3.1 Verify Mechanical <strong>and</strong> Electrical Installation<br />

3.1 Verify Mechanical <strong>and</strong> Electrical Installation<br />

Mechanical Installation<br />

The first step is to verify the mechanical installation. Refer to the<br />

BEMP mechanical drawings.<br />

Electrical Installation<br />

Refer to your electrical drawings found in the documentation binder for<br />

customer specific wiring.<br />

Below are examples of electrical connections for the <strong>INTECONT</strong><br />

<strong>Satus</strong>.<br />

Load Cell Connections<br />

Figure 3: Load Cell Connections<br />

6 BV-H5123GB / 0852 <strong>INTECONT</strong> <strong>Satus</strong> <strong>Commissioning</strong> <strong>and</strong> <strong>Set</strong>-<strong>Up</strong><br />