GNDTP (160 MW) <strong>Islanding</strong> <strong>Scheme</strong><br />

Annexure-II C<br />

B.C.<br />

132 kV Bus Bars<br />

220 kV Bus Bars<br />

B.C.<br />

40/50 MVA, 132kV/66 kV<br />

25 MW<br />

M1/M2<br />

47.9 Hz<br />

M1/M2<br />

47.9 Hz<br />

M1/M2<br />

47.9 Hz<br />

M1/M2<br />

47.9 Hz<br />

S1/S2<br />

47.7 Hz<br />

S1/S2<br />

47.7 Hz<br />

M1/M2<br />

47.9 Hz<br />

M1/M2<br />

47.9 Hz<br />

16/20 MVA, 132kV/66 kV<br />

10 MW<br />

Cantt NFL-2 NFL-1 Balluana<br />

Auto T/F<br />

Leh-2 Leh-1 Muktsar Malout<br />

IGC<br />

All these relays will be disabled in non paddy<br />

season<br />

Auto T/F<br />

100 MVA, 220kV/66 kV<br />

70 MW<br />

66 kV Bus Bars<br />

Coupling<br />

M1/M2<br />

47.9 Hz<br />

132 KV IGC<br />

132/11 KV (8 MW)<br />

66 kV Bus Bar<br />

M1/M2<br />

47.9 Hz<br />

Installed at IGC S/S<br />

66KV Kot Shamir 66 KV Mahavir<br />

M1/M2<br />

47.9 Hz<br />

Maur<br />

All these relays will be disabled in non paddy season<br />

66 KV Dabwali Road<br />

S1/S2 at 47.7 Hz<br />

32 MW<br />

66 KV MES (20 MW)<br />

At 47.7 Hz with TD of 1 sec<br />

S1/S2<br />

iv<br />

66 KV C-Compound (15 MW)<br />

At 47.7 Hz with TD of 0.5sec<br />

SI/S2