong>WSF</strong>-funded<br />
positions on the input sheets, with a comparison of FY <strong>2007</strong>-<strong>08</strong> to FY 2006-<br />
07, and the difference. This sheet will be used to review personnel changes<br />
required by the FY <strong>2007</strong>-<strong>08</strong> plan. Note: When submitting the Template to<br />
the CAS, the FY <strong>2007</strong>-<strong>08</strong> data should have no positions funded by Program<br />
ID 15954, LSB-1.<br />
9. <strong>WSF</strong> Expenditure Plan Load: This worksheet contains the details of <strong>WSF</strong><br />
funds which will be loaded into the Budget System Expenditure Plan file for<br />
FY <strong>2007</strong>-<strong>08</strong>. Note: The FTE funds will be loaded into the Central Salary<br />
Org ID, instead of the school’s Org ID.<br />
Pre-populated data.<br />
The Financial Plan Template has been pre-loaded with historical data. The<br />
Program ID crosswalk was used to determine which data was loaded into each<br />
worksheet.<br />
• FTEs and funds included in the school’s approved FY 2006-07 Financial<br />
Plan Template<br />
• General fund FTEs established at your school as of October 2, 2006,<br />
multiplied times average salary, plus fringe<br />
• Non-salary funds in your school’s expenditure plan as of June 30, 2006 for<br />
all General and Federal programs<br />
• Amounts spent from cash accounts as of June 30, 2006 for all Special and<br />
Trust programs<br />
The principal needs to change the items that will be different from the prior years’<br />
data to create the FY <strong>2007</strong>-<strong>08</strong> Financial Plan. The principal can change FTEs,<br />
add or zero out programs, change hours or days for casual hires, and add or<br />
zero out non-payroll expenditures. Carryover data is not included on the<br />
Financial Plan Template. The Categorical, Federal, Special, and Trust amounts<br />
are included as an estimate of the FY <strong>2007</strong>-<strong>08</strong> available resources. The actual<br />
allocation or revenue may be different for these programs. The data entry is for<br />
FY <strong>2007</strong>-<strong>08</strong> allocations.<br />
Layout of the Input Worksheets.<br />
Draft Version 5.0 Page 47 of 64