Table EX-2: Key Cost Assumptions<br />

Annual Cost Escalation 8.5%<br />

Assumed Construction Start Date 2020<br />

Cost Basis<br />

June 2007 Dollars<br />

Land Acquisition Costs<br />

Not included<br />

4 Years for ABBNR<br />

Construction Duration<br />

5 Years for FSBNR<br />

8 Years for all other technologies<br />

Contractor Overhead and Profit 21%<br />

Design Contingency<br />

60% for MBR<br />

40% for all other technologies<br />

Bond and Insurance 6%<br />

Construction Allowances and Unit Price Items 6%<br />

Table EX-3 provides capital construction cost estimates for each technology at each WPCP in<br />

this study. These figures exclude the cost of land acquisition at space constrained facilities,<br />

which would be major cost drivers at the North River and Owls Head WPCPs. Detailed cost<br />

estimates follow the conceptual design reports in this deliverable.<br />

Table EX-3: Estimated Capital Construction Costs (Escalated to the Midpoint of<br />

Construction)<br />

North River Owls Head Red Hook Port Richmond<br />

Solids Filtration $587 $485 $307 $274<br />

Microfiltration/<br />

Ultrafiltration<br />

$813 $650 $379 $374<br />

Advanced Basic<br />

BNR<br />

$434 $257 $225 $216<br />

Full Step BNR $499 $319 $296 $270<br />

Full Step BNR with<br />

Solids Filtration<br />

$1,334 $931 $632 $501<br />

Full Step BNR with<br />

Denitrification<br />

$1,501 $1,051 $682 $578<br />

Full Step BNR with<br />

Microfiltration/ $1,568 $1,096 $704 $601<br />

Ultrafiltration<br />

Membrane<br />

Bioreactor<br />

$3,210 $2,345 $1,572 $1,398<br />

Technology Cost Curves<br />

Figures EX-1 through EX-8 provide cost curves for capital construction costs for each level of<br />

technology included in this study. Previous work conducted at several <strong>New</strong> <strong>York</strong> City WPCPs<br />

that yielded costs for various treatment and technology levels were included in some of the cost<br />

curves, including an analysis examining the impact of BNR upgrades at the four Upper East<br />

River WPCPs (Bowery Bay, Hunts Point, Tallman Island, and Wards Island).<br />

___________________________________________________________________________________________________________<br />

EX-7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!