Drainage<br />

Easi-Slide Handling Instructions<br />

P12<br />

Easi-slide Lifting Chains<br />

A<br />

B<br />

C<br />

Nominal size 1800 2100 2400<br />

Medium Duty Chain Set 3 3 X<br />

Heavy Duty Chain Set X X 3*<br />

*Only suitable for Lifting not Jointing<br />

Ensure the tension is even.<br />

Do not use Lubricants when jointing Easi-Slide Pipes<br />

Ensure each pipe to be laid is aligned with the laid<br />

pipeline and is fully supported along its length.<br />

Recommended method of joining pipes is shown below.<br />

A<br />

B<br />

C<br />

12<br />

Handling/Lifting Instructions<br />

Pipe Diameters DN1800 to DN2400 are designed and<br />

manufactured to incorporate Easi-Lift jointing and<br />

lifting system.<br />

Easi-Lift System<br />

A<br />

The Lift<br />

To lift the pipes, select the two short legs A and B on<br />

the chain set. Place the spherical coupling over the cast<br />

in anchor and engage by turning the tail of the head<br />

link down to the concrete. The pipe can then be lifted<br />

as normal.<br />

Never pass slings or other lifting appliances through<br />

the barrel and never lift more than one pipe at a time.<br />

Jointing<br />

C<br />

B<br />

Ensure that the seal is of the correct size, and is not<br />

damaged.<br />

Ensure pipe sockets and spigots are not damaged.<br />

Position the rubber ring on the end of the spigot end.<br />

www.fpmccann.co.uk<br />

Easi-Lift joint<br />

To joint the pipe using the chain system. Attach the long<br />

leg C to the already laid pipe and the short leg B to the<br />

pipe to be laid. Take up the slack in the chains with the<br />

lifting pulley over the anchor of the laid pipe, and increase<br />

the upward force to joint the pipes. When jointed, ensure<br />

that there is no excessive slew or misalignment, this can<br />

easily be checked by reference to the joint gap.<br />

Joint Gap<br />

Notes:<br />

1. All dimensions are in mm.<br />

2. Weights in kg are based on a concrete density of<br />

2500kg/m³.<br />

3. Where relevant pipes are manufactured in<br />

accordance with BS EN 1916.<br />

4. Note right hand or left hand junctions (viewed<br />

socket to spigot) should be specified when<br />

ordering reduced junctions in pipe diameters<br />

DN1800 and above.<br />

5. Note lifting chains are not suitable for joining<br />

purposes in pipes of diameter DN2400. Joint in the<br />

traditional method.<br />

6. All junctions to be installed on their side only.<br />

precast@fpmccann.co.uk<br />

WARNING<br />

When Lifting ≥45°<br />

Inclined pull only