Project Team Resumes | 2-36<br />
Pedro L. Trevin, PE, LEED AP, LC<br />
Signage and Lighting<br />
the size and type of each transformer, main breakers and feeder breakers at each unit substation;<br />
verifying the location of each electrical manhole and the underground duct banks to indicate<br />
the spare conduits; evaluating the condition, capacity, safety and age of each primary and<br />
secondary electrical equipment including conductors, oil switches, panels, transformers, shoretie<br />
receptacles and emergency generators; verifying the load connected at each unit substation;<br />
developed a list of re<strong>com</strong>mendations on how the electrical system needs to be improved;<br />
prepare cost estimate for each re<strong>com</strong>mendations and a priority list.<br />
Okaloosa Fishing Pier, Fort Walton Beach, Florida. Electrical design for a 1,680-foot long<br />
fishing pier including department of environmental protection (DEP) special lighting design for<br />
turtle nesting. The electrical design included NAV AIDS along each side of the pier and at the<br />
pier end.<br />
Town of Cape Charles, Virginia. Complete electrical design for a 34-slip inner harbor marina.<br />
The electrical design included the underground 480 volt three-phase power distribution to each<br />
of three 480-volt three-phase distribution panels, 480-volt to 120/240 volt single-phase transformers<br />
and 120/240 volt single phase panels to provide 120/240 volts to each power pedestal.<br />
The rating of each power pedestal was coordinated with the Dockmaster since some of the<br />
boats were fishing boats.<br />