____________________________________________________________________________________________<br />

[1.1]<br />

The Works consist ofConstruction of <strong>Building</strong> for National Centre for<br />

Sustainable Coastal Management, Chennai.<br />

The work is to be executed in the financial year 2013-14 and to be continued in the financial year 2014-15.<br />

[brief summary, including relationship to other contracts under the Project].<br />

The Start Date shall be the date of issue of notice to proceed with the work. (1.1)<br />

The Intended Completion Date for the whole<br />

of the Works is12months with the following milestones: [17, 28]<br />

Milestone dates:<br />

Physical works to be completedPeriod from the date of issue of<br />

notice to proceed with the work<br />

Milestone 1 i.e. Completion of foundation & plinth beam works6 Weeks .<br />

Milestone 2 i.e. Completion of all RCC slab and frame up-to roof slab level. 22 Weeks .<br />

Milestone 3 i.e. Completion of all works 52Weeks<br />

The following documents also form part of the Contract: [2.3]<br />

NIL<br />

The Contractor shall submit a revised Program including Environmental<br />

Management Plan for the Works (in such form and detail as the<br />

engineer shall reasonably prescribe) within 14 days of<br />

delivery of the Letter of Acceptance. [27]<br />

[This program should be in adequate detail and generally conform to the program submitted alongwith bid in<br />

response to ITB Clause 4.3 (k). Deviations if any from that should be clearly explained and should be satisfactory to<br />

the Engineer]<br />

The Site Possession Date shall be: [21]<br />

Seven daysfrom the date of signing the Agreement.<br />

The Site is located at Anna University Campus, Chennai, [1]<br />

and is defined in drawings nos. NC-001.<br />

The Defects Liability Period is 365 days from the date of certification of completion of works. [35]<br />

Insurance requirements are as under: [13]<br />

(i)<br />

Works and Plant and<br />

Materials<br />

Minimum Cover<br />

for Insurance<br />

Contract Value<br />

Maximum deductible<br />

for Insurance<br />

5% of the Contract<br />

Value<br />

(ii) Loss or damage to<br />

Total book value of 5% of the figure<br />

Equipment<br />

the equipments alongside<br />

brought to the site<br />

by the Contractor<br />

(iii) Other Property Rs.1,00,00,000/- Rs.10,000/-<br />

(iv)<br />

Personal injury or death<br />

insurance:<br />

a) for other people;<br />

As per Workmen’s<br />

Compensation Act<br />

1923 and other<br />

Acts in force.<br />

As per Workmen’s<br />

Compensation Act<br />

1923 and other Acts in<br />

force.<br />

66<br />

NCB.CW/W-2