16.11.2012 Views

POWER GEN Europe - BET Aachen

POWER GEN Europe - BET Aachen

POWER GEN Europe - BET Aachen

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Track 4: Coal Fired Power Plants, Biomass<br />

Combustion and Waste to Energy<br />

Session 5: Large Coal Fired Power Station<br />

16:00 - 17:30<br />

Chair: Giampiero Valenti, Thermal Power Plant Development, Enel<br />

Produzione, Italy<br />

Co-Chair: Philippe Delage, Vice President Global Integration, Alstom<br />

Power, Switzerland<br />

Present challenges and future perspectives<br />

Best Available Materials for Boilers Operated at Ultra-Supercritical<br />

Steam Parameters (653/672ºC – 303/60 bar)<br />

Krzysztof Cieszynski, Designer, Rafako S.A., Poland<br />

Co-Authors:<br />

Adam Sutowicz, Design Department Manager, Boiler Equipment Construction,<br />

Rafako S.A., Poland<br />

Jerzy Pasternak, Integrated Management System Manager, Rafako S.A.,<br />

Poland<br />

Stanislaw Fudali, Chief Welding Engineer, Rafako S.A., Poland<br />

Belchatow: Retro�tting the EU Largest Power Plant Site<br />

Bernhard Pinkert, Process Engineer, Babcock Borsig Steinmüller GmbH,<br />

Germany<br />

Co-Authors:<br />

Georg Gasteiger, Chief Executive O�cer, Babcock Borsig Steinmüller GmbH,<br />

Germany<br />

Frank Adamczyk, Head of Department, Babcock Borsig Steinmüller GmbH,<br />

Germany<br />

Krzystof Matyskiewicz, Head of Department, PGE Górnictwo i Energetyka<br />

Konwencjonalna S.A. Belchatów, Poland<br />

Challenges on Operation and Design of Existing and New Build Coal<br />

Fired Power Plants<br />

Florian Krull, Team Leader Boiler & Combustion, RWE Technology,<br />

Germany<br />

Co-Author:<br />

Gereon Thomas, Head of Engineering, RWE Technology, Germany<br />

Advanced Boiler Technology Meets New Electricity Market<br />

Conditions<br />

Kurt Busekrus, Manager, Hitachi Power <strong>Europe</strong>, Germany<br />

Track 5: Electrical, Instrumentation and Control<br />

Session 5: Online Optimization<br />

16:00 - 17:30<br />

Chair: Enrico Filusch, Marketing & Communications Manager, Siemens<br />

AG, Germany<br />

Co-Chair: Jari Leppäkoski, Manager, Energy E�ciency, Metso<br />

Automation Oy, Finland<br />

Achieving Low NOx Levels with the Combustion Manage<br />

Pawel Domanski, Senior Performance Specialist, Metso, Poland<br />

Three-Dimensional Temperature Pro�ling of Pulverized Coal Flames<br />

Francesco Turoni, Product Manager, EUtech Scienti�c Engineering<br />

GmbH, Germany<br />

Co-Authors:<br />

Izet Delalic, Chief Rngineer, TPP Tuzla, Public Enterprise Elektroprivreda of<br />

Bosnia and Herzegovina<br />

Reinhardt Kock, Product Manager, EUtech Scienti�c Engineering GmbH,<br />

Germany<br />

Clemens Lindscheid, Development Engineer, EUtech Scienti�c Engineering<br />

GmbH, Germany<br />

Exploring the Possibilities of Transient Simulation with the Fully<br />

Flexible Plant Modelling System EBSILON®Professional<br />

Sergej Pulyaev, Engineer, Steag Energy Services, Germany<br />

Reserve Presentation<br />

Co-Firing Optimisation with Continuous Coal Flow Measurement<br />

Reinhardt Kock, Product Manager, EUtech Scienti�c Engineering GmbH,<br />

Germany<br />

Co-Authors:<br />

Stefan Stooker, Specialist Generation Technology, N.V. Nuon Energy,<br />

The Netherlands<br />

Francesco Turoni, Product Manager, EUtech Scienti�c Engineering GmbH,<br />

Germany<br />

Clemens Lindscheid, Development Engineer, EUtech Scienti�c Engineering<br />

GmbH, Germany<br />

Track 6: Refurbishment, Operation, Maintenance<br />

and Optimization<br />

Session 5: Lifetime Optimization<br />

16:00 - 17:30<br />

Chair: Enrico Malusardi, Senior Consultant, Edison SpA, Italy<br />

Co-Chair: Andreas Feldmuller, Head of Service Technology<br />

Implementation, Siemens Power, Germany<br />

New life of power plants to face market changes<br />

Steam Turbine Optimization for Operation in Thermal Solar Power<br />

Plants<br />

Markus Jöcker, Specialist Steam Turbine Operation, Siemens Industrial<br />

Turbomachinery AB, Sweden<br />

Co-Authors:<br />

Jesus Santos, Manager, Teyma Gestión de Contratos de Contrucción e<br />

Ingeniería, Spain<br />

Rolf Wikström, Senior Company Specialist, Siemens Industrial Turbomachinery<br />

AB, Sweden<br />

Jari Nyqvist, Manager, Siemens Industrial Turbomachinery AB, Sweden<br />

Stepwise Evolution of Hydraulic, Instrumentation and Controls<br />

to Protect Customer’s Investments and Ensures 20 More Years of<br />

Operation<br />

Daniel Looser, General Manager Service, ABB Switzerland Ltd.,<br />

Switzerland<br />

www.powergeneurope.com 23

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!