where<br />
A =<br />
N =<br />
B =<br />
Assessed Available <strong>Bid</strong> capacity = ( A*N*1.5 - B )<br />
Maximum value of civil engineering works executed in any one year during the last five years (updated<br />
to 2013-14 price level) taking into account the completed as well as works in progress.<br />
Number of years prescribed for completion of the works for which bids are invited.<br />
Value, at 2013-14 price level, of existing commitments and on-going works to be completed during the<br />
next.1.years (period of completion of the works for which bids are invited)<br />
Note:<br />
The statements showing the value of existing commitments and on-going works as well as the stipulated<br />
period of completion remaining for each of the works listed should be countersigned by the Engineer in<br />
charge, not below the rank of an Executive Engineer or equivalent.<br />
4.8 Even though the bidders meet the above qualifying criteria, they are subject to be disqualified if they have:<br />
- made misleading or false representations in the forms, statements and attachments submitted in proof of<br />
the qualification requirements; and/or<br />
- record of poor performance such as abandoning the works, not properly completing the contract,<br />
inordinate delays in completion, litigation history, or financial failures etc.; and/or<br />
- participated in the previous bidding for the same work and had quoted unreasonably high bid prices and<br />
could not furnish rational justification to the employer.<br />
5. One <strong>Bid</strong> per <strong>Bid</strong>der<br />
5.1 Each bidder shall submit only one bid for one contract. A bidder who submits or participates in more than one<br />
<strong>Bid</strong> (other than as a subcontractor or in cases of alternatives that have been permitted or requested) will cause<br />
all the proposals with the <strong>Bid</strong>der’s participation to be disqualified.<br />
6. Cost of <strong>Bid</strong>ding<br />
6.1 The bidder shall bear all costs associated with the preparation and submission of his <strong>Bid</strong>, and the Employer will<br />
in no case be responsible and liable for those costs.<br />
7. Site visit<br />
7.1 The <strong>Bid</strong>der, at the <strong>Bid</strong>der’s own responsibility and risk is encouraged to visit and examine the Site of Works<br />
and its surroundings and obtain all information that may be necessary for preparing the <strong>Bid</strong> and entering into a<br />
contract for construction of the Works. The costs of visiting the Site shall be at the <strong>Bid</strong>der's own expense.<br />
__________________________________<br />
* the financial year in which bids are received<br />
13<br />
NCB.CW/W-2