Guj Ambuja Ropar Asron<br />
Annexure-I C<br />
GGSSTP, Ropar<br />
<strong>Islanding</strong> <strong>Scheme</strong><br />
755 MW<br />
B.C.<br />
132 kV Bus Bars<br />
ILK – 100 MVA, 220kV/132 kV<br />
ILK – 100 MVA, 220kV/132 kV<br />
Mohali<br />
Kharar<br />
115 MW-PADDY<br />
110 MW NON PADDY<br />
GG-4<br />
80 MW PADDY<br />
40 MW NON PADDY<br />
GG-3<br />
80 MW<br />
GG-2<br />
125 MW<br />
GG-1<br />
200 MW<br />
Goraya<br />
75 MW in non<br />
paddy season<br />
Jamsher<br />
Only Railway<br />
Load<br />
Sahnewal<br />
No Load<br />
Kohara<br />
30 MW<br />
M1/M2<br />
47.9 Hz<br />
M1/M2<br />
47.9 Hz<br />
M1/M2<br />
47.9 Hz<br />
B.C.-2<br />
220 kV Bus Bars<br />
B.C.-1<br />
v