You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>POWER</strong>-<strong>GEN</strong> EUROPE<br />
Conference Programme<br />
DAY 2 - WEDNESDAY 13 JUNE<br />
Track 1: Strategies for the <strong>Europe</strong>an Power Sector<br />
Session 3: No Coal, No Nuclear - Security of Supply?<br />
09:00 - 10:30<br />
Chair: Jim Cronin, Principal Consultant, Cronin Energy Consulting, Ireland<br />
Co-Chair: Neils Bergh-Hansen, Executive Vice President, DONG Energy<br />
Generation, Denmark<br />
Ensuring Security of Supply - A Movement Towards Capacity Markets<br />
Neil Bush, Head Energy Economist, Department of Energy and Climate<br />
Change, UK<br />
Track 2: Reducing the Carbon Footprint<br />
Session 3: Pre Combustion Technologies for Zero<br />
Emmision Plants<br />
09:00 - 10:30<br />
Chair: Giancarlo Benelli, Head of Technological Scouting, Enel<br />
Engineering and Innovation Division, Italy<br />
Co-Chair: Eric Labi, President, Megalia Foundation, Italy<br />
Focusing on innovation in pre-combustion processes suitable for CO2<br />
concentration in zero emissions plants mainly fed with solid fuels<br />
Puertollano IGCC: Elcogas 14MWT CO2 Capture and H 2<br />
Co-Production Pilot Plant Results<br />
Francisco Garcia Peña, Engineering - R&D Director, ELCOGAS, Spain<br />
Co-Authors:<br />
Pilar Coca llano, R&D Researcher, ELCOGAS, Spain<br />
Pedro Casero Cabezon, R&D Researcher, ELCOGAS, Spain<br />
Integration of Fixed-bed Chemical Looping Combustion<br />
Sven Van der Gijp, Research Manager, TNO, The Netherlands<br />
Co-Authors:<br />
Erin Kimball, Research Scientist, TNO, The Netherlands<br />
Patricia Van den Bos, Research Technician, TNO, The Netherlands<br />
Earl Goetheer, Lead Scientist, TNO, The Netherlands<br />
Large Scale Biomass Gasi�cation Plant Integrated to a PC-Boiler<br />
Mauri Blomberg, Managing Director, Vaskiluodon Voima Oy, Finland<br />
Co-Authors:<br />
Ville Hankalin, Product Engineer, Metso Power Oy, Finland<br />
Juhani Isaksson, Product Manager, Metso Power Oy, Finland<br />
Matti Tiilikka, Power Plant Manager, Vaskiluodon Voima Oy, Finland<br />
Track 3: Gas Fired Power Technology<br />
Session 3: Plant Operation, Innovation and<br />
Optimisation I<br />
09:00 - 10:30<br />
Chair: Terry Raddings, Technology Marketing Manager <strong>Europe</strong>, GE<br />
Energy, UK<br />
Co-Chair: Arthur Close, Sales Director, Black & Veatch Energy, UK<br />
18 www.powergeneurope.com<br />
Introduction of an Upgraded 50 Hz F Class Gas Turbine Operating at<br />
1500ºC TIT for High Combined Cycle E�ciency<br />
Carlos Koeneke, VP of Project Engineering and Quality Assurance,<br />
Mitsubishi Power Systems Americas, USA<br />
Dunamenti G3 Repowering: Minimizing Investment Cost Through<br />
Conversion of a 220 MW Thermal Power Plant into a 400 MW CCGT<br />
Rob Versteirt, Project Manager, Tractebel Engineering S.A., Belgium<br />
Co-Author:<br />
Guillaume Lassaux, Design Engineer, Tractebel Engineering S.A., Belgium<br />
The 37 MW Siemens SGT-750 Approaches Commercial Application<br />
Anders Hellberg, Product Manager, Siemens, Sweden<br />
Co-Authors:<br />
Anders Haeggmark, Project Manager, Siemens, Sweden<br />
Anders Junsten, Project Manager, Siemens, Sweden<br />
Performance Improvements in GE’s 9FB Gas Turbine: Field Testing<br />
at E.ON’s Oresundsverket CHP Plant<br />
Laurent Cornu, 9FB Product Line Manager, GE Energy, France<br />
Co-Authors:<br />
Anders Svensson, Plant Manager, E.ON Värmekraft Sverige AB, Sweden<br />
Markus Feigl, 9FB System Engineering Leader, GE Energy, USA<br />
Track 4: Coal Fired Power Plants, Biomass<br />
Combustion and Waste to Energy<br />
Session 3: Biomass Combustion Experiences<br />
09:00 - 10:30<br />
Chair: Giorgio Dodero, Chairman, IPG Industrial Project Group, Italy<br />
Co-Chair: Matti Rautanen, Manager - Research and Development, Metso<br />
Power Oy, Finland<br />
The role of biomass is improving DNA worldwide basis to reduce CO2 impact<br />
After Thirty Years of Development: Low Carbon Energy in Large<br />
Scale with Demanding Biomass<br />
Ari Kokko, Manager, Power Generation Systems, Metso Power Oy, Finland<br />
A Modern Straw Fired Boiler Plant. Plant: BEKW Emlichheim/<br />
Germany<br />
Carsten Bo Petersen, Lead Project Engineer, Burmeister & Wain Energy<br />
A/S, Denmark<br />
From Coal to Biomass, the Challenges of a Successful Conversion of<br />
the Unit 4 at Rodenhuize<br />
Sébastien Verhaeven, Mechanical Engineer, Tractebel Engineering (GDF<br />
SUEZ), Belgium<br />
Co-Authors:<br />
Thomas Bauthier, Engineer, Tractebel Engineering S.A. (GDF SUEZ), Belgium<br />
Frank Van den Spiegel, Project Manager, Electrabel, Belgium