Harbor Estuary Program June 2007<br />

Port Richmond Water Pollution Control Plant<br />

DRAFT<br />

Table 11-1: Operating Flow Distribution Assumptions for MBR ............................................. 11-3<br />

Table 11-2: Anticipated Inter-Zone Baffle Wall Locations for MBR ....................................... 11-3<br />

Table 11-3: Anticipated Mixed Liquor Concentrations for MBR ............................................. 11-3<br />

Table 11-4: Anticipated Mixing Zone Sizing (per tank) for MBR............................................ 11-4<br />

Table 11-5: Anticipated Number of Anoxic Zone Mixers for MBR ......................................... 11-4<br />

Table 11-6: Diffuser Requirements for MBR............................................................................ 11-5<br />

Table 11-7: Future 2045 Air Requirements for MBR ............................................................... 11-5<br />

Table 12-1: Secondary Effluent for Each Level of Technology................................................ 12-1<br />

Table 12-2: Capital Construction Costs for Levels of Treatment.............................................. 12-1<br />