04.05.2015 Views

Easi-Pit Installation Procedure - FP McCann Ltd

Easi-Pit Installation Procedure - FP McCann Ltd

Easi-Pit Installation Procedure - FP McCann Ltd

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>FP</strong> <strong>McCann</strong> <strong>Easi</strong>-<strong>Pit</strong> <strong>Installation</strong> <strong>Procedure</strong><br />

<strong>FP</strong> <strong>McCann</strong> <strong>Easi</strong>-<strong>Pit</strong> Dimensions<br />

To ensure that the <strong>Easi</strong>-<strong>Pit</strong> and subsequent manhole structure remains vertical, accurate<br />

levelling of the formation and preparation of the manhole foundation is essential.<br />

Bedding and sidefill materials must comply with the requirements of Water Industry Specification<br />

BS EN 13242.<br />

F P <strong>McCann</strong> <strong>Ltd</strong> <strong>Easi</strong>-<strong>Pit</strong> Instal lation <strong>Procedure</strong><br />

Issue date: Jan 2010 Next review d ate: Jan 2014<br />

V ersion 1.0<br />

Page 4 of 12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!