Figure EX-2: Microfiltration/Ultrafiltration<br />

$250<br />

Capital Construction Cost (Millions 2007 Dollars)<br />

$200<br />

$150<br />

$100<br />

$50<br />

Red Hook<br />

Port Richmond<br />

Owl's Head<br />

y = 4.3975x 0.7491<br />

R 2 = 0.9981<br />

North River<br />

$0<br />

0 20 40 60 80 100 120 140 160 180<br />

Plant Size (MGD)<br />

The best fit cost curve is y= $4.3975x 0.7491 ; this has an R 2 correlation of 0.9981. Note this<br />

equation estimates the capital construction cost (in millions of 2007 dollars) excluding the<br />

impact of escalation. Escalated cost is a more accurate representation of future project costs.<br />

This curve is statistically valid over a range of 60-170 mgd.<br />

___________________________________________________________________________________________________________<br />