____________________________________________________________________________________________<br />
[1.1]<br />
The Works consist ofConstruction of <strong>Building</strong> for National Centre for<br />
Sustainable Coastal Management, Chennai.<br />
The work is to be executed in the financial year 2013-14 and to be continued in the financial year 2014-15.<br />
[brief summary, including relationship to other contracts under the Project].<br />
The Start Date shall be the date of issue of notice to proceed with the work. (1.1)<br />
The Intended Completion Date for the whole<br />
of the Works is12months with the following milestones: [17, 28]<br />
Milestone dates:<br />
Physical works to be completedPeriod from the date of issue of<br />
notice to proceed with the work<br />
Milestone 1 i.e. Completion of foundation & plinth beam works6 Weeks .<br />
Milestone 2 i.e. Completion of all RCC slab and frame up-to roof slab level. 22 Weeks .<br />
Milestone 3 i.e. Completion of all works 52Weeks<br />
The following documents also form part of the Contract: [2.3]<br />
NIL<br />
The Contractor shall submit a revised Program including Environmental<br />
Management Plan for the Works (in such form and detail as the<br />
engineer shall reasonably prescribe) within 14 days of<br />
delivery of the Letter of Acceptance. [27]<br />
[This program should be in adequate detail and generally conform to the program submitted alongwith bid in<br />
response to ITB Clause 4.3 (k). Deviations if any from that should be clearly explained and should be satisfactory to<br />
the Engineer]<br />
The Site Possession Date shall be: [21]<br />
Seven daysfrom the date of signing the Agreement.<br />
The Site is located at Anna University Campus, Chennai, [1]<br />
and is defined in drawings nos. NC-001.<br />
The Defects Liability Period is 365 days from the date of certification of completion of works. [35]<br />
Insurance requirements are as under: [13]<br />
(i)<br />
Works and Plant and<br />
Materials<br />
Minimum Cover<br />
for Insurance<br />
Contract Value<br />
Maximum deductible<br />
for Insurance<br />
5% of the Contract<br />
Value<br />
(ii) Loss or damage to<br />
Total book value of 5% of the figure<br />
Equipment<br />
the equipments alongside<br />
brought to the site<br />
by the Contractor<br />
(iii) Other Property Rs.1,00,00,000/- Rs.10,000/-<br />
(iv)<br />
Personal injury or death<br />
insurance:<br />
a) for other people;<br />
As per Workmen’s<br />
Compensation Act<br />
1923 and other<br />
Acts in force.<br />
As per Workmen’s<br />
Compensation Act<br />
1923 and other Acts in<br />
force.<br />
66<br />
NCB.CW/W-2