Details of Load to be met :-<br />

Page-(i)<br />

Sr.No. Name of Plant Details of area to be fed Summer<br />

Load<br />

Gross Total<br />

Generation(MW)<br />

Generation considered for<br />

islanding purpose(MW)<br />

Winter<br />

Load<br />

Relief<br />

from<br />

UFRs(in<br />

MW)<br />

(MW) (MW) Paddy<br />

Load<br />

Relief from<br />

df/dt relays(in<br />

MW)<br />

Paddy Load<br />

Relief<br />

from<br />

SPS (in<br />

MW)<br />

Paddy<br />

Load<br />

G. Total<br />

Load<br />

relief(MW)<br />

Paddy Load<br />

Annexure-IA<br />

Net Demand<br />

to be met<br />

(MW)<br />

220KV s/s Gobindgarh G-1 200 200 0 0 0<br />

1 GGSSTP, Ropar 220KV s/s Gobindgarh G-2 120 120 0 0 0 0 755<br />

(6x210=1260MW) 755 ((i.e. 80% of 945) 220KV s/s Gobindgarh G-3 80 80 0 0 0<br />

Ex-bus generation of 5 units 220KV s/s Gobindgarh G-4 80 40 0 0 0<br />

= 945 MW<br />

220 KV S/S Amloh 120 80 0 0 0<br />

220 KV S/S Kharar 115 110 0 0 0<br />

220 KV S/S Kohara 30 30 0 0 0<br />

220 KV S/S Sahnewal 10 10 0 0 0<br />

220 KV S/S Jamsher NA 10<br />

220 KV S/S Goraya NA 75<br />

Total 755 755 0 0 0 0 755