Item No. 022<br />

PROPOSAL: OUTLINE - FOUR BEDROOMED, SINGLE STOREY DWELLING WITH<br />

DOUBLE GARAGE (VARIATION OF CONDITION OF F27726/003 - TO<br />

EXTEND TIMESCALE FOR SUBMISSION OF RESERVED MATTERS)<br />

LOCATION: 29 Finchdean Road, Rowland's Castle, <strong>Hampshire</strong>, PO9 6DA<br />

REFERENCE NO. F.27726/004/OUT/SM PARISH: Rowlands Castle<br />

APPLICANT: Greengage Projects Ltd<br />

CASE OFFICER: Sarah Marr DATE REGISTERED: 20/06/2002<br />

--------------------------------------------------------------------------------------------------------------------------<br />

PERMISSION subject to the following conditions:<br />

1. (ST1) Applications for the approval of the matters referred to herein shall be made within a period<br />

of three years from the date of this permission. The development to which the permission relates<br />

shall be begun not later than whichever is the later of the following dates:-<br />

(i) five years from the date of this permission; or<br />

(ii) two years from the final approval of the said reserved matters, or, in the case of<br />

approval on different dates, the final approval of the last such matter to be approved.<br />

Reason To comply with the provisions of Section 92(2) of the Town and Country Planning Act,<br />

1990<br />

2. (UNQ1) During Construction, any facilities for the storage of oils, fuels or chemicals shall be sited<br />

on impervious base and surrounded by impervious bund walls. The volume of the bunded<br />

compound should be at least equivalent to the capacity of the tank plus 10%. If there is multiple<br />

tankage, the compound should be at least equivalent to the capacity of the largest tank, or the<br />

combined capacity of interconnected tanks, plus 10%. All filling points, vents, gauges and sight<br />

glasses shall be located within the bund. The drainage system of the bund shall be sealed with<br />

no discharge to any watercourse, land or underground strata. Associated pipework should be<br />

located above ground and protected from accidental damage. All filling points and tank overflow<br />

pipe outlets should be detailed to discharge downwards into the bund. This should be removed<br />

and the ground returned to its original condition once the development is occupied.<br />

Reason To prevent pollution to the water environment<br />

Informative Notes to Applicant:<br />

1. The conditions on F27726/003/OUT remain in place and the applicant should consider these<br />

when submitting any further application.<br />